Uploaded by Chidhuro Owen

rfplanningtraining-170306225753(1)

advertisement
RF Planning Training
By:
Ahmed Mohamed Ahmed Nosier
Under The Supervision of
Eng. Aly Bedewy
Eng. Khaled Radi
Eng. Ramadan
Eng. Taha
National Telecommunication Institute
Network Planning Department
Dec. 2016
Agenda
1. Nominal Classifications:
5. Acceptance:
● Coverage Gaps.
● Drive Test.
● Capacity.
● Checking Alarms.
● Sales Complains.
● Checking KPI’s.
● Improves KPI’s.
2. New Site Process.
3. Creation Tools:
● H/W Generator.
● Piano Template.
● MAP INFO/ATOLL.
● Creation Macro Tool.
4. Creation Steps:
● 2G Creation Steps.
● 3G Creation Steps.
6. Conclusion & Future Vision.
Nominal Classifications
1- Coverage Gaps.
2- Capacity.
3- Sales.
4- Improve KPI’s.
Coverage Gaps
Sites
Capacity Site
Sales Complains Site
Account
New Site Process
H/W Generator
Creation Macro Tool
Creations Steps
2G Creation
GSM-900MHz/DCS-1800MHz
General information for (BCCH):
DL Channel, Carry Cell Specific (Frequency, LAC, List of
Neighboring Cells and Sync).
General information for (TCH):
Carries either encoded speech or user data up and down link
between a single mobile and a single BTS.
Neighbors Configuration: Reselection (2G – 3G ) in Idle mode.
Identifying BCCH & TCH
Identifying BSC
Identifying Neighbors
Identifying BSIC
3G Creation
UMTS-2100MHz
• IRAT (3G – 2G) on Call.
Acceptance Steps
(1)
Drive Test
RSCP Level
Indoor
Outdoor
Tems Investigation Important Windows
Expected Problems
Cross “Sector & Feeder”
Bad Quality
If we have interfered frequency, We should re-plan it.
.Expected Problems Cont
• Pilot Pollution: Only in 3G.
Solution: Keep dominant site and down tilting the others, reduce their Power or
adjust antenna azimuth.
• Overshooting : 2G & 3G
Solution: reduce the Power or down tilting.
• Hand Over Failure: 2G and 3G , Due to cross or Missing neighbors.
Solution: revise neighbor list and re-sent configuration.
(2)
Alarms
Upper Site )Upp1780( Alarms
• There are two type of Alarms: Service Affecting Such as cell out of service or HW
problem..etc
and service Non affecting such as Pulglar “tower lamb”, air conditioning and door open alarms.
(3)
Key Performance Indicator
KPI’s
Case Study: Site )UPP1780(, Aswan
TRX Level Samples
Inc-H/O Efficiency “Bad”
ICM
Cell Level Samples: Traffic Volume
GSM S4
“Low Traffic”
DCS S1
“High Traffic”
Call Drop Rate
“CDR”
Call Setup Success Rate
“CSSR”
3G KPI’s
3G KPI’s Samples
IP Path
Packet Loss
IUB
Flow Control Packet Drops “DL”
HSDPA RAB Success Rate
Call Drop Rate “CS”
Conclusion & Future Vision
• Among the last training month we gained much additive information and
practicing.
• We had explained the detailed planning steps of a practical case study.
• Our future vision is to concentrate on practicing and help the planning team in his
tasks.
• Developing our abilities and experience to become one of RF team.
Thanks 
Download