RF Planning Training By: Ahmed Mohamed Ahmed Nosier Under The Supervision of Eng. Aly Bedewy Eng. Khaled Radi Eng. Ramadan Eng. Taha National Telecommunication Institute Network Planning Department Dec. 2016 Agenda 1. Nominal Classifications: 5. Acceptance: ● Coverage Gaps. ● Drive Test. ● Capacity. ● Checking Alarms. ● Sales Complains. ● Checking KPI’s. ● Improves KPI’s. 2. New Site Process. 3. Creation Tools: ● H/W Generator. ● Piano Template. ● MAP INFO/ATOLL. ● Creation Macro Tool. 4. Creation Steps: ● 2G Creation Steps. ● 3G Creation Steps. 6. Conclusion & Future Vision. Nominal Classifications 1- Coverage Gaps. 2- Capacity. 3- Sales. 4- Improve KPI’s. Coverage Gaps Sites Capacity Site Sales Complains Site Account New Site Process H/W Generator Creation Macro Tool Creations Steps 2G Creation GSM-900MHz/DCS-1800MHz General information for (BCCH): DL Channel, Carry Cell Specific (Frequency, LAC, List of Neighboring Cells and Sync). General information for (TCH): Carries either encoded speech or user data up and down link between a single mobile and a single BTS. Neighbors Configuration: Reselection (2G – 3G ) in Idle mode. Identifying BCCH & TCH Identifying BSC Identifying Neighbors Identifying BSIC 3G Creation UMTS-2100MHz • IRAT (3G – 2G) on Call. Acceptance Steps (1) Drive Test RSCP Level Indoor Outdoor Tems Investigation Important Windows Expected Problems Cross “Sector & Feeder” Bad Quality If we have interfered frequency, We should re-plan it. .Expected Problems Cont • Pilot Pollution: Only in 3G. Solution: Keep dominant site and down tilting the others, reduce their Power or adjust antenna azimuth. • Overshooting : 2G & 3G Solution: reduce the Power or down tilting. • Hand Over Failure: 2G and 3G , Due to cross or Missing neighbors. Solution: revise neighbor list and re-sent configuration. (2) Alarms Upper Site )Upp1780( Alarms • There are two type of Alarms: Service Affecting Such as cell out of service or HW problem..etc and service Non affecting such as Pulglar “tower lamb”, air conditioning and door open alarms. (3) Key Performance Indicator KPI’s Case Study: Site )UPP1780(, Aswan TRX Level Samples Inc-H/O Efficiency “Bad” ICM Cell Level Samples: Traffic Volume GSM S4 “Low Traffic” DCS S1 “High Traffic” Call Drop Rate “CDR” Call Setup Success Rate “CSSR” 3G KPI’s 3G KPI’s Samples IP Path Packet Loss IUB Flow Control Packet Drops “DL” HSDPA RAB Success Rate Call Drop Rate “CS” Conclusion & Future Vision • Among the last training month we gained much additive information and practicing. • We had explained the detailed planning steps of a practical case study. • Our future vision is to concentrate on practicing and help the planning team in his tasks. • Developing our abilities and experience to become one of RF team. Thanks