Abstract of Total Capital Budget for the year 2019-20 (Rs. In lakhs) Bengaluru Sl. No. Particulars Nos. Tumakuru Budet 19-20 Budet 19-20 Nos. Hassana Nos. Budet 19-20 Mysuru Nos. Bagalkote Budet 19-20 Nos. Kalaburagi Budet 19-20 Nos. Total Budet 19-20 Nos. Budet 19-20 A MAIN CAPITAL WORKS 1 List-I : Commissioned Works 13 10709.00 22 3691.51 21 2205.50 36 2233.20 47 5653.00 11 5983.00 150 30475.21 2 List-II : Ongoing Works 54 124483.00 35 31751.00 60 21193.00 47 15123.00 26 12476.00 34 14323.00 256 219349.00 3 List-III : Works proposed to be taken up this year 90 5748.00 84 3411.00 46 2734.00 45 1381.00 60 7460.00 39 591.00 364 21325.00 4 Sub-Total 5 List-IV Total of Works 157 60 217 140940.00 141 38853.51 127 0.00 100 140940.00 241 0.00 85 38853.51 212 26132.50 128 0.00 64 26132.50 #### 18737.20 133 25589.00 84 20897.00 770 271149.21 0.00 119 0.00 67 0.00 495 0.00 18737.20 B GENERAL CAPITAL WORKS C Total D a) Civil Budget (at the disposal of CEE (P&C) for meeting the budgetary requirement for Civil works). 5000.00 217 145940.00 241 2200.00 41053.51 212 2500.00 28632.50 #### 252 3122.66 21859.86 25589.00 151 6585.98 252 32174.98 20897.00 1265 3039.98 151 23936.98 0 1265 b) Construction of office complex at A.R Circle Bangaluru c)Construction of multipurpose auditorium , Amphi theatre executive hostel block and addtion hostel block at HRDC hudi Bangaluru. E 271149.21 22448.62 293597.83 4000.00 10000.00 2500.00 LDC / SCADA (at the disposal of CEE LDC for procurement of materials for Telecommunication Division and for meeting Expenditure for SCADA works only). a) SCADA Phase-I 1690.00 b) New works 4199.00 c) GCB in respect of SADA and Telecomunication Divisions 5889.00 F Transport for meeting expenditure for procurement of Vehicles. G T&P, Computers and RT and R&D (at the disposal of CEE (P&C) for meeting budgetary requirment for procurement of Tools & Plants, Computers, office equipments and RT and R & D equipments 5000.00 H Contingency Budget : (to be held by CEE (P&C) for releasing budgetary requirement for taking up unforeseen and urgent works/Expenses. 4000.00 I GRAND TOTAL (Rs.in Lakhs) 50.00 330925.83 List - I : Abstract of Commissioned works for the year 2019-20 Rs. in Lakhs Sub-Stations Sl. No. Name of the Zone Augmentations Exclusive Lines TB's & Others Total Nos. Budget 18-19 Revised Budget 18-19 Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 1 Bengaluru 9 2353.00 2164.30 10299.00 1 25.00 2 185.00 1 200.00 13 10709.00 2 Tumakuru 7 580.00 638.33 1733.13 10 419.05 5 1539.33 0 0.00 22 3691.51 3 Hassana 7 1431.20 1582.55 1360.00 5 91.00 8 604.50 1 150.00 21 2205.50 4 Mysuru 16 1129.00 1190.00 1641.00 16 444.20 3 98.00 1 50.00 36 2233.20 5 Bagalkote 15 399.00 425.17 4041.00 23 625.00 8 827.00 1 160.00 47 5653.00 6 Kalaburagi 5 1589.51 1190.82 793.00 2 60.00 2 4700.00 2 430.00 11 5983.00 59 7482 7191 19867.13 57 1664.25 28 7953.83 6 990.00 150 30475.21 Total List - I List - II : Abstract of Ongoing works for the year 2019-20 Rs.in Lakhs Sub-Stations Augmentations Exclusive Lines Total TB's & Others Sl. No. Name of the Zone Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 1 Bengaluru 26 111575.00 11 2793.00 10 4990.00 7 5125.00 54 124483.00 2 Tumakuru 11 21225.00 12 1656.00 10 7870.00 2 1000.00 35 31751.00 3 Hassana 16 12723.00 34 5570.00 9 2700.00 1 200.00 60 21193.00 4 Mysuru 11 10530.00 32 4108.00 3 210.00 1 275.00 47 15123.00 5 Bagalkote 8 5966.00 10 1469.00 6 4001.00 2 1040.00 26 12476.00 6 Kalaburagi 9 9518.00 21 3847.00 3 458.00 1 500.00 34 14323.00 81 171537.00 120 19443.00 41 20229.00 14 8140.00 256 219349.00 Total List - II List - III : Abstract of Works Proposed to be taken up during 2019-20 Rs.in Lakhs Sub-Stations Sl. No. Name of the Zone Augmentations Exclusive Lines TB's & Others Total Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 1 Bengaluru 15 2443.00 57 2898.00 18 407.00 0 0.00 90 5748.00 2 Tumakuru 3 300.00 72 2750.00 9 361.00 0 0.00 84 3411.00 3 Hassana 5 905.00 27 1116.00 9 630.00 5 83.00 46 2734.00 4 Mysuru 6 1100.00 24 204.00 15 77.00 0 0.00 45 1381.00 5 Bagalkote 9 1804.00 37 2561.00 12 2757.00 2 338.00 60 7460.00 6 Kalaburagi 9 280.00 20 248.00 8 43.00 2 20.00 39 591.00 47 6832.00 237 9777.00 71 4275.00 9 441.00 364 21325.00 Total List - III List - IV : Abstract of Works which have been cleared by either TAC/TCCM. Or administrative sanction has been accorded for the DPR (in the absence of TAC/TCCM clearance) and are not intended to be taken up during the year 2019-20 Rs. in Lakhs Sub-Stations Augmentations Exclusive Lines TB's & Others Total Nos. Nos. Nos. Nos. Nos. Bengaluru 10 20 24 6 60 Tumakuru 32 35 33 0 100 Hassana 41 20 21 3 85 Mysuru 35 23 0 6 64 Bagalkote 59 26 31 3 119 Kalaburagi 37 12 18 0 67 214 136 127 18 495 Name of the Zone Total List - IV GENERAL CAPITAL BUDGET FOR 2019-20 Rs. In Lakhs Category Particulars Bengaluru Zone Tumakuru Zone Hassana Zone Mysuru Zone Bagalkote Zone Kalaburagi Zone TOTAL Budget 19-20 Budget 19-20 Budget 19-20 Budget 19-20 Budget 19-20 Budget 19-20 Budget19-20 A Providing new 11kV Switch Gears 2562.11 580.44 674.8 1135.39 608.71 156.97 5718.42 B Providing new EHV breakers & C&R panels 1620.34 176.60 234.27 385.00 706.16 169.72 3292.09 C Spare Transformers 54.00 100.00 314.00 194.50 164.39 1115.54 1942.43 D Survey & Investigation 100.00 169.43 257.59 213.00 581.96 303.92 1625.90 E Land acquisition, levelling and area fencing 200.00 725.00 516.30 784.93 3413.55 1165.25 6805.03 F Protection Equipments & Metering 189.04 97.86 130.00 342.85 493.01 0.00 1252.76 G Budgetary grant for procurement of materials for Minor Capital Works. 274.51 350.67 373.04 66.99 618.20 128.58 1811.99 Total 5000.00 2200.00 2500.00 3122.66 6585.98 3039.98 22448.62 Zone Wise Abstract of all Works 2019-20 Rs inLakhs Sub-Stations Sl. No. Augmentations Exclusive Lines TB's & Others Total Name of the Zone Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 Nos. Budget 19-20 1 Bengaluru 50 124317.00 69 5716.00 30 5582.00 8 5325.00 157 140940.00 2 Tumakuru 21 23258.13 94 4825.05 24 9770.33 2 1000.00 141 38853.51 3 Hassana 28 14988.00 66 6777.00 26 3934.50 7 433.00 127 26132.50 4 Mysuru 33 13271.00 72 4756.20 21 385.00 2 325.00 128 18737.20 5 Bagalkote 32 11811.00 70 4655.00 26 7585.00 5 1538.00 133 25589.00 6 Kalaburagi 23 10591.00 43 4155.00 13 5201.00 5 950.00 84 20897.00 187 198236.13 414 30884.25 140.00 32457.83 29.00 9571.00 770 271149.21 Total List I - Commissioned Works 2019-20 Rs. in Lakhs Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks BENGALURU TRANSMISSION ZONE 1 2 3 AA1038 AA1131 AA1161 Vikas Tech Park: a) Establishing 2x150MVA, 220/66kV Station with line. b) Vikas Technical Park_Evacuation line 1: Running 66kV 630 sqmm UG cable from Vikas Technical Park 220kV S/s to 66 kV Shobha Developers S/s 3.5 Kms c) Vikas Technical Park_Evacuation line 2: 66kV 1000 sq. mm SC UG cable line from the proposed 220 kV Vikas Tech Park S/s to Devarabeesanahalli for a route length of 3.5 ckt. Kms Koramangala: Establishing 220/66/11kV GIS substation at Kormangala with 220 kV 1000 sqmm LILO UG cable from existing HSRNIMHANS UG cable with associated 66kV lines. Hulimangala : Establishing 2x12.5MVA, 66/11kV Keonics (ElectronicCity) Sub-Station for a route length of 3.789Kms. Bengaluru Urban ES 42.81 BCR 2.67 7587.86 & 31.10.09 a) 28.04.10 b) 04.11.11 c) 09.03.11 a) 3123.78 b) 1064.93 c) 1794.96 0.00 7789.43 600.00 Budget 18-19 STN FQV-20L & LINE fqv-150L Stn Rtn -200L. Stn Rtn-100L Cable : Rtn Bills 368.41L Total: 838.41 FY 19-20 UG cable FQV-100L Bengaluru Urban Bengaluru Urban ES.8.75 & 37339.12 & BCR 1.334 24.11.15 ES 1.39 & BCR 0.27 06.05.17 Stn14.03.1 4531.08 & 8 23.12.16 cable4278. 98 18047.93 0.00 18047.93 13188.28 3500.00 Budget 18-19 Cable: Supply Rtn -1400L Erection & civil -200L Stn: Erection and civil -100L Total: 1700.00 Budget 19-20 Supply - 3000L erection/civil - 500L Total: 3500L Budget 18- 19 Supply rtn -334L Stn713.26 cable2760.87 0.00 3474.13 3187.70 350.00 Budget 19-20 Supply Rtn - 354L swg -120L Total -474L Sl. No. 4 5 6 Work Code Name of the Work AB1009 Dobbaspet (Nelamangala): a) Establishing 2x100MVA, 220/66kV Station with 220kV LILO of Kadur-Nelamangala b) 66kV lines to Nelamangala & Kolala Sub-Station upto loc 65 c) Construction of 66kV SC line on DC towers from Dabaspet to Kolala from location 66 to 99 for a distance of 5.856 kms AB1014 AC1056 Jigani : Establishing 2x31.5MVA & 2x150MVA, 220/66KV Station b) Jigani line:Construction of 220KV DC line with drake Conductor for a route length of 5.714 Kms to LILO Somanahalli Yerandanahalli line using MONOPOLE on the road median. B. V. Halli : Establishing 1x12.5MVA, 66/11kV Sub-Station with associated line for a distance of 18.40Kms District Bengaluru Rural Energy Savings & BCR ES 38.7 BCR 4.72 Cost of Original / Date of LOI Revised DPR & Date 5259.00 & 05.05.12 a) 25.04.07 b) 05.09.07 c) 02.02.13 Cost of DWA a) 2555.42 b) 993.54 c) 380.98 Cost of Deptly. Supplied Materials & others 1487.00 Total Work Cost 5416.94 Cum Exp up to 31/03/19 4646.58 Budget 2019-20 37.00 Remarks FY 18-19 Final 10% Bill against Handing over: Supply: 31Lakhs Erection: 2Lakhs Civil: 15Lakhs Total : 48 L FY 19-20 FQV BILLS: 17L LS: 20L Bengaluru Rural Ramanagar ES 9.93 BCR 2.54 ES 1.32 BCR 1.421 6491.35 & 20.07.09 797.16 & 05.12.15 FY-18-19 Workslip: 518.18 L 08.10.07 14.02.17 9301.38 953.29 1300.21 43.00 10601.59 996.29 7622.33 984.34 200.00 1000.00 FY-19-20 Stn & Line FQV:- 200L FY 18-19 Line civil & erection-40L Tree cut-348L Land compension-150L Total-538 FY 19-20 Land compensation-150L QV-50L Total-200L Excess due to tree cut & land compensation of 700L Sl. No. 7 8 Work Code AC1060 AE1026 Name of the Work Srigiripura : Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 8.6Kms Mittemari: Establishing 2x100MVA, 220/66/11kV Station with associated lines for a distance of 220kV 91 kms & 66kV 80.36 kms District Ramanagara C.B.Pura Energy Savings & BCR ES 3.05 BCR 1.96 ES 25.38 BCR 1.46 Cost of Original / Date of LOI Revised DPR & Date 761.87 & 08.09.15 7564.79 & 10.07.15 13.06.16 10.07.15 Cost of DWA 780.78 8858.74 Cost of Deptly. Supplied Materials & others 30.00 38.64 Total Work Cost 810.78 8897.38 Cum Exp up to 31/03/19 878.73 8128.38 Budget 2019-20 290.00 4300.00 Remarks FY 18-19: Land compn-110L Rtn-93L TB erection & civil-10L Line Civil-25L Total-238L FY -19-20 QV-30L tree cut-125L Total-155L Excess due to tree cut and land compensation - 360L Workslip-1 approved for Rs.10559.9L FY-18-19: 10% retention supply, civil, erection: 1060L Land / tree cut comp:723L Railways payment:17L Total-1800L FY-19-20: Retention bills: 1100L Amount for the execution of NON DWA civil and electrical works & other minor works:200L Land compensation:1000L Total:2300L Sl. No. 9 Work Code AB1008 Name of the Work Sarjapura : a) Est 2x100 MVA, 220/66/11 kV S/S with 220kV LILO of SomanahalliMalur line b) Const. of 66KV LILO line from Sarjapura station to 66 kV S/C Hoody-Chandapura line near Muttenallur Village limits for a distance of 8.5 Kms and Const. of 66KV S/C line from 220/66/11KV Sarjapura station to the CTT for running 66KV 630 sqmm UG Cable to 66/11KV S/s at Attibele for a distance of 11.1 Kms and Terminal Bay at Attibele. a) 5.885 Kms b) 8.5 & 11.1 Kms 9 Total of Sub-stations 1 Malur Industrial Area: Replacing of 2X8 MVA, 66/11kV by 2X20 MVA Transformer at 66/11KV S/S Malur Industrial Area AD1040 1 Total of Augmentation 1 Tubagere Sub-station: Stringing of 2nd circuit for Providing LILO arrangement 2 AB1046 AD1041 Malur- Malur I/A: Construction of 66kV SC line for a distance of 10.77Kms partly on MC towers and partly on DC towers from 220/66kV Malur S/s to 66/11kV Malur Industrial area S/s District Energy Savings & BCR Bengaluru Rural ES 21.13 BCR 2.38 Kolar 6855.93 & 06.10.08 435.98 & 10.06.15 KOLAR Bengaluru Rural Cost of Original / Date of LOI Revised DPR & Date NA 61.41 & 24.01.12 a) 26.04.07 b) 05.09.07 24.08.17 & 18.12.17 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost a)4339.33 b) 342.86 1200.67 5882.86 5000.58 22.00 56012.05 4100 54128 51426 10299 Cum Exp up to 31/03/19 Budget 2019-20 4.83 298.00 302.83 308.23 25.00 4.83 298.00 302.83 308.23 25.00 Remarks FY 19-20 22L - Balance works payment FY 18-19 PV Bill : 16.18 L 10% Rtn: 0.95 L MEI bill: 18.65 L Adopter Panel: 1.73 L 1AP: 2.2 L Brk Erection: 2.5L Total: 42.23 L FY 18-19 Erection & retention - Rs.24.68L 05.12.13 74.13 0.00 74.13 49.31 15.00 FY 19-20 Erection & retention - Rs.15L NA 569.61 & 23.09.15 05.09.17 619.75 0.00 619.75 477.62 170.00 Work slip approved for Rs.665.6L FY- 18-19: Suppply:80L Erection:20L Civil: 27L Crop/ tree cut comp:15L Total: 142L FY-19-20: Retention bills: 40L Tree cut comp:10L construction of 66KV TB at Malur R/s 38L Total: 88L Sl. No. Work Code 2 1 Name of the Work District Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date Total of Lines AA1057 1 400kV R/S Hoody: Providing 63MVAR Bus Reactor at 400/220kV Station. Bengaluru Urban NA 895.98 & 01.07.09 06.01.11 Total Work Cost 693.88 0.00 693.88 526.93 185.00 726.20 0.00 726.20 267.82 200.00 Cum Exp up to 31/03/19 Budget 2019-20 Remarks Budget 18-19 Erection-100L Budget 19-20 erection & civil - 200L Total of TB's & Others 13 Cost of DWA Cost of Deptly. Supplied Materials & others Total for Bengaluru Zone 726.20 0.00 726.20 267.82 200.00 57436.96 4397.52 55850.81 52529.33 10709.00 Tumakuru transmission zone 1 2 3 4 BB1048 Shyagale(Lokikere): Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 6.04 Kms. Davanagere ES 2.56 BCR 1.93 455.42 & 13.01.12 06.09.13 530.52 50.82 581.34 526.73 76.00 BA1034 Pavagada: Establishing 2x100MVA, 220/66kV Station with associated lines for a distance of 120.00 Kms. Tumakuru ES 81.5 BCR 4.00 7160.37 & 17.10.11 16.01.13 7661.00 1812.37 9473.37 7887.75 1400.00 BB1078 Nallur : Establishing 1x8MVA, 66/11kV Sub-Station with associated line Davangere ES 4.633 & BCR 4.83 BC1070 Neeragunda Gate: Establishing 1x8MVA, 66/11kV Sub-Station in Neeraguda gate in Hosadurga Taluk, Chitradurga Dist.by constructing 66kv SC tap line on DC towers from existing 66kv Hosadurga-Bagur line for a distance of 10.205 kms Chitradurga ES 14.05 BCR 2.95 566.96 & 09.02.17 646.70 & 07.12.15 20.03.18 534.75 22.58 557.33 364.80 80.00 20.01.16 663.00 24.60 687.60 600.60 25.50 40.00 Lakhs budget surrendered during 2018-19 and 40.00 lakhs required for FY2019-2020 for LD and crop compensation Tree/Crop- Rs 348.08L , Retention-Rs625L, FY 2018-19 Split up Crop: 15.25 lakhs PV: 40.00 Lakhs Supply: 40.00lakhs Rentation: 64.00 lakhs Total-159.25 Lakhs FY-2019-20 QV: 28.00 Lakhs LD: 8.27 Lakhs Total: 36.27 Lakhs Sl. No. Work Code Name of the Work 5 BA1119 Theriyur: Establishing 1 x 8 MVA 66/11 KV S/S with associated line in Madhugiri Taluk, Tumakuru District. 6 BA1120 Thippur: Establishing 1 x 8 MVA 66/11 KV S/S with associated line 7 BC1054 Madadakere : Establishing 2x8MVA, 66/11kV Sub-Station with associated lines for a distance of 13.33Kms Cost of Original / Date of LOI Revised DPR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost District Energy Savings & BCR Cum Exp up to 31/03/19 Tumakuru ES 1.008 & BCR 1.25 488.65 & 28.01.17 20.09.17 498.41 31.50 529.91 513.63 42.00 Tumakuru ES 2.091 & BCR 3.20 442.5 & 01.07.16 27.09.17 509.60 31.50 541.10 514.30 54.00 Chitradurga ES.224.72 BCR 1.289 777.14 & 03.07.15 21.12.16 851.34 49.34 900.68 914.49 55.63 11248.62 2022.71 13271.33 11322.30 1733.13 16.09.17 621.73 0.00 621.73 718.68 200.00 Retention Bill Rs 173.59 Lakhs Surrender - 100.00 Lakhs Retenation-57.91Lakhs Budget 2019-20 7 Total of Sub-stations 1 BA1091 K.B. Cross: Providing Spare 1 x 100 MVA 220/110/11 KV Power transformer Tumakuru ES 14040.5 BCR 3.903 2 BA1116 Huliyar: Providing Additional 1x10MVA, 110/11kV Power Transformer at 110/11kV Station. Tumakuru BCR 1.69 253.85 & 03.03.15 23.07.18 107.26 40.00 147.26 10.00 85.00 3 BA1117 Ankasandra: Providing Additional 1x8MVA, 66/11kV Power Transformer at 66/11kV Station. Tumakuru BCR 1.01 112.36 & 03.11.14 11.07.18 92.20 32.20 124.40 110.38 10.00 4 BA1127 Kallur: Replacing 1x10 MVA,110/11kV by 1x 20 MVA, 110/11kV Transformer. Tumakuru BCR 1.14 204.53 & 11.05.17 0.00 190.33 20.00 5 BA1063 Chowdanakuppe: Providing additional 1x8MVA, 66/11kV Transformer Tumakuru ES 1.36 BCR 1.15 168.49 & 12.10.11 03.10.13 75.00 98.00 173.00 67.38 11.00 6 BC1034 BG Kere: Providing additional 1x6.3MVA, 66/11kV transformer Chitradurga ES NA BCR 0.76 201.58 & 05.03.11 23.01.12 92.53 78.55 171.08 85.17 3.29 7 BC1040 Rangenahalli: Providing additional 1x8MVA, 66/11kV Transformer Chitradurga ES NA BCR 1.14 170.97 & 12.10.11 16.03.17 92.58 32.00 124.58 116.32 16.40 621.73 & 12.02.14 Remarks Retention-25 & FQV = Rs 57.50 Lakhs Sl. No. Work Code 8 BA1118 9 BA1122 10 BC1041 10 1 2 3 4 Name of the Work Halukurke: Providing Additional 1x10 MVA, 110/11 kV Power Transformer at 110/11kV Station. Yadavani: Providing additional 1x12.5 MVA, 66/11kV Power Transformer Transformer Dyavaranahalli: Providing additional 1x8MVA, 66/11kV Transformer Cost of Original / Date of LOI Revised DPR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost District Energy Savings & BCR Tumakuru BCR 1.058 229.41 & 02.09.14 04.07.17 275.50 33.00 308.50 116.33 13.00 Tumakuru BCR 2.19 ES 160.48 224.28 & 13.01.16 23.12.17 88.26 153.00 241.26 203.01 22.00 Chitradurga ES NA BCR 1.14 170.97 & 12.10.11 16.03.17 89.52 0.00 89.52 120.18 38.36 1534.58 466.75 2001.33 1737.78 419.05 Total of Augmentation Cum Exp up to 31/03/19 Budget 2019-20 Remarks BA1094 Vasanthanarasapura to Anthrasanahally: Construction of 220kV DC line from PGCIL station at Vasanthanarasapura to existing 220kV station at Anthrasanahally along with terminal bays for a distance of 18.8 kms. Tumakuru NA 2241.56 & 28.06.14 18.05.15 2799.00 1466.39 4265.39 3941.00 150.00 FQV -128.96Lakhs BB1056 220kV SRS, Davangere to 66kV MUSS Davangere: Construction of 66kV DC Line on DC Narrow Based Towers in the existing corridor for a distance of 3.263 Kms. Davanagere NA 258.00 & 30.03.12 17.10.12 248.50 0.00 248.50 284.73 42.00 27.00 Lakhs budget surrendered during 2018-19 and 27.00 lakhs required for FY2019-2020 for LD BC1052 Tumakuru to Rampura limits: Construction of 400kV DC with Quad Moose ACSR from V.N.pura to Rampura Limits (Kelaginakanive) for distance of 188.74Kms BA1121 HAL Project: a) Construction of 220/220KV MC line for Shifting of Existing 220KV B1,B2 & B3,B4 Lines at proposed HALpremises b) Construction of 110KV D/C line with NBT for the shifting of existing 110KV S/C Nittur-Doddaguni line at Prposed HAL premises near Bidarehalli Kaval village limits in Gubbi taluk in Tumakuru District. Chitradurga NA 43277.77 & 08.04.14 24.12.14 54347.73 8980.00 63327.73 61657.34 1000.00 The budget will be booked subject to approval of Time extension proposal. 40.5 Crores for 2nd Retension. If not approved.40.5Crores is required for FY-19-20 Tumakuru NA 5764.00 31.05.16 3645.52 3279.80 6925.32 5308.89 300.00 FQV-300Lakhs, Retention-96.13Lakhs, Compension-100Lakhs, Surrendor200Lakhs b. Commissioned on 29.12.2018 Sl. No. Work Code 5 BC1038 5 22 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 575.96 45.00 620.96 658.18 47.33 Total of Lines 61616.71 13771.19 75387.90 71850.14 1539.33 Total of Tumakuru Zone 74399.91 16260.65 90660.56 84910.22 3691.51 Name of the Work Thallak-Hanagal: Construction of 66kV D/C Thallak Hanagal line in the existing corridor for a distance of 33.52 Kms. District Energy Savings & BCR Chitradurga NA Cost of Original / Date of LOI Revised DPR & Date 543.28 & 18.07.11 28.01.12 Cum Exp up to 31/03/19 Budget 2019-20 HASSANA TRANSMISSION ZONE 1 2 3 CA1037 CD1034 CD1055 Arasikere: Establishing 2x100MVA, 220/110kV and 1x10MVA, 110/11kV Station Arasikere Taluk,with associated lines for a distance of 9.883 Kms. Jade: Establishing 1x10MVA, 110/11kV Sub-Station at Jade in Soraba Taluk, Shivamogga District along with associated line for a distance of 11.850 Kms. Rippenpete: Establishing 1x10MVA, 110/11kV Sub-Station at Ripponpet in Hosanagara Taluk, along with associated line for a distance of 10.16Kms Hassana ES 29.5 BCR 3.67 3526.17 & 06.09.11 24.11.12 3251.50 193.00 3444.50 2868.93 460.00 Remarks Probable for Mar-19 : Bills on hand: Rtn:7.11 bills to receive: Rtn:22.00 work Bills:20.00 For fy-19-20 LD:325.15 FQV: 130.00 Total:455.15 Shimoga ES 0.97 BCR 0.62 792.16 & 22.08.13 26.12.14 780.27 50.62 830.89 778.05 10.00 Bills on hand : 1) BR No: 517/06.09.2018 Rs.0.98 Lakhs. 2) BR No: 1239/27.02.2019 Rs.7.97 Lakhs. Budget FY 2019-20 Line Civil FQV difference amount Rs.10.00 Lakhs. Shimoga ES 0.571 ES 0.82 916.38 & 18.02.15 21.01.16 975.42 51.95 1027.37 909.71 40.00 LD Rs.48.34 Lakhs. Bills on hand: 1) BR No: 1298/10.03.2019 Rs.3.72 Lakhs. 2) BR No: 1296/10.03.2019 Rs.0.85 L 3) BR No: 1291/10.03.2019 Rs.13.42 L. 4) BR No: 1297/10.03.2019 Rs.4.47 L. 5) BR No: 1299/10.03.2019 Rs.2.90 L. 6) BR No: 1300/10.03.2019 .4.01 L. 7) BR No: 1301/10.03.2019 Rs.7.89 L. 8) BR No: 1302/10.03.2019 Rs.7.99 L. 9) BR No: 1292/10.03.2019 Rs.7.00 L. 10) BR No: 1293/10.03.2019 Rs.2.76 L. 11) BR No: 1295/10.03.2019 Rs.2.20 L. 12) BR No: 1294/10.03.2019 Rs.2.62 L. Total Rs.59.83 Lakhs. Probable Expenditure: Retention Rs.28.00 Lakhs Crop compensation Rs.5.82Lakhs Total Rs.33.82 Lakhs Sl. No. 4 5 6 Work Code CE1008 CD1039 CD1060 Name of the Work District Shivapura: Establishing 1x10MVA, 110/11kV Sub-Station at Shivapura in Chikkamagal Tarikere Taluk, Chikkamagaluru uru District along with associated line for a distance of 0.03 Kms. Santhekadur: Establishing 1x8MVA, 66/11kV Sub-Station at Santhekadur in Shivamogga Taluk & District along with associated line for a disance of 0.095Kms. Kortigere: Establishing 1x10MVA, 110/11kV Sub-Station at Koratigere in Shikaripura Taluk , Shivamogga District along with associated line for a distance of 7.139Kms Shimoga Shimoga Energy Savings & BCR ES 1.116 BCR 1.6 ES 1.25 & BCR 2.047 ES 1.87 & BCR 0.61 Cost of Original / Date of LOI Revised DPR & Date 520.34 & 05.03.09 395.99 & 22.06.16 692.42 & 22.06.16 23.05.07 12.02.18 04.01.18 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 318.64 140.90 459.54 422.08 683.76 0.00 0.00 422.08 683.76 Cum Exp up to 31/03/19 305.67 272.71 520.90 Budget 2019-20 50.00 185.00 265.00 Remarks Budget FY 2019-20 civil-40Lakhs T&P - 10Lakhs LD Rs.2.25 Lakhs Bills on hand : BR No: 1277/08.03.2019 Rs.17.64 Lakhs. BR No: 1278/08.03.2019 Rs.1.02 Lakhs. BR No: 1303/10.03.2019 Rs.6.95 Lakhs. BR No: 1304/10.03.2019 Rs.2.19 Lakhs. Total Rs.27.80 Lakhs. Probable expenditure: Power Transformer supply Rs.75.00 Lakhs. Erection Rs.20.00 Lakhs. Civil Rs.5.00 Lakhs. Total Rs.100.00 Lakhs. Budget for 2019-20 Supply Rs.125.00 Lakhs Erection Rs.10.00 Lakhs Civil Rs.20.00 Lakhs Retention Rs.30.00 Lakhs Total Amount Rs.185.00 Lakhs Bills on hand: BR No: 1276/08.03.2019 Rs.14.96 Lakhs. BR No: 1279/08.03.2019 Rs.2.80 Lakhs. BR No: 1288/08.03.2019 Rs.2.26 lakhs. BR No: 1280/08.03.2019 Rs.13.55 Lakhs. BR No: 1286/08.03.2019 Rs.15.26 lakhs. BR No: 1287/08.03.2019 Rs.2.39 Lakhs. BR No: 1283/08.03.2019 Rs.56.98 Lakhs. BR No: 1284/08.03.2019 Rs.5.18 lakhs. Total Rs.113.38 Lakhs. LD Rs.20.78 Lakhs. Retention Rs.57.53 Lakhs. Probable Expenditure: Rs.40.00 Lakhs Budget for 2019-20 Supply Rs.40.00 Lakhs. Erection Rs.30.00 Lakhs Retention Rs.50.00 Lakhs Civil Rs.70.00 Lakhs Land/crop Rs.75.00 Lakhs Total Rs.265.00 Lakhs Sl. No. 7 Work Code CA1063 Name of the Work Rudrapatna: Establishing 1 X 8 MVA ,66/11 KV S/S at Rudrapatna in Arkalgud Taluk, Hassana District along with associated line for a disance of of 4.8Kms. 7 Total of Sub-stations 1 Netlamadnur 220kV R/S: Replacement of 1x10MVA, 110/11kV Transformer by 1x20MVA, 110/11kV Transformer at existing 220/110/33/11kV Netlamudnur sub-station in Bantwal Taluk. 2 CB1045 CD1057 Balligavi: Providing additional 1x10MVA, 110/11kV Transformer at 110/11kV Balligavi sub-station in Shikaripura Taluk. District Hassana Dakshina Kannada Shimoga Energy Savings & BCR ES 1.64 BCR 1.37 BCR 1.43 BCR 0.78 Cost of Original / Date of LOI Revised DPR & Date 467.64 & 31.10.07 274 & 18.11.15 284.42 & 18.07.14 12.03.18 09.02.17 05.07.16 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 527.13 31.85 58.98 320.88 350.00 6958.80 468.32 6927.12 5976.85 1360.00 103.98 60.58 164.56 155.61 6.00 126.89 50.94 177.83 171.28 40.00 Remarks On Hand Bills:8.55 MEI:31.85 Bills to receive:15.66 Total:56.06 For Fy 19-20 Work bills to receive: S:82.51 E:15.91 C:50.91 Subtotal:149.36 Compensation:25 Workslip2:40 Rtn: S:63.96 E:0.14 C:11.54 Subtotal:75.64 LD:52.7 FQV:12.52 Total:355.22 Probable Expenditure for 2018-19 : Erection - 3 L, Retention(MEI) - 2 L Bills on hand: 1) BR No: 1235/25.02.2019 Rs.2.17 lakhs. 2) BR No: 1236/24.02.2019 Rs.10.53 Lakhs. 