RISK ASSESSMENT FOR EARTHWORKS ( EXCAVATION and SHEETPILING WORKS ) Frequency Qualitative Description Severity 5 Likely to occur during operation (frequently recorded) 5 4 Could occur during operation (recorded infrequently) 4 3 Unlikely to occur (isolated recorded occurrence) Very unlikely (seldom recorded occurrence) Not likely (no recorded occurrence) 2 1 Prepared by : JASON PAUL BANDIWAN SAFETY OFFICER Qualitative Description 2 Extreme Potential to cause more than 1 death or serious injury or illness to personnel, or cause major damage Serious Potential to cause a fatality, or serious injury/illness to personnel, or cause serious damage to eqpt. or plant Moderate Potential to cause injury, illness or minor damage. Minimal Potential to cause injury, illness or damage. 1 Insignificant Potential to cause injury, illness or damage 3 Reviewed by : CHRISTIAN PERIAMESA PROJECT MANAGER NO 1 2 ACTIVITY HAZARDS IDENTIFIED CONSEQUENCES PEOPLE INVOLVED Risk Rating CONTROL MEASURES Residual Risk Site Surveying and services scanning Movement of Air dust and equipment within the area, ➢ Hitting and collision with the buildings and Vehicle movement within the area. Workers and surveyor within the vicinity 4 or 3 1 or 2 Accumulated dust while surveying the area. ➢ Low visibility ➢ vision problem due to dust ➢ Respiratory disease Problem Workers and surveyor within the vicinity 4 or 3 Encroaching of areas other than the approved location for Excavation Works and Sheet Piling. Obstructions to other usual movements by the unit’s operating in the area. ➢ Obstructions to the services. ➢ Vehicle collision that may result to damage of property and serious injury to the people within the vicinity Workers and other people working within the vicinity 4 or 3 ➢ All traffic movements to be adequately identified and managed by banks man. ➢ No reversing very close to work, reverse alarm fitted with heavy heavy equipments and construction vehicles. ➢ All materials and equipment will be having revolving lights. ➢ Dust suppression/watering the area to ensure dust will not accumulate within the area being surveyed. ➢ Housekeeping ➢ The area which is allotted by the authority to be covered with screens and protected from other services. ➢ Suitable control measures to be sought and approved by the Engineer ➢ All services to be identified and protected by approved methods. ➢ Agencies working in the vicinity to be Site Preparation and traffic management 1 or 2 2 3 Loading and unloading of Sheet piling Materials and other materials on site Movements of heavy equipment ➢ Obstructions to other usual movements by the unit’s operating in the area.Workers and other people working within the vicinity Workers and other people working within the vicinity 4 or 3 Unsafe loading and unloading or storage of materials and other materials or objects that can fall on workers ➢ Injury ➢ Fatality ➢ Property damaged Workers, operators and others working within the vicinity 4 or 3 informed by adequate means. ➢ All areas to be demarked and signage to be placed for the identification of others moving around. ➢ All traffic movements to be adequately identified and managed by banks man. ➢ All the operations to be supervised thoroughly to avoid the usual services in the area. ➢ Workers to be briefed about the method of the work and means of risk mitigating measures. ➢ All traffic movements to be adequately identified and managed by banks man. ➢ All the operations to be supervised thoroughly to avoid the usual services in the area. ➢ All sheet piling materials and other materials are to be load and unload properly in designated area ➢ Signage and warning signs will be 2 3 in place during loading and unloading materials ➢ No over loading of materials ➢ Secure all materials to be unload using safe and certified lifting Accessories, Use appropriate PPEs and wear properly at all times. 4 Lifting Operations Unstable ground ➢ Collapse of the ground ➢ Plant and equipment tipping that may result to tip over Workers and all the people involved in the activity 4 or 3 Uncontrolled lift ➢ Hitting and collision with the plants and vehicles that may result to property damaged ➢ serious injury ➢ fatality ➢ Breaking of lifting tackles ➢ Injury to the people while lifting and moving the load being lifted. ➢ Collision of plant and equipment that may result to property damage and serious injury or even fatality Workers, supervisor and all the people within the vicinity 3 or 2 ➢ Ensure ground is levelled and compacted ➢ Task Briefing to all operators will be given to inform about the hazards within the backfilling area ➢ Will be using tag lines to ensure the load being lifted is controlled properly ➢ No lifting activity if the wind speed exceeds 20 km/hr ➢ Wil be using a calibrated anemometer to measure accurate wind speed ➢ A competent rigger/banks man to control the lift of the work. ➢ Communication to be established ➢ Information will be delivered to all site operatives about the 2 or 1 1 or 2 Damaged and uncertified lifting gears ➢ serious injury ➢ fatality ➢ Breaking of lifting tackles ➢ Injury to the people while lifting and moving the load being lifted. Workers, supervisor and all the people within the vicinity 4 or 2 lifting operation every day ➢ Inform the completion of each days lifting work with crane. ➢ Pre lift will be initially performed in the height of 15-20 cm to ensure all the lifting accessories are placed safely ➢ The load to be lifted must be balance properly before fully unloading. ➢ Will ensure the crane is operating within the radius as per the drawing and load chart and wear appropriate PPEs such as working Gloves, Hard Hat, High Visibility Vest and Safety Shoes. ➢ All lifting tackles/accessories such as spreader beam, shackles, slings etc. to be checked and certified by third party ➢ No local made tools to be used for lifting heavy objects. ➢ All lifting equipment, accessories and gears are inspected and certified by a 3rd party accredited by DM. 1 or 2 5 Use of Crawler Excavator with Vibro