3) BR No: 1237/24.02.2019 Rs.1.16 Lakhs. Total Rs.13.86 Lakhs. Budget 2019-20 Supply Rs.28.00 Lakhs Erection Rs.6.00 Lakhs Civil Rs.5.00 Lakhs Retention Rs.1.00 Total Rs.40.00 Lakhs Sl. No. 3 4 5 Work Code Name of the Work Cost of Original / Date of LOI Revised DPR & Date CE1039 Kadur: Providing additional 1 X10MVA, 110/11kV Spare Transformer at 220/110kV Kadur Station in Kadur Taluk . CA1057 CR Patna: Replacement of 1 X 12.5MVA, 66/11 KV power Transformer by 1 X 20 MVA, 66/11kV Power Transformer at CR Patna S/S Hassana BCR 0.951 174.86 & 16.03.15 CB1054 Bantwala: Replacement of existing 1x10MVA,110/33KV Transformer by 1x20MVA,110/33KV Transformer at 110/33/11kV Bantwala sub-station in Bantwal Taluk. Dakshina Kannada BCR 0.46 204.02& 12.06.17 5 Total of Augmentation 1 CA1034 Hagare Sub-Station: Providing LILO arrangement to Hagare S/S by stringing of 2nd ckt on existing DC towers from 66kV HassanaChikkamagalur line to Hagare S/S with TB at Hagare S/s for a distance of 0.7Kms CA1035 Balupete: Providing LILO arrangements to 66/11kV Balupete Sub-Station by stringing the 2nd ckt line on the existing DC towers from 66kV Hassana-S.K.Pura 2nd Ckt line to 66/11kV Balupet S/S with TB at 66/11kV Balupet S/s for a distance of 0.6Kms 2 District Energy Savings & BCR Chikkamagal BCR 1.660 uru 236.14 & 12.06.15 27.08.16 Cost of DWA Hassana 32.77 & 22.03.13 33.31 & 11.02.13 23.05.16 23.05.16 Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks Budget 2019-20 Retention Bill Rs.30.00 Lakhs Total Rs.30.00 Lakhs 88.95 25.63 114.58 111.14 30.00 0.00 155.00 155.00 158.39 10.00 20MVA, power transformer commissioned on 12.12.2018 remaining works under progress. 0.00 180.43 5.00 Probable expenditure for 2018-19: PV - 20 L, Work Cost - 8 L. Award Cost: Supply - 1.76L, Erection 9.16L, Civil - 1.54; Total - 12.47L. 611.97 776.85 91.00 319.82 Hassana Cost of Deptly. Supplied Materials & others 28.46 38.38 292.15 2.66 2.66 31.12 41.04 26.78 36.72 3.00 Work is combined package For probable Fy 2018-19 Workslip3:2.00 Fro Fy-19-20 FQV:2.00 LD:1.00 Total:3.0 3.50 Work is combined package For probable Fy 2018-19 Workslip3:1.00 Fro Fy-19-20 FQV:2.00 LD:1.50 Total:3.50 Sl. No. 3 4 5 6 7 Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date Work Code Name of the Work CA1043 Doddahally: Stringing of 66kV 2nd circuit on existing 66kV DC towers from tap point of 2nd circuit of 66kV Kadavinakote-Hootagally line to the existing 66/11kV Doddahally S/S with TB at Doddahally SubStation for a distance of 0.315Kms CA1047 Hangarahally: Construction of 66kV D/C line for providing LILO arrangement to 66/11kV Hangarahalli S/S with TB at 66/11kV Hangarahalli S/S.for a distance of 0.35 kms CB1008 Varahi - Khemar & Khemar Kavoor: Construction of 220kV DC line in the existing corridor of 110kV SC SK line for a distance of 113.3 Kms Dakshina Kannada CB1028 Gurupura Sub-Station: Construction of 110kV LILO line from the proposed (under Construction) 220/110kV VarahiKavoor DC line (b/n Loc no.30 & 31) to 110kV S/s at Gurupura for a distance of 1.50Kms. Dakshina Kannada 72.32 & 06.07.13 CA1054 Shravanabelagola: Providing metering and protection to 66kV YachenahalliShravanabelagola at 66/11kV sub station at Shravanabelagola Hassana 21.47 & 30.07.14 District Hassana Hassana 29.05 & 07.11.12 52.93 & 03.04.13 ES 57.812 10082.99 & BCR 2.71 05.03.09 23.05.16 23.05.16 Cost of DWA 37.50 39.48 Cost of Deptly. Supplied Materials & others 2.80 29.34 Total Work Cost 40.30 68.82 Cum Exp up to 31/03/19 37.52 71.41 Budget 2019-20 3.00 Work is combined package For probable Fy 2018-19 Workslip3:1.00 Fro Fy-19-20 FQV:2.00 LD:1.00 Total:3.0 25.00 Bills to be received : Workslip-3 :6.65 For Fy 19-20 LD:4.06 Rtn:20.48 Total:24.54 Time extension agenda received at this office on 11.12.2018, to be cleared in CPC. 07.02.07 8317.16 2221.76 10538.92 9752.92 450.00 19.08.16 113.21 8.25 121.46 105.00 3.00 06.01.17 22.70 22.70 19.34 Remarks 7.00 FQV for an amount of Rs. 91,21,70,297.19 which is 9.67% excess over the DWA amount Rs. 83,17,16,150.26 submitted CEE, T&P vide letter no 13207-10 Dated 13.02.2019 of CEE,TZH. Retention - Rs.282.19Lakhs. Bills on FQV - Rs. 70Lakhs. Bills to be received; Rtn: 0.25 LD-3.00, Supply-0.68 Bill to receive: S:1.42 E:0.67 Rtn:3.03 LD:1.84 Sl. No. 8 Work Code CD1059 Name of the Work 110/11KV MUSS Thirthahalli LILO: 1) Construction of 110kV, 0.523KM LILO Line tapping from 110kV SK line to the existing 110/11kV Thirthahalli Substation in Thirthahalli Taluk, Shivamogga District. 2) Construction of 110kV line Terminal bay at 110/11kV Thirthahalli S/s. 8 Total of Lines 1 Providing Capacitor Bank and allied equipment’s in KPTCL Substations of Hassana Zone. CA1056 District Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date 155.43 & 19.12.15 Shimoga 762.72 & 09.09.14 Hassana 17.03.18 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 200.29 0.00 200.29 140.69 110.00 8797.18 2267.47 11064.65 10190.38 604.50 Remarks Bills on hand: 1. BR No: 1170/08.02.2019 Rs.9.00 Lakhs 2. BR No: 1171/08.02.2019 Rs.0.42 Lakhs 3. BR No: 1172/08.02.2019 Rs.3.53 Lakhs. 4. BR No: 1173/08.02.2019 Rs.2.14 Lakhs. 5. BR No: 1269/08.03.2019 Rs.1.56 lakhs. 6. BR No: 1268/08.03.2019 Rs.9.30 Lakhs. 7. BR No: 1267/08.03.2019 Rs.1.56 lakhs. 8. BR No: 1266/08.03.2019 Rs.0.42 Lakhs. 9. BR No: 1265/08.03.2019 Rs.0.16 Lakhs. Total Rs.28.09 Lakhs Budget for 2019-20 Retention Rs.20.00 Lakhs Supply Rs.51.00 Lakhs Erection Rs.20.00 Lakhs Civil Rs.15.00 Lakhs Total Rs.106.00 Lakhs Probable expenditure from Nov to Mar-19: Hsn Circle: On Hand: 23.96 07.08.15 517.05 301.67 818.72 559.97 150.00 Budget required for the FY19-20: Hsn Circle: Retention & LD 149.51 1 Total of TB's & Others 517.05 301.67 818.72 559.97 150.00 21 Total of Hassana Zone 16592.85 9859.32 10625.28 17504.05 2205.50 15.02.14 12.09.16 3880.29 390.00 4270.29 3901.15 193.00 09.06.17 476.57 31.27 507.84 493.18 50.00 MYSURU TRANSMISSION ZONE 1 DA1043 Kalamandir Campus: a) Establishing 2x12.5 MVA, 66/11kV Gas Insulated (GI) SubStation near Dhobighat in Mysuru with associated line b) Running of 66 kv single core, 630 sq mm XLPE copper UG cable LILO line for a route length of 3.08 kms from the existing 66 kv bogadi-mysuru south line to the proposed Kalamandir GIS Station. 2 DA1106 Kanagalu Establishing 1x8MVA, 66/11kV Sub-Station with associated line Mysuru ES 4.38 BCR 0.52 Mysuru ES 1.61 & BCR 2.4 3521.03 & 15.05.14 410.20 & 17.03.16 Physically & Financially will be Closed Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 12.06.17 422.61 39.88 462.49 442.36 54.00 Physically & Financially will be Closed 628.76 & 11.05.17 20.03.18 563.00 100.00 663.00 613.32 60.00 Amount required for payment of FQV Bills ES 1.048 & BCR 1.14 651.24 & 06.03.17 26.09.17 605.71 64.50 670.21 567.04 62.00 Physically & Financially will be Closed Mysuru ES 1.318 & BCR 1.23 716.11 & 10.04.17 16.02.18 627.00 160.00 787.90 468.00 245.00 11kV Switchgear to be supplied by KPTCL, Madavadi (Parinamipura) : Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 1.153Kms Mysuru ES 1.29 & BCR 1.46 570.79 & 06.03.17 26.09.17 527.00 45.00 572.00 530.14 50.00 DA1123 Hemmargala: Establishing 1x8MVA, 66/11kV Substation with associated line for a distance of 3.905Kms Mysuru ES 1.609 & BCR 1.62 645.90 & 20.03.17 26.09.17 588.70 65.00 653.70 605.80 57.00 9 DB1047 Tumbekere: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 6.596 Kms. Mandya ES 12.84 BCR 1.34 504.98 & 24.01.12 12.03.18 638.96 140.00 778.96 615.75 100.00 10 DB1098 Vadakepura Limits: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 0.356Kms Mandya ES 1.313 BCR 1.72 520.20 & 11.05.17 20.03.18 505.91 80.00 585.91 363.56 140.00 Cost of Original / Date of LOI Revised DPR & Date Sl. No. Work Code Name of the Work District Energy Savings & BCR 3 DA1107 Kittur : Establishing 1 x 8 MVA,66/11 KV sub-station with associated lines Mysuru ES 1.93 & BCR 2.78 398.43 & 28.12.15 4 DA1115 Bannikuppe Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 3.575Kms Mysuru ES 0.99 & BCR 1.12 5 DA1119 Maliyur: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 2.809Kms Mysuru 6 DA1120 Chandalli (Madapura) Village: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 5.668Kms 7 DA1121 8 Cum Exp up to 31/03/19 Budget 2019-20 Remarks Amount required for payment of FQV bills Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 14.03.18 761.84 120.00 881.84 779.09 50.00 Amount required for payment of FQV bills 783.36 & 10.08.16 16.09.17 654.68 125.00 779.68 653.43 80.00 Physically Closed; Amt required for FQV payments 833.18 & 10.01.17 15.11.17 853.49 119.00 972.49 649.75 180.00 Amount required for payment of Non DWA items after approval of FQV Agara mamballi : Establishing 1 x 8 MVA,66/11 KV sub-station Chamarajan ES 1.005 & BCR 1.02 with associated line for a distance agar of 3.047Kms 690.70 & 12.06.17 20.03.18 638.98 90.00 728.98 526.79 200.00 Amount required for payment of Non DWA items after approval of FQV DA1116 Ranganathapura(Tumbla) Village Establishing 1x8MVA, 66/11kV SubStation with associated line for a distance of 0.597Kms Mysuru ES 1.72 & BCR 2.05 544.15 & 11.01.17 26.05.17 563.00 30.11 593.11 517.70 20.00 Physically & Financially will be Closed DB1100 (Thirumalapura) Vaderahalli Establishing 1 x 8MVA, 66/11 KV Sub-Station with associated line for a distance of 3.869Kms Mandya ES 1.321 & BCR 1.4 635.59 & 13.04.17 01.09.17 591.38 39.69 631.07 545.20 100.00 Physically & Financially Closed 12899.12 1639.45 14539.47 12272.26 1641.00 Cost of Original / Date of LOI Revised DPR & Date Work Code Name of the Work District Energy Savings & BCR 11 DB1101 Devalapura Handpost (Kasalagere) Establishing 1 x 8MVA, 66/11 KV Sub-Station with associated line for a distance of 7.65Kms Mandya ES 1.523 BCR 1.16 849.21 & 11.05.17 12 DD1043 Bargi: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 10.864Kms Chamarajan agar ES 2.03 & BCR 1.77 13 DD1044 Kothanoor: Establishing 1x8MVA, 66/11kV Sub-Station with associated line. Chamarajan agar ES 1.1 & BCR 0.91 14 DD1049 15 16 Sl. No. 16 Total of Sub-stations Cum Exp up to 31/03/19 Budget 2019-20 Remarks 1 DA1046 Kadakola: Replacing 2x8MVA, 66/11kV Tr. by 2x12.5MVA, 66/11kV Transformer 2 DA1104 Vajamangala: Providing additional 1X20 MVA , 66/11 KV transformer . Mysuru BCR 2.589 331.59 & 29.06.15 03.09.16 144.79 189.00 333.79 300.49 31.00 Physically Closed. 3 DB1082 Seelenere: Providing additional 1 X 12.5 MVA ,66/11 kV Transformer Mandya ES NA BCR 1.22 226.74 & 12.02.14 28.03.15 89.00 147.00 236.00 186.67 20.00 DPR to be approved Mysuru ES NA BCR 0.92 237.08 & 03.08.11 08.01.13 19.27 210.20 229.47 220.75 5.00 • Final Variation submitted to SEE, T(W&M) Circle, Mysuru on 07.11.2018 Sl. No. Work Code Name of the Work District DA1098 R.K Nagar : Replacement of 2 nd 12.5 MVA NGEF Power Transformer by 20 MVA, 66/11kV Power Transformer Mysuru 5 DA1108 Hampapura : Providing Additional 1x12.5MVA 66/11kV Transformer and Replacement of 1 X 8 MVA by 1 X 12.5 MVA, 66/11kV with additional SWG Mysuru 6 DA1109 Hanagodu : Replacement of 1 X 8 MVA by 1 X 12.5 MVA 66/11kV Transformer. 7 DB1070 8 Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks 198.75 & 16.03.15 30.06.17 35.33 161.18 196.51 180.33 23.00 Amt required FQV payments 1.16 227.39 & 25.08.15 29.06.17 90.96 243.34 334.30 181.04 70.00 Physically Closed (Amt required for FQV & PV Payments) Mysuru BCR 1.23 152.75 & 05.10.15 30.06.17 20.35 121.57 141.92 125.86 40.00 Physically Closed (Amt required for FQV & PV Payments) Huygonahalli 220kV: Providing additional 1x12.5 MVA, 66/11kV at 220/66/11kV Transformer Mandya ES NA BCR 0.93 296.98 & 19.02.14 05.08.15 135.56 182.44 318.00 192.13 80.00 Physically Closed DB1077 BG Pura: Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Mandya ES NA BCR 0.68 146.24 & 08.11.13 16.02.17 22.40 116.37 138.77 94.51 20.00 Physically Closed 9 DB1086 Hardanahally (Devalapura): Provding Additional 1 X 8 MVA, 66/11kV Transformer Mandya ES NA BCR 0.95 186.58 & 28.06.14 02.07.16 90.00 35.00 125.00 85.81 30.00 Amount required for payment of FQV Bills 10 DD1037 P.G.Palya : Providing Additional 1X8 MVA, 66/11kV Transformer Chamarajan agara BCR 0.84 186.91 & 03.11.14 03.11.14 75.45 45.00 120.45 84.94 11.00 Physically Closed ; Amt required for FQV payments 11 DA1105 Haradanahalli : Providing additional 1 X 8 MVA, 66/11 KV Transformer and Replacing 1 X 6.3 MVA by 1 X 8 at 66/11 KV in Periyapatna taluk, Mysuru District. Mysuru ES NA BCR 2.10 270.38 & 18.08.15 12.05.17 85.00 224.16 309.16 73.34 14.00 Physically Closed (FQV Balance amount to be paid) 12 DB1072 Kirugavalu: Replacing 1x6.3MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Mandya ES NA BCR 0.78 193.40 & 05.12.13 28.03.15 38.95 30.86 69.81 58.02 10.00 4 Mysuru BCR 2.1 233.05 & 22.06.15 02.07.16 84.18 146.48 230.66 174.45 40.00 Physically & Financially will be Closed DA1103 Bylukuppe: Providing Additional 1X8 MVA,and replacing 1x8MVA by 1x12.5MVA 66/11kV Transformer. Mysuru BCR 3.24 232.28 & 29.06.15 04.06.16 85.79 146.48 232.27 172.22 40.00 Physically & Financially will be Closed DD1031 Terakanambi: Replacing 2X8MVA, 66/11kV by 2x12.5MVA, 66/11kV Transformers Chamarajana gara BCR 0.96 226.51 & 27.12.12 13.05.16 12.22 239.78 252.00 193.17 10.00 Physically & Financially will be Closed DB1088 Hardanahally (Devalapura): Replacing the existing 1 X 8 MVA by 1 X 12.5 MVA at 66/11 KV in Nagamangala taluk, Mandya District. Mandya ES NA BCR 0.64 155.78 & 08.04.15 125.00 125.00 92.35 0.20 Physically Closed 1029.25 2363.86 3393.11 2416.08 444.20 DA1102 14 15 16 2 Total Work Cost Ravandur : Provding Additional 1X8 MVA,and replacing 1x8MVA by 12.5MVA 66/11kV Transformer. 13 1 Cost of DWA Cost of Deptly. Supplied Materials & others District Work Code 16 Cost of Original / Date of LOI Revised DPR & Date Energy Savings & BCR Sl. No. Name of the Work Total of Augmentation DA1072 Vajamangala-Varun limits: Construction of 220/66KV MCMV line from location 4(3) to 20 along the proposed 66kV VajamangalaKadakola DC line corridor in Varun limits and providing 2 Nos. of 66kV TBs at Kadkola R/S for a distance of 4.52 kms DD1040 SFC-Madhuvanahalli to Kollegala Limits: Reconstruction of existing I BEAM 66kV line by 66kV D/C towers with replacement of existing deteriorated Coyote Conductor /earth wire by new one for a distance of 22.0KM Cum Exp up to 31/03/19 Budget 2019-20 Remarks Mysuru NA 556.67 & 04.05.13 13.08.14 705.03 55.00 760.03 728.21 25.00 Physically Closed (FQV is approved.However LD has to be approved from CPC) Chamaraja nagara ES 1.81 BCR 0.296 564.2 & 23.06.15 09.11.16 510.00 125.00 635.00 564.62 23.00 Final variation is approved, revised price schedule is to be approved. Sl. No. 3 Work Code DB1055 3 1 Sri Rangapatna LILO: LILO Arrangement for the Garudanaukkada - Metagalli 66kV line for a distance of 1.322Kms along with TBs at Sri Rangapatna Sub-Station for a distance of 1.322 kms District Cost of Original / Date of LOI Revised DPR & Date 136.5 & 31.10.12 Mandya 13.11.17 Total of Lines DA1097 1 36 1 Name of the Work Energy Savings & BCR Providing 12.1kV 2.9MVAR Capacitor Bank and allied equipment’sto 14 Nos of existing KPTCL Sub-stations in the jurisdiction of Mysuru Transmission Zone. Total of TB's & Others 324.59 & 09.09.14 Mysuru 07.08.15 Total of Mysuru Zone BAGALKOTE TRANSMISSION ZONE EE1118 Khadaklat: Upgradation of 2x5MVA,33/11 kV S/S to 2x10 MVA, 110/11 kV S/S with associated line. Belgaum ES 3.064 & BCR 1.96 920.69 & 05.02.16 23.08.16 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 179.19 20.00 199.19 74.85 50.00 1394.22 200.00 1594.22 1367.68 98.00 205.95 134.86 340.81 288.80 50.00 Cum Exp up to 31/03/19 Budget 2019-20 205.95 134.86 340.81 288.80 50.00 15528.54 4338.17 19867.61 16344.82 2233.20 923.41 79.01 1002.42 978.53 30.00 Remarks Amount required for payment of FQV Bills Physically Closed ; Payment required for FQV & Retention amount FY 2018-19: CC: 17.00 Total: 17.00 2 EF1061 Halaki: Establishing 1x10MVA, 110/11kV Sub-Station with associated line for a distance of 13.154Kms Bagalkote ES 4.72 BCR 1.94 767.97 & 06.01.15 12.09.06 882.02 39.75 921.77 954.82 38.00 3 EF1062 Tolamatti:(Anagawadi) Establishing 1x10MVA, 110/11kV Sub-Station with associated line. Bagalkote ES 3.21 BCR 1.48 721.67 & 23.03.15 20.09.16 746.17 39.75 785.92 803.36 29.00 4 EF1066 Navalagi: Establishing 2x10MVA, 110/11kV Sub-Station with associated line for a distance of 1.906Kms Bagalkote ES 4.89 BCR 2.15 791.98 & 06.01.15 20.02.16 856.05 73.37 929.42 885.18 13.00 FY 2019-20: Budget not required. Excess due to veriation of CC bills in the line and awaiting for the approval. FY 2018-19: FY 2019-20: Budget not required FY 2018-19: FY 2019-20: Budget not required Sl. No. 5 Work Code EG1030 Name of the Work Devaragennur: Up-gradation of 33/11kV to 2x10MVA, 110/11kV Sub-Station with associated line for a distance of 1.464Kms District Bijapur Energy Savings & BCR ES 6.252 BCR 4.18 Cost of Original / Date of LOI Revised DPR & Date 761.22 & 10.06.15 22.10.16 Cost of DWA 820.00 Cost of Deptly. Supplied Materials & others 82.53 Total Work Cost 902.53 Cum Exp up to 31/03/19 914.65 Budget 2019-20 18.00 EG1050 Hiremasali: Establishing 1x10MVA, 110/11kV Sub-Station with associated line for a distance of 6.955Kms Bijapur ES 1.64 BCR 1.6 625.40 & 13.08.15 16.08.16 660.00 39.75 699.75 691.70 55.00 7 EB1030 Garag (Shedabal): Establishing 2x10MVA, 110/11kV Sub-Station with associated line for a distance of 4.598Kms Dharwad ES.13.36 BCR 6.71 920.16 & 05.09.15 16.09.17 952.95 127.67 1080.62 997.47 90.00 9 EC1010 EC1018 FY 2018-19 CC : 9.00 Savings : 9.0 Total: 18.09 FY 2019-20: Budget not required. 6 8 Remarks Doni 400kV (Gadag): Establishing 2x500MVA, 400/220kV Station with associated 440kV & 220kV link lines for a distance of 26.798Kms Gadag Belavanaki: Establishing 1x10MVA, 110/11kV Sub-Station with associated line for a distance of 22.27Kms Gadag ES 12.39 BCR 2.1 13249.28 & 25.03.14 30.07.16 17638.35 100.00 17738.35 16007.74 1920.00 Fy2018-19 CC:6.11 PV29.05 LD8.79 INC9.90 Total53.85 Savings8.9 FY19-20 Budget not required Budget break up for 2018-19: Retention of station supply: Rs. 1296.00L Line: Rs. 312.00L Erection: Rs. 61.00L Civil: Rs. 40.00L Budget break up for 2019-20: LD: Rs. 880.00L PV: Rs. 150.00L QV: Rs. 150.00L ES 4.05 BCR 1.83 1071.11 & 13.08.15 07.06.17 1204.66 40.00 1244.66 1161.48 165.00 Sl. No. 10 11 12 Work Code EE1048 EE1065 EE1114 Name of the Work Islampur: Establishing 2x10MVA, 110/11kV Sub-Station with associated line for a distance of 7.875Kms Kakamari: Establishing 2x10MVA, 110/11kV Sub-Station with associated line & TB. Morab: Establishing 2x10MVA 110/11kV Sub-Station with associated line for a distance of 7.526Kms District Belagum Belagum Belagum Energy Savings & BCR ES 7.26 BCR 3.92 ES 4.870/ 2.59 ES 6.83 BCR 2.37 Cost of Original / Date of LOI Revised DPR & Date 811.67 & 01.06.15 861.42 & 16.08.16 949.92 & 05.05.15 04.01.18 05.01.18 23.12.16 Cost of DWA 935.19 880.03 956.21 Cost of Deptly. Supplied Materials & others 63.62 42.00 81.43 Total Work Cost 998.81 922.03 1037.64 Cum Exp up to 31/03/19 886.47 493.65 894.94 Budget 2019-20 92.00 415.00 154.00 Remarks Budget required for the Remaining Year 18-19 Supply ( T& P , Aux Trf, Fire Fighting Equpiments, Yard Lighting , Furniture for Control Room , Mandatory Spares & Misc)Rs 19.00 Lacs Ret - Rs 47.224 Lacs Civil- Rs 56.685 Lacs Erection- Rs 3.692 Lacs CC- Rs 11.22 Lacs Total - Rs 137.82 Lacs Budget required for the Remaining Year 18-19 Supply ( Trf , Aux Trf , Battery charger , Fire Fightining Equpiments, Station Yard Lighting ) - Rs 164.005 Lacs Ret - Rs 126.645 Lacs Civil - Rs 170.26 Lacs Erection- Rs 19.084 Lacs SWG Cost ( CGL) - Rs 42.00 Lacs CC- Rs 25.00 Lacs Total - Rs 546.995 Lacs Say- Rs 547.00 Lacs Budget Required For the Year 18-19 Ret - Rs 28.98 Lacs CC- Rs 20.00 Lacs Civil- Rs 65.18 Lacs Erection- Rs 04.41 Lacs Total - Rs 118 Lacs Bagalkot required for the year 19-20 LD : Rs. 25.59 QV: Rs. 20.00 45.59 FY 2018-19: 13 EF1063 Hebballi: Establishing 1x10MVA, 110/11kV Sub-Station with associated line for a distance of 14.18Kms. Bagalkote ES 2.2 BCR 1.02 769.06 & 02.01.15 03.06.17 914.21 40.00 954.21 848.41 326.00 LD: 46.00 Civil: 50.00 QV: 24.00 Ret: 90.00 PV: 30.89 Total: 240.89 FY 2019-20: Ret: 90.00 LD: 46.00 PV: 30.89 Total: 166.89 Sl. No. 14 15 Work Code Name of the Work EG1049 Talikote: Up-gradiation of existing 33/11kV S/s to 2x10MVA, 110/11kV SubStation with associated line for a distance of 17.557Kms EG1051 Rodagi (Khedagi cross) : Establishing 1x10MVA, 110/11kV Sub-Station with associated line for a distance of 10.969 District Bijapur Energy Savings & BCR ES 3.58 BCR 1.83 Cost of Original / Date of LOI Revised DPR & Date 1140.34 & 18.08.15 09.06.17 Cost of DWA 1323.29 Cost of Deptly. Supplied Materials & others 80.00 Total Work Cost 1403.29 Cum Exp up to 31/03/19 1069.48 Budget 2019-20 394.00 Remarks FY 2018-19: Supp: 90.00 Erc: 60.00 Civil: 23.57 Total: 173.57 FY 2019-20: Budget required of Rs: 238.40 Bijapur ES 1.52 BCR 1.26 758.09. & 05.10.15 06.06.17 863.25 40.00 903.25 628.07 302.00 FY 2018-19: Sup: 150.00 Erc: 10.00 Civil: 50.81 Total: 210.81 FY 2019-20: Budget required Carry forward: 166.00 15 1 2 Total of Sub-stations EE1095 Ugar: Replacement of 1x10MVA, 110/11kV by 1x20MVA, 110/11kV transformer EF1056 110KV S/S Teradal: Providing additional 1X10MVA, 110/11kV Power Transformer 3 EA1019 Haveri: Providing spare 1x20MVA, 110/33-11kV Transformer 4 ED1021 ED1022 5 Belagum Bagalkote BCR 0.64 BCR 0.67 258.50 & 20.11.14 244.70 & 03.12.14 11.11.16 27.05.17 30555.79 968.88 31524.67 28215.95 4041.00 64.98 203.95 268.93 262.64 1.00 109.51 48.79 158.30 253.05 11.00 FY 2018-19: LD: 1.29 Total: 3.32 FY 2019-20: Budget not required. Haveri BCR 1.89 207.93 & 01.08.14 25.03.17 61.26 217.74 279.00 209.05 83.00 Karwar(Shejwad): Providing additional 1x20MVA, 110/33-11kV Transformer Uttar Kannada BCR 1.52 320.05 & 21.08.14 22.03.17 225.35 200.00 425.35 366.46 68.00 Haliyal: Replacement of 1X10 MVA, 110/11kV by 1X20MVA, 110/11kV Power Transformer at 110kV S/s Haliyal Uttar Kannada BCR 1.3 330.2 & 13.08.15 18.04.17 99.42 240.00 339.42 319.14 21.00 Sl. No. Work Code 6 ED1023 7 8 EF1052 EF1064 Name of the Work Sirsi: Replacement of 1x10MVA by 1x20MVA 110/11KV Transformer District Energy Savings & BCR Uttar Kannada BCR 1.51 110KV S/S Banahatti: Replacement of 1x10MVA, 110/11kV by 1x20MVA, 110/11kV Transformer Bagalkot Rampur: Replacement of 1x10MVA, 110/33kV by 1x20MVA, 110/33kV Transformer Bagalkote BCR 1.13 BCR 0.96 Cost of Original / Date of LOI Revised DPR & Date 284.66 & 10.07.15 23.05.17 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 99.99 220.77 320.76 Cum Exp up to 31/03/19 272.89 Budget 2019-20 Remarks 40.00 FY 2018-19: Supply: 18.36 Ret: 9.14 QV: 8.38 Ere: 15.00 Civil: 7.00 Total: 57.88 257.56 & 17.11.15 22.03.18 171.55 & 21.08.14 30.03.17 58.60 16.37 240.50 200.00 299.10 216.37 258.15 324.01 70.00 30.00 FY 2019-20: Supply: 18.36 Ret: 9.14 QV: 8.38 Ere: 15.00 Civil: 7.00 Total: 57.88 FY 2018-19: LD: 17.00 Civil: 4.47 Erc: 8.00 Others: 5.85 PV : 18.80 Ret: 18.35 Total: 72.47 FY 2019-20: Budget not required 9 EG1039 Hirebevanur: Providing additional 1x10MVA, 110/11kV Transformer. Bijapur BCR 0.88 222.40 & 17.09.14 17.03.17 88.23 41.07 129.30 107.46 24.00 FY 2018-19: LD: 12.89 Ere: 1.00 Civil: 2.00 QV: 8.04 Ret: 1.36 Total: 25.25 FY 2019-20: Budget required of Rs: 7.00 Sl. No. 10 Work Code EG1040 Name of the Work Lachyan: Replacing 1x10MVA, 110/11kV by 1x20MVA, 110/11kV Transformer. District Bijapur Energy Savings & BCR BCR 0.80 Cost of Original / Date of LOI Revised DPR & Date 245.85 & 27.10.14 27.03.17 Cost of DWA 63.89 Cost of Deptly. Supplied Materials & others 241.07 Total Work Cost 304.96 Cum Exp up to 31/03/19 229.26 Budget 2019-20 15.00 Remarks FY 2018-19: Supply: 1.00 QV: 3.00 PV: 8.50 Total: 12.50 Savings: 43.50 (Due to cost of transformer) FY 2019-20: Budget required of Rs: 6.00 11 EG1044 110 KV S/S Malaghan: Replacement of 1X10 MVA, 110/11 KV by 1X20 MVA, 110/11 KV transformer instead of Providing additional 1x10MVA, 110/11kV Transformer Bijapur BCR 1.37 252.44 & 13.08.15 25.03.17 58.41 247.12 305.53 226.88 10.00 FY 2018-19: QV: 00 Supply: 15.00 Erection: 1.00 Civil: 2.00 Total: 18.00 Savings: 15.00 FY 2019-20: Budget required of Rs: 6.26 12 13 EG1046 EG1048 Moratagi: Providing additional 1x10MVA, 110/11kV Transformer B Bagewadi: 1x100MVA Transformer 220/110KV for arranging the power supply to the Chimmalagi LIS. Bijapur BCR 0.83 237.24 & 25.03.14 25.10.16 88.37 148.87 237.24 216.58 24.00 FY 2018-19: Supply: 63.55 Ere: 1.74 Civil: 17.40 Total: 82.69 FY 2019-20: Budget required for carry forward QV: 8.00 Savings: 17.49 Bijapur BCR 3.39 579.19 & 19.01.15 FY 2018-19: Supply: 178.00 Ere: 7.85 Civil: 21.00 TOTAL: 206.85 16.09.17 847.00 0.00 847.00 787.37 115.00 FY 2019-20: QV: 40.00 PV : 40.00 Total: 80.00 Sl. No. 14 Work Code EG1054 Name of the Work 110/11kV Devanagaon: Providing additional 1x10MVA, 110/11kV Transformer at 110/11kV Devanagaon Substation District Vijayapura Energy Savings & BCR BCR 0.61 Cost of Original / Date of LOI Revised DPR & Date 271.09 & 25.05.17 22.03.18 Cost of DWA 99.74 Cost of Deptly. Supplied Materials & others 41.63 Total Work Cost 141.37 Cum Exp up to 31/03/19 119.87 Budget 2019-20 6.00 Remarks FY 2018-19: Supply: 20.00 Erec : 10.01 Ret: 10.00 Civil: 13.50 Total: 53.51 FY 2019-20: Budget required of Rs: 19.00 15 16 EC1014 EG1042 Dambal: Providing additional 1x10MVA, 110/11kV Transformer 110KV S/S Shirabur: Replacement of 1x10MVA, 110/11kV by 1x20MVA, 110/11kV Transformer Gadag Bijapur BCR 1.14 BCR 1.37 172.34 & 28.01.13 252.58 & 14.08.15 22.02.18 22.02.18 78.42 46.96 17.29 254.39 95.71 301.35 88.93 268.84 12.00 4.00 FY 2018-19: Supply: 16.00 Ret: 3.50 QV: 2.00 PV: 22.98 Civl: 2.00 Others: 3.35 Total: 49.83 FY 2019-20: Budget not required 17 EB1026 Gadag Road: Providing additional 1x10MVA, 110/11kV Transformer Dharwad BCR 1.12 215.78 & 2.06.14 15.09.16 71.92 6.24 78.16 66.70 1.00 18 EB1027 Lakamanahalli: Replacing 1x10MVA by 1x20MVA, 110/11kV Transformer Dharwad BCR 1.79 239.65 & 19.06.15 13.05.16 48.09 198.12 246.21 202.42 1.00 19 EF1067 110 KV S/s Badami: Replacement of 1X10 MVA, 110/11 KV by 1X20 MVA, 110/11 KV transformer Bagalkote BCR 1.15 253.68 & 18.05.15 11.11.16 62.28 248.69 310.97 251.37 3.00 FY 2018-19: LD: 1.30 FY 2019-20: Budget not required. Sl. No. 20 21 22 23 Work Code EE1091 220KV Kudachi: Providing additional 1x10MVA, 110/11kV Transformer EE1109 M.K.Hubli: Replacement of 1x10MVA, 110/11kV by 1x20MVA, 110/11kV transformer at 110 KV S/S M.K.Hubli EE1111 Soundatti: Providing spare 1x10MVA, 110/11KV Transformer at 110KV S/S Soundatti EE1112 23 1 Name of the Work Nehru Nagar: Replacing 2x10MVA, 110/11kV by 2x20MVA, 110/11kV Transformers District Belagum Belagum Belagum Belagum Energy Savings & BCR BCR 0.68 Cost of Original / Date of LOI Revised DPR & Date 243.87 & 27.08.13 BCR 0.64 256.48 & 21.08.14 BCR 0.88 188.48 & 26.08.14 BCR 0.78 420.54 & 04.06.14 15.06.17 22.02.18 17.06.16 22.02.18 Total of Augmentation EF1021 Gadag-Bagalkote : Construction of 220kV DC line for a distance of 95.295 Kms. Dharwad ES 16.23 BCR 1.016 4869.82 & 21.09.11 31.01.14 Cost of DWA 106.83 59.38 64.42 Cost of Deptly. Supplied Materials & others 35.00 41.63 20.99 Total Work Cost 141.83 101.01 85.41 Cum Exp up to 31/03/19 162.46 72.03 75.45 Budget 2019-20 2.00 20.00 6.00 67.04 42.37 109.41 460.97 58.00 2586.46 3156.23 5742.69 5601.98 625.00 7624.00 81.66 7705.66 7660.45 433.00 Remarks Budget for the Year 18-19 Supply- Rs 02.00 Lacs Erection - Rs 04.00 Lacs Ret- Rs 25.06 Lacs SWG - Rs 42.41 Lacs QV- Rs 12.00 Lacs LD- Rs 1.15 Lacs Transportation of 1X10 MVA - Rs 3.00 Lacs Total - Rs 89.62 Lacs Say Rs 90.00 Lacs For theYear 18-19 Erection - Rs 12.18 Lacs, Transportation of 20 MVA- Rs 4.00 Lacs QV- Rs 1.00 Lacs Civil Rs 11.44 Lacs Ret- Rs 24.63 Total - Rs 53.25 Lacs For the Remaining Year 18-19 Civil- Rs 2.72 Lacs QV- Rs 3.00 Lacs Ret - Rs 6.86 Total - Rs 12.58 Lacs Budget required for the Remaining Year 1819 Supply - Rs 15.44 Lacs,Ret- Rs 11.42Lacs, SD- Rs 15.56 Lacs,Civil- Rs 11.21 Lacs Erection- Rs 20.00 Lacs SWG- Ret- Rs 5.15 Lacs Trf PV- Rs 40 Lacs ( 20 Lacs for each Trf ) QV- Rs 3.00 Lacs Total - Rs 121.78 Lacs Sl. No. Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date Cost of Deptly. Supplied Materials & others Name of the Work EF1059 Mahalingapur-Mudhol : Conversion of 110KV SC tap line to LILO line at 110kV Uttur Substation by construction of 110kV TB & 110kV SC line on DC towers from 110kV MahalingapurMudhol station for a distance of 5.945Kms. EG1037 Kudagi Ultra Mega Power Plant Evacuation Lines: Construction of 220kV MC Line from proposed Kudagi 400kV STPP to LILO existing 220kV B.Bagewadi-Bijapur DC line for a distance of 18.168 kms. Bijapur EA1021 Hirekerur - Rattihalli Line: Stringing of 110kV 2nd Circuit on existing D/C towers between Rattihalli and Hirekerur SubStations for a distance of 12.34 Kms Haveri 200.52 & 05.11.14 27.05.17 203.82 0.00 203.82 167.10 57.00 5 EB1028 Bidnal LILO: Construction of 220kV DC line for having LILO arrangement of 220kV Narendra-Haveri first circuit to 220kV Station Bidnal for a distance of 15.505Kms Dharwad 1331.89 & 20.11.15 06.05.17 1713.67 0.00 1713.67 1751.94 238.00 6 ED1024 Siddapur LILO: Providing LILO arrangement to 110kV Sub-Station Siddapur. Uttar Kannada 243.25 & 28.09.15 15.06.17 215.29 57.99 273.28 229.78 46.00 EE1026 Belgaum-Ghataprabha: Re-construction of 110kV SC line on DC towers in the existing 110kV Ghataprabha line corridor from Belgaum (6-pole structure near Kanabargi) to 110kV Ghataprabha Sub-Station for a distance of 49.045 Kms. Belgaum 863.65 & 08.08.06 17.07.07 812.74 40.00 852.74 681.56 1.00 2 3 4 7 District Cost of DWA Total Work Cost Cum Exp up to 31/03/19 Work Code Budget 2019-20 Remarks FY 2018-19: LD : 26.37 CC: 12.65 Total: 40.00 Bagalkote 240.75 & 28.02.15 2143.75 & 23.05.13 22.07.15 04.03.14 263.70 3161.88 15.26 255.85 278.96 3417.73 194.20 3512.10 50.00 1.00 FY 2019-20: Budget not required. (If dicision of LD is accorded within this F/Y 2018-19, if not it will be spill over 2019-20) FY 2018-19: QV: 12.00 Others: 3.00 Total: 15.00 FY 2019-20: Budget not required. Sl. No. 8 Work Code EG1026 Name of the Work Atharga LILO: Conversion of 110kV tap line to LILO line for a distance of 10.705 kms. District Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date 94.76 & 24.01.12 Bijapur 08.01.16 Cost of DWA 102.82 Cost of Deptly. Supplied Materials & others 5.14 Total Work Cost 107.96 Cum Exp up to 31/03/19 108.40 Budget 2019-20 1.00 Remarks FY 2018-19: QV: 4.00 Total: 4.00 Savungs: 10 FY 2019-20: Budget not required. 8 1 Total of Lines EB1015 1 47 14097.92 455.90 14553.82 14305.53 827.00 1714.71 0.00 1714.71 1648.51 160.00 Total of TB's & Others 1714.71 0.00 1714.71 1648.51 160.00 Total of Bagalkote Zone 48954.88 4581.01 53535.89 49771.97 5653.00 SRS Hubli : R & M Works at 220kV SRS Hubli Station Dharwad 0.00 1789.35 & 03.03.11 13.09.11 KALABURAGI TRANSMISSION ZONE 1 2 3 FA1032 Mallat (Manvi): Establishing 2x100MVA, 220/110/11kV and 1x10MVA, 110/11kV Station with associated 220kV and 110kV lines. 220KV line: 2.80Kms. 110KV lines:39.727 Kms FB1039 Bachigondanahalli: Establishing 1x8MVA, 66/11kV Sub-Station with associated line or a distance of 6.85Kms FB1081 Harivi : Establishing of 66/11kV Substation with installed capacity of 1x8MVA 66/11kV Transformer or a distance of 6.638Kms Raichur Bellary Bellary ES 34.22 BCR 3.48 ES1.883 BCR 1.49 ES 1.36 & BCR 1.20 3948.94 & 17.07.12 474.36 & 23.09.14 467.78 & 05.11.14 12.02.13 23.12.16 16.03.16 4093.00 549.00 561.06 39.86 36.00 24.33 4132.86 585 585.39 3356.27 522.67 392.53 650.00 28.00 95.00 Budget for FY 19-20 Supply: 20.00 Lakhs Erection: 10.00 Lakhs Civil: 60.00 Lakhs RTN: 450.00 Lakhs QV: 80.00 Lakhs PV: 30.00 Lakhs Budget Surrendered:Rs- 150.0 Lakhs Probable Expenditure for 2018-19 Total : 41.66 Lakhs Budget reqd for 2019-20 Crop bills:22.0 Lakhs Retention Amt: 5.5 lakhs Total:27.50 Lakhs Expenditure to be booked in 2018-19 Work completed bills: 181.1 Lakhs QV:39.5 LakhsPV 25.0 Lakhs( Subject to Approved by Corporate office for brought out items)Crop bills:12.0 LakhsLD: 26.0 Lakhs (Subject to approval of delay condonation) Total :283.5 Lakhs. Budget is required for FY2019-20- 95 lakhs. retention amount 60 lakhs crop compensation 20 lakhs QV civil 15 lakhs. Sl. No. 4 5 Work Code FD1015 Yeradona: Establishing of 1x10MVA, 110/11kV Sub-Station with associated line for a distance of 4.964 Kms. FD1026 Bennur: Establishing 1x10MVA, 110/11kV Sub-station with associated line for a distance 8.647Kms 5 1 2 2 Name of the Work District Energy Savings & BCR Koppal ES 3.58 BCR 2.32 Koppal ES 1.94 BCR 1.39 Cost of Original / Date of LOI Revised DPR & Date 528.71 & 06.04.11 802.56 & 28.09.15 02.11.11 28.02.17 Total of Sub-stations FB1050 BislaHalli : Creating 33kV reference by Providing 1x20MVA, 110/33kV Transformer. FB1085 Siruguppa : Replacing 1x10MVA, 110/11kV by 1x20MVA, 110/11kV Transformer Total of Augmentation Bellary Bellary BCR 1.517 292.46 & 03.08.13 BCR 1.123 197.51 & 12.09.14 24.10.17 28.10.17 Cost of DWA 413.29 Cost of Deptly. Supplied Materials & others 36.20 Total Work Cost 449.49 Cum Exp up to 31/03/19 624.57 Budget 2019-20 15.00 Budget of Rs.41.83 Lakhs has been proposed for surrender. Utilisation of Balance Budget for year 2018-19 LD - 67 Lakhs Retention - 3 Lakhs PV - 25 Lakhs. Total 95 Lakhs Subject to Approval of LD, PV during this FY-2018-19 If PV OM for the project is not placed during 2018-19 budget of Rs32Lkahs is required for 2019-20 and the same needs to be retained in List-I. Subject to Approval of PV bills during FY2018-19 895.90 32.00 927.90 828.28 5.00 6512.25 168.39 6680.64 5724.32 793.00 189.58 146.34 335.92 250.68 Remarks 28.00 10.78 151.98 162.76 162.29 32.00 200.36 298.32 498.68 412.97 60.00 Expenditure for FY-2018-19 Supply - 69.74 Lakhs Erection -9.42Lakhs Civil - 47.19 Lakhs. Dept Supply:a)110kV Breakers: 6.31Lakhs b) 33kV Breakers:8.65Lakhs(Gescom) c) Power Trf : 9.5515Lakhs ( Total - 150.86 Lakhs Proposed Budget Required- 27.60 Lakhs for FY-2019-20 LD: 18.6Lakhs Supply & Erection - 4Lakhs Civil - 5Lakhs Departmentally supply portion: for supply of 2 No's of 11KV MCVCB +1AP PO placed to MEI. Material not yet received. So for payment of supply bills and labour bills budget is required Sl. No. 1 2 Work Code Name of the Work FB1080 Bellary 400kV pooling station to Ramapura limits: Construction of 400kV MC Line with Quad Moose Conductor from Proposed Bellary 400kV pooling station (BPS to Ramapura limits (Kelagina kanavi) to connect to 400kV Madhurgiri & Chikkanayakan Halli DC Lines for a distance of 43.018Kms Bellary FA1036 YTPS to 400kV Bellary pooling station (BPS): Construction of 400kV DC Line with Quad Moose Conductor from YTPS to Proposed 400kV Bellary pooling station (BPS) for a distance of 142.49Kms Raichur 2 Total of Lines 1 Lingapur 220kV switching station : R & M Works at 220kV Lingapur Station FB1063 District Bellary Energy Savings & BCR NA NA Cost of Original / Date of LOI Revised DPR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 25819.26 & 26.02.15 24.12.14 34190.82 0.00 34190.82 32100.43 4100.00 39439.25 & 26.02.15 19.10.15 51500.42 0.00 51500.42 42995.44 600.00 85691.24 0.00 85691.24 75095.87 4700.00 1488.04 & 16.02.13 04.03.14 1768.92 12.83 1781.75 1439.32 410.00 Remarks Final 10% retention amount pending for approval of FQV which is submitted to CEE/T&P on 05.06.2018. Rtn.: 3251.86 Lakhs QV:851.56 Probable Exp for FY-2018-19 Total:4103.42 Lakhs. Additional Budget Required - 118.58 Lakhs for FY-2018-19 subject to Approval of FQV pending at Corporate offfice. Budget for FY-2019-20 is Nil : Subject to approval of QV by Coprporate office in 2018-19 else same budget shall be escalated to 2019-20. Subject to Approval of FQV Budget of Rs.237.17 Lkahs has been surrendered for FY 2018-19 Budget requirement fro FY2019-20 For payment of RetentionFinal Bills,QV Bills and LD bills Retention-& QV: 237.35 Lakhs LD : 172.00Lakhs Total 409.35 Sl. No. 2 2 11 150 Work Code FC1055 Name of the Work Providing 12.1KV, 2.9MVAR Capacitor Bank and other allied equipment’s in KPTCL Substations of Kalaburagi Zone. Total of TB's & Others Total of Kalaburagi Zone Total of List-I for All Zones District Energy Savings & BCR Cost of Original / Date of LOI Revised DPR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks Probable Exp. upto 31.03.2019 Supply: 30 Lakhs Erection: 6.23 Lakhs Rtn: 5 Lakhs Kalaburagi 577.83 & 02.09.14 07.08.15 387.00 232.45 619.45 294.14 20.00 2155.92 245.28 2401.20 1733.46 430.00 94559.77 711.99 95271.76 82966.62 5983.00 307472.91 40148.66 325811.91 304027.01 30475.21 Budget required for the year 19-20 Supply: 0.00 Lakhs Rtn: 20 Lakhs Erection: 0.00 Lakhs Civil: 0.00 Lakhs List-II Ongoing Works 2019-20 Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks BENGALURU TRANSMISSION ZONE 1 2 3 AA1129 Samanduru : a)Establishing 2x8MVA, 66/11kV Sub-Station.b) laying of 3cx300 Sqmm UG Cable from Anekal S/s to Samanduru s/S for a Route length of 8.64 Kms. AA1132 ITI : Establishing 2x150 MVA, 220/66/11kV GIS substation at ITI with 220kV DC 1200 sq mm Copper single core XLPE UG cable from existing Hoody-Hebbal for a route length of 2.607Kms along with associated 66kV line. AA1154 Brindavan alloys: Establishing 220/66/11kV GIS Sub-station along with construction of 220kV DC line for a distance of 0.52 kms FY-18-19 498L - Surrender Bengaluru Urban Bengaluru Urban Bengaluru Urban ES 0.40 BCR 0.72 764.24 & 24.02.14 ES.32.31 & 14429.10 & BCR 1.203 15.04.15 ES 21.86 BCR 2.95 7710.86 & 05.09.15 27.08.14 06.05.17 30.12.17 735.60 19711.21 10570.24 0.00 0.00 0.00 735.60 19711.21 10570.24 522.97 14080.58 5250.89 2500.00 3500.00 4500.00 Budget 19-20 Supply -1000L Erection & civil- 1000L Total-2000L Budget 2018-19 BTS-378.0L RTn bills -1171.00 supply: 416.83L erection : 300L Erection and civil -400L Total -2665.83L Budget 19-20 Supply - 3000L erection / civil - 500L Total -3500L FY 18-19 Supply: 205.42 Erection : 50L Civil 365.08L TR cost: 1900 L Total: 3450.50 L FY- 19-20 Supply retention - Rs.2100L Erection retention - Rs.200L Civil - Rs. 500L Total Rs.3400L Rs.in Lakhs Sl. No. 4 5 6 7 Work Code Name of the Work AA1156 Kumbalgodu: Establishing 2x150MVA, 220/66/11 kV sub-satation at Kumbalagodu with 220kv 1200sqmm UG Cable between 400/220kv Bidadi and Vrishabhavathi Valley AA1162 Huskuru : Establishing 2x12.5MVA, 66/11kV Sub-Station with Cable from existing 66/11 KV Malgudi(Elecrtronic City sector-II, Phase-II) Substation for a Route length of 6.885Kms AA1163 Kumbaranahalli : Establishing 2X12.5MVA, 66/11kV Power Transformer at Kumbaranahalli AA1166 Mylasandra (Near Electronic City): Establishing 3 X 500 MVA, 400/220kV GIS Sub-Station at Mylasandra (Near Electronic City) in Bengaluru South Taluk, Bengaluru Urban District along with associated transmission lines and providing additional terminal bays (3 Nos) at 220/66/11Kv S/s at Yerandanahalli (Short closed work code AA1043) District Bengaluru Urban Bengaluru Urban Bengaluru Urban Bengaluru Urban Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 24.33 BCR 0.65 ES 8.11 & BCR 0.96 ES 0.85 & BCR 0.4 ES 124.88 BCR 2.58 37339.12 & 24.11.15 5140.00 & 22.12.16 2662.00 & 06.02.17 36730 & 30.02.17 15.03.18 Cost of DWA 48981.49 Stn:05.01.1 Stn759.21 8 cable:4278.9 cable:15.03. 8 18 06.02.17 24.03.18 694.61 44017.63 Cost of Deptly. Supplied Materials & others 0.00 Total Work Cost 48981.49 Cum Exp up to 31/03/19 20363.50 Budget 2019-20 21990.00 Remarks Budget 18-19 Supply-3000L Erection and civil-225L FY 19-20 Supply - 15000L Erection/civil - 13900L Budget 18- 19 5L -Surrender 0.00 0.00 0.00 5038.19 694.61 44017.63 0.00 1617.29 10794.71 2500.00 Budget 19-20 Supply - 1500L Erection / civil -1000L 900.00 Budget 18-19 Station: 1) Supply-367L 3) Supply rtn=100L 4) CIVIL & Erection-33.00L Cable: 200L Total:700L Budget 19-20 Supply - 600L erection/Civil - 300L Total: 900L 28000.00 FY2018-19 Supply-1000.00L Total: 1000L FY 2019-20 SUPPLY=25000.00 L ERECTION/CIVIL=12016.50 L Total: 37016.5L Rs.in Lakhs Sl. No. 8 9 10 Work Code AB1007 Name of the Work Hoskote: a) Establishing 2x100MVA, 220/66kV Station with 220/66kV MC line from BIAL with 220kV TB at BIAL b) Hoskote 220KV LILO line from Hoody-Kolar line c) 66KV SC line from Hoskote to Mandur, Pillaguppa-sulibele line to Nandagudi, 66 kV TB at Nandagudi & BIAL d) Hoskote to Tower no5 of existing Pillagumpa-Sulibele 66kV line and Tower no5 of existing PillagumpaSulibele 66kV line to Hoskote s/s 1) 21.03 Kms 2) 13.12 Kms 3) 10.25 Kms 4) 10.28 Kms. AB1018 Mandur: Establishing 1x12.5MVA, 66/11kV Sub-Station with 66kV D/C line from Budigere for a distance of 9.00 Km. AB1019 Sondekoppa: Establishing 2x8MVA, 66/11kV Sub-Station with 66kV tap from Dobbaspet - Nelamangala SBT line for a distance of 12.50 Kms. District Bengaluru Rural Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 61.72 BCR 4.05 5249.00 & 05.07.06 a) 220kV S/s & 220kV MCMV line 23.4.07 b) 23.04.07 c) &d) 08.06.07 Cost of DWA (a) & (b) : 5057.5 Cost of Deptly. Supplied Materials & others (a) & (b): 1525.3 Total Work Cost 7475.45 Cum Exp up to 31/03/19 6686.78 Budget 2019-20 900.00 (c) 892.65 Remarks FY 19-20 1000L for land comp,erection & civil for 220kV Hoskote - Hoody Kolar line FY - 18-19 9L- Surrender Bengaluru Rural Bengaluru Rural ES 1.26 BCR 1.10 ES 2.09 BCR 1.49 724.54 & 12.05.08 848.02 & 28.04.08 03.10.07 16.03.07 486.10 647.27 129.00 177.00 615.10 824.27 439.72 598.78 50.00 120.00 FY 19-20 Rs.80L for balance station portion work. FY - 18-19 Nil FY- 2019-20: 93L Supply Retention Bills 1L Erection Bills 6L Civil Bills 20L- Treec Cut Bills(Approx) TOTAL==> 120L Rs.in Lakhs Sl. No. 11 12 Work Code AB1057 AC1015 Name of the Work Devanahalli Hardware Park: Establishing 2 X 500 MVA, 400/220kV Sub-Station (400KV GIS & 220KV AIS) at KIADB Hardware Park, Devanahalli, Bengaluru Rural District and also for creation of required 220kV Terminal Bays at the receiving 220/66kV sub-stations for evacuation of power. Kothipura (Ramanagara): Establishing 2x100MVA, 220/66kV Station with 220/66kV MC lines from Bidadi & SC line from Tubinakere. 220 KV DC line -68.82 Kms, MCMV 18.117 Kms District Bangalore Rural Ramanagara Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 98.39 & BCR 2.60 ES 27.22 BCR 2.02 36815 & 04.02.17 10501.25 & 05.01.09 16.03.18 13.2.07 Cost of DWA 43939.54 7637.98 Cost of Deptly. Supplied Materials & others 0.00 1323.00 Total Work Cost 43939.54 8960.98 Cum Exp up to 31/03/19 4392.60 13480.51 Budget 2019-20 30000.00 1900.00 Remarks FY2018-19 Bills on hand- 808.79lakhs supply- 940.01 lakhs Erection & civil1107.94lakh Total: 2856.74 FY 2019-20 SUPPLY=20900.00 ERECTION=12034.25 CIVIL=4000.00 Total: 36934.25L FY 18-19 Land and tree cut compensation-1423L Supply Rtn-850L Erection -50L Civil-50L Isolators - 88L Breaker-75L CTR-14.5L Total-2552.33L FY 19-20 Land compensation-800L MCMV line portion-1000L TB portion-100L Total-1900L Rs.in Lakhs Sl. No. 13 14 15 Work Code AC1029 AC1055 AC1065 Name of the Work a) Magadi: Establishing 2x100MVA, 220/66/11kV Station with associated line. b) Evacuation of 66kV lines from Magadi station: 1. Construction of 66KV MC and D/C towers to link 66KV Magadi & T.G.Halli 66KV Gudemaranahalli sub-station 2. Construction of 66KV S/C line on D/C towers from Magadi station to Hulikatte 3. Construction of 66KV Terminal Bay at the 66KV Hulikatte Vandaraguppe: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 0.926Kms Hegganur: Establishing 1X8 MVA, 66/11 kV s/s with construction of SC line DC towers from Doddalahalli S/s for a distance of 12.238 kms. District Ramanagara Ramanagar Ramanagara Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 40.39 BCR 1.77 ES 1.40 BCR 1.568 ES 1.82 BCR1.011 7659.56 & 02.08.14 531.57 & 29.08.15 991.51 & 21.03.16 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks FY - 18-19 Supply - Rs.50L Erection - Rs.15.21L Civil - Rs.50L Total Rs.115.21 L 24.09.07 8660.00 0.00 8660.00 8773.65 800.00 FY 19-20 Supply - Rs.300L Erection - Rs.400L Civil - Rs.300L Total - Rs.1000L 18.05.16 14.02.17 573.42 1064.61 30.00 35.00 603.42 1099.61 496.72 853.78 190.00 300.00 FY 18-19 Forest payment-20L FY 19-20: Rtn: 120L Tree Cut: 3L Civil & Erection : 7L QV& PV-30L Other bills-30L Total-190L FY18-19: Line supply & erection-85L Total -85L FY19-20 Forest-100L , Rtn-200L QV-30L Line Civil & erecn-50L Total-380 Rs.in Lakhs Sl. No. 16 17 18 Work Code AC1068 AC1069 AC1070 Name of the Work Channapatna: Establishing 1x100 MVA, 220/66/11KV Sub-station (220kVPartial Hybrid/ Partial AIS, 66kV AIS) in the premises of existing 66/11kV Sub station Channapatna , Ramanagara District. Uragahalli: Establishing 2x8MVA, 66/11kV Sub-Station with associated line. Kunur: Establishing 1x12.5MVA, 66/11kV S/s at Kunur District Ramanagara Ramanagara Ramanagara Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 5.29 & BCR 1.13 ES 5.87 & BCR 2.52 ES 1.262 & BCR 1.06 9342.30 & 10.10.17 1412.15& 01.03.17 822.65 & 11.07.17 16.03.18 20.03.18 21.03.18 Cost of DWA 8910.88 1193.12 703.77 Cost of Deptly. Supplied Materials & others 0.00 0.00 0.00 Total Work Cost 8910.88 1193.12 703.77 Cum Exp up to 31/03/19 2222.42 597.52 315.04 Budget 2019-20 Remarks 3500.00 FY-18-19 Stn supply-808L Stn Civil-101.55L stn erection-68L Line civil-139L Line erection-101L Total-1217.55L FY 19-20 Stn supply- 994L Stn Civil- 400L stn erection - 70L Line supply- 880L Line civil- 337L Line erection-666L Tree cut-153L Stn supply-700L Total-4200 450.00 FY 18-19 Line supply-100L Station civil-60L Line civil-30L Total-190L FY 19-20 Retension-195L Running bill-45L Tree cut-100L Land compensation-92L QV-33L Total-465L 500.00 FY 18-19 Erection stn & line -20L Station civil-60L Line civil-66L Total-86L FY 19-20 Trf-120L Switch gear-60L Retention-150L Running bill-10L Tree cut-70L Land compensation-82L QV-30L Total-522L Rs.in Lakhs Sl. No. 19 20 Work Code AD1006 AB1034 Name of the Work T.Gollahalli (Thimmasandra) Establishing 2x100MVA, 220/66/11kV and 1x12.5MVA 66/11kV Station with associated lines for a distance of 220kV 27.269 Kms & 66kV (5.828+10.93+12.28)Kms Channarayapattana: Establishing 2x8MVA, 66/11kV Sub-Station with associated line. District Kolar Bengaluru Rural Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 38.00 BCR 2.243 9106.29 & 19.09.15 992 & 10.05.17 07.09.16 Cost of DWA 9533.08 Cost of Deptly. Supplied Materials & others 46.16 Total Work Cost 9579.24 0.00 Cum Exp up to 31/03/19 6036.14 471.81 Budget 2019-20 5000.00 400.00 Remarks FY- 18-19: Suppply:150L Erection:100L Civil:41L Total: 291L FY-19-20: Suppply:2000 Erection:400 Civil: 600 Retention bills(20%) Supply, Civil, Erection:2200L Land / tree cut comp to be approved for :1300L Total:6500L Work slip was submiited to appoval for 1700L, considering WS amount the budget is requested FY 18-19 Bills under process Rs.170L Land compensation Rs.100L S/E/C/Rtn -130L FY 19-20 Compensation - 200L S/E/C/Rtn - 300L 21 AA1179 Bagganadoddi: a)Establishing 1x8MVA, 66/11kV Sub-Station with associated line b)Running of 3Cx300 sqmm , 66kV (E) grade Copper conductor UG cable from proposed 66/11kV Kumbaranahalli S/s to proposed 66/11kV Bagganadoddi S/S for 9.052Kms Bengaluru Urban 2913.00 & 21.11.17 0.00 0.00 1500.00 FY 19-20 station & UG cable Supply 800L Erection & Civil - 1200L Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks 22 AC1073 Sathanur(Achalu): Establishing 2x8MVA, 66/11kV Sub-Station with associated line Ramanagara 780.02 & 21.12.17 0.00 138.17 550.00 FY 18-19 Bills in hand earthmat & Civil bills-75L Station supply-75L Total-150L FY 19-20 Supply-450L erection -15L Civil-130L Switch gear-55L Total-650L 23 AE1049 Bommepalli cross: Establishing 1x8MVA, 66/11kV Sub-Station with associated line C.B.Pura 661.64 & 05.02.18 0.00 0.00 520.00 FY 18-19 Supply+Civil: 55 L FY 19-20 S+E+C=600 L 24 AB1058 Sasalu(Sriramanahalli: Establishing 1x8MVA, 66/11kV Sub-Station with associated line Bengalulru Rural 1118 & 10.05.17 0.00 0.00 400.00 FY 19-20 500L - 50% of the DPR cost 25 AD1021 Tadigol Cross : Establishing 2x8MVA, 66/11kV Sub-Station with associated line. C. B. PURA 0.00 0.00 500.00 FY 19-20 S+E+C=600 L 26 26 AA1042 Yelahanka (DG Plant): a) Establishing 2x150MVA, 220/66kV Station b) 220-220 kV MC line from NelamangalaD.B.Pura to Singanayakanahalli 10.33Kms c) Running of DC 220KV, 2000 Sq mm UG cable for a route length of 5.875 Kms from 400/220kV Singanayakanahalli station to 220/66/11kV DG Plant Yelahanka station & Construction of two numbers of 220 kV Terminal Bay at 220/66KV/11kV DG Plant sub-station. d) 220-66 kV MC line from yelahanka to 8 pole structure Chikkabettahalli 5.84k Kms e) 66 kV DC line from DG Plant to DG Plant-Peenya 1 & 2. 1.07 Kms. Total of Sub-stations Bengaluru Urban ES 30.68 BCR 4.05 9902.75 & 25.06.10 (a)28.04.10 a) 3346.95 (d) & (e) 2330.93 0.00 5677.88 31774.22 105.00 FY 18-19 Bills on hand RS 30.24L Retention Rs.150L LD Rs. 34L FQV Rs.200L Total: 414.24 L FY 19-20 5 lacs nominal budget, the work is to be shifted to list-1 & to be deleted 224726.77 1740.16 227992.23 129907.80 111575.00 Rs.in Lakhs Sl. No. Work Code 1 AA1168 2 AA1176 3 4 5 6 Name of the Work Augmentation of 1x12.5 MVA, 66/11kV Power Transformer 1 by 1x20MVA at 220/66/11kV R/s Somanahalli, Bengaluru. 