Hammer Attachment Untrained operatives ➢ Accident and injury due to lack of training and knowledge Operator and Workers and other people working in the area 4 or 3 Assembly of vibro hammer ➢ Accident and injury due to lack of training and knowledge for assembly of the vibro hammer ➢ Equipment damage and malfunction Operator and Workers and other people working in the area 4 or 3 ➢ Regular Inspection of all lifting accessories and gears ➢ Damaged lifting accessories will not be allowed to use on site. ➢ Only competent operators will be allowed to operate the plant and equipment ➢ TBT and daily task briefing will be given to all operatives involve in the activity ➢ Only competent person will do the assembly of the equipment ➢ Barricade and adequate signage will be in the area while the assembly of the equipment is on progress. ➢ Will use adequate tools, inspect all tools and equipment for the assembly. ➢ Strictly Supervision 2 2 or 1 and monitoring in every activities by the Supervisor and safety officer 6 Hot Works Incompetent person such as welder etc. ➢ Serious injury to the operative and other working within the area Workers and other people within the vicinity 4 ➢ All welders are trained and certified by TESDA 3 Damaged tools and equipment ➢ Serious injury to the operative and other working within the area Workers and other people within the vicinity 4 ➢ Task briefing and training will be given to all before works starts ➢ All equipment such as welding machines, grinders and other power tools use for hot works will be inspected and checked before use. ➢ Valid Certificates of inspection of all equipment will be checked and kept on site for record ➢ All damaged tools and equipment will not be use on site ➢ Regular inspection of all tools and equipment ➢ Oxy Acetylene cylinders and compressed gas cylinders utilised for cutting/flame torch will have Flash back arrestors. ➢ Fire extinguishers must be readily available must be kept in a convenient place without obstruction. Used appropriate PPEs such as Welding Gloves, Welding Mask or Respirator. ➢ Strictly Supervision and monitoring in every 3 activities by supervisor and safety officer. 7 Excavation Hitting the personnel/Other vehicle with JCB, excavator bucket while slewing. ➢ Serious injury/fatality Workers,supervisors and other people working within the vicinity 4 or 3 ➢ NOC’s & PTW to be obtained prior to start of work. ➢ Helper/guide to the operator should stay in a safe distance. ➢ If need to go to the work area for anything, operator should be asked to stop the operation. ➢ Ensure operator understood that you or someone is entering the work area. Operator should start the operation only after ensuring the slewing area is clear. ➢ No personnel should be sitting/ resting near/under the tier of the excavator. Proper access for the workers. Soil protection or Slope to avoid soil erosion (max 30deg). Use appropriate PPEs. ➢ Strictly Supervision and monitoring in every activities by supervisor and safety officer. 1 or 2 Collapse of excavated trench ➢ Causing serious injury/ workers being buried, ➢ Damage to services Workers,supervisors and other people working within the vicinity 4 or 3 Fall in to excavation ➢ Workers,supervisors and other people working within the vicinity 3 or 4 Serious injury ➢ Proper trench support to be done for excavation depth exceeding 1.2m ➢ Excavated trenches to be inspected on daily basis and in case of unexpected rain. ➢ Daily excavation check list to be maintained at work place. ➢ Excavated materials to be kept a minimum of 1.00m away from the excavation ➢ Excavated area shall be adequately barricaded. ➢ Signage should be posted to alert and prevent unauthorized entry. ➢ Barrier should be placed at least one meter distance from the edge of excavation. ➢ Strictly Supervision 1 or 2 1 or 2 and monitoring in every activities by the supervisor and safety officer. 8 Welding H beams Incorrect connection to welding machine. Machine unearthed Cutting of H -beams ➢ Poor welding operation. Burns, injury to employees.electrical shock. Workers,supervisors and other people working within the vicinity 4 or 3 ➢ Operator and supervisor must ensure only approved connections are used. ➢ Operator / Supervisor to ensure. 1 or 2 With flame torch ➢ Ignition, fire and explosion ➢ Personal injury ➢ fire ➢ Maintain routine and regular housekeeping. ➢ Signs of slips, ➢ trips and falls should be avoided. ➢ Fire retardant clothing ➢ Fire blankets must be provided and fire extinguisher must be easily available. ➢ Trained fire fighter must be available. ➢ Flames, sparks shatter must be controlled. ➢ Used appropriate PPEs such as Welding Gloves, Welding Mask or Respirator ➢ Strictly Supervision and monitoring in every activities by the supervisor and safety officer. 9 Extraction of sheet piles Failure of Vibro hammer, hydraulic hose and other lifting gears, load failure Striking underground utilities. Plant hiting, striking operatives in the vicinity. ➢ Major injury, ➢ Serious injury to the work force, ➢ property damage ➢ fatality ➢ loss of reputation ➢ delay in project. Workers,supervisors and other people working within the vicinity 4 or 3 ➢ Vibro hammer should have 3rd party certificate with certified operator. ➢ Daily and monthly inspection of gears and equipment. Workers should keep safe distance from the hammering machine. 1 or 2 ➢ Hydraulic hose should be inspected for any leaks/damages on daily basis. ➢ All lifting gears need to be certified by 3rd party. Daily and monthly inspection of gears and equipment. Workers should keep safe distance from the sheet piles. Only serviceable and certified lifting gears of appropriate capacity will only be used for lifting loads. ➢ Foreman/supervisor to ensure strict compliance. Third party certified rigger should be there to control the lifting activity. Proper access for the workers. Soil protection or Slop to avoid soil erosion. Use appropriate PPEs. ➢ Strictly Supervision and monitoring in every activities by the supervisor and safety officer.