66/11kV S/S Kodigehalli: Replacing 2x8MVA, 66/11kV Power Transformer by 2x20MVA, District Bengaluru Urban BCR 1.00 340.27 & 17.05.17 27.03.17 3.08 0.00 3.08 0.00 150.00 FY-19-20 SWG cost: 150 L (If MEI delays the supply of Switchgear, the budget has been provisioned) Bengaluru Urban BCR 1.72 397.72& 28.03.17 28.09.17 2.16 163.00 165.16 2.16 2.00 FY-19-20 Nominal Budget: 2 L AB1028 Nelamangala 400kV: Providing additional 3rd 500MVA, 400/220kV three phase Power ICT with associated equipments for a distance of 3.06 kms Bengaluru Rural AA1170 Somanahalli: Replacing 2x100MVA, 220/66/11kV Power Transformer by 2x150MVA at 220/66/11kV R/s Somanahalli, Bengaluru. Bengalulru urban 1635.73 & 17.05.17 AA1164 Naganathapura: Augumentation of 2x100 MVA, 220/66/11kV Power Transformer by 2x150MVA, 220/66/11kV Power Transformers at 220/66/11kV Naganathapura Receiving Station, Bangalore South Taluk, Bangalore Urban District. Bengaluru Urban 1616.20 & 28.01.17 AA1177 Army Welfare Housing Organisation: Providing Additional 1X31.5MVA, 66/11kV Power Transformer Cost of Deptly. Supplied Materials & others Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Bengaluru Urban BCR 3.06 4489.57 & 20.03.10 400.00 & 21.10.17 Cost of DWA Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks FY 2018-19: 83L for Handing Over of 220KV Bays. 04.02.11 4177.12 0.00 4177.12 4060.98 190.00 0.00 0.00 900.00 FY 2019-20 100L for Handing Over of 220KV Bays. 90L for 400KV Panel Works FY 19-20: Supply - 1000L FY 18-19: Supply TF -42L 0.00 0.00 0.00 900.00 FY 19-20: Supply - 1000L 0.00 49.82 200.00 FY 18-19 Supply/Erection/Civil 30.41L FY19-20 Transformer Cost - 220L retention - 20L Erection & Civil -10L Rs.in Lakhs Sl. No. Work Code 7 AB1061 8 9 AC1075 AC1076 Name of the Work Providing additional 20 MVA TR at 220 kV KIADB Doddaballapura Bidadi: Providing additional 1x20 MVA Power Transformer at 220/66/11 kV Bidadi Sub-station Hukunda: Providing additional 1x8MVA, 66/11kV Power Transformer at 66/11kV Hukunda Sub-station. District Bengaluru Rural V.G.Doddi: Providing additional 1x8MVA, 66/11kV Power Transformer at 66/11kV V.G.Doddi Sub-station. Ramanagara 11 AC1087 Kanakapura : Providing 1X20MVA, 66/11kV Power transformer as a SPARE at Kanakapura 66/11kV S/s with associated bay equipments Ramanagara 387.00& 12.02.18 Hebbal-ITI: Replacing Coyote ACSR by HTLS Conductor from the existing 66kV line for a distance of 14.334 Kms. 0.00 225.17 & 25.05.17 0.00 225.30 & 10.05.17 0.00 307.00& 11.10.18 4182.36 Bengaluru Urban Total Work Cost 0.00 Total of Augmentation AA1046 Cost of DWA Cost of Deptly. Supplied Materials & others 359 & 17.06.17 Ramanagara AC1077 1 BCR 1.46 Ramanagara 10 11 Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date NA 1780.46 & 21.06.11 07.02.12 1679.14 163 0.00 4345.36 1679.14 Cum Exp up to 31/03/19 Budget 2019-20 Remarks 150.00 FY 19-20 50% of the DPR cost including Tr. Su - 200L 200.00 FY 18-19 Supply-50L Total-50L FY -19-20 erection -6L civil-19L swith gear-45L Transformer-160L QV-5L Rtn-15L Total-250L 50.00 FY 18-19 DWA cost-70L swith gear-30L Total-100L additional budget of Rs.95L requested FY -19-20 QV-5L 0.00 50.00 FY 18-19 DWA cost-70L swith gear-30L Total-100L additional budget of Rs.95L requested FY -19-20 QV-5L 0.00 1.00 shifted as per approved dpr 0.00 0.00 21.43 4134.39 934.50 2793.00 100.00 FY 19-20 Rtn /erection/civil - 100L Rs.in Lakhs Sl. No. 2 3 4 5 6 Work Code AA1134 Name of the Work BIAL toVidyanagar: Running 66kV SC 1000Sq mm XPLE copper UG Cable for a route length 9.5 Kms from 220/66/11kV Sub-station to 66/11kV Vidyanagar S/s AA1146 EPIP & Yerandanahalli: Strenghtening of existing 66 kV line between EPIP & Yerandanahalli sub-station by replacing Coyote by Drake ACSR AB1017 Somanahally to Kolar via Malur: Construction of 220kV DC line (balance works). AC1063 T.K Halli to Iggalur: Construction of 66kV DC line for a distance of 9.924Kms from 220/66/11kV T.K.Halli Station to 66kV Iggalur Tap point in the existing corridor of 66kV T.K Halli-Akkurmole SC line and Providing 66kV TB's at T.K Halli AD1042 Malur to Lakkur: Construction of 66kV SC line on DC towers and partly on DC towers from 220/66kV Malur Sub-station to 66/11kV Lakkur Sub-station District Bengaluru Urban Bengaluru Urban Bengaluru Rural Ramanagara Kolar Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date NA NA NA NA NA 5082.46 & 25.02.15 2202.46 & 13.08.15 3085.00 & 19.12.06 304.32 & 16.04.15 297.43 & 20.02.13 15.12.15 30.07.16 28.08.06 05.06.17 13.03.17 Cost of DWA 5947.00 2177.30 2739.09 326.26 410.00 Cost of Deptly. Supplied Materials & others 0.00 0.00 0.00 0.00 0.00 Total Work Cost 5947.00 2177.30 2739.09 326.26 410.00 Cum Exp up to 31/03/19 4364.20 1287.26 3381.37 143.88 233.33 Budget 2019-20 1250.00 800.00 800.00 100.00 285.00 Remarks FY 19-20 Supply retention - 1000L Erection - 30L Civil - 220L Final retention & FQV 700L FY 18-19: Probable : 170L a) supply - 100L 2) Erection & civil - 70L FY-19-20 Erection-400L Civil-100L Supply/Erection and Rnt bills: 300L Total:800L Budget 18-19 Supply-100L Budget 19-20 Supply -400L erection/ civil -400L Total: 800L FY 18-19 Line supply - 27.63L Total -27.63L FY 19-20 Line erection-26L Line supply-50L Rtn-20L Total-96L FY- 18-19: Suppply:50L Erection:45L Civil: 15L Total:110L FY- 19-20: Suppply:80L Erection:10L Civil: 35L tree/crop cut comp:10L Additional Rs 80L required if re-check survey gets approval Rs.in Lakhs Sl. No. 7 8 9 10 Work Code District Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 AA1190 Kanteerava GIS Station: Establishing link line between 220/66/11kV Sir.M.V.GIS station(East Division Compound) and 66kV Kanteerava GIS station by laying kV SC 1000Sqmm UG cable for a route length of 2.488Kms AC1080 66kV Mattikere- Jalamangala Line: Construction of 66kV Line from 66/11kV Mattikere to Jalamangala for a distance of 10.78Kms AA1171 Somanahalli : Replacing 66 kV North and South Strung bus by rigid bus at 220/66/11 kV Somanahalli substation Bengalulru urban 657 & 26.09.17 0.00 0.00 500.00 AC1036 Ramnagara Sub-Stn. : Constructing additional 66kV circuit from Bidadi - Bevoor line to provide LILO arrangements for a distance of 0.65 kms. Ramanagara 34.13 & 11.01.13 0.00 0.00 55.00 13278.79 10344.54 4990.00 10 1 Name of the Work Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date FY 18-19: 10L - Surrender Bengaluru Urban Ramanagara NA 1782.00 & 24.01.18 0.00 0.00 1000.00 564.07& 05.05.18 0.00 0.00 100.00 Peenya : R & M works at Peenya 220/66kV Station. FY 19-20 Supply/Erection/Civil 100L FY 19-20 Supply/Erection - 100L FY 18-19 Supply: 300 L Total of Lines AA1050 Remarks 13278.79 Bengaluru Urban NA 3539.98 & 17.02.11 12.11.13 4093.35 0.00 0.00 4093.35 3306.63 800.00 FY 19-20 Supply+Erection+Civil: 500 L FY-19-20 supply, erection and civil bills-55L FY2018-19 SUPPLY=50 L ERECTION=100.00 CIVIL=100.00 Total : 250 L FY 2019-20 SUPPLY=100.00 ERECTION=200.00 CIVIL=200.00 Total: 500 L Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 2 AA1054 SRS Hoody : R & M Works at SRS Hoody 220/66kV Station Bengaluru Urban NA 3 AA1150 Providing Capacitor Bank and allied equipment’s in KPTCL Substations of Bengaluru Zone. Bengaluru Urban NA 2779.67 & 13.01.15 AA1153 Renovation and upgradation of protection systems of 220 kV substations (26 Nos.) & 400 kV (2 Nos) in Bengaluru Transmission Zone NA 1353.30 & 20.06.14 4 5 6 AA1073 Somanahalli: R&M works at Somanahalli 220/66kV Station AB1030 Nelamangala: Providing 63MVAR Bus Reactor at 400/220kV Station. Bengaluru Urban Bengaluru Urban Bengaluru Rural 1807.71 & 27.08.11 NA 2286.04 & 04.09.10 NA 859.04 & 20.07.09 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 07.11.13 2452.88 0.00 2452.88 1599.78 500.00 12.12.16 2308.36 0.00 2308.36 2170.07 800.00 Remarks Probable expenditure for remaining FY2018-19 Bill on hand -158.00L Supply: 150.00 L FY 2019-20 SUPPLY & RETN=250.00 ERECTION=100.00 CIVIL=50.00 FY 18-19: Supply+Erection: 2375 L FY 19-20 Supply+Erection: 560 FY 18-19: Supply+Erection: 835 L 26.12.15 1573.21 0.00 1573.21 1031.14 2000.00 FY 19-20 Supply+Erection: 240 L 08.03.12 06.01.11 2016.71 641.73 0.00 0.00 2016.71 641.73 1617.38 232.94 355.00 170.00 FY-19-20 a) supply-65L & Erection 50L FY-19-20 rtn -308L Erection -100L FY 19-20 149L Balance Supply & Retention Bills 7L Balance Erection Bills 14L Balance Civil Bills TOTAL==> 170Lakhs FY 18-19 Bills on hand -35.00L 7 7 AB1048 KIADB DB Pura: R & M works at 220/66kV KIADB DB Pura Station for a distance of 0.56 Total of TB's & Others Bengaluru Rural BCR 1.67 2488.00 & 08.11.12 04.03.14 3072.66 0.00 3072.66 2738.98 500.00 16158.90 0.00 16158.90 12696.92 5125.00 FY 19-20 supply retention( 10 %) : 250 L Erection & civil : 50 L, work slip: 200 L Rs.in Lakhs Sl. No. Work Code 54 Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Total for Bengaluru Zone Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 258346.82 1903.16 261775.28 Cum Exp up to 31/03/19 157083.65 Budget 2019-20 Remarks 124483.00 Tumakuru transmission zone 1 2 3 BB1042 BB1049 BC1053 Benkikere (Channagiri): Establishing 2x100MVA, 220/66kV Station with associated 220kV line for a distance of 47.43Kms Jagalur (Hiremallanahole): a) Establishing 2x500MVA,400/220 KV partly GIS S/S i.e., 400kV GIS and 220kV AIS with associated 400kV lines. b) 220kV DC Line to Thallak, Chitradurga & Kudligi along with 220kv TB's Malladihalli : Establishing 2x8MVA, 66/11kV Sub-Station with associated line for a distance of 11.467 Kms. Davanagere Davanagere Chitradurga ES.1.39 BCR 0.518 ES.13.68 BCR 2.83 ES 4.3 BCR 2.56 8341.82 & 20.11.14 31.05.17 a) 14186.67 & 19.11.15 29.07.16&6. b) 8142.88 5.17 & 28.04.16 622.98 & 19.10.12 06.02.13 9763.96 18597.43& 9434.43 670.64 0.00 408.63 32.11 9763.96 18597.43 702.75 7652.82 20402.31 666.03 3000.00 FY 2018-19 Split up Supply Rentation, Erection and Civil : 400.00 lakhs Total- 400.00 Lakhs FY 2019-20 Split up Supply Retension-1975.93 Lakhs Civil: 823.30 Lakhs erection: 493.98 lakhs Total- 3293.22 Lakhs 10000.00 Surrender of Rs. 1800.00 lakhs for FY-2018-19 Split up for FY-2018-19 Supply and rentation :1500 Lakhs Civil: 400.00 lakhs Erection: 153.34 lakhs FY 19-20: Supply & etension1800 Lakhs PV : 530.00 Work Slip: 124.00 Lakhs Total - 1800.00 Already surrender of Rs. 151.72 Lakhs Surreder of Rs. 1560.00 due to Forest clearnace FY 2018-19 Split up Supply and Rentation: 1195.00 lakhs erection: 200.00 Lakhs Civil: 255.00 Lakhs Crop: 50.00 Lakhs Total-2200.00 Lakhs FY 2019-20 Split up Supply Retension- 2106.04 Lakhs Erection : 412.68 Lakhs Civil: 753.77 Laksh Crop-400Lakhs Total-3672.49 Lakhs 150.00 Additional Rs.50.00 lakhs required FY-2018-19 Crop: 175.00 lakhs Retantion: 25.00 lakhs FY-2019-20 Retantion: 75.00 Lakhs Civil: 25.00 Laksh QV: 40.00 lakhs LD: 10.00 lakhs Rs.in Lakhs Sl. No. 4 Work Code BC1055 Name of the Work Visveswarapura: Establishing 1x8MVA, 66/11kV Sub-Station with associated line District Chitradurga Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 3.377 & BCR 3.87 528.33 & 26.04.17 20.03.18 Cost of DWA 517.10 Cost of Deptly. Supplied Materials & others 32.00 Total Work Cost 549.10 Cum Exp up to 31/03/19 236.38 Budget 2019-20 275.00 Remarks Splitup for 2018-19 Rs. In Lakhs Supply:-130.00 Erection:-30.00 Civil:- 32.70 Total - 192.70 Lakhs Splitup for 2019-20 Supply:-130.00 Erection:-20.00 Civil:- 09.24 QV :-10.00 Total - 169.24 5 BC1068 Hosadurga: Establishing 2x100MVA, 220/66 KV S/s with associated 220kV & 66kV lines Chitradurga Surrender 2000.00 Lakhs Splitup for 2018-19 Supply - 3200 Erection - 200.5 Civil - 496 Lakhs Total - 3896.5 Lakhs ES 18.225 & BCR 1.22 7468.00 15.03.18 10034.77 652.28 10687.05 439.47 5000.00 Splitup for 2019-20 Supply& Rtn-:5000.00 Civil:600.00 Erection: 150.00 Crop comp:250.00 Total: 6000.00 Lakhs 6 BA1131 Karadi: Establishing 1x10MVA, 110/11kV Sub-Station with associated line Tumakuru BCR 1.05 590.73 & 23.01.18 7 BC1073 Godabanalu : Establishing 2x12.5MVA, 66/11kV Sub-Station with associated line in Chitradurga Taluk & Dist. Chitradurga ES 5.032 BCR 3.18 8 BC1074 Neralagunte: Establishing 1x12.5MVA, 66/11KV substation with associated line in Challakere Taluk ,Chitradurga dist Chitradurga 9 BC1072 Mallapanahalli: Establishing 2x8MVA, 66/11kV Sub-Station with associated line Chitradurga 0.00 0.00 0.00 600.00 Rs.1053.64 & 21.04.18 0.00 500.00 ES 2.067 BCR 1.89 Rs.745.54& 21.04.18 0.00 400.00 ES 4.499 BCR 3.16 Rs.900.93& 05.05.18 0.00 400.00 Rs.in Lakhs Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Sl. No. Work Code 10 BA1134 Changawara: Establishing 1x8MVA, 66/11kV Sub-Station with associated line Tumakuru ES 1.3484 BCR 1.48 612.50 & 28.03.18 11 BA1048 Sira(Kallukote) : Establishing 2x100MVA, 220/66/11kV Sub-station with associated line Tumakuru BCR 2.78 6800.90 &16.03.18 11 Name of the Work District Cost of DWA Cost of Deptly. Supplied Materials & others 0.00 Total of Sub-stations 49018.33 1125.02 Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 0.00 0.00 400.00 0.00 0.00 500.00 40300.29 29397.01 21225.00 Remarks Transformer Cost - 604 Lalhs Other works - 112 Lakhs Total - 716 Lakhs 1 BB1031 Davanagere: Replacing 2x60MVA, 220/66kV by 2x100MVA, 220/66kV transformers Davanagere NA 2 BA1130 Heggere: Providing additional 1x8MVA Power Transformer at 66/11kV Substation Tumakuru BCR 0.65 273.12 & 21.11.17 3 BB1051 Kattige: Providing additional 1x8MVA, 66/11kV Transformer Davanagere ES NA BCR 0.90 173.45 & 12.10.11 4 BB1052 Kundur: Providing additional 1x8MVA, 66/11kV Transformer Davanagere ES NA BCR 0.90 174.69 & 24.09.11 5 BB1082 Bennihalli: Replacing 1x6.3 MVA, 66/11kV by 1x 12.5 MVA, 66/11kV Tranformer. Davangere BCR 0.75 140.08 & 11.05.17 1203.66 & 27.10.10 248.41 1050.00 1298.41 65.50 680.00 Power Transformer allotted. Hence, to book the expenditure towards transformer cost 500 Lakhs addl budget required during18-19 109.94 32.05 141.99 29.33 100.00 Retention-63 & surrendor 70Lakhs 31.12.18 103.40 148.50 251.90 22.86 100.00 Additional Rs. 45.00 Lakhs 28.12.18 102.21 148.50 250.71 22.86 100.00 Additional Rs. 45.00 Lakhs 0.00 0.00 100.00 Rs. 100 Lakhs to be surrendered Rs.in Lakhs Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 274.74 & 25.05.17 8.51 226.14 234.65 0.00 100.00 BCR 0.78 272.75 & 12.06.17 6.40 226.14 232.54 0.00 5.00 Davanagere BCR 0.66 273.90& 29.05.17 6.50 126.00 132.50 0.00 1.00 Davangere BCR 0.59 223.52 & 20.05.17 82.22 148.50 230.72 0.00 150.00 Surrender of Rs. 50.00 lakhs 0.00 100.00 Additional 80.00 required for FY-2018-19 Supply: 74.00 lakhs Erection: 1.00 lakhs Civil: 10.00 lakhs Total : 85.00 lakhs FY-2019-2020 Supply: 46.00 lakhs Erection: 1.00 lakhs Civil: 10.00 lakhs Total: 57.00 lakhs Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 0.77 Davangere Sl. No. Work Code Name of the Work District 6 BB1083 Halavagalu: Replacing 2x6.3MVA, 66/11kV by 2x 12.5MVA, 66/11kV Transformer. Davangere 7 BB1084 Telagi: Replacing 2x6.3 MVA, 66/11kV by 2x12.5MVA, 66/11kV Transformer. 8 BB1085 Sasuvehalli : Replacing of 1x6.3 MVA 1x8MVA by 2x12.5MVA 66/11kv Power Transformer 9 BB1087 Savalanga: Providing additional 1x8MVA,power Transformer at 66/11kV Savalanga S/S. 10 BC1071 Kanchipura: Providing Additional 1x8 MVA, 66/11kV Power Transformer. 11 BA1149 BC1081 12 27.12.18 Cum Exp up to 31/03/19 Budget 2019-20 Chitradurga ES 112.36 BCR 1.87 183.72 & 21.07.15 Gubbi: Replacing 2x10 MVA, 110/11kV by 2x 20 MVA, 110/11kV Transformer Tumakuru BCR 1.13 411.61 & 22.05.18 206.19 70.00 JG Halli: Replacing 2x6.3MVA, 66/11kV power transformer by 2x 12.5 MVA, 66/11kV power at 66/11kV J.G Halli S/s. Chitradurga BCR 1.00 285.90 & 19.09.18 0.00 150.00 31.12.18 82.22 1485.00 1567.22 Remarks Rs. 100 Lakhs to be surrendered Augmentation of one transformer completed and another transformer to be allotted. Rs.in Lakhs Sl. No. Work Code 12 1 2 3 Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Total of Augmentation BA1024 Kibbanhalli - CN Hally - Huliyar : Construction of 110kV DC line in the new corridor from 220kV K.B.Cross to Thimmanahally tapping point for a distance of 26.00 Kms. Tumakuru BA1096 Vasanthanarasapura to Madhugiri: Construction of 220kV DC line with Moose ACSR from PGCIL Station at Vasanthanarasapura to existing 220kV station at Madhugiri along with terminal bays for a distance of 44.481KMS. Tumakuru BA1112 400 KV BTPS from Rampura Limts to Chikkanayakanahalli: a) Construction of 400 KV Quad Moose DC Line from 400 KV Rampura Limits to Jagaluru Limits for 65Kms b) Construction of 400 KV Quad Moose DC Line from 400 KV Jagaluru Limits to Chikkanakanahalli for 123.69Kms Tumakuru Cost of DWA Cost of Deptly. Supplied Materials & others 749.81 3,590.83 Total Work Cost 4,340.64 Cum Exp up to 31/03/19 346.74 Budget 2019-20 Remarks 1,656.00 NA 966.15 & 01.12.09 15.09.10 733.50 242.00 975.50 681.97 300.00 Rs -100.00 Lakhs proposed to be Surrender to (TL&SS Division, Tumakuru) Compensation Rs-86.39 Lakhs NA 5678.46 & 15.09.14 07.07.15 6056.94 1889.00 7945.94 6694.52 500.00 Compensation Rs-510.00 Lakhs, Retention Rs-251.82 Lakhs, NA a) 49189.74 & 21.11.15 Splitup for 2018-19 Supply 2428.72 lakhs Work slip: 600.00 lakhs Erection - 200.00 lakhs Civil - 200.00 lakhs Crop - 130.53 lakhs Total - 3559.25 Lakhs 29.07.16 17820.75 1264.57 19085.32 14733.69 4000.00 Splitup for 2019-20 Supply110.00 Erection-150.00 Civil- 150.00 Crop - 250.00 PV- 560.00 LD - 50.00 Total- 1270.00 lakhs Rs.in Lakhs Sl. No. 4 Work Code BB1018 Name of the Work Davanagere - Chitradurga No. 1 : Re-construction of 66kV S/C line on D/C towers in the existing corridor for a distance of 55.70 Kms. District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks Surrender of Rs. 41.33 Lakhs Split up for 2018-19 Errection-10.88 Lakhs Civil-4.00Lakhs Crop - 15.00. Total - 19.88 Lakhs Davanagere NA 771.90 & 27.07.09 28.04.10 570.24 75.00 645.24 501.35 100.00 Split up for 2019-20 Supply & Retension-128.00 Lakhs Errection-10 Lakhs Civil-7 Lakhs Crop - 15 Total - 160 Lakhs Excess due to Work slip, PV and Crop compensation Split up for 2018-19 Supply & Retension-6.44 Lakhs Errection-5 Lakhs Civil-5 Lakhs Total - 16.44 Lakhs 5 BB1019 Davanagere - Chitradurga No. 2: Re-construction of 66kV S/C line on D/C towers in the existing corridor for a distance of 53.84 Kms. Davanagere NA 649.58 & 14.07.09 28.04.10 453.79 86.00 539.79 447.47 70.00 Split up for 2019-20 Supply & Retension-73 Errection-22 Lakhs Civil-10 Lakhs Crop - 15 Total - 120 Lakhs Excess due to Work slip, PV and Crop compensation Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks Split up for 2018-19 Supply & Retension-48.66 lakha Total - 48.66 Lakhs 6 BB1039 Davanagere to Harapanahalli: Construction of new 66kV SC line on DC towers for a distance of 45.40 kms. Davanagere NA 737.11 & 28.03.11 14.07.14 955.31 0.00 955.31 794.86 100.00 Supply & Retension-175.81 lakha Split up for 2019-20 Total - 175.81 Lakhs Excess due to Work slip 69.59 Lakhs and crop31.37 lakhs 7 8 BC1017 Tallak: Construction of Balance 220kV DC line from LILO Point of 220kV Hiriyur-Chitradurga to 400/220kV PGCIL Hiriyur station for a distance of 20.90 kms Chitradurga NA 7359.37 & 21.04.08 22.09.09 5082.28 1312.24 6394.52 5718.56 25.00 Rs.19.00 lakhs Surrender for FY-2018-19 Fy-2019-2020 Short close proposal of Rs.50.00 lakhs Work stoped by agency. BC1025 Pandarahalli - Holalkere: Construction of 66kV DC line in the existing corridor of 66kV S/C line with TBs for a distance of 25.34 Kms. Chitradurga NA 512.08 & 10.08.06 22.05.07 646.00 0.00 646.00 444.91 25.00 Fy-2019-2020 Short close proposal of Rs.50.00 lakhs Work stoped by agency. Rs.in Lakhs Sl. No. 9 10 Work Code BC1069 Construction of 220KV link lines: 1. Hiriyur PGCIL to Hiriyur: Construction of 220kV SC line on DC towers for a length of 15.168 Kms from existing 400/220KV PGCIL station at Beerenahalli( Hiriyur) to existing 220/66/11KV Hiriyur S/s in existing Corridor of 220KV S/C line from Hoysala Katte to 220/66/11 KV Station Hiriyur(Partly in new Corridor i.e.from PGCIL point to link 220KV S/C line from Hoysala Katte to 220/66/11 KV SRS at Hiriyur) including re-arrangement of existing 220KV lines near Beernahalli 400KV Station & dismantling of existing 220KV line Tower. BB1090 Honnalli -Lingadahalli: Stringing of 66 2nd circuit from loc 98 on Honnalli -Lingadahalli line to 66kv Lingadahalli S/s for a distance of 2.215 in the existing corridor along with formation of 4 Nos of terminal bays at 66 kV Lingadahalli S/s in Channagiri taluk,Davangere district 10 1 2 2 Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks For the FY-2018-19 Supply:-200.00 lakhs Erection:-100.00 lakhs civil:-100.52 lakhs Crop comp:-77.00 lakhs Total: 477.52 lakhs.(274.55 budget booked) 4944.26 & 24.11.16 Chitradurga 26.01.18 5548.55 534.00 6082.55 3736.76 2500.00 For the FY-2019-20. Supply:-1301.55 lakhs Erection:-200.00 lakhs civil:-350.00 lakhs Crop comp:-442.00 lakhs Total: 2293.55 lakhs. surrendered Rs.600.00 Lakhs PC Approved. Work to be taken up. 240.46 & 30.08.18 Davangere Total of Lines BA1109 Providing 12.1kV 2.9MVAR Capacitor Banks and Other allied equipments to 57 Nos of existing KPTCL Sub-station in the jurisdiction of Tumakuru Transmission Zone Tumakuru BA1115 Renovation and Up gradation of Protection systems of 220kV substations(11 Nos) & 400kV Substations(1 No) in Tumakuru Transmission Zone Tumakuru Total of TB's & Others Cost of DWA Cost of Deptly. Supplied Materials & others NA 0.00 250.00 37867.36 5402.81 43270.17 33754.09 7870.00 Rs. 290.00 lakhs required for the work of Stringing of 2nd circuit using coyote ACSR conductor on existing DC towers of 66kv line from loc 98 of Honnalli Lingadahalli proposal submitted 1430.00 & 23.09.14 07.08.15 1000.00 600.00 1600.00 754.84 500.00 Rs 200L required for payment of Rtn amount and Civil * erection. 1283.10 & 20.06.14 26.12.15 1505.46 0.00 1505.46 883.63 500.00 WS-2 submitted for approval. 2505.46 600.00 3105.46 1638.47 1000.00 Rs.in Lakhs Sl. No. 35 Work Code Name of the Work Total of Tumakuru Zone District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 90140.96 10718.66 91016.56 Cum Exp up to 31/03/19 65136.31 Budget 2019-20 31751.00 Remarks Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks HASSANA TRANSMISSION ZONE 1 2 3 CA1027 Kadavina Kote: Establishing 2x100MVA, 220/66kV Station at 220/66kV Kadavinakote sub-station in Hassan Taluk & District along with associated 220kV & 66kV lines. 220kV 16.355 Kms 66kV 36.39 Kms. Hassana CA1036 Shettihalli: Establishing 1x8MVA, 66/11kV Sub-Station at Shettihalli in Bantwal Taluk, D.K. District along with associated line for a distance of 2.34 Kms. CB1012 Jeppu: Establishing 1x20MVA, 110/33kV & 2x10MVA, 110/11kV Sub-Station Dakshina Kannada at Jeppu in Mangaluru Taluk, D.K. District along with associated line for a distance of 10.00 Kms. Hassana ES 35.66 BCR 3.91 ES 3.59 BCR 2.55 ES 2.95 BCR 1.06 Stn 5026.21 & 23.9.08 220kV Line 796.98 66kV Line 1428.32 465.60 & 17.12.09 1518.53 & 20.12.06 220kV 15.06.06 66kV 14.06.07 30.04.10 6137.07 280.72 168.76 135.79 6305.83 416.51 6201.81 278.60 300.00 LOI Supply:265.36 LOI Erection:29.46 LOI Civil:20.07 Total DWA cost:316.89 170.00 For 2019-20 Rtn: S:42.82 E:0.26 C:7.35 Subtotal:50.43 LD: S:14.71 E:5.05 C:11.30 Subtotal:31.06 Balance Work: S:20.56 E:1.35 C:27.85 Subtotal:49.76 Compensation as per DC order:37.9 Final :169.15 Shortclosed on 07.05.2016. To be tendered for balance works 29.01.08 901.68 436.15 1337.83 1007.15 450.00 Balance works estimate amount Rs. 1094.05L (60% Budget asked for next year) Rs.in Lakhs Sl. No. 4 5 Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date CB1013 Karaya: Establishing 2x10MVA, 110/11kV Sub-Station at Karaya in Belthangadi Taluk, D.K. District along with associated line for a distance of 15.00 Kms. Dakshina Kannada ES 2.367 BCR 0.60 1761.26 & 20.12.06 CB1015 Mulky: Up-grading 2x5MVA, 33/11kV substation to 1x10MVA, 110/11kV SubDakshina Kannada Station at Mulky in Mangaluru Taluk, along with associated line for a distance of 11.00 Kms. ES 13.326 BCR 4.20 937.43 & 11.12.06 07.02.08 29.01.08 Cost of DWA 1097.16 598.00 Cost of Deptly. Supplied Materials & others 476.89 143.76 Total Work Cost 1574.05 741.76 Cum Exp up to 31/03/19 1401.82 408.14 Budget 2019-20 50.00 500.00 Remarks Probable expenditure for 2018-19: Tree cut compensation - 7 L Balance works Supply - 6 L, Errection -1.5 L, Civil works Road & TB - 35 L; Total 42.5 L. Additional budget will be sought after awarding the work. Savings due to agency has not taken up TB work at Puttur and balance revetment work. Probable expenditure for 2018-19: Station civil - 10 L, Line Erection - 20L, Compensation - 20L. Probable expenditure from 18-19: Supply & Civil - 250 L 6 CB1017 Madavu: Establishing 2x20MVA, 110/3311kV & 1x10MVA, 110/11kV SubDakshina Kannada Station at Madavu in Puttur Taluk, along with associated line for a distance of 27.00 Kms. ES 9.273 BCR 1.2 2414.24 & 23.09.09 Stn:07.07.1 8 Stn:1438.13 Line:18.01.1 Line:778.91 0 219.52 333.72 1863.72 1500.00 Station(DWA): S-1055.91L E38.33L C-343.89L Switchgear: Rs.65.84Lakhs Probable expenditure for 2018-19: Tree cut compensation 150L Line(DWA):S-627.26L, E49.03L, C-102.61L. For 2019-20: RetentionRs.200.63L, Tree cut-500L Budget required for FY19-20 is: Retention-Rs.200.63L, Tree cut-500L Rs.in Lakhs Sl. No. 7 8 9 Work Code Name of the Work CB1024 Mangalore SEZ: Establishing 2x100MVA, 220/110kV and 2x20MVA, 110/11kV Station at MSEZ near Bajpe in Mangalore taluk , along with associated lines for a distance of 6.854Kms CC1016 Karkala: Up-gradation of 2x5MVA, 33/11kV Sub-station to 2x10MVA, 110/11kV Sub-station at Karkala in Karkala Taluk along with associated line for a distance of 1.10Kms CD1022 Konandur: Establishing 1x10MVA, 110/11kV Sub-Station at Konandur in Thirthahalli Taluk, along with associated line for a distance of 11.83 Kms. District Dakshina Kannada Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 0.9 Udupi ES 1.58 BCR 0.909 Shimoga ES 1.05 BCR 0.71 4375.96 & 21.10.10 1127.95 & 18.02.15 875.98 & 29.08.08 13.5.11 Cost of DWA 3726.98 Cost of Deptly. Supplied Materials & others 128.64 Total Work Cost 3855.62 Cum Exp up to 31/03/19 3852.01 Budget 2019-20 350.00 24.06.16 921.80 115.50 1037.30 1061.38 130.00 Stn:07.01.0 6 Line:07.07.1 8 631.22 396.26 1027.48 976.20 530.00 Remarks Substation commissioned on 05.03.2015 Probable Expenditure for 2018-19: Bill on Work slip 34 L Budget for 2019-20: Land compensation and treecut compensation appx - 200 Lakhs Work cost- 50 Lakhs Budget for 2019-20: (Department supplied Material Cost- 48Lakhs), Civil: 50Lakhs, LD29.5lakhs(supply-15.02, erection-2lakhs, civil12.12lakhs) Total127.5Lakhs. say 130lakhs Budget FY 2019-20 Retention Rs.43.00 Lakhs Supply Rs.12.00 Lakhs Erection Rs.20.00 Lakhs Civil Rs.45.00 Lakhs Total Rs.120.00 Lakhs Budget FY 2019-20: Retention Rs.6.00 lakhs Supply Rs.184.00 Lakhs Erection Rs.40.00 Lakhs Civil Rs.80.00 Lakhs compensation Rs.100.00 Lakhs Total Rs.410.00 Lakhs Rs.in Lakhs Sl. No. 10 Work Code CD1062 Name of the Work Mcgann Hospital; Establishing 1x10MVA,110/11KV S/S at McGann Hospital premises in Shivamogga Taluk along with associated line for a distance of 2.123Kms. District Shivamogga Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 1.51 & BCR 0.75 1655.35 & 09.03.17 Stn:15.03.1 8 Line:12.03.1 8 Cost of DWA 1540.20 Cost of Deptly. Supplied Materials & others 0.00 Total Work Cost 1540.20 Cum Exp up to 31/03/19 958.83 Budget 2019-20 600.00 Remarks Bills on hand: 1) BR No: 1285/08.03.2019 Rs.18.35 Lakhs. 2) BR No: 1284/08.03.2019 Rs.3.38 lakhs. 3) BR No: 1282/08.03.2019 Rs.25.90 Lakhs. 4) BR No: 1281/08.03.2019 Rs.3.99 Lakhs. Total Rs.51.62 Lakhs. Prbable: Rs. 8.40 Lakhs LD Rs.42.27 Lakhs. Retention Rs.4.02 Lakhs. Probable Expenditure: Rs.60.00 Lakhs (11KV switchgear) Budget for 2019-20 Supply Rs.180.00 Lakhs Erection Rs.46.00 Lakhs Civil Rs.60.00 Lakhs 11 CE1009 Chikkamagalur: Part A: Establishing 2 x 100MVA, 220/66KV Substation & 1 x 12.5 MVA 66/11 KV Sub Station at Chikkamagalur and Construction of 220KV DC line for a length of 28.55 Kms from 220KV Shimoga-Mysuru DC line to the proposed 220/66KV S/S at Chikkamagalur on PTK Basis Part B:Construction of 66KV Evacuation lines from the proposed 220KV Station at Chikkamagalur 1) Chikkamagalur to Hassana DC line: 0.6 Kms 2) Chikkamagalur MC line : .74Kms. 3) 66KV DC line from proposed 66KV MC line to Balehonnur (Mattavara Limits): 7.8 Kms Chikkamagaluru ES 71.43 BCR 3.38 5935.32 & 29.11.06 220KV S&L 27.03.08 Eva-line 14.06.0714. 06.07 3974.94 1311.80 5286.74 4465.32 150.00 FQV is being prepared & will be submitted. Budget 201920 (As per estimate) Supply Rs.120.00 Lakhs Erection Rs.20.00 Lakhs Civil Rs60.00 Lakhs Total Rs.200.00 Lakhs Rs.in Lakhs Sl. No. 12 13 14 15 Work Code CE1016 Name of the Work Yemmedoddi: Establishing 2x10MVA, 110/11kV Sub-Station at Yemmedoddi in Kadur Taluk & District, along with associated line for a dist of 8.731Kms Heggunje : Establishing 2x100 MVA, 220/110 kV , 1x10 MVA 110/11kV Sub Station at Heggunje in Udupi Taluk & District along with associated lines and TB's District Chikka-magalur Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 1.87 & BCR 0.61 1016.17 & 02.05.16 05.01.18 Cost of DWA 1104.30 Cost of Deptly. Supplied Materials & others 0.00 Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 1104.30 614.33 650.00 Remarks Bills on hand: 1) BR No: 1178/13.02.2019 Rs.4.79 Lakhs. 2) BR No: 1289/08.03.2019 Rs.24.46 Lakhs. 3) BR No: 1290/08.03.2019 Rs.15.06 Lakhs. LD Rs.11.01 Lakhs. Budget for 2019-20 Supply/ Rs.250.00 Lakhs Erection Rs73.00 Lakhs Civil Rs.92.00 Lakhs Retention Rs.135.00 Lakhs Land/Crop Rs.100.00 Lakhs Total Rs.650.00 Lakhs Budget surrendered in the year 2018-19 Rs.150 Lakhs. Udupi 8651.63 & 04.04.17 0.00 38.88 6000.00 CC1031 Belman(Nandalike): Establishing 1x10MVA, 110/11KV sub-station at Belman(Nandalike) in Karkala Taluk, along with associated line for a distance of 1.031 Kms. Udupi 878.75 & 05.02.18 0.00 0.00 650.00 LOI issued to M/s Sri Vinayaka Electricals, CA1066 Nagarthi: Establishing 1x8 MVA,66/11kV Sub-station at Nagarthi in Holenarasipura Taluk, along with Associated Line for a distance of 4.343kms Hassana 680.67 & 17.09.18 0.00 0.29 600.00 LOI issued CC1020 ES 1.67& BCR 1.5 Rs.in Lakhs Sl. No. 16 Work Code CA1055 16 1 2 3 Name of the Work Hettur: Establishing 1x8MVA, 66/11kV Sub-Station at Hettur in S.K.Pura tq & Hassana District along with associated line for a distance of 12.67kms District Hassana Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 0.05 BCR 0.3 642.98 & 01.10.14 14.08.15 Total of Sub-stations CB1049 Vittla: Replacing 1x10MVA,110/11kV & 1x10MVA, 110/12.1kV Transformer by 2x20MVA, 110/11kV Transformer at 110/11kV Vittla S/s in Bantwala Taluk . Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 738.78 156.77 895.55 655.58 93.00 23869.89 3689.84 25456.89 23784.06 12723.00 136.80 345.19 481.99 320.71 125.00 Remarks For Fy 2018-19 Tree cut compensation:20.00 Horticulture:17.00 Coffee board:15.00 cropcomp: 9.00 subtotal:61.0 MEI Rtn:3.96 On hand bills: 16.12 Rtn: S:106.12 E:22.48 C:40.01 Subtotal:168.61 Balance work bills: S:61.16 E:52.25 C:36.9 SubTotal: 150.31 Total:400.00 For FY-2019-20 LD: S:44.10 E:3.3 C:26.50 Subtotal:73.9 FQV:18.67 Total for 19-20 :92.57 Probable Exp for 2018-19: Work cost - 15 L, PV - 19L. Budget for 2019-20: Balance work cost - 125L Dakshina Kannada BCR 1.4 489.27 & 17.07.15 CA1068 Salagame: Replacement of 2 X 8 MVA, 66/11 KV power Transformer by 2 X 12.5 MVA, 66/11kV Power Transformer at Salagame S/S in Hassana Taluk Hassana BCR 2.018 275.27 & 23.03.17 0.00 0.00 200.00 2X12.5MVA, 66/11kV class power transformer is required for copletion of the work. CA1069 Shanthigrama: Replacement of 2 X 8 MVA, 66/11 KV Transformer by 2 X 12.5 MVA , 66/11kV Transformer at 66/11kV Shanthigrama sub-station in Hassana Taluk & District Hassana BCR 2.018 275.27 & 20.03.17 0.00 80.65 150.00 1X12.5MVA, 66/11kV class power transformer is required for copletion of the work. 14.09.17 Rs.in Lakhs Sl. No. 4 Work Code CA1070 Name of the Work Juttanahally: Providing Additional 1x8MVA, 66/11kV Trnasformer at 66/11kV Juttanahlly sub-station in C.R. Patna Taluk, Hassan District District Hassana Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 1.77 222.54 & 28.03.17 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 0.00 Cum Exp up to 31/03/19 24.11 Budget 2019-20 95.00 Probabl for 18-19: MEI:27.20 Transformer to be diverted For Fy 19-20 DWA:88.21 Transportation of Transformer:3.00 FQV:5.00 Total:96.21 90.00 Tr diverted from Singapura For Fy 19-20 DWA:86.01 Transportation of Transformer:3.00 FQV:5.00 Total:94.01 8MVA releeased Transformer from Singapura is alloted to Chikkabomenahally. 11kV Switchgear received at MWD stores. CA1072 Chikkabommenahally: Augmentation of 1 X 8 MVA, 66/11 KV Transformer by 1 X 12.5 MVA ,66/11kV Transformer@ 66/11kV Chikkabommenahally S/S in Arkalgud Taluk. 6 CA1073 Bychanahally: Providing additional 1x8MVA transformer @ 66/11kV sub-station Bychanahally, in Arkalagud Taluk. Hassan BCR 0.78 232.09 & 17.05.17 0.00 73.82 90.00 7 CA1074 K.Byrapura: Providing additional 1x8MVA, 66/11kV transformer at 66/11kV K.Byrapura sub-station in C. R. Patna Taluk. Hassan BCR 0.88 209.30 & 12.06.17 0.00 19.71 90.00 CA1075 Kallusadarahally :Providing additional 1x10 MVA, 110/11 kV power transformer at 110/11 kV Kallusadarahally Sub station in Arasikere Taluk. Hassan BCR 0.84 271.33 & 12.06.17 0.00 0.00 200.00 5 8 Hassana BCR 0.74 244.09 & 12.06.17 0.00 0.00 Remarks For fy-2018-19 DWA:81.94 MEI:31.86 For Fy 19-20 Pending Bills:10.00 FQV:5.00 Total:15.00 For fy-2018-19 MEI:22.22 For Fy 19-20 DWA:82.13 FQV:5.00 Tr diverted from Bagur Transportation:3.00 Total:90.13 For Fy 19-20 DWA:100.85 Trfr :126.56 MEI:32.61 Total:260.02 Rs.in Lakhs Sl. No. 9 10 Work Code Name of the Work CA1076 Arehalli :Providing additional 1x8 MVA, 66/11 kV power transformer at 66/11 kV Arehalli Sub station in Belur Taluk. CB1050 Salethur: Providing additional 1X10 MVA 110/11kV Transformer at 110/11kV Salethur sub-station in Bantwala Taluk, D.K. District. District Hassan Dakshina Kannada Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 0.47 BCR 0.8 277.26& 21.11.17 285.78 & 16.06.17 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 0.00 0.00 Cum Exp up to 31/03/19 0.00 7.66 Budget 2019-20 150.00 For fy-2018-19 Work bills to receive:10.00 For Fy 19-20 DWA:111.83 MEI:51.99 100.00 Probable expenditure for 2018-19: Supply+Civil - 25L Award Cost: Supply 62.94L, Erection - 15.64L, Civil - 20.01; Total - 98.59L. Cost of switchgear(DPR): Rs.47.65L 11 CB1051 Netlamudnur: Providing additional 1x20 MVA, 110/33 kV transformer at 220 kV Netlamadnur station, in Bantwal Taluk. Dakshina Kannada BCR 0.996 335.86 & 31.10.17 0.00 0.00 300.00 12 CB1052 Bantwala:Providing additional 1x20 MVA, 110/33 kV transformer at Dakshina Kannada BCR 0.988 110 kV Bantwal sub-station, in Bantwal Taluk . 338.10 & 23.10.17 0.00 15.57 300.00 CB1053 Gurupura: Replacement of 1x10MVA, 110/11kV transformer by 1x20MVA, 110/11kV Transformer at 110/11kV Gurupura sub-station in Mangaluru Taluk. 249.52& 30.10.17 13 Dakshina Kannada BCR 0.65 0.00 0.00 Remarks 150.00 Probable expenditure for 2018-19: Supply - 20L. Cost of LOI: Supply113.49L, Erection - 20.41L, Civil - 16.37L; Total 150.27L Cost of Power Transformer: Rs.191L 20 MVA, Transformer required Probable expenditure for 2018-19: Civil - 10L. Cost of LOI: Supply- 97.83L, Erection - 24.35L, Civil 39.50L; Total - 161.68L Cost of Power Transformer: Rs.191L 20 MVA, Transformer required Award Cost: Supply 19.15L, Erection - 13.89L, Civil - 1.72; Total - 34.76L. Transformer cost - 191L, Switchgear - 14.52L (PO) Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks 14 CC1030 Madhuvana:Providing additional 1x20 MVA, 110/11KV Transformer at 110/11KV Madhuvana Substation in Udupi Taluk and District. Udupi BCR 0.75 256.44 & 05.07.17 0.00 7.92 100.00 Cost of LOI 87.6Lakhs, Transformer cost122.17Lakhs, Switchgear Cost- 17.77Lakhs. Budget required for FY 201920, Supply-43.56Lakhs, Erection-17.17Lakhs, Civil6.86Lakhs, Dept. Switchgear - 22.75Lakhs, Total- 90.34Lakhs, Budget required is 100Lakhs. Since released Power Transformer at 110kV S/s Vitla is proposed to be diverted to Madhuvana. Savings in new Power Transformer cost. 15 CC1032 Hiriyadka: Replacement of existing 1x10MVA, 110/33KV Transformer by 20MVA, 110/33KV Transformer at 110/33/11kV Hiriadka Substation in Udupi Taluk & Dist. Udupi BCR0.79 212.13& 26.09.17 0.00 0.00 180.00 Cost of LOI 14.27Lakhs, Transformer cost160.73Lakhs, NFE cost8.3Lakhs. CD1063 Thogarsi: Providing additional 1 x 10MVA, 110/11KV Transformer at 110/11kV Thogarsi sub-station in Shikaripura Taluk, Shivamogga District Shivamogga BCR 0.55 289.70 & 11.10.17 0.00 0.00 150.00 LOI issued CD1064 Tyvarachatnalli: Replacement of existing 6.3MVA 66/11KV transformer to 12.5 MVA, 66/11kV transformer at 66/11KV Tyavarechatnahalli sub-station in Shivamogga taluk & District Shivamogga BCR 0.56 176.10 & 07.10.17 0.00 0.00 150.00 CE1040 Mudigere: Replacement of 2x6.3MVA, 66/11kV Transformers by 2x12.5MVA, 66/11kV Transformer at 66/11kV Mudigere sub-station in Mudigere Taluk. Chikkamagaluru BCR 0.74 574.31 & 01.03.18 0.00 6.06 150.00 16 17 18 LOI issued Rs.in Lakhs Sl. No. 19 20 21 22 23 24 Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Work Code Name of the Work District CE1042 Chikkamagalur: Replacing 2X12.5MVA, 66/11kV Transformer by 2X20MVA, 66/11kV transformer at 66kV Chikkamagaluru Substationin Chikkamagaluru Taluk & District. Chikkamagalur BCR 1.21 647.00& 09.03.18 CA1077 Javagal: Replacement of 1 X 10 MVA, 110/11 KV power Transformer by 1 X 20 MVA 110/11KV power transformer at 110/11KV Javagal S/S in Arasikere Taluk Hassana BCR 0.52 204.20& 08.06.18 CA1078 Ramnathapura: Augmentation of 1x6.3MVA 66/11kV power transformer by 1x12.5 MVA 66/11 KV Power Transformer at 66/11 KV Ramanathapura S/s in Arakalagud Taluk, Hassan District. BCR 2.76 207.38& 02.05.18 CA1079 Bagur: Replacement of 1 X 8 MVA, 66/11 KV Power Transformer by 1 X 12.5 MVA, 66/11 KV Power Transformer at 66/11 KV Bagur S/S in C. R. Patna Taluk Hassana BCR 0.52 166.89& 27.06.18 CA1080 Belur: Replacement of 1x6.3MVA, 66/11kV Power Transformer-2 by 1x12.5MVA, 66/11 KV Power Transformer at 66/11KV Belur S/s in Belur Taluk, Hassan District Hassan BCR 0.82 CA1081 Rameshwaranagara: Replacement of 2x8MVA, 66/11kV Power Transformer by 2x12.5MVA , 66/11KV Power Transformer at 66/11 KV Rameshwaranagara S/s in Hassan Taluk, Hassan District Hassan BCR 0.6 Hassan Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 0.00 Cum Exp up to 31/03/19 Budget 2019-20 Remarks 0.00 300.00 LOI to be issued 0.00 150.00 LOI issued 30.00 12.5MVA, 66/11kV class power transformer Comissioned on 22.12.2018. Switchgear work under progress 0.00 10.00 12.5MVA, 66/11kV class power transformer Comissioned on 20.12.2018. Switchgear work under progress 152.68& 08.06.18 0.00 150.00 work to be takenup 292.35& 08.06.18 0.00 200.00 2X12.5MVA, 66/11kV class power transformer is required for copletion of the work. 0.00 Rs.in Lakhs Sl. No. 25 26 27 28 29 30 Cost of Deptly. Supplied Materials & others District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date CA1082 Basavaghatta Replacement of 2x8MVA, 66/11kV Power Transformers by 2x12.5MVA 66/11KV Power Transformers at 66/11KV Basavaghatta S/s in Hassan Taluk, Hassan District Hassan BCR 0.63 278.63& 27.06.18 0.00 200.00 2X12.5MVA, 66/11kV class power transformer is required for copletion of the work. CA1083 Halebeedu: Replacement of1x12.5MVA, 66/11kV Power Transformer by 1x20 MVA 66/11KV Power Transformer at 66/11KV Halebeedu S/s in Belur Taluk, Hassan District Hassan BCR 0.63 229.09& 28.06.18 0.00 200.00 20 MVA, 66/11kV class power transformer is required for copletion of the work. CA1084 Singapura: Enhancement of 1x8MVA, 66/11kV Power Transformer-2 by 1x12.5MVA 66/11 kV power transformer at 66/11kV Singapura S/s in Holenarasipura Taluk, Hassan District Hassan BCR 3.34 186.75& 08.05.18 80.65 30.00 12.5 MVA, power transformer commissioned on 28.12.2018. Switchgear under progress. CA1085 Shanivarsanthe: Providing additional 1X8MVA, 66/11kV Power Transformer at 66/11kV at Shanivarasanthe Substation Somavarpet Taluk. Work Code Name of the Work Cost of DWA Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks Kodagu BCR 0.87 234.92& 01.06.18 0.00 130.00 For Fy 19-20 DWA:90.42 MEI:52.43 FQV:5.00 Transportatio:3.00 Total:150.85 Power transformer to be diverted. CC1035 Nittur: Replacement of 1x10MVA, 110/11KV Power Transformer by 1x20MVA, 110/11KV Power Transformer at 110/11kV Nittur S/s . Udupi BCR 2.321 355.16& 07.04.18 0.00 200.00 Tendered CC1036 Kundapura: Providing additional 1X10MVA, 110/11KV Power Transformer at existing 110/33/11kV Kundapura substation in Kundapura Taluk. Udupi 329.45& 07.04.18 0.00 200.00 Cost of LOI 143Lakhs, Transformer cost126.56Lakhs, Switchgear Cost- 28.68Lakhs. Rs.in Lakhs Sl. No. Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Name of the Work CC1037 Manipal: Providing additional 1X20 MVA, 110/11KV Power Transformer at 110/33/11KV Manipal Sub-station in Udupi Taluk and District. CB1057 Karaya: Creating 33KV reference by installing 1x20MVA, 110/33KV Power Transformer at 110/11k Karaya S/s in Belthangudi Taluk Dakshina Kannada BCR 1.08 323.41& 08.06.18 0.00 300.00 33 CD1066 Holaluru: Replacement of 1x 8 MVA, 66/11KV Power transformer by 1x 12.5,66/11kV power transformer at 66/11kV Holalur S/s in Shivamogga taluk . Shimoga BCR 4.21 148.84& 05.04.18 0.00 100.00 work to be takenup 34 CB1059 Puttur: Providing additional 1x20 MVA, 110/33kV Transformer at 110 Dakshina Kannada kV Puttur Sub-station in puttur District Taluk, Dakshina Kannada District. BCR 1.05 301.27 & 23.1.19 0.00 200.00 Tendered 636.86 5570.00 32 34 1 Udupi BCR 0.769 440.70& 09.03.18 0.00 Total of Augmentation CA1031 Hassana: a) Re-orientation of 220kV & 66kV lines from Hassana 220kV Station. b) Shifting of 220kV B-4 LILO line passing through Airport Land near Bhoovanahalli Cross. c) Providing 2Nos of 66kV TB's for C R Patna 66kV DC line at 220kV/66KV R/S Hassana for a distance of 66kV 7.8/220kV 17.68Kms Cost of DWA Cost of Deptly. Supplied Materials & others Work Code 31 District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 136.80 Hassana 2092.57 & 11.7.07 21.09.07 1569.93 345.19 280.25 481.99 1850.18 1176.34 400.00 800.00 Remarks Cost of LOI 222.03Lakhs, Transformer cost160.73Lakhs, NFE cost8.3Lakhs, Switchgear Cost48.24Lakhs. Probable expenditure for 2018-19: Supply - 35L. Award Cost: Supply 112.11L, Erection - 16.47L, Civil - 27.33; Total 155.91L. Transformer cost - 191L For Fy-19-20 pending work bills to receive: S:16.00 E:15.11 C:10.56 Subtotal:41.67 Rtn: S:267.18 E:10.66 C:33.84 Subtotal:311.68 LD; S:133.59 E:5.33 C:16.92 Subtotal:155.84 Land compensation:440.00 Total for Fy 19-20:949.19 Rs.in Lakhs Sl. No. 2 3 4 5 Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date CA1032 Shanthigrama: Construction of 1) 2 Nos of 220kV DC lines from 400KV PGCIL Station to LILO the existing Shimoga-Mysore 220KV DC M1& M2 lines near Melgodu limits7.14 Kms 2) 220KV DC line from Shanthigrama Station to existing B4 line near Hedanahalli limits7.76 Kms. Hassana 2266.14 & 16.08.08 CB1007 Kavoor - Kulashekar : Construction of 110kV DC line from Kavoor to Kulashekara in the Dakshina Kannada existing 33kV line corridor for a distance of 8.50 Kms CB1018 Puttur: Construction of 110-110kV MC and 110kV DC lines from loc no.28 (Kabaka Railway Crossing limits) to the 110/33/11kV Puttur S/S for a Dakshina Kannada dist of 4.5Kms & Construction of 2nos of 110kV TBs at 110/33/11kV Puttur S/S for a distance of 4.5 Kms CB1020 Kavoor-Baikampady: Strengthening of 110kV-KavoorBaikampady line converting SC line by DC line with TB at Kavoor for a distance of 3.885 Kms ES 2.4332 BCR 1.18 13.03.09 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 1050.11 72.00 1122.11 Cum Exp up to 31/03/19 767.23 Budget 2019-20 Remarks 250.00 1099.36 & 14.10.08 05.04.07 906.92 10.50 917.42 475.48 100.00 562.43 & 17.12.09 07.09.10 431.30 8.17 439.47 199.46 50.00 Shortclosed on 04.10.2017. To be tendered for balance works. Balance works estimate amount Rs. 386.55L. Additional budget will be sought after awarding the work Budget for 2019-20: Supply10 Lakhs, Erection-10 Lakhs, Civil-30 Lakhs. Probable Exp from 18-19: Pending Bills-40 Lakhs Dakshina Kannada 517.94 & 28.01.10 23.10.10 345.65 12.43 358.08 210.95 110.00 Budget required for FY 1920: Retention - 83.32L , Civil 15.00L, Others-12L Rs.in Lakhs Sl. No. 6 7 8 Work Code Name of the Work CC1029 Brahmavara-Nittur: Stringing 2nd circuit in the existing 110kV Brahmavara-Nittur line and creating 110kV TB at Brahmavara & Nittur Sub-Stations. CD1058 MRS to Lingadahalli: Construction of new 66kV SC line on DC towers for a distance of 46.039Kms in the existing corridor of 66kV DVG-2 SC line From MRS Shivamogga to Lingadahalli (Channagiri Taluk) in Shivamogga & Davanagere Districts. CE1013 Chikamagalur-Balehonur: Construction of 66kV DC line with coyote ACSR in the existing corridor of 66kV SC line from chikkamagalur to Balehonnur (43.74 Kms) District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 173.11 & 05.05.15 Udupi 823.01 & 11.09.15 Shimoga Chikka magaluru ES 19.13 BCR 9.38 517.94 & 06.07.04 14.09.17 20.03.18 13.07.06 Cost of DWA 157.32 864.20 945.96 Cost of Deptly. Supplied Materials & others 12.32 0.00 0.00 Total Work Cost 169.64 864.20 945.96 Cum Exp up to 31/03/19 108.02 236.56 1068.04 Budget 2019-20 50.00 Remarks Budget required for FY 1920: Supply : 10.1Lakhs, Supply ret : 27.9Lakhs, Erection: 4.5Lakhs, Erection Retn: 0.4Lakhs, Civil: 2.3Lakhs, Civil Retn: 0.7 Lakhs, LD: 0.10Lakhs Total46Lakhs. Budget required 50Lakhs. 450.00 Bills on hand:1) BR No: 1245/02.03.2019 Rs.4.05 Lakhs. 2) BR No: 1248/05.03.2019 Rs.13.11 lakhs. Total Rs.17.16 Lakhs. Budget for 2019-20 Retention Rs.50.00 lakhs Supply Rs.250.00 Lakhs Erection Rs.50.00 Lakhs Civil Rs.100.00 Lakhs Total Rs.450.00 Lakhs 800.00 Bills on hand: 1. BR No: 950/09.01.2019 Rs.68.59 Lakhs 2. BR No: 1229/22.02.2019 Rs.67.73 Lakhs 3. BR No: 1230/22.02.2019 Rs.16.69 lakhs. 4.BR No: 1273/08.03.2019 Rs.83.42 Lakhs. 5. BR No: 1272/08.03.2019 Rs.3.95 Lakhs. 6. BR No: 1271/08.03.2019 Rs.14.51 Lakhs. 7. BR No: 1270/08.03.2019 Rs.17.11 Lakhs. Total Rs.272.00 Lakhs. Budget for 2019-20 Supply & Erection Rs.296.00 Lakhs Civil Rs.180.00 Lakhs Retention Rs.324.00 Lakhs Total Rs.800.00 Lakhs Rs.in Lakhs Sl. No. Work Code 9 CB1056 Name of the Work Baikampady: Providing 110KV,20MVAR Capacitor Bank Dakshina Kannada along with associated TB at existing 110/33/11KV Baikampady S/s 9 Total of Lines 1 Renovation and upgradation of protection system of 220kV Substations (10Nos) & 400kV SubStation (1No) in Hassana Transmission Zone CA1059 District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others 85.30& 04.11.17 6271.39 1257.03 & 20.06.14 Hassana 395.67 Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 0.00 0.00 90.00 6667.06 4242.08 2700.00 Remarks Tendered Budget required for the FY19-20: 26.12.15 1449.82 0.00 1449.82 822.76 200.00 Hsn Circle: 79.46 Mng Circle: 138 1 Total of TB's & Others 1449.82 0.00 1449.82 822.76 200.00 60 Total of Hassana Zone 31727.90 4430.70 34055.76 29485.76 21193.00 MYSURU TRANSMISSION ZONE 1 DA1117 Chandravadi (Nallitalapura):Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 1.290Kms 2 DB1089 220kV Shivanasamudra: Establishing 2x100MVA, 220/66kV Station with assosiated lines 3 DD1041 66kv Badanakuppe Industrial area : Establishing 2 X 31.5 MVA, 66/11kV Station with MCMV with 220kv at top x arm provision & 66kv at bottom assosiated d/c lines Chamarajanagar ES 2.06 & BCR 0.51 3408.19 & 11.01.17 11.01.18 3069.48 302.00 3371.48 1834.36 800.00 Awaiting for 1* 31.5 MVA Transformer 4 DD1046 Jannur: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 8.63Kms Chamarajanagar ES 1.13 BCR 1.11 700.9 & 23.10.17 20.03.18 709.66 110.00 819.66 406.09 400.00 Awating for 8MVA power Transformer & Switch gear & Amount required for payment of Non DWA items after approval of FQV Mysuru ES 1.16 & BCR 1.54 523.98 & 06.03.17 24.03.18 504.00 100.00 604.00 264.80 280.00 Amount required for regular payment Mandya ES 48.94 & BCR 3.45 9252.27 & 03.06.17 15.03.18 9653.72 520.00 10173.72 8852.77 2000.00 Amount required for payment of FQV bills Rs.in Lakhs Sl. No. Work Code 5 DD1045 220kV Begur: Establishing 2X100MVA, 220/66kV Station with assosiated lines 6 DB1102 7 Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Chamarajanagar ES 30.680 & BCR 1.72 12499.11& 27.02.2018 Hariyaldamma Temple Establishing 1 x 8MVA, 66/11 KV Sub-Station with associated line for a distance of 8.591Kms Mandya ES 1.973 & BCR 1.52 815.94 & 05.07.17 DB1099 Kadukothanahalli Establishing 1x 8MVA, 66/11 KV Sub-Station with associated line for a distance of 0.08Kms Mandya ES 1.473 & BCR 1.86 526.11 & 06.10.17 8 DA1126 Vyasarajapura Establishing 1x8 MVA 66/11kV Sub-Station with associated line for a distance of 3.498Kms Mysuru ES 1.883 & BCR 2.03 9 DA1136 Gargeshwari: Establishing 1x8MVA, 66/11kV Sub-station with associated line for a distance of 0.543Kms Mysuru 10 DA1112 Kaggere (Hampapura) Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 1.0Kms Mysuru 11 11 DA1124 Mandakalli(Koppaluru): Establishing 1x8 MVA, 66/11 KV Sub-station at Mandakalli(Koppaluru) and construction of 66kV LILO line from existing 66kV Kadakola-Mysore SC line to proposed 66/11kV substation at Mandakalli (Koppaluru) for a distance of 2.261Kms Total of Sub-stations Mysuru Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 0.00 0.00 4000.00 Remarks 767.05 118.00 885.05 420.02 300.00 Awaiting for transformer and switchgear 4.7.18 507.56 47.00 554.56 268.07 250.00 Physically & Financially will be Closed 593.80 & 06.01.18 5.11.18 575.68 120.00 695.68 0.00 600.00 Work Under Progress ES 0.96 & BCR 1.008 780.89 & 23.02.18 14.1.19 737.51 60.00 797.51 0.00 600.00 Work under progress. ES 0.841 & BCR 1.19 528.36 & 15.05.17 0.00 0.00 450.00 DPR Approved vide NO.B19/69664/17-18 Dtd:15.05.2017. LOI to be Issued. Koppalur (Srinagar): Establishing 1x12.5MVA, 66/11kV Sub-Station with associated line deleted instead added mandakallikoppaluru ES 1.187 & BCR 0.96 885.21& 09.03.18 18.01.19 847.82 70.00 917.82 0.00 850.00 17372.48 1447.00 18819.48 12046.11 10530.00 Rs.in Lakhs Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 13.05.16 13.72 231.00 244.72 97.66 145.00 Awaiting for 2nd 12.5 MVA Power Transformer which is to be supplied by KPTCL . 156.76 & 12.05.14 09.03.18 196.97 115.00 311.97 107.53 26.00 Awaiting for 11kV Switchgear to be supplied by KPTCL 270.57 & 12.11.14 09.03.18 20.96 250.00 270.96 110.09 150.00 Awaiting for 2nd 12.5 MVA Transformer 348.82 & 19.11.14 29.06.17 33.22 318.22 351.44 155.33 190.00 Awaiting for 2nd 20 MVA Transformer BCR 0.93 390.20 & 20.11.14 25.02.17 38.60 330.72 369.32 313.67 35.00 Awaiting for 2 Nos. of 11kV MCVCB Breaker from MEI to be supplied by KPTCL. Mandya ES NA BCR 2.11 131.00 & 25.10.10 04.03.14 50.93 80.00 130.93 56.75 15.00 Physically Closed Mandya ES NA BCR 0.97 288.31 & 05.05.15 02.07.16 62.00 270.00 332.00 186.07 100.00 Awaiting for switchgear Koppa: Replacing 2x8MVA, 66/11kV by 2x12.5MVA, 66/11kV Transformers Mandya ES NA BCR 0.67 298.36 & 21.11.13 02.07.16 62.00 248.00 310.00 119.11 130.00 Awaiting for 2nd Transformer DB1085 Jakkanhalli: Replacing 1x6.3MVA, by 1x12.5MVA, 66/11kV Transformer Mandya ES NA BCR 0.78 176.36 & 24.07.14 29.06.17 46.19 132.89 179.08 20.36 130.00 Awaiting for Transformer DB1092 Basaralu : Replacement of 1 X 6.3 MVA by 1 X 12.5 MVA 66/11kV Transformer. Mandya BCR 0.81 203.87 & 16.10.15 30.06.17 59.16 132.47 191.63 24.60 145.00 Awaiting for Transformer Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 1 DA1076 Suttur : Replacing 2x8MVA, 66/11kV by 2x12.5MVA, 66/11kV Transformers Mysuru ES NA BCR 0.71 279.99 & 23.12.13 2 DA1089 Megalapura : Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Mysuru BCR 0.70 3 DA1093 Santhesargur: Replacing 2x6.3MVA, 66/11kV by 2x12.5MVA, 66/11kV Transformers Mysuru BCR 1.112 4 DA1095 H.D.Kote: Replacing 2x12.5MVA, 66/11kV by 2x20MVA, 66/11kV Transformers Mysuru BCR 1.04 5 DA1096 Hunsur: Replacing 2x12.5MVA, 66/11kV by 2x20MVA, 66/11kV Transformers Mysuru 6 DB1039 7 DB1080 8 DB1083 9 10 Tubinakere 220kV R/S: Providing Spare 1x12.5MVA, 66/11kV Transformer Kolkaranadoddi: Providing Additional 1X8 MVA,and replacement 8MVA by 12.5MVA 66/11kV Transformer. Cum Exp up to 31/03/19 Budget 2019-20 Remarks Rs.in Lakhs Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 30.06.17 94.36 160.46 254.82 62.77 145.00 Awaiting for Transformer 136.76 & 15.08.15 09.05.17 13.66 113.07 126.73 0.00 127.00 Awaiting for 12.5 MVA 66/33 KV Transformer BCR 0.72 168.61 & 18.02.15 30.06.17 60.69 117.83 178.52 28.49 150.00 11kV Power Transformer / Switchgear to be supplied by KPTCL Mysuru BCR 0.65 426.97 & 20.06.14 14.09.18 90.92 320.00 410.92 12.57 200.00 Work Under Progress Hullahalli : Replacement of 2 X 8 MVA by 2 X 12.5 MVA, 66/11kV Transformer. Mysuru BCR 1.11 285.16 & 05.05.15 210.00 210.00 112.28 125.00 Awaiting for 2nd 1x12.5 MVA Power Transformer & 11kV Switchgear to be supplied by KPTCL. DA1127 Dattagalli: Replacing 1x5 MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Mysuru BCR 0.76 168.51 & 23.05.17 0.00 0.00 145.00 Tender Evaluation under process DB1068 Hadli : Providing additional 1x12.5MVA, 66/11kV Transformer Mandya ES NA BCR 1.11 248.71 & 23.12.13 251.70 27.71 160.00 Awaiting for transformer and switchgear DB1078 Addihalli: Replacing 1X6.3MVA & 1X8MVA, 66/11kV Trs. by 2x12.5MVA, 66/11kV Trs. at Addihalli along with stringing of 2nd ckt 66kV line b/w 220kV K.R.Pet-Santhebachally and linking by 66kV SC line to Addihally Sub-station with construction of 2Nos of 66kV TBs at Santhebachahalli, One TB at Addihalli Sub-station and One TB at 220kV K.R.Pet station Mandya 0.00 0.00 100.00 District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Yethambadi : Providing additional 1 X 12.5 MVA, 66/11 KV Power Transformer. Mandya BCR 1.84 235.30 & 19.12.15 DC1010 Kushalanagara : 1 X 8 by 1 X 12.5 MVA, 66/33/11 KV Kodagu BCR 0.96 13 DD1038 Begur MUSS: Replacing 1x6.3MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Chamarajanagara 14 DA1090 T.N.Pura : Repl 2X12.5MVA by 2X20 MVA 66/11kV Transformer 15 DA1110 16 17 Sl. No. Work Code 11 DB1096 12 18 Name of the Work 1216.71 / 13.06.16 28.08.18 91.70 160.00 Cum Exp up to 31/03/19 Budget 2019-20 Remarks Rs.in Lakhs Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 28.08.18 26.46 135.00 161.46 0.00 150.00 Awaiting for transformer and switchgear 28.08.18 35.12 150.00 185.12 0.00 150.00 Awaiting for transformer and switchgear 0.00 0.00 150.00 Awaiting for transformer and switchgear 246.13 0.00 160.00 Awaiting for transformer and switchgear 0.00 0.00 150.00 160.00 244.71 22.80 150.00 Awaiting for transformer and switchgear 160.00 245.70 39.43 150.00 Awaiting for transformer and switchgear 168.14 / 20.03.17 0.00 0.00 150.00 LOI Issued BCR 0.51 144.89 & 20.03.17 0.00 0.00 150.00 LOI Issued Chamarajanagara BCR 0.69 290.17 & 16.03.15 Kunthur: Providing additional 1x8MVA, 66/11kV Power Tr. Chamarajanagara BCR 0.56 235.25& 26.09.17 Bandalli: Providing additional 1x8MVA, 66/11kV Power Tr. Chamarajanagara BCR 0.49 265.14& 11.10.17 Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 0.87 158.85 & 14.09.15 BCR 0.99 178.62 & 19.09.15 BCR 1.06 166.97 & 10.09.15 BCR 0.40 257.18 & 03.10.17 Sl. No. Work Code 19 DB1093 Guddenahalli : Replacement of 1 X 6.3 MVA by 1 X 12.5 MVA 66/11kV Transformer. Mandya 20 DB1094 Akkihebbal : Replacement of 2 nd 8 by 12.5 MVA, 66/11kV Transformer. Mandya 21 DB1095 Gamanahalli : Replacement of 1 X 8 MVA by 12.5 MVA, 66/11kV Transformer. Mandya 22 DB1104 Mandagere : Providing additional 1 X 12.5 MVA, 66/11 KV Power Transformer. Mandya 23 DB1107 Chinakurali : Replacement of 1 X 8 MVA, 66/11 KV Power Transformer by 1 X 12.5 MVA, 66/11 KV. Mandya BCR 0.56 156.19& 21.11.17 24 DB1108 Kadaballi : Providing additional 1 X 12.5 MVA, 66/11 KV Power Transformer. Mandya BCR 0.86 254.93& 26.09.17 28.08.18 84.71 25 DB1109 Adichunchangiri: Additional 1X12.5MVA 66/11kV Power Transformer Mandya BCR 0.40 257.06& 03.10.17 28.08.18 85.70 26 DC1013 Ponnampet: Replacing 1 X 8MVA, 66/11kV by 1x12.5MVA, 66/11kV transformers Kodagu BCR 0.43 27 DC1014 Ponnampet : 1 X8 by 1 X 12.5, 66/33/11 KV Kodagu 28 DD1039 Chandakavadi : Replacing 2X8 MVA,66/11 KV transformers by 2X12.5 MVA transformers . 29 DD1051 30 DD1052 Name of the Work District 28.08.18 05.11.18 17.09.18 86.13 160.00 Cum Exp up to 31/03/19 Budget 2019-20 Remarks 33.15 245.00 278.15 0.00 150.00 Work Under Progress 86.33 0.00 86.33 0.52 80.00 Work Under Progress 114.46 0.00 114.46 33.94 100.00 Work Under Progress Rs.in Lakhs Sl. No. Work Code 31 DA1129 DA1133 32 32 Cost of Deptly. Supplied Materials & others District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Hosur Gate : Providing additional 1x8MVA, 66/11 KV Power Transformer at Hosur Gate S/s at Hunsur Taluk & Mysuru Dist. Mysuru BCR 0.57 230.75 27.03.18 0.00 0.00 100.00 LOI to be issued Gavadagere: Providing additional 1x8MVA, 66/11kV Power Transformer at Gavadagere substation Hunsur Taluk Mysuru District. Mysuru BCR 0.57 230.26 16.04.18 0.00 0.00 100.00 LOI to be issued Name of the Work Total of Augmentation Cost of DWA Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 1487.14 4199.66 5686.80 1531.68 4108.00 Remarks DA1028 Kadakola - Vajamangala: Construction of 220kV D/C line from Kadakola to Vajamangala with TB's for a distance of 19.64Kms Mysuru ES 6.08 BCR 1.40 1217.40 & 24.08.09 12.03.10 964.67 88.00 1052.67 446.05 100.00 tender to be called for remaining pending works DC1005 Virajpet - Madekeri: Construction of 66kV SC Link line on DC towers between 66kV Virajpet & Madekeri Sub-Stations for a distance of 36.16kms. Kodagu ES 17.49 BCR 7.15 687.13 & 25.05.10 02.02.11 655.71 186.66 842.37 262.48 50.00 Short closure of this work is approved in CPC, tendering is under process for balance work. DB1087 Kiragavalu LILO: Converstion of 66kV S/C Line on SC Tower to 66kV LILO line on DC Towers from the existing 66kV SFCVajamangala DC line. Mandya 132.38 & 01.10.14 26.06.18 187.51 187.51 65.39 60.00 3 Total of Lines 2082.55 773.92 210.00 1 DA1101 Renovation and upgradation of protection system of 220kV Substations (8 Nos) ) in Mysuru Transmission Zone 828.72 711.93 275.00 1 2 3 1807.89 Mysuru 965.39 & 10.05.13 26.12.15 274.66 828.72 1 Total of TB's & Others 828.72 0.00 828.72 711.93 275.00 47 Total of Mysuru Zone 21496.23 5921.32 27417.55 15063.64 15123.00 BAGALKOTE TRANSMISSION ZONE Rs.in Lakhs Sl. No. 1 2 Work Code EE1066 EE1117 Name of the Work Aratagal(Kitadal): Establishing 2x10MVA, 110/11kV Sub-Station with associated line & TB for a distance of 8.574Kms Koganolli Up-gradiation 33/11kV S/s to 2x10MVA, 110/11kV Sub-Station with associated line for a distance of 17.192Kms District Belagum Belgaum Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 10.522 BCR 5.25 ES 3.644 BCR 1.72 908.81 & 17.06.15 1182.71 & 23.09.15 08.06.17 06.01.18 Cost of DWA 922.44 1376.54 Cost of Deptly. Supplied Materials & others 80.00 84.00 Total Work Cost 1002.44 1460.54 Cum Exp up to 31/03/19 942.84 694.11 Budget 2019-20 236.00 780.00 Remarks Budget required for the Remaining Year 18-19 Supply( 1X10 MVA Power Trf approx Cost - Rs 125 Lacs), Mandatory Spares- Rs 134.96 Lacs Ret - Rs 22.89 Lacs ,Civil- Rs 72.26 Lacs Erection- Rs 14.05 Lacs SWG Cost- 5.1Rs Lacs,CCRs20.00 Lacs Total - Rs 289.26 Lacs Excess due to Due to QV ( Approx)- Rs 20.00 Lacs CC ( approx) - Rs 20.00 Lacs Budget under Utilized for the Year 18-19 Delay in supply of 1X10 MVA IInd Trf Budget of the Year 19-20 QV- Rs 20.00 Lacs Budget required for the Remaining Year 18-19 Supply ( 2X10 MVA Trf, 110 KVBreaker, Control Cable,Line Conductor and Insulators ) - Rs 209 .54 Lacs Civil- Rs 141.00 Lacs Erection- Rs 26.5 Lacs SWG Ret- Rs 3.44 Lacs CC- Rs 08.00 Lacs Ret ( for Trf ) - Rs 75.51 Lacs Total- Rs 463.99 Lacs For the Year 19-20 Supply -Rs 256.00 Lacs Civil- Rs 133.78 Lacs Erection- Rs 33.81 Lacs CC- Rs 25.00 Lacs QV- Rs 20.00 Lacs Total- Rs 468.59 Say- Rs 469.00 Lacs Excess due to Due to QV- ( approx )- Rs 20.00 Lacs, CC ( Approx) - Rs 40.00 Lacs CC is more due to highly irrigated Land Rs.in Lakhs Sl. No. 3 4 5 Work Code EE1121 EG1029 EE1064 Name of the Work G.Hosakoti: Establishing 2x10MVA, 110/11kV Sub-Station with associated line. Inchageri: Establishing 1x10MVA, 110/11kV Sub-Station with associated line & TB for a distance of 19.759 Kms Shiraguppi: Up-gradation of 33kV MUSS to 1x10MVA, 110/11kV Sub-Station with associated line for a distance of 16.7 kms & TB. District Belgaum Bijapur Belgaum Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 3.478 & BCR 2.13 ES 0.57 BCR 0.6 ES 5.665 & BCR 2.37 948.89 & 28.03.17 958.08 & 05.11.15 1075.44 & 24.09.16 15.02.18 06.02.18 27.10.18 Cost of DWA 943.11 1188.60 1228.95 Cost of Deptly. Supplied Materials & others 0.00 4.00 41.67 Total Work Cost 943.11 1192.60 1270.62 Cum Exp up to 31/03/19 381.29 771.77 35.54 Budget 2019-20 Remarks 600.00 For the Year 18-19 Supply ( 1X10 MVA Trf, 110 KV CB, Isolators,33/11 Station structure, Aux Trf , battery Set and Charger , Control Cable, Yard Lightining Fixture, furnitures, T & P , 220 KV Towers, Conductor and Earthwire )Rs 151.01 Lacs Ret - Rs 13.18 Lacs,Civil- Rs 71.3 Lacs Erection- Rs 25.87 Lacs SWG- Rs 42.00 Lacs (divereted from 110 KV S/S Islamapur to be booked for this project ) Total - Rs 303.36 Lacs For the Year 19-20 Ret -Supply- Rs 182.77 Lacs Civil- Rs 197.49 Lacs Erection- Rs 05.31 Lacs CC- Rs 20.00 Lacs QV- Rs 55.00 Lacs Total - Rs 460.57 Lacs Say Rs 461.00 Lacs 450.00 FY 2018-19: Sup: 186.00 Erc: 17.01 Civil: 81.00 Total: 284.01 FY 2019-20: Budget required of Rs. 230.23 1300.00 Budget required For the Year 18-19 Supply ( Line Towers/Station Structure /Earthmat Work) - Rs 200.00 Lacs For the Year 19-20 Remaining DWA Cost- Rs Supply+ Erection+ Civil- Rs 1028.95 Lacs SWG- Rs 41.67 Lacs QV- Rs 10.00 Lacs Total- Rs 1080.62 Lacs say Rs 1081 Lacs Excess due to QV (approx ) is Rs 10.00 Lacs Rs.in Lakhs Sl. No. 6 7 8 Work Code EG1056 EG1057 EC1021 8 1 Name of the Work Ukkali : Establishing 1x10MVA, 110/11KV S/s at Ukkali & Contruction of 110KV LILO Line from 110KV B Bagewadi-Vijayapura SC line for a distance of 7.165 in B Bagewadi taluk. District Vijayapur Ronihal: Establishing 2x10MVA 110/11KV S/s at Ronihal and Construction of 110KV LILO line from B Bagewadi Mamadapura SC line to proposed 110KV s/s at Ronihal for a distance of 5.897Kms in Vijayapura Dist. Bijapur Singatalur : Up-gradiation of existing 33/11kV MUSS to 110/11kV Sub-Station with associated line. Gadag Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 40.5 2.63 904.02 07.04.18 Ambevadi: Replacing 2x55MVA, 220/110kV by 2x100MVA, 220/110kV Transformer with R&M works. North Canara 10.01.19 Budget 2019-20 Remarks 942.51 50.00 992.51 0.00 800.00 FY 2018-19: Budget required for Sup: 25.00 1097.31& 16.4.18 10.01.19 3.879MU/ 2.35 1046.60& 09.03.18 23.01.19 1682.70 & 17.02.11 Cum Exp up to 31/03/19 FY 2019-20: Budget required of Rs: 800.00 7.55 4.10 BCR 1.30 Total Work Cost FY 2018-19: Budget required for Sup: 25.00 1122.52 100.00 1222.52 0.00 1000.00 FY 2019-20: Budget required of Rs: 800.00 Total of Sub-stations ED1007 Cost of DWA Cost of Deptly. Supplied Materials & others 12.09.11 1027.85 0.00 1027.85 0.00 800.00 8752.52 359.67 9112.19 2825.55 5966.00 722.32 744.04 1466.36 847.64 1.00 Rs.in Lakhs Sl. No. Work Code Name of the Work 2 EE1120 Kittur: Swapping of 1x20MVA, 110/33KV & 1x10MVA, 110/11KV Power Transformers at 110KV Sub-Station Kittur with additional 11KV switch gear 3 EA1023 Hangal: Providing additional 1X10MVA, 110/11kV Power Transformer at 110kV S/s Hangal 4 EB1023 5 EC1015 District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Belgaum Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 95.50 & 27.09.14 22.02.18 60.05 49.32 109.37 67.23 43.00 22.03.18 83.72 0.00 83.72 60.18 65.00 203.55 203.55 203.35 266.00 23.87 79.87 62.81 22.00 Haveri BCR 1.74 199.5 & 10.07.15 Navanagar: Replacement of exisiting 1x10MVA by 1x20 MVA , 110/11 KV Transformer Dharwad BCR 1.06 227.96 & 11.02.14 Naregal: Providing spare 1x10MVA, 110/3311kV Transformer Gadag BCR 1.084 181.41 & 07.12.13 22.03.18 56.00 Remarks For the Remaining Year 1819 SWG- Rs 06.79 Lacs Supply- Rs 2.00 Lacs Erection - Rs 5.00 Lacs Civil- Rs -5.00 Lacs Total - Rs 18.79 Lacs For the Year 19-20 ( Subject to allotment of 20 MVa Trf ) Supply ( Balance Cable, Conductor and Hardware )Rs 3.55 Lacs,Erection Rs 10.01 Lacs Civil- Rs 06.45 Lacs QV- Rs 3.00 Lacs Ret- Rs 8.03Lacs , Total - Rs 31.04 Lacs Rs.in Lakhs Sl. No. 6 7 8 Work Code EE1100 Name of the Work 110KV S/S Nagaramunnoli/Kabbur Replacement of 1x10MVA, 110/11kV by 1x20MVA, 110/11kV Transformer EE1122 110 kV S/S Sulthanpur : Replacement of 1x10 MVA, 110/11 kV transformer by 1x20 MVA, 110/11 kV transformer at 110 kV Sulthanpur sub-station, in Raibag Taluk, Belagavi District EE1125 110 kV S/S Satti : Providing additional 1x10 MVA, 110/11 kV transformer at 110 kV Satti substation, in Athani Taluk, Belagavi District District Belagum Belagavi Belgaum Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 0.67 BCR 0.46 BCR 0.44 247.71 & 02.12.14 283.46 & 28.06.17 289.84& 09.06.17 02.01.18 22.03.18 Cost of DWA 42.50 43.72 Cost of Deptly. Supplied Materials & others 0.00 49.40 Total Work Cost 42.50 93.12 0.00 Cum Exp up to 31/03/19 0.00 59.88 0.00 Budget 2019-20 290.00 230.00 154.00 Remarks For theYear 18-19 ( supply of Mounting Structure, Control Cable ) 15.00 lakh For theYear 1920 Remaining Cost of the Tender -27.18 Lacs Cost of new 20 MVA- Rs 160.00 Lacs SWG- Cost- Rs 42.00 Lacs QV- Rs 3.00 Lacs Say - Rs 232.00 Lacs Additional Budget Required for theYear 18-19 Supply- Rs 11.89 Lacs Erection-6.10 Lacs Civil - Rs 5.99 Lacs SWG Cost- Rs 4.78 Lacs Total - Rs 28.76 Lacs Says - Rs 29.00 Lacs For theYear 19-20 Erection+ Dec - Rs 05.10 Lacs New 1X20 MVA Trf- Rs 200 Lacs Total - Rs 205.10Lacs Says - Rs 205.00 Lacs Excess due to Due to Cost of New 1X20 Trf ( approx )- Rs 200.00 Lacs For theYear 18-19 Token Budget - Rs 10.00 Lacs For theYear 19-20 Budget of 150lakh sought exculding cost of the transformer. Rs.in Lakhs Sl. No. 9 10 Work Code EE1126 EG1043 10 1 Name of the Work 110 kV S/S Itnal : Replacement of 1x10 MVA, 110/11 kV transformer by 1x20 MVA, 110/11 kV transformer at 110 kV Itnal substation, in Raibag Taluk, Belagavi District 220KV Station, Indi: Providing Additional 1x10MVA, 110/11kV transformer District Belgaum Bijapur Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 0.46 BCR 1.36 281.98& 20.06.17 255.13 & 19.06.15 02.01.19 EF1029 23.00 03.11.18 120.13 Bagalkote 0 23.00 Cum Exp up to 31/03/19 0.00 Budget 2019-20 Remarks 281.00 For theYear 18-19 Tender Cost ( approx )- Rs 10.00 Lacs ( supply of Mounting Structure, Control Cable ) For theYear 19-20 Remaining Cost of the Tender -33.00 Lacs Cost of new 20 MVA- Rs 200.00 Lacs SWG- Cost- Rs 42.00 Lacs QV- Rs 3.00 Lacs Total- Rs 278.00 Lacs Say - Rs 278.00 Lacs 53.24 173.37 56.02 117.00 FY 2019-20 Supply: 120.00 Ere: 15.00 Civil: 15.00 Total: 150.00 1151.44 758.25 & 04.12.10 Total Work Cost FY 2018-19: Supply: 80..00 Civil: 10.00 Ere: 10.00 Total: 100.00 Total of Augmentation Guledgud - Ilkal: Construction of 110kV S.C. link line on D/C towers from 110kV SubStation Guledgudda to 110kV SubStation Ilkal for a distance of 34.575 Kms. Cost of DWA Cost of Deptly. Supplied Materials & others 30.08.11 619.68 1123.42 0.00 2274.86 619.68 1357.11 159.28 1469.00 460.00 FY 2019-20: Supply: 300.00 Ere: 80.00 Civil: 79.35 Total: 459.35 Rs.in Lakhs Sl. No. 2 3 4 5 Work Code EF1050 EG1047 EE1113 EG1055 Name of the Work Mahalingpur to Jamkhandi: construction of 110 kV DC line from 220 kV Mahalingapur S/S to 110 kV Jamakhandi S/S in the existing 110 kV SC line corridor along with 110 kV Terminal bays at both ends for a distance of 23.897 kms. Kudagi to Vajaramatti: Construction of 220kV DC Line from proposed Kudagi 400kV STPP to 220kV Sub-station Vajramatti for a distance of 79.42Kms Nehru nagar-6 Pole Struture: conversion of 110 kV Nehrunagar-6 pole structure SC line constructed on 110 kV SC towers(MS towers)to 110 kV SC line on DC towers for a distance of 2.3 kms Shifting and Re-routing of 110 kV line from Loc 125-145 of BagalkotB.Bagewadi DC line in TLM section B.Bagewadi jurisdiction in Vijayapura District District Bagalkote Bijapur Belagum Vijayapur Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 917.86 & 19.04.14 5002.81 & 08.01.15 82.19 & 15.05.14 583.23 & 10.11.17 03.02.17 Cost of DWA 1089.71 Cost of Deptly. Supplied Materials & others 40.00 Total Work Cost 1129.71 Cum Exp up to 31/03/19 671.53 Budget 2019-20 200.00 Remarks FY 2018-19: Supply: 145.05 Ere: 65.00 Civil: 35.49 Ret: 198.90 CC: 36.61 Total: 481.05 F`Y 2019-20: Supply: 145.05 Ere: 65.00 Civil: 35.49 Ret: 198.90 CC: 36.61 Forest: 200.00 Total: 681.05 (Forest clearance awaited. If clearance obtained work will be executed in forest area as there is no ROW issues if not, Budget will be spill over to FY19-20) FY 2018-19: Erec: 58.00 Civil: 70.00 Ret: 120.52 CC: 60.00 Total: 308.52 26.11.15 5782.67 606.00 6388.67 3835.47 2500.00 FY 2019-20 Erec: 200.00 Civil: 150.00 Ret: 1786.00 CC: 375.43 Rs: 2511.43 0.00 0.00 140.00 0.00 0.00 700.00 For theYear 18-19 Token Budget of Rs 10.00 Lacs For the Year 19-20 Token Budget of Rs 10.00 Lacs DPR cost requested for 201920. Rs.in Lakhs Sl. No. 6 Work Code Name of the Work District EF1013 a) B.Bagewadi - Bagalkote (46KM) b) Mahalingapur - Mudhol-Vajramati - Katarki (110kV SC line 67Km): Re-conductoring of existing wolf ACSR by LYNX ACSR conductor for a distance of 113.00 Kms. Bagalkote 6 Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 1341.96 & 19.05.08 24.02.07 Total of Lines Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 1957.59 0.00 1957.59 1112.80 1.00 9449.65 646.00 10095.65 5779.08 4001.00 Cum Exp up to 31/03/19 Budget 2019-20 1 EF1058 Providing 12.1kV 2.9MVAR Capacitor Bank and other allied equipment’s in KPTCL Sub-stations of Bagalkote Zone. Bagalkote 1612.78 & 27.08.14 07.08.15 1116.65 667.18 1783.83 990.95 100.00 2 EF1065 Renovation and up-gradation of protection systems of 220KV Sub Stations(22 Nos) in Bagalkot Transmission Zone Bagalkote 1481.29 & 20.06.14 26.12.15 1818.29 0.00 1818.29 1111.65 940.00 2 Total of TB's & Others 2934.94 667.18 3602.12 2102.60 1040.00 26 Total of Bagalkote Zone 22288.55 2796.27 25084.82 12064.34 12476.00 Remarks Proposed for short close and it is under process. KALABURAGI TRANSMISSION ZONE Probable Expenditure for 2018-19 SupplyRs.150.00Lakhs 1 FA1013 Raichur town: Establishing of 110kV Ring Mains & associated 110kV Sub-Stations viz Malayabad and Vadavatti with 1x10MVA, 110/11kV Trs for a distance of 37.00 Kms. Raichur NA 1883.00 & 30.06.06 14.02.07 2297.11 282.00 2579.11 2543.66 250.00 Budget required for the year 19-20 Supply: 150.00 Lakhs Erection: 10.00 Lakhs Civil: 60.00 Lakhs PV: 20.00 Lakhs RTN: 10.0 Lakhs Total:250.0 Lakhs Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks Probable Exp. upto 31.03.2019 Supply: 36.81 Lakhs Erection: 10.0 Lakhs Civil: 40.0 Lakhs Total: 86.81 Lakhs 2 3 4 FA1049 Adavi Amareshwara: Establishing 1x10MVA, 110/11kV Sub-Station with associated line FB1035 Kudligi: Establishing 2x100MVA, 220/66/11kV & 1x12.5MVA, 66/11kV Station at Kudligi (Badeladaku) along with associated lines & TB's for a distance of (220kV 32.63Kms & 66kV M/C 5.36Kms) Bellary ES 36.23 BCR 2.94 4967.70 & 21.09.11 20.11.12 4565.69 38.00 4603.69 2756.65 1800.00 FC1048 Chowdapura: Up-gradation of 33/11kV MUSS to 1x10MVA, 110/11kV and 1x20MVA, 110/33kV Sub-Station with associated line for a distance of 20.30 Kms. Kalaburagi ES 6.46 BCR 1.79 1284.94 & 27.05.11 29.11.11 912.79 36.20 948.99 748.62 378.00 Raichur ES 1.447 BCR 1.22 493.50 06.06.07 541.76 0.00 541.76 279.35 280.00 Budget required for the year 19-20 Supply: 140.0 Lakhs Civil: 10.00 Lakhs PV: 10.00 Lakhs QV: 10.00 Lakhs RTN: 100.00 Lakhs crop:10.0 Lakhs Total: 280.0Lakhs Expenditure for FY-201819. On Hand Bills- 173Lakhs. Bills to be submitted (Supply & Erection) - 18.34 Total - 191.34Lakhs Budget required for FY-201920 is 1800Lakhs. retention amount- 880 supply amount- 600 Short closed by no:CEE/TZ/GLB/SEE(O)/A EE-3/2016-17/6771-79 Dtd:19.09.2016 Work was awarded to AR Construction. Work under Progess. To be Surrendred Rs.185.48 lakhs Rs.in Lakhs Sl. No. 5 Work Code FD1016 Name of the Work Koppal : Establishing 2x100MVA, 220/110kV and 1x10MVA, 110/11kV Station at Koppal (Halavarthi) along with associated lines & TB's. 11.06 (11KM-110KV&0.06KM220KV) 6 FD1018 Thavaragera: Establishing 1x10MVA, 110/11kV and 1x20MVA, 110/33kV Sub-Station with associated 110kV line for a distance of 26.495 Kms. 7 FF1003 Ramsamudra: Establishing 220/110kV Sub Station with associated 220kV and 110kV lines District Koppal Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date ES 15.9 BCR 2.435 3759.87 & 25.06.11 14.08.12 Cost of DWA 2997.91 Cost of Deptly. Supplied Materials & others 0.00 Total Work Cost 2997.91 Cum Exp up to 31/03/19 3340.02 Budget 2019-20 1500.00 Remarks Budget Utilisatin for 2018-19 Supply -218.35 Dep Supply- 57.28 Erection/Civil -24.37 Total300 lakhs Further the budget of Rs. 197.46 proposed for surrender. Budget requirement for 201920 Supply-709.55 Erection- 121.64 Civil482.51 Tree/Crop cut- 21 statutory- 4 Work slip- 8 Total- 1346.64 Koppal ES 4.17 BCR 1.21 1433.55 & 16.05.13 09.03.17 1974.90 43.50 2018.40 1504.25 610.00 Budget of Rs.150 Lakhs is required for payment of Crop cut ,Line Erection and Retention Bills for the FY 2018-19 it self. Budget Requirement for 2019-20 Suplly 304.49 Lakhs Erection 18.72 lakhs Civil 89.27Lakhs Dep.Ret 2.17 Lakhs Work Slip 22.36 Lakhs Statutory 3.75 Lakhs Tree/Crop 20.00 Lakhs PV 60.00 Lakhs Total 520.80 Lakhs Yadgir ES 0.706 MU&BCR 0.86 5831.49 & 03.11.17 15.03.18 6284.13 47.63 6331.76 0.00 3000.00 Supply bills : 100 Lakhs Work under Progess. Rs.in Lakhs Sl. No. 8 9 9 Work Code Name of the Work FD1029 Mangalore: Up-gradation of 33/11kV MUSS to 2X10 MVA,110/11kV Sub-Station with associated lines for a distance of 7.426 Kms. FD1032 Kukanoor(Dyamapura) : Upgradation of 2x5MVA,33/11KV Sub-station to 2x10MVA, 110/11kV and 1x20MVA 110/33kV Substation Kukanoor(Dyamapura) in Yelburga Taluk. Total of Sub-stations District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 1076.00 & 27.04.17 Koppal Koppal ES6.540 BCR2.67 Cost of DWA Cost of Deptly. Supplied Materials & others 0.00 0.00 1600.13& 21.4.18 19574.29 Total Work Cost 447.33 Cum Exp up to 31/03/19 419.03 Budget 2019-20 500.00 0.00 6.04 1200.00 20021.62 11597.62 9518.00 Remarks Budget Utilisatin for 201819 Supply -128 Lakhs Erection -24 Lakhs Civil -63 lakhs Total -215 Lakhs Further the budget of Rs. 61.43 lakhs proposed for surrender. Budget requirement for 2019-20 Supply- 349.5 Erection- 8.19 Civil- 107.52 Tree/Crop Cut:30.00 Statutory 02.00 Dep Ret 05.01 Total 502.31 Lakhs Budget requirement for 2019-20 Supply-920 Erection-62 Civil218 Total-1200 Lakhs Rs.in Lakhs Sl. No. 1 2 Work Code FA1045 FA1046 Name of the Work Alkod: Providing additional 1 x 10 MVA, 110/11 kV Power Transformer at Alkod S/s Maliyabad : Providing additional 1 x 10 MVA, 110/11 kV Power Transformer at Maliyabad S/s District Raichur Raichur Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 1.44 BCR 1.43 241.17 & 10.06.15 241.97 & 10.06.15 26.03.18 26.03.18 Cost of DWA 124.78 124.83 Cost of Deptly. Supplied Materials & others 101.95 101.95 Total Work Cost 226.73 226.78 Cum Exp up to 31/03/19 64.04 60.60 Budget 2019-20 Remarks 215.00 Probable Expenditure for 2018-19 Supply : 15.70 L Erection : 10 Lakhs Civil : 15.0 Lakhs Total : 40.7 Lakhs Budget required for 2019-20 Supply: 170.0 Lakhs Erection : 10 Lakhs Civil : 5.0 Lakhs Retn: 25 Lakhs QV: 5.0 Lakhs Total : 215.0 Lakhs Transformer, 110 KV Breaker & 11 KV Switchgears are to be Supplied by KPTCL 215.00 Expenditure for 2018-19 Supply : 15.36 L Erection: 10.0 L Civil: 15.0 L Total : 40.36Lakhs Addl Budget Reqd for 18-19 : 27.0 L Budget for 2019-20 Supply: 170.0 L Erection: 10.0 Lakhs Civil: 5.0 Lakhs QV 5.0 Lakhs Retn : 25.0 Lakhs Total : 215.0Lakhs Transformer, 110 KV Breaker & 11 KV Switchgears are to be Supplied by KPTCL Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date 3 FA1048 Gurugunta: Providing additional 1 x 10 MVA, 110/11 kV Power Transformer at Gurugunta S/s 4 FC1037 Chincholi: Providing additional 1x10MVA, 110/33kV Transformer FA1052 Raichur: Enhancement of 1x10MVA, 110/11KV Power Transformer by 20MVA ,110/11kV power transformer & providing 3 no's of 1x1000sq.mm XLPE CABLES TO 11V Bank III at 220KV S/S Raichur. Raichur BCR 0.75 227.84& 16.04.18 FA1053 Valkamdinni: Replacement of 1x10MVA by 1x20MVA 110/33KV Power Transformer at 110KV S/S Valkamdinni. Raichur BCR 0.85 202.25& 11.04.2018 FA1055 Sindhanoor: Replacement of 1x10MVA by 1x20MVA 110/11KV Power Transformer at 110KV S/S Sindhanoor BCR 0.75 217.63& 03.06.17 5 6 7 Raichur BCR 1.43 Kalaburagi BCR 1.41 243.44 & 08.01.16 157.75 & 01.08.11 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 Remarks 26.03.18 124.33 101.95 226.28 17.56 215.00 Expenditure for the FY 201819 Supply : 15.41 L Erection: 10.0 L Civil: 15.0 L Total : 40.41 L Addl budget rqd: 12.0 L Budget for 2019-20 Supply:170.00 L Erection: 10.0 Lakhs Civil: 5.0 Lakhs QV : 5.0 Lakhs Retn : 25.0 Lakhs Total : 215 Lakhs Transformer, 110 KV Breaker & 11 KV Switchgears are to be Supplied by KPTCL 19.01.18 68.49 98.16 166.65 37.14 110.00 Supply, Erection & Civil 136.65 Lakhs Budget for FY-2019-20 Raichur 0.00 0.00 Tfr cost : 160.73 Lakhs Erection cost: 34.54 Lakhs Total : 195.27 Lakhs Transformer to e Supplied by KPTCL 0.00 200.00 0.00 200.00 Budget for FY-2019-20 Tfr cost: 160.73 Lakhs Erection cost:7.0 Lakhs Total 167.73 Lakhs 200.00 Budget for FY-2019-20 Tfr cost:160.73 Lakhs Switchgear:37.7 Lakhs Erection cost: 19.1 Lakhs Total 216.63 Lakhs 0.00 Rs.in Lakhs Sl. No. 8 9 Work Code FB1075 FB1076 Name of the Work Kogali: Providing additional 1x8MVA, 66/11kV Transformer Sovenahalli: Providing additional 1x8MVA, 66/11kV Transformer District Bellary Bellary Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 1.00 BCR 0.994 178.18 & 20.08.13 178.52 & 20.08.13 Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 0.00 0.00 Cum Exp up to 31/03/19 0.00 0.00 Budget 2019-20 150.00 150.00 10 FB1077 Banavikallu: Providing additional 1x8MVA, 66/11kV Transformer Bellary BCR 0.99 180.84 & 20.08.13 0.00 0.00 150.00 11 FB1084 HB Halli: Replacement of 1X 8MVA,66/11KV Transformer by 1X12.5MVA,66/11KV H.B.Halli S/s. Bellary BCR 0.732 136.45 & 02.09.14 0.00 0.00 135.00 Remarks Addl Budget for 18-19 is Rs 24.0 Lakhs Budget for FY-2019-20 Tfr cost: 40.0 Lakhs(Released good) Switchgear:28.75 Lakhs Erection cost: 65.12 akhs Total : 133.87 Lakhs Budget required for FY 1920: 133.87 L Addl Budget for 18-19 is Rs 24.0 Lakhs Budget for FY-2019-20 Tfr cost: 40.0 Lakhs(Released good) Switchgear:28.75 Lakhs Erection cost: 59.87 Lakhs Total 128.62 Lakhs Addl Budget for 18-19 is Rs 24.0 Lakhs Budget for FY-2019-20 Tfr cost: 40.0 Lakhs(Released good) Switchgear: 28.75 Lakhs Erection cost: 62.14 Lakhs Total : 130.89 Lakhs Budget for FY-2019-20 Tfr cost: 117.12 Lakhs Erection cost: 16.08 Lakhs Total : 133.21 Lakhs Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 FB1086 Somasamudra: Providing additional 1x10MVA, 110/11kV Transformer 13 FB1089 Kamalapur (Hospet Tq.): Providing additional 1 X10MVA, 110/11kV Power Transformer at kamalapur in Hospet Tq. Bellary BCR 1.62 268.92 & 01.06.15 0.00 0.00 174.00 14 FB1093 Sankalapura: Repl of 1X10MVA by 1X20MVA, 110/11kV Trf at 110/11kV S/S Sankalapura Ballari BCR 0.77 258.56 & 01.03.18 0.00 0.00 218.00 15 FC1062 Providing additional 1 x 20 MVA 110/33 kv Transformer along with construction of 33kV Terminal Bay at existing 110/33/11kV at Kalaburagi (West) Sub-Station Kalaburagi BCR 1.267 356.58 & 10.05.17 0.00 13.49 200.00 16 FC1064 Providing additional 1 X 10MVA, 110kV Power Transformer at 110/33/11kV MUSS, Chowdapur. Kalaburgi BCR 0.73 298.07 & 05.01.18 0.00 200.00 FD1024 Bevoor : Providing additional 1 x 10 MVA, 110/11 kV Power Transformer at Bevoor S/s BCR 1.42 243.72 & 01.06.15 12 17 18 FD1025 Ganadal : Providing additional 1 x 10 MVA, 110/11 kV Power Transformer at Ganadal S/s Bellary Koppal BCR 1.06 209.74 & 15.05.14 0.00 0.00 0.00 28.18 135.00 200.00 Remarks Addl Budget for 18-19 is Rs 24.0 Lakhs Budget for FY-2019-20 Tfr cost: 40.0 Lakhs Switchgear: 37.7 Lakhs Erection cost:53.86 Lakhs Total : 131.57 Lakhs Addl Budget for 18-19 is Rs 25.0 Lakhs Budget for FY-2019-20 Tfr cost : 40.0 Lakhs Switchgear: 37.7 Lakhs Erection cost: 96.0 Lakhs Total : 173.70 Lakhs Approved in 75th TCCM,Dtd: 04.11.2017. Budget of Rs.51.82Lakhs has been proposed for surrender. Budget required for FY-201920 :227.08 Lakhs Koppal BCR 1.44 241.45 & 01.06.15 0.00 28.18 200.00 Budget of Rs.56.82Lakhs has been proposed for surrender. Budget required for FY-201920: 231.25 Lakhs Rs.in Lakhs Sl. No. Work Code Name of the Work District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 19 FD1034 Enhanncement of 1X10MVA, 110/33KV power Transformer NGEF Make) by 1X20MVA, 110/33Kv POWER Transformer at 110/33/11kV MUSS Betegera S/s in Koppal Tq, District. 20 FF1002 Konkal: Providing additional 1x10MVA, 110/11kVTransformer Yadgir BCR 1.48 164.46 & 04.06.14 0.00 0.00 165.00 FF1004 Creating 33 KV reference by providing additional 1 x 20 MVA 110/33 kv Power Transformer along with construction of 33kv Terminal Bay at Existing 110/11kV Gurmitkal Sub-Station in Yadgir Tq. yadgir Dist. Yadgir BCR 1.392 326.128 & 10.10.17 0.00 0.00 250.00 21 21 1 Koppal BCR 0.85 200.50 & 05.02.18 0.00 0.00 165.00 Transformer to be Supplied by KPTCL To be Surrendred Rs. 163.46Lakhs Total of Augmentation FB1025 Munirabad - Ujjini: Dismantling of existing 66kV Munirabad-Sokke-Davangere line emanating from Munirabad Generating Station & Erecting a new 66kV line with Coyote conductor upto 66kV Ujjani SubStation in Kudligi Taluk for a distance of 204.31 Kms Remarks Bellary NA 991.18 & 24.10.09 28.08.10 442.43 404.01 846.44 249.19 3847.00 773.98 0.00 773.98 439.86 10.00 Work short closed. Estimate is under preparation for the balance work at MWD, Ballari Rs.in Lakhs Sl. No. 2 3 Work Code 1 34 District FC1023 Chincholi-Mannekalli-Sedam: i) Construction of 110kV DC link line between 110kV Chincholi and 110kV Manna-E-Khelly SubStations 49.87Kms. ii) Stringing Second circuit on existing DC towers from 220kV Sedam Station to 110kV Chincholi Sub-Station for a distance of 32kms. Kalaburagi FC1042 Shahapur - Hattigudar: Re-construction of 110kV DC line from 220kV Hattigudar(Shahapur) S/s to 110kV Shahapur S/s for a distance of 10.63kms using Lynx conductors Yadgir 3 1 Name of the Work Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date BCR 1.236 1128.89 & 07.01.11 11.07.11 494.34 & 05.05.15 Renovation and Upgradation of Protection systems of 220kV Substations (12 Nos) in Kalaburagi Transmission Zone Total of TB's & Others Total of Kalaburagi Zone 924.99 1698.97 Kalaburagi 1384.05 & 20.06.14 0.00 0.00 Total of Lines FC1057 Cost of DWA Cost of Deptly. Supplied Materials & others 26.12.15 1436.37 0.00 0.00 Total Work Cost Cum Exp up to 31/03/19 Budget 2019-20 924.99 1134.68 310.00 0.00 489.57 138.00 1698.97 2064.11 458.00 1436.37 948.17 500.00 1436.37 0.00 1436.37 948.17 500.00 23152.06 851.34 24003.40 14859.09 14323.00 Remarks Work Awarded to M/S Deepak Cable Short closed by vide ltr No:CEE/GLB/AEE-3/662332 Dtd:16.09.2016 Supply : 835.67 L Erection : 140 L Civil : 130 L Total : 1105.67 L Balance work Awarded to M/S AR Construction on TTK basis Work under Progess. Addiitional Req.-Rs.431.41 Lakhs. Munirabad Circle : Total On hand Bills for 176.94 lakhs 220kV Allipura (WUP)- 2.38 lakhs 220kV Lingasugur- 98.50 lakhs 220kV Raichur- 8.87 lakhs 220KV Kustagi:(WUP)29.88 Lakhs 220KV Sindhanur:- 7.41 lakhs 220KV Ittigi:- 29.88 lakhs Total 176.94 Lakhs Gulbarga Cicrle : Total On hand Bills for Rs.in Lakhs Sl. No. 256 Work Code Name of the Work Total of List-II for All Zones District Cost of Energy Original / Savings & Date of LOI Revised DPR BCR & Date Cost of DWA Cost of Deptly. Supplied Materials & others Total Work Cost 447152.53 26621.45 463353.38 Cum Exp up to 31/03/19 293692.78 Budget 2019-20 219349.00 Remarks List III Works which are proposed to be taken up during the present fiscal year 2019-20 (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks BENGALURU TRANSMISSION ZONE Ramanagara 601.87 & 18.12.17 0.00 0.00 10.00 FY 18-19 civil-10L Total-10L FY 19-20 Supply-300L erection -20L Civil-140L Switch gear-40L Total-500L EXORA Business park: Establishing 2x150MVA, 220/66/11kV Station with associated line. Bengaluru Urban 10413 & 09.03.18 0.00 0.00 900.00 FY 18-19: 10L - Surrender. FY 19-20 Supply+Erection+Civil: 5000 L AA1165 S.Medehalli: Establishing 2x12.5 MVA, 66/11kV sub-station at S.Medehalli, in Anekal Taluk, Bengaluru Urban District. Bengaluru Urban 1978 & 09.03.17 0.00 0.00 1.00 FY-19-20 Nominal Budget: 5 L 4 AA1167 Muthanallur: Establishing 2x31.5MVA, 66/11kV Sub-Station with associated line at anekal taluk. Bengaluru Urban 1080.00 & 19.04.17 0.00 0.00 1.00 FY-19-20 Nominal Budget: 5 L 5 AA1183 Madappanahalli: Establishing 2x20MVA, 66/11kV SubStation with associated line for a distance of 3.604Kms Bengaluru Urban 1119.73 & 25.05.17 0.00 0.00 1.00 FY-19-20 Nominal Budget: 5 L 1 AC1074 Shivanahalli: Establishing. 1x8 MVA, 66/11kV S/s and associated line 2 AA1075 3 ES 1.59 & BCR 0.61 (Rs. In Lakhs) District Energy Savings & BCR AE1027 Nandi (Muddenahalli): Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 3.466 Km. C.B.Pura ES 1.42 BCR 1.41 7 AA1199 400 kV Peenya: Establishing 2x500 MVA, 400/220 kV Sub Station( 400 kVGIS &220kV AIS) at existing 220kV SRS Peenya premises Bengaluru.Running of single circuit 220kV single core 10000sqmm XLPE Copper UG Cable fo aroute length of 10.265 Kms from proposed 400/200kV Peenya sub-sation to existing 220/66kV "A" station. Bengaluru Urban 8 AA1193 Sahakarinagar: Establishing 2x150 MVA, 220/66/11kV GIS sub station 9 10 Sl. No. 6 Work Code Name of the Work Cost of Original / Date of Revised LOI DPR & Date 394.20 & 20.06.11 31.01. 12 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 99.07 10.00 FY-19-20 Nominal Budget: 15 L 43315.05 & 28.11.18 0.00 10.00 FY 19-20 Civil: 100 L Bengaluru Urban 14960.67 & 19.07.18 0.00 500.00 FY 19-20 S/E/C - 7500L 50% of the DPR cost AA1202 Audugodi GIS: Conversion of existing 66/11 kV Audugodi substation(AIS) to GIS substation in Bengaluru South Taluk, Benglauru Urban District. Bangalore Urban 4442.40 & 18.12.18 0.00 10.00 FY 19-20 Supply+Erection+Civil: 1000 L AD1047 Thorlakki:Establishing 1x12.5 MVA, 66/11kV Substation at Torlakki with associated line&Bay Kolar 801.15& 26.12.18 0.00 100.00 FY 19-20 S+E+C : 500 L 320.96 104.75 425.71 (Rs. In Lakhs) Sl. No. Work Code Name of the Work District AD1020 Talgunda: Establishing 2x8MVA, 66/11kV sub -station at Talagunda village in Kolar Taluk &District. 12 AA1180 HBR: Establishing 2x150 MVA, 220/66/11kV GIS sub station at HBR Layout 13 AD1048 Gownpalli :Establishing 2x12.5MVA, 66/11kV SubStation with associated line 14 AE1025 Alipura:Estabilishing 1 x 12.5 MVA, 66/11kV Sub-Station at Alipura in Gowribidanur Chikkaballapura Taluk, Chikkaballapura District 15 AA1204 Establishing 2x150MVA Trf at Sobha dreams balagere varthur hobli Bangalore east taluk. 11 15 1 Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Kolar 789.26& 31.12.18 Bengaluru Urban 25149.10& 28.12.17 revised /16718& 07.01.19 Kolar 1004.35& 14.01.19 Bengaluru Urban Hoody: Providing 3rd additional 1x31.5 MVA, 66/11 kV transformer. 7319.9 & 12.03.19 555 & 10.05.17 Remarks 100.00 FY 19-20 S+E+C=500L 0.00 500.00 Ratification to proposal approved in 74th TCCM held on 20.06.17 0.00 100.00 FY 19-20 S+E+C : 500 L 0.00 100.00 FY 19-20 Supply: 100 L 0.00 100.00 425.71 99.07 2443.00 0.00 0.00 5.00 0.00 104.75 Budget 2019-20 0.00 0.00 320.96 Bengaluru Urban Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 1055.32& 25.02.19 Total of Sub-stations AA1151 Cost of DWA FY-19-20 Nominal Budget: 5 L (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks AA1173 Rajarajeshwarinagar: Replacement of 2X20MVA by 2X31.5MVA transformer at 66/11kV Rajarajeshwarinagar S/s Bengalulru urban 700.03 & 09.06.17 0.00 0.00 200.00 FY-19-20 Tr supply + Erection: 200 L AA1174 Kumbalgodu: Replacement of 1x12.5MVA by 1x31.5MVA 66/11kV Transformer at 66/11kV Kumbalagodu Substation Bengalulru urban 276.38 & 09.06.17 0.00 0.00 200.00 FY-19-20 Nominal Budget: 3 L AA1175 Prestige Shanthinikethan: Replacing 1X20MVA by 1X31.5MVA 66/11kV Power transformerat 66/11kV Prestige Shanthinikethan substation . Bengalulru urban 248.90 & 15.07.17 0.00 0.00 200.00 FY-19-20 Tr supply + Erection: 2 L AA1182 Attibele: Replacement of 1x20 MVA, 66/11 kV transformer by 1x31.5MVA 66/11kV Transformer Bengaluru Urban 319.13 & 05.12.17 0.00 0.00 200.00 FY-19-20 Nominal Budget: 5 L 6 AA1184 Peenya: Augmentation of 2x20MVA, 66/11kV power transformer no.II & III by 2x31.5MVA, 66/11kV power transformer at SRS Peenya 220/66/11kV Substation Bengaluru Urban 597.33 & 205.05.17 0.00 0.00 200.00 FY-19-20 Tr supply + Erection: 200 L 7 AA1185 Abbigere: Replacement of 2x12.5MVA, 66/11kV by 2x20MVA, 66/11kV transformer Bengaluru Urban 546.12 & 29.05.17 0.00 1.29 5.00 FY-19-20 Nominal Budget: 5 L 2 3 4 5 (Rs. In Lakhs) Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Work Code 8 AA1186 IISC: Replacing of 2x20MVA, 66/11kV power transformer by 2x31.5MVA power transformer Bengaluru Urban 676.65 & 03.07.17 0.00 0.00 200.00 FY-19-20 Nominal Budget: 5 L 9 AA1187 Raj Mahal Vilas (RMV): Augmentation of 2x20MVA, 66/11kV by 2x31.5MVA, 66/11kV transformer Bengaluru Urban 530.00 & 13.11.17 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L 10 AA1188 Byadarahally: Replacement of 1x20MVA, 66/11kV Power Transformer by 1x31.5MV, 66/11kV power transformer Bengaluru Urban 351.00 & 26.10.17 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L 11 AA1189 Brindavaan: Replacement of 2x20MVA, 66/11kV Power Transformer II & III by 2x31.5MVA, 66/11kV power transformer Bengaluru Urban 635.30 & 08.11.17 0.00 0.00 200.00 FY-19-20 Nominal Budget: 5 L 12 AA1194 Naganathapura : Replacing 2X20MVA by 2X31.5MVA 66/11kV Power transformer Bengaluru Urban 530.00 & 30.11.17 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L 13 AA1195 Adugodi: Replacing 3X20MVA by 3X31.5MVA 66/11kV Power transformer Bengaluru Urban 10.01.07 & 13.03.19 0.00 0.00 200.00 FY-19-20 Tr supply + Erection: 200 L 14 AA1196 Nelagadaranahalli: Replacing 2x20MVA, 66/11kV by 2x31.5MVA, 66/11kV transformer Bengaluru Urban 668.45& 25.05.17 0.00 172.11 5.00 FY-19-20 Tr supply + Erection: 200 L Name of the Work District BCR 0.951 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Sl. No. Budget 2019-20 Remarks (Rs. In Lakhs) Sl. No. Work Code 15 AB1059 Anekal.: Replacing 1X20MVA by 1X31.5MVA , 66/11KV Power transformer at 66/11KV S/S, Bangalore rural AB1060 66/11KV S/s Volvo: Replacing of 1X6.3 MVA by 1X12.5 MVA Transformer at 66/11KV S/S Volvo Bengaluru Rural AB1062 Sulibele : Replacing of 2 x 12.5MVA Transformers by 2x 20MVA transformers 16 17 18 19 20 Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 282.61& 09.06.17 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L BCR 0.76 139.36& 13.07.17 0.00 0.00 120.00 FY-19-20 Nominal Budget: 5 L Bengalore Rural BCR 0.60 206.87& 05.12.17 0.00 0.00 5.00 FY 19-20 Tr supply+Erection: 175 L AB1063 Nanadagudi : Replacing 2 x12.5MVA Transformers by 2x 20 MVA Transformers Bengalore Rural BCR 0.63 397.39& 24.08.17 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L AB1064 CBPura(I/A): Replacing 1x12.5MVA NGEF make Tr-1, 66/11kV by 1x20MVA, 66/11kV Transformer Bengaluru Rural BCR 0.61 264.07& 09.06.17 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L AB1065 220KV EKARAJAPURA: a) Providing additional 1x100 MVA, 220/66 kV transformer b) Providing additional 1x12.5 MVA, 66/11 kV transformer and replacing the existing 1x20 MVA, 66/11 kV transformer by 1x12.5 MVA transformer at 220 kV Hosakote(Ekarajapura) substation.. Bengalore Rural BCR 2.24 1351& 09.04.18 0.00 0.00 50.00 FY-19-20 Nominal Budget: 5 L (Rs. In Lakhs) Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Work Code 21 AC1049 Channapatna: Augmentation of 1X12.5 MVA 66/11 kV Tr. By 1 X 20 MVA at 66/11 kV Channapatna Ramanagara 181.74 & 05.06.15 0.00 0.00 180.00 FY 19-20 Tr supply+Erection:180 L 22 AC1067 Magadi: Replacing 1x12.5MVA by 1x20MVA, 66/11kV Pwer Transformer at 66/11kV Magadi Ramanagara 175.95 & 17.02.16 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L 23 AC1071 Gudemaranahalli: Replacing 2x8MVA by 2x20MVA 66/11kV Power Transformer Ramanagara 394.72 & 16.06.17 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L 24 AD1025 Dalasanur: Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Kolar BCR 0.72 121.55 & 26.10.11 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L AD1028 S.M.Mangala: Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Kolar BCR 0.72 0.00 0.00 5.00 FY-19-20 Labour portion: 5 L 26 AD1029 Masti: Replacing 2nd 2x12.5MVA, 66/11kV by 2x20MVA, 66/11kV Transformer Kolar 286.15 & 20.02.13 35.00 134.17 2.00 FY-19-20 Nominal Budget: 2 L 27 AD1039 Anderdsonpet : Replacing 2x8MVA, 66/11kV by 2x12.5MVA, 66/11kV Transformer Kolar 269.61 & 05.11.14 0.00 0.00 2.00 FY-19-20 Nominal Budget: 5 L 25 Name of the Work District Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Sl. No. 121.55 & 27.08.11 35.00 Budget 2019-20 Remarks (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Srinivasapura: Replacing 1x12.5MVA, 66/11kV by 1x20MVA, 66/11kV Transformer Kolar BCR 0.61 205.12& 11.10.17 0.00 0.00 2.00 FY-19-20 Nominal Budget: 5 L AD1045 Thayalur: Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Kolar BCR 0.52 142.06& 31.10.17 0.00 0.00 2.00 FY-19-20 Nominal Budget: 5 L 30 AD1046 Malasandra: Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Kolar BCR 0.52 140.87& 26.09.17 0.00 0.00 2.00 FY-19-20 Nominal Budget: 5 L 31 AE1017 M.G.Halli: Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer C.B.Pura BCR 1.25 110.49 & 09.11.10 0.00 0.01 2.00 FY-19-20 Nominal Budget: 5 L 32 AE1031 Cheemangala: Replacing 1x6.3MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer C.B.Pura BCR 0.97 143.26 & 16.12.17 0.00 0.43 2.00 FY-19-20 Nominal Budget: 5 L 33 AE1051 Talagavara: Replacing second 1x12.5MVA, 66/11kV by 1x20MVA, 66/11kV transformer CBPura BCR 0.61 204.67& 12.02.18 0.00 0.00 2.00 FY-19-20 Nominal Budget: 5 L 34 AE1052 Cheemangala: Replacing second 1x6.3MVA, 66/11kV by 1x12.5MVA, 66/11kV transformer CBPura BCR 0.51 142.26& 12.02.18 0.00 0.00 2.00 FY-19-20 Nominal Budget: 5 L 35 AE1053 Replacing of 2x8 MVA by 2x12.5 MVA at Manchenahalli 272.12& 05.06.15 0.00 0.00 2.00 FY-19-20 Nominal Budget: 5 L Sl. No. Work Code 28 AD1043 29 Name of the Work Chikkaballapura Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Sl. No. Work Code 36 AA1197 Widia S/s: Providng addnl 1X20MVA, 66/11kV Power Transformer. Bengaluru 555.00& 18.07.18 AA1200 BTM 4th Stage:Providing 1x31.5MVA, 66/11 kV Power Transformer at existing 66/11 kV BTM 4th Stage Substation in Subramanyapura TL&SS Division Bengaluru Urban District. Bengaluru Urban AA1201 ELITA PROMENEDE: Providing additional 1x20MVA, 66/11kV Power Transformer at existing 66/11kV ELITA PROMONEDE Sub-station in Subramanyapura TL&SS Division, Banaglore South Taluk & Urban District. Bengaluru Urban 39 AC1086 Gudemaranahalli:Providing 1X20MVA spare power transformer as spare with associated bay at 66/11kV , Gudemaranahalli S/s in Magadi Taluk, Ramanagara District Ramnagara 40 AA1204 Koramangala: Replacing 2X20MVA by 2X31.5MVA 66/11kV Power transformer Bengaluru Urban 37 38 Name of the Work District BCR 1.80 BCR 1.14 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 150.00 FY 19-20 S+E+C-250L 296.20 & 01.10.18 0.00 200.00 FY 19-20 Supply+Erection+Civil : 200 L 297.92 & 01.10.18 0.00 100.00 FY 19-20 Supply+Erection+Civil : 150 L 256.02 & 24.11.18 0.00 5.00 FY 19-20 S/E /C - 10L 527.18 & 24.12.18 0.00 200.00 0.00 (Rs. In Lakhs) Sl. No. 41 42 43 44 45 46 Work Code Name of the Work Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Mandya BCR 0.58 283.15 & 26.12.18 0.00 5.00 Cost of DWA Budget 2019-20 AB1070 Augmentation of 2 X 8 MVA Power Transformer by 2 X 12.5MVA Power Transformer at 220/66/11 kV Substation T.K.Halli AA1203 220/66kV Hoody:Replacement of 2x100MVA Power Transformer by 2x150MVA 220/66kV Power Transformer at 220/66kV Hoody Sub-station. Bengaluru Urban BCR 1.06 1648.00 & 1.1.19 0.00 5.00 AC1088 Providing additional 1X 12.5 MVA, 66/11 kV Tansformer at 66/11 kV MUSS Sankalgere along with Capacitor bank Ramnagar BCR 0.84 256.81 & 07.01.19 0.00 1.00 AB1069 DoddaballapuraProviding additional (3rd)1X100MVA, 220/66kV Power Transformer at 220/66kV NRS Doddaballapura substation . Bengaluru Rural BCR 2.80 1035.61 & 5.2.19 0.00 10.00 AD1049 Enhancement of 66/11kV power transformer 2 of capacity 1x6.3MVA to 1x12.5MVA at 66/11kV substation, Byrakur Kolar BCR 0.71 0.00 2.00 AD1050 Enhancement of 66/11kV power transformer 2 of capacity 1x6.3MVA to 1x12.5MVA at 66/11kV substation, Mudiyanur. Kolar BCR 0.69 0.00 2.00 140.11 & 01.03.19 141.58 & 05.03.19 Remarks FY 19-20 Nominal Budget : 5 L FY 19-20 10L (Rs. In Lakhs) District Energy Savings & BCR AD1051 Lakkur: Replacing of 1X 8 MVA Power Transformer-2 by 1X12.5 MVA Power Transformer at 66/11 KV S/S Lakkur. Kolar BCR 0.47 AE1054 Providing 1X12.5MVA, 66/11kV Power transformer as a SPARE at Ganjigunte 66/11kV S/s with associated bay equipments C.B.Pura 49 AD1052 Malur (Town): Augementation of existing 1x8 MVA, 66/11 kV (PTR No:2) by 1x12.5MVA, 66/11 kV transformer at 66/11 kV Malur (Town) substation. 50 AA1205 HSR Layout: Replacing 1X20MVA by 1X31.5MVA 66/11kV Power transformer 51 AD1053 Tamaka : Replacing 1x12.5MVA, 66/11kV by 1x20MVA, 66/11kV Transformer Kolar 52 AD1054 Bangarpet: Replacing second 1x12.5MVA, 66/11kV by 1x20MVA, 66/11kV Transformer Kolar Sl. No. 47 48 Work Code Name of the Work Kolar Cost of Original / Date of Revised LOI DPR & Date 144.14 & 05.03.19 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 0.00 2.00 216.97 & 12.03.19 0.00 1.00 144.08 & 15.03.19 0.00 2.00 263.29 & 19.03.19 0.00 10.00 BCR 1.02 191.14 & 23.03.19 0.00 2.00 BCR 0.99 208.62 & 08.04.19 0.00 2.00 BCR 0.47 Bengaluru Urban Remarks (Rs. In Lakhs) Sl. No. 53 54 55 56 Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 AD1055 Bangarpet: augmentation of 1X12.5 MVA, 66/11 kV power transformer2 by 1X20 MVA, 66/11 kV Kolar power transformer at 66/11 kV Bangarpet sub-station in Bangarpet Taluk, Kolar District BCR 0.55 208.62 & 08.04.2019 0.00 2.00 AD1056 Tekal:-augmentation of existing 1X8 MVA, 66/11 kV power transformer-2 by 1X12.5 MVA, 66/11 kV power Kolar transformer at 66/11 kV Tekal sub-station in Malur Taluk, Kolar District BCR 0.47 144.08 & 08.04.19 0.00 3.00 AD1057 KGF:-Replacing 1x8 MVA, 66/11 kV transformer by 1x20 MVA, 66/11 kV transformer at Kolar 66 kV KGF sub-station in Bangarpet Taluk, Kolar District BCR 1.10 210.81 & 09.04.19 0.00 2.00 AC1089 Ranganadoddi:-Replacement of 2nd 1x12.5 MVA, 66/11 kV power transformer by 1X20 MVA, 66/11 kV Power Ramanagara transformer at 66/11kV Ranganadoddi sub-station in Kanakapura taluk, Ramanagara district BCR 1.10 205.12 & 22.02.19 0.00 150.00 Remarks (Rs. In Lakhs) Sl. No. 57 Work Code AD1058 57 1 2 3 Name of the Work Vemagal:Augmentation of 1x12.5MVA Power Transformer-1 by 1x20MVA Power Transformer at 66/11kV Vemagal Substation in Kolar Taluk District Energy Savings & BCR Kolar BCR 1.04 Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 191.55 & 27.03.19 Total of Augmentation 0.00 35.00 Budget 2019-20 0.00 2.00 35.00 308.01 2898.00 Remarks AC1084 Construction of 66kV MC/DC line in the existing corridor of 66kV Somanahalli Kanakapura - T.K.Halli DC line B1 & B2 having old H frame towers and cat conductor Ramanagara NA 4157.00& 17.04.18 0.00 0.00 100.00 FY 19-20 Supply/Erection - 1000L AC1081 66kV DC line to 66/11kV Maralavadi S/s: Replacing of existing 66 KV SC Tower of 66KV Maralwadi line by Constructing DC Tower, Drake DC line from tapping point of existing 66KV Kanakapura-Chatra (TapppingMarlawadi Tapping)HanumanthanagaraYedamadu-Somanahalli line -1 Ramanagara NA 656.00& 01.06.18 0.00 0.00 10.00 FY 19-20 Supply/Erection - 100L AA1040 HAL-Amarjyothi: Strengthening of existing 66kV line by replacing Coyote by HTLS Conductor for a distance of 3.21 kms Bengaluru Urban 481.6 & 21.06.11 0.00 0.00 5.00 (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date AA1047 Somanahalli Subramanyapura : i) Construction of 220kV 66kV MC - MV line from Somanahalli in the Existing corridor ii) Rearrangement of existing 220kv lines around 220kV Somanahalli Station. iii) 220kV DC line using AAAC Moose conductor in Somanahalli- Peenya SC line corridor upto Nagarabhavi tap point. Bengaluru Urban 4118.9 & 02.06.11 AA1139 Amarjyothi-Audugodi: Replacement of Existing Coyote ACSR Conductor by HTLS Conductor for a route length of 4.20Kms in the existing 66kV DC AudugodiAmarjyothi line. Bengaluru Urban 6 AA1181 Nelagadarenhalli to WIDIA: Running of 66kV 1000sqmm SC UG cable from existing 66/11kV Nelagadarenahalli S/s to existing Widia S/s for a route length of 3.540Kms 7 AB1066 66KV D.B.Pura -Devanahalli line: Strengthening the 66KV D.B.Pura -Devanahalli line by Drake conductor 20KMS 4 5 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 6666.28 0.00 5.00 FY-19-20 Nominal Budget: 5 L 665.24 & 05.11.14 0.00 0.00 100.00 FY-19-20 Nominal Budget: 5 L Bengaluru Urban 2359.00 & 25.05.17 0.00 0.00 100.00 FY 19-20 Supply+Erection+Civil - 1100L Bengaluru rural 950& 28.11.17 0.00 0.00 10.00 FY 19-20 Supply/Erection - 100L 29.12. 14 6666.28 0.00 (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks AB1067 D cross to Thondebhavi: Strengthening of about 31 Kms 66kV line from D cross to Bengaluru Rural & Thondebhavi limites (Existing CBPura fabricated small tower and rabit conductor) 1177.04& 01.03.18 0.00 0.00 10.00 FY 19-20 Supply/Erection - 500L 9 AC1035 Ranganadoddi Sub-Station: Providing 66kV LILO arrangement to 66/11kV SubStation for a distance of 0.10 kms. Ramanagara 41.00 & 24.01.12 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L 10 AC1082 Conversion of existing 66kV SC line to DC line from Harobele station to Kodihalli station Ramanagara 142.00& 17.03.18 0.00 0.00 10.00 FY-19-20 Nominal Budget: 10 L AE1034 Siddlaghatta Y.Hunasenahalli: Running of 2nd Circuit on existing DC Tower of Siddlaghatta 66kV line upto Tower No.51 and linking the same to Y.Hunasenahalli line with TB at 220kV R/S Chintamani for a distance of 12.3 kms. C.B.Pura 115.04& 05.05.12 529.93 0.00 5.00 FY-19-20 Nominal Budget: 5 L AE1036 Jangamkote Sub-Station: Providing 66kV LILO arrangement to 66/11kV SubStation for a distance of 7.00 kms. C.B.Pura 54.97 & 14.05.12 0.00 0.00 5.00 FY-19-20 Nominal Budget: 5 L 8 11 12 NA 529.93 (Rs. In Lakhs) Sl. No. 13 14 15 Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Work Code Name of the Work District AB1068 66KV D.B.Pura - Vijaypura line : Strengthening of 66kV Doddaballapura-Vijayapura SC line from 220/66 kV NRS, Doddaballapura to 66/11 kV Vijayapura sub-station by replacing the existing SC Coyote ACSR Conductor on SC towers by SC Drake ACSR Conductor on DC towers for a distance of 28.211km. Bengaluru Rural 1586.00 & 04.09.18 0.00 10.00 FY 19-20 Nominal Budget: Rs. 10 L AA1198 Magadi-Byadarahalli: Conversion of existing 66kV Byadarahalli-Magadi S/C line to DC line with Drake ACSR conductor using proposed 110kV Narrow based DC towers for a distance of 28.990Kms and 66Kv 1000sqmm, UG cable from existing 66/11Kv Byadarahalli station to U.G. cable terminating tower for a route length of 0.098 Kms. Bengaluru Urban Ramanagara 2232 19.07.18/ 27.07.18 0.00 10.00 Fy-2019-20, Budget S+E+C-1100 AC1083 66kV SC line from 220kV Kanakapura to Kunur station: Construction of 66kV SC line partially cable and partially overhead line from Kanakapura to proposed Kunur station for a distance of 7.481Km Ramanagara 0.00 10.00 FY 19-20 Supply/Erection - 1000L NA 3149.00& 31.07.18 0 0.00 Remarks (Rs. In Lakhs) Sl. No. 16 17 Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 AC1085 Construction of 220-66kV MC line in the corridor of existing 66kV KanakapuraChikkenahalli-Channapatna SC line for providing 220kV source to proposed 220/66kV Kothipura sub station in kanakapura taluk Ramanagara district with construction of 2 nos of 220 kV terminal bays at 220kV Kanakapura and 2 nos of 220kV terminal bays at Kothipura substation. Ramanagara 5798.00 & 09.08.18 0.00 1.00 AC1039 Somanahalli Station to T.K.Halli Station: Conversion of existing 220kV SC Somanahalli-T.K Halli line to DC line from existing 220/66 kV T.K.Halli substation to existing 220/66kV Somanahalli sub-station for a distance of 62.221 Kms Ramanagara 5000.00 & 02.02.19 0.00 10.00 Remarks FY 19-20 Nominal Budget: Rs. 10 L (Rs. In Lakhs) Sl. No. 18 Work Code Name of the Work District AA1206 Sarjapura station to 66 kV Lakkur : Construction of 66 kV DC line from 220 kV Sarjapura station to 66 kV Lakkur substation & construction of 66 kV terminal bay at 220/66/11 kV Sarjapura sub-station for connecting already approved ACSR line on existing 66 kV SC line DC towers of SarjapuraLakkur line from 20/66/11kV Sarjapura sub-station up to the existing 66/11 kV Lakkur substation ; partly in the existing 78 kV line corridor using 66 kV NBT KPTCL design towers for a route length of 13.531 kMs Bengaluru Urban Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 698.00 & 05.03.19 Budget 2019-20 0.00 1.00 18 Total of Lines 7196.21 0.00 7196.21 0.00 407.00 90 Total for Bengaluru Zone 7517.17 139.75 7656.92 407.08 5748.00 Remarks Tumakuru transmission zone 1 BC1083 Vijapura: Establishing 1x12.5 MVA, 66/11kV at Vijapura S/S in Chitradurga Taluk & Dist. 2 BA1145 3 BA1150 Chitradurga ES BCR 4.87 550.46 & 10.09.18 0.00 100.00 Honnenahalli: Establishing 1 x 8 MVA 66/11 KV S/S with associated line in Tumakuru Taluk & District. Tumakuru ES BCR 1.66 716.84 & 15.10.18 0.00 100.00 Nandihalli:Estabilishing 1 x8 MVA, 66/11 kV sub-station at Nandihalli cross in Gubbi taluk Tumakuru district. Tumakuru ES BCR 4.83 533.00 & 0.00 100.00 Tender under evaluation at CEE.T&P. (Rs. In Lakhs) Sl. No. Work Code 3 Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Total of Sub-stations Cost of DWA 0.00 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 Budget 2019-20 0.00 0.00 300.00 Remarks BA1105 Kolala: Replacing 1x8 MVA,66/11kV by 1x 12.5 MVA, 66/11kV Transformer. Tumakuru BCR 0.80 136.52 & 15.04.14 0.00 0.00 0.00 5.00 Additional 1X10MVA is proposed.Hence, the work may be dropped. 2 BA1107 Thovinakere: Replacement of 1x12.5MVA, 66/11kV by 1x 20MVA, 66/11kV Transformer. Tumakuru BCR 1.028 177.07 & 08.04.14 0.00 0.00 0.00 5.00 Transformer to be allotted 3 BA1123 Kadaba: Replacing 1x10 MVA,110/11kV by 1x 20 MVA, 110/11kV Transformer. Tumakuru BCR 1.14 204.20 & 11.05.17 0.00 0.00 5.00 Transformer to be allotted 4 BA1124 Kolala: Replacing 2nd 1x8 MVA, 66/11kV by 1x 12.5 MVA, 66/11kV Transformer. Tumakuru BCR 0.73 139.07 & 17.05.17 0.00 0.00 5.00 Transformer to be allotted 5 BA1125 Sampige: Replacing1x10MVA,110/11kV by 1x 20MVA, 110/11kV Transformer. Tumakuru BCR 1.14 204.20 & 17.05.17 0.00 0.00 5.00 Transformer to be allotted 6 BA1126 K.G Temple: Replacing1x10MVA,110/11kV by 1x 20MVA, 110/11kV Transformer. Tumakuru BCR 1.14 204.53 & 11.05.17 0.00 0.00 5.00 . BA1129 Bellavi: Replacing 1x12.5MVA Power Trnasformer-1 by 1x20MVA Power Transformer at 66/11kV Bellavi Substation Tumakuru BCR 0.84 203.49 & 27.09.17 0.00 0.00 5.00 Transformer to be allotted 1 7 (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR BA1132 Tavarekere: Replacing 1x8MVA, 66/11kV Power transformer-1 by 1x12.5MVA 66/11kV Power transformer Tumakuru BCR 0.73 142.26 & 27.09.17 0.00 0.00 5.00 Transformer to be allotted 9 BA1133 Koratagere: Replacement of 1x 12.5MVA 66/11kV Power Transformer by 1x 20 MVA, 66/11kV Transformer. Tumakuru BCR 0.83 206.30 & 10.10.17 0.00 0.00 5.00 Transformer to be allotted 10 BA1135 Thimmasandra: Replacing1x8MVA, 66/11kV by 1x 12.5MVA, 66/11kV Transformer. Tumakuru BCR 0.75 136.44& 27.09.17 0.00 0.00 5.00 Transformer to be allotted 11 BA1136 Hebbur: Replacing 1x12.5 MVA, 66/11kV by 1x 20 MVA, 66/11kV Transformer. Tumakuru BCR 0.81 212.01& 10.10.17 0.00 0.00 5.00 Transformer to be allotted BA1137 Sira: Replacing 12.5MVA,66/11kV by 1x 20 MVA, 66/11kV Transformer. Tumakuru BCR 0.8 214.02& 28.03.18 0.00 0.00 5.00 Transformer to be allotted 13 BA1138 Hirehalli: For replacement of 1 x 12.5 MVA Tr.-1 by 1 X20 MVA Tr. at 66/11 KV Sub-station with 1IC+4F+1BC Tumakuru BCR 0.84 204.16& 15.02.18 0.00 0.00 200.00 Transformer to be allotted 14 BA1139 Yadiyur: For replacement of 1 x 6.3 MVA by 1 X 20 MVA Tr. at 66/11 KV Sub-station Tumakuru BCR 1.58 205.68& 28.03.18 0.00 0.00 5.00 Sl. No. 8 12 Work Code Name of the Work Cost of DWA 0.00 Budget 2019-20 Remarks (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Kunigal: For replacement of 1 x 12.5 MVA Tr-2 by 1 X 20 MVA Tr. 1Bank + 4Feeders at 66/11 KV Sub-station Tumkur BCR 0.84 204.52& 27.03.18 0.00 0.00 5.00 BA1141 Honnudike: Replacing 1x8 MVA-1 66/11kV by 1x 12.5 MVA, 66/11kV Transformer (2nd Tr.) Tumkur BCR 0.7 145.00& 15.02.18 0.00 0.00 5.00 17 BB1061 Davanagere: Providing Spare 1x20MVA, 66/11kV Transformer at 220/66kV Davanagere SRS. Davanagere ES NA BCR 2.44 253.24 & 09.12.13 0.00 0.00 1.00 18 BB1072 Bidarekere: Providing Additional 1x8MVA, 66/11kV Power Transformer. Davanagere BCR 0.877 179.01 & 27.08.14 0.00 0.00 150.00 19 BB1073 Obbajjihalli: Providing Additional 1x8MVA, 66/11kV Power Transformer Davanagere BCR 0.87 179.01 & 02.09.14 0.00 0.00 150.00 20 BB1074 Avaregare: Replacing 1x8MVA, 66/11kV by 1x 12.5MVA, 66/11kV Tranformer. Davanagere BCR 0.8 136.52 & 05.09.14 0.00 0.00 5.00 21 BB1076 Mayakonda: Replacing 1x8MVA, 66/11kV by 1x 12.5MVA, 66/11kV Transformer. Davanagere BCR 0.792 137.84 & 02.09.14 0.00 0.00 10.00 Sl. No. Work Code 15 BA1140 16 Name of the Work Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Davangere BCR 0.62 201.47 & 11.05.17 0.00 0.00 1.00 Bharamasagara: Providing Spare 1x12.5MVA, 66/11kV Transformer Chitradurga ES NA BCR 1.53 198.54 & 23.01.14 0.00 0.00 1.00 BC1075 Pandarahalli : Replacing 2nd 12.5 MVA, 66/11kV by 20MVA, 66/11kV Transformer. Chitradurga BCR 0.71 203.88& 30.05.17 0.00 0.00 1.00 25 BC1076 Mylanahalli : Replacing 1x8 MVA, 66/11kV by 1x 12.5 MVA, 66/11kV Transformer. Chitradurga BCR 0.71 142.42& 08.02.18 0.00 0.00 0.00 1.00 26 BC1077 Thallak : Replacing 1x6.3 MVA, 66/11kV by 1x 12.5 MVA, 66/11kV Transformer. Chitradurga BCR 1.03 139.75& 23.02.18 0.00 0.00 0.00 1.00 27 BC1078 Hanagal: Replacing 1x8 MVA, 66/11kV by 1x12.5 MVA, 66/11kV Transformer. Chitradurga BCR 0.69 156.71& 23.02.18 0.00 0.00 1.00 BA1142 Chikkanayakanahalli: Replacement of 1x10 MVA power transformer-1 by 1x 20 MVA, 110/11kV Transformer at 110/11kV Chikkanayakanahalli Tumakuru BCR 1.11 212.26 & 03.04.18 0.00 5.00 Sl. No. Work Code 22 BB1081 Harapanahalli: Replacing 1x12.5 MVA, 66/11kV by 1x 20 MVA, 66/11kV Transformer. 23 BC1060 24 28 Name of the Work Cost of DWA Budget 2019-20 Remarks Surrender of Rs. 5.00 lakhs Estimate submitted for Technical Sanction. (Rs. In Lakhs) Sl. No. 29 30 31 32 33 Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR BA1143 Bidare: Providing Additional 1x10 MVA, 110/11kV Power Transformer at 110/11kV S/s at Bidare. Tumakuru BCR 0.90 254.05 & 08.05.18 0.00 120.00 BA1144 Guligenahalli: Replacing 1x6.3MVA, 66/11kV power Transformer by by 1x 12.5 MVA, 66/11kV Transformer at 66/11kV Guligenahalli. Tumakuru BCR 1.00 143.85 & 03.04.18 0.00 5.00 BA1146 Hosakere(Madhugiri): Replacing 1x8MVA Power Transformer by 1x12.5MVA, 66/11kV Power Transformer at 66/11kV Hosakere(Madhugiri), Tumakuru BCR 0.48 142.00 & 23.11.18 0.00 5.00 BA1147 Holavanahalli :Replacing 1X8 Power Transformer-2 by 1X12.5MVA 66/11KV Power Transformer at 66/11kV Holavanahalli Tumakuru BCR 0.47 144.00 & 23.11.18 0.00 5.00 BA1148 Pulamaghatta: Replacing 1x8 MVA, Power Transformer -2 by 1x12.5MVA, 66/11kV Power Transformer at 66/11kV Pulmaghatta S/s. Tumakuru BCR 0.45 143.00 & 23.11.18 0.00 5.00 Work Code Name of the Work Cost of DWA Budget 2019-20 Remarks Estimate submitted for DPR preparation. (Rs. In Lakhs) Sokke: Providing Additional 1x8MVA, 66/11kV Power Transformer at 66/11kV Sokke S/S Davanagere BCR 0.35 329.00 & 15.11.18 0.00 10.00 BC1079 Nagasamudra : Providing addl. 1x8 MVA, 66/11 KV Power Transformer at 66/11KV Nagasamudra S/S Chitradurga BCR 0.07 230.07 & 16.08.18 0.00 10.00 Tendering under process BC1080 Kalamaranahalli: Providing addl. 1x8 MVA, 66/11 KV Power Transformer at 66/11KV S/S Chitradurga BCR 0.74 229.32 & 06.09.18 0.00 10.00 Tendering under process BC1082 Hariyabbe: Replacement of 1x6.3+1x8MVA, 66/11kV power transformer by 2x 12.5 MVA, 66/11kV Power Transformer at 66/11 kV hariyabbe S/s Chitradurga BCR 0.85 286.43 & 23.05.18 0.00 100.00 BC1084 P.D.Kote: Providing additional 1x8 MVA, 66/11 kV Power transformer at 66/11kV P.D.Kote Sub-Station in Hiriyur Taluk, Chitradurga District. Chitradurga BCR 0.73 150.00& 16.09.18 0.00 150.00 34 BB1091 35 36 38 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Work Code 37 Cost of Original / Date of Revised LOI DPR & Date Energy Savings & BCR Sl. No. Name of the Work Cost of DWA Budget 2019-20 Remarks DPR Approved on 06.09.2018. Tendering under Process. (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR BC1085 Venkatapura: Replacement of 1x5 MVA Trasformer by 1x12.5 MVA, Transformer at 66/11kV Venkatapura SubStaion. Chitradurga BCR 0.73 144.00 & 30.11.18 0.00 5.00 70th TCCM approved on 20.12.2016. BC1086 Thallak: Providing additional 3rd 1x100 MVA, 220/66kV power transformer at 220/66/11kV Thallak SubStation in Challakere taluk Chitradurga District. Chitradurga BCR 2.34 964.51 & 03.11.18 0.00 500.00 Tendering under Process.. BC1087 Rampura : Replacing 1x6.3 MVA, 66/11kV Power transformer by 1x12.5 MVA, 66/11kV power Transformer at 66/11kV Rampura S/s . Chitradurga BCR 0.67 155.00 & 14.11.18 0.00 5.00 42 BC1088 Turuvanur: Replacing 1x6.3MVA Power Transformer by 1x 12.5MVA, 66/11kV Power Transformer at 66/11kV Turuvanuru S/s. Chitradurga BCR 0.68 144.00 & 18.12.18 0.00 5.00 43 BA1151 Honnavalli: Replacing 1x10 MVA,110/11kV by 1x 20 MVA, 110/11kV Transformer. Tumakuru BCR1.12 209.10 & 11.04.18 0.00 150.00 Estimate submitted for Technical Sanction. 44 BA1152 Bevinahalli: Replacing 1x8MVA, 66/11kV by 1x 12.5MVA, 66/11kV Transformer. Tumakuru BCR0.71 142.56 & 01.03.18 0.00 100.00 Estimate submitted for Technical Sanction. Sl. No. 39 40 41 Work Code Name of the Work Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Balenahalli: Replacing 1x8 MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer. Chitradurga BCR 0.48 141.00 & 26.12.18 0.00 5.00 BC1091 Sanikere: Replacing 1x6.3 MVA, 66/11kV by 1x 12.5 MVA, 66/11kV Transformer. Chitradurga BCR 0.85 287.07 & 28.03.18 0.00 5.00 47 BC1092 Hiriyur: Replacing 1x8 MVA, 66/11kV by 1x12.5 MVA, 66/11kV Transformer. Chitradurga BCR 0.69 145.48 & 11.06.18 0.00 5.00 48 BC1093 Bharamasagara: Replacing 2x12.5 MVA, 66/11kV by 2x 20 MVA, 66/11kV Transformer. Chitradurga BCR 0.56 206.00 & 31.12.18 0.00 5.00 49 BB1094 Attigere: Replacing 1x8MVA, 66/11kV by 1x 12.5MVA, 66/11kV Transformer. Davangere BCR 0.73 282.00 & 09.09.19 0.00 5.00 50 BB1095 Punabghatta: Replacing 1x8MVA, 66/11kV by 1x 20 MVA, 66/11kV Transfformer. Davangere BCR 0.98 212.77 & 18.05.18 0.00 50.00 51 BB1096 Kurubarahalli: Replacing 1x8MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer. Davangere BCR 0.48 142.63 & 17.09.18 0.00 50.00 52 BA1153 Badavanahalli: Replacing 2nd 1x12.5MVA, 66/11kV by 1x 20MVA, 66/11kV Transformer. Tumakuru BCR 0.56 206 & 01.02.19 0.00 5.00 Sl. No. Work Code 45 BC1090 46 Name of the Work Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Sl. No. Work Code Name of the Work Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Tumakuru BCR 1.12 207.08 & 11.04.18 0.00 150.00 Cost of DWA Budget 2019-20 53 BA1154 Bandihalli: Replacing 1x10MVA,110/11kV by 1x 20MVA, 110/11kV Transformer. 54 BA1155 Chikkabanagere: Replacing 1x12.5MVA, 66/11kV by 1x 20MVA, 66/11kV Transformer. Tumakuru BCR 0.83 205.99 & 11.04.18 0.00 100.00 55 BA1156 K.B.Cross: Replacing 1x10 MVA, 110/11kV by 1x 20 MVA, 110/11kV Transformer @ 220/110kV Tumakuru BCR 1.08 216.24 & 18.05.18 0.00 5.00 56 BA1157 Mayasandra: Replacing 2nd 10 MVA,110/11kV by 1x 20 MVA, 110/11kV Transformer. Tumakuru BCR 1.08 215.88 & 02.05.18 0.00 100.00 57 BA1158 Nonavinakere: Replacing 1x10 MVA,110/11kV by 1x 20 MVA, 110/11kV Transformer. Tumakuru BCR 1.10 211.07 & 11.04.18 0.00 150.00 58 BA1159 Turuvekere: Replacing 1x10 MVA, 110/11kV by 1x 20 MVA, 110/11kV Transformer. Tumakuru BCR 1.08 214.87 & 02.05.18 0.00 5.00 BA1160 Pandrahalli : Replacement of 2nd 1x12.5MVA, 66/11KV Power Transformer by 1x20MVA at 66/11KV S/S in Chitradurga district. Tumakuru BCR 0.84 203.88 & 30.05.17 0.00 150.00 59 Remarks (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Pavagada: For replacement of 1 x 12.5 MVA Tr-1 by 1 X 20 MVA Tr. at 66/11 KV Substation . Tumakuru BCR 0.56 207.00 & 08.08.19 0.00 5.00 BC1094 Aimangala :Replacing 1x12.5 MVA, 66/11kV by 1x 20 MVA, 66/11kV Transformer. Chitradurga BCR 0.55 210.00 & 31.12.18 0.00 5.00 BB1097 Guttur:Providing 125 MVAR Bus Reactor at 400/220 KV Station Guttur Davanagere NA 1138.00 & 05.03.19 0.00 5.00 BA1162 Nagalamadike : Replacment of 1x8MVA power transformer at 66/11kV nagalmadike substation in pavagada taluk Tumkur district Tumakuru 0.45 145.00& 11.03.19 0.00 1.00 64 BB1098 Anagodu: Replacement of Existing 1x8 MVA power transformer-1 by 1x20 MVA Power transformer and 1x8 MVA power transformer-2 by 1x12.5 MVA power transformer at 66/11 kV Anagodu Sub-station in Davangere Taluk, Davangere District. Davangere BCR 0.76 345.00 & 18.01.19 0.00 1.00 65 BC1095 Hireguntanur: Replacing 1x8 MVA, 66/11kV by 1x 12.5 MVA, 66/11kV Transformer. Chitradurga BCR 0.48 285.00 & 14.01.19 0.00 1.00 Sl. No. Work Code 60 BA1161 61 62 63 Name of the Work Cost of DWA Budget 2019-20 Remarks DPR approved vide OM No.B19/5747/96-97/11.2.2019 (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Work Code Name of the Work District Energy Savings & BCR BC1096 Chitradurga: Replacing 1x12.5 MVA, 66/11kV by 1x 20 MVA, 66/11kV Transformer at 66/11 KV station chitradurga. Chitradurga BCR 0.51 225.00 & 05.01.19 0.00 100.00 BC1097 Chitrahalli:Replacement of 1x8MVA power transformer-2 by 1x12.5 MVA Power transformer at 66/11kV SubStation in Holalkere Taluk, Chitradurga district. Chitradurga BCR 0.49 140.00 & 31.12.18 0.00 50.00 BA1163 Doddasarangi: Providing additional 1 x 8 MVA 66/11kV Transormer at 66/11kV Doddasrangi Substation Tumakuru BCR 0.49 250.00 & 23.03.19 0.00 1.00 BC1098 Nayakanahatti: Replacing 1x12.5 MVA, 66/11kV by 1x 20 MVA, 66/11kV Transformer. Chitradurga BCR 0.53 218.00 & 28.03.19 0.00 1.00 70 BA1164 Somalapura : Providing additional 1x10MVA, 110/11kV Power Transformer at 110/11KV S/S Somapalapura Tumkur BCR 0.58 266.00 & 23.03.19 0.00 1.00 71 BC1099 Sirigere: Replacing 2nd 8MVA, 66/11kV by 1x 12.5MVA, 66/11kV Transformer. Chitradurga BCR 0.48 143.00 & 09.01.19 0.00 1.00 BA1165 Kora: Replacement of existing 1x8MVA power transformer-1 by 1x20MVA, power transformer at 66/11kV Kora substation in Tumakuru Taluk. Tumakuru BCR 0.90 215.50 & 27.04.19 0.00 1.00 Sl. No. 66 67 68 69 72 Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Sl. No. Work Code 72 1 2 3 4 Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA 0.00 Total of Augmentation Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 Budget 2019-20 0.00 0.00 2750.00 0.00 0.00 10.00 BA1079 Chelur Sub-Station: Construction of DC line for a length of 16.22 kms using Drake conductor from Chelur tap point to Chelur SubStation and in the exisiting corridor with modification of 66kV Bays Tumakuru 116.47 & 23.04.14 BB1067 Chilur Station to Chilur Tap point: Conversion of SC line on SC towers to DC line on DC towers from Tap point to Chilur 66kV Sub-Station for a distance of 1 Km with TB at Chilur station for LILO arrangement. Davanagere 54.14& 20.06.17 0.00 0.00 10.00 BB1088 Jagalur-Sokke 66KV line: Recontruction of existing 66kV, age old coyote conductor SC line from 66kV Sub-Station Jagalur to 66kV Sub-Station Sokke as SC line on DC towers with coyote conductor for a distance of 20.961 Kms. Davanagere 401.10& 29.06.18 0.00 0.00 10.00 BB1089 Sasvehalli Station to Sasvehalli Tap point:Providing LILO arrangement at 66kv station Sasvehalli from tap point of Lingadahalli-Channagiri line for a distance of 0.5 kms with TB. Davanagere 53.3& 20.06.17 0.00 0.00 10.00 NA 0.00 Remarks Rs. 10 Lakhs to be surrendered (Rs. In Lakhs) Sl. No. 5 6 7 Work Code Name of the Work District BB1092 Harihara Hospet line: Providing LILO arrangement to existing 66/11kv Harihara Sub station from 66kV Harihara-Hospete line at LOC.78-79(79-80) to 66kV Harihara Substation by stinging 2nd circuit on existing DC tower withcoyote conductor for a distance of 50m in Harihara Taluk, Davangere District. Davanagere BB1093 66kV Itagi-Bennehalli SC line:Stringing of 66 kV second circuit on existing 66kV ItagiBennehalli SC line on DC towers from 220kV Itagi station to 66/11kV bennehalli for a distance of 19.06 Kms in the existing corridor along with construction of 1 no of 66kV terminal bay at both stations Davangere BC1089 Hiriyur & J.G Halli :Stringing of second circuit on existing 66kV Hiriyur-Bevinahalli (220 kV SRS Hiriyur to J.G Halli sub-station) SC line on existing DC towers using Coyote conductor with construction of new TB at both 220kV SRS Hiriyur & J.G Halli Sub-station for distance of 21.352 kms in Hiriyur taluk, Chitradurga district. Chitradurga Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date 43.50 & 17.11.18 547.00 & 15.02.19 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 0.00 1.00 0.00 100.00 0.00 200.00 Remarks Hiriyur-Bevinahalli Line : Proposal for conversion of 66kv Hiriyur-Bevinahalli (Hiriyur 220kv SRS to JG Halli muss) Single circuit line to double circuit line on existing line on existing double circuit towers by drawing 2nd circuit using coyote conductor in existing corridor with extension of new terminal bay in both 220kv SRS Hiriyur and 66/11kv Javagondanahalli (Rs. In Lakhs) Sl. No. 8 9 Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR BA1043 Nagalamadike : Construction of new 66kV SC tap line on DC towers from Pavagada tapping point to Nagalamadike S/ S (Replacement of Rabbit conductor on RCC poles) for a distance of 13.46Kms. Tumakuru NA 211.20 & 03.03.11 04.11. 11 197.11 0.00 197.11 41.30 10.00 Short closed already, proposed for retendered BA1044 Shylapura - Y. N. Hosakote: Construction of new 66kV SC line on DC towers (Replacement of Rabbit conductor on RCC poles by Coyote conductor on 17.24 Kms. Tumakuru NA 235.24 & 11.05.11 30.11. 11 265.00 0.00 265.00 71.62 10.00 Short closed already, proposed for retendered Total of Lines 462.11 0.00 462.11 112.92 361.00 Total of Tumakuru Zone 462.11 0.00 462.11 112.92 3411.00 0.00 0.30 400.00 Work Code 9 84 Name of the Work Cost of DWA Budget 2019-20 Remarks HASSANA TRANSMISSION ZONE 1 CA1064 Kundur Mata: Establishing 1 X 8 MVA ,66/11 KV S/S at Kunduru Mata in CR Patna Taluk, Hassana District along with associated line for a distance of 6.2Kms Hassana ES 0.92 BCR 0.89 491.91 & 04.04.07 Tendered at CE/ T&P (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date District Energy Savings & BCR CC1018 Sulia: Up-gradation of existing 2 x 5 MVA, 33/11kV to 1 x 10 MVA, 110/33kV sub-station & 1 x 10MVA, 110/11kV at 110/33/11kV Sullia Substation in Sulliya Taluk, D.K. District along associated line for a distance of 20kMs. Dakshina Kannada ES5.56 BCR0.72 1492.02 & 01.09.10 CA1007 Gangur : Est 1x8 MVA, 66/11 kV sub-station Gangur in Belur taluk, Hassan District with associated line for a distance of 13.14kMs. Hassan ES1.12 BCR1.023 4 CD1070 Mavali:Establishing 1 x 10MVA, 110/11KV substation at 110/11kV Mavali sub-station in Soraba Taluk, Shivamogga District with associated line. Shivamoggga 5 CD1071 Ulavi:Establishing 1x10MVA, 110/11kV Ulavi Sub-Station in Soraba Taluk, Shivamogga District with associated line. Shiamoga Sl. No. 2 3 Work Code Name of the Work 5 Total of Sub-stations 1 MSEZ: Providing 1 x20 MVA, 110/33/11kV Transformer as spare at 220kV Station MSEZ, Dakshina Kannada Bajpe in Mangalore Taluk, DK Dist CB1055 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 Budget 2019-20 Remarks 0.00 5.00 386.77& 21.04.07 0.00 300.00 ES1.10 BCR0.869 646.07& 09.01.19 0.00 100.00 tendered ES1.08 BCR0.9628 709.45& 06.02.19 0.00 100.00 tendered 0.00 0.30 905.00 0.00 0.00 1.00 0.00 285.41& 13.11.17 0.00 To be tendered. (Rs. In Lakhs) Sl. No. 2 3 4 5 6 Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others CD1061 Balligavi (Shiralkoppa): Providing 1X20MVA, 110/11kV Spare Transformer at 220kV Balligavi (Shiralkoppa) sub-station in Shikaripura Taluk, Shivamogga District . CD1065 Kumsi:Replacement of 2nd 1x 10MVA 110/11KV Power transformer by 1 x 20 MVA, 110/11KV power transformer at existing 110/11KV Kumsi S/s in Shimogga Taluk Shivamogga BCR 0.5 312.09 0.00 CE1041 Mudigere: Creating 33kV reference by installing 1x8MVA, 66/33kV Transformer at 66/33/11kV Mudigere sub-station in Chikkamagaluru Taluk & District Chikka-magalur BCR 1.75 400.53& 20.03.18 0.00 CE1043 Singtagere: Providing additional 1x10MVA, 110/11KV Power Transformer at 110/11kV Singatagere S/s Kadur Taluk Chikkamagalur BCR 0.68 CE1044 Tangli: Enhancement of 1 x 10MVA 110/11KV Power transformer 2 by 1 x 20 MVA, 110/11KV power transpower at 110/11kV Tangli S/s in Kadur Taluk. Chikkamagalur BCR 2.24 376.64 & 07.02.17 Shivamogga 0.00 0.00 Budget 2019-20 Remarks 10.00 To be tendered 0.00 80.00 1X20MVA Transformer is charged on 08.02.2019. other related works are under tendering stage. 0.00 150.00 289.44& 22.05.18 0.00 10.00 To be re-tendered 319.38& 18.05.18 0.00 100.00 Tendered (Rs. In Lakhs) Sl. No. 7 8 9 10 Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Work Code Name of the Work District Energy Savings & BCR CE1045 Panchanahalli : Replacement of 1x6.3 MVA, 66/11 kV Power Transformer2 by 12.5MVA, 66/11 kV power transformer at 66/11kV Panchanahalli sub-station, in Kadur Taluk, Chikkamagalur District Chikkamagalur BCR 2.05 277.33& 11.04.18 0.00 50.00 CA1086 Bandishettyhally: Providing additional 1x8MVA, 66/11kV Power Transformer at Bandishettyhally S/s in Holenarasipura Taluk, Hassan District Hassan BCR 0.68 216.95 & 24.09.18 0.00 100.00 Tender invited CA1087 Mattanavile: Replacement of 1x8MVA, 66/11kV Power Transformer by 1x12.5MVA, 66/11kV Power Transformer at 66/11kV Mattanavile S/s in Channarayapattana Taluk, Hassan District Hassan BCR 0.49 300.00 & 17.11.18 0.00 100.00 Tender invited CA1089 Juttanahally: Providing Spare 1x12.5MVA, 66/11kV Power Transformer at 66/11k Juttanahally Sub-station in Channarayapattana Taluk, Hassan District Hassan BCR 1.13 213.14 & 17.11.18 0.00 1.00 Tender invited on 06.03.2019 Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Sl. No. 11 12 13 14 Work Code Name of the Work Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Hassan BCR 0.86 145.75 & 28.05.18 0.00 10.00 To be tendered. BCR 1.31 251.85 & 17.11.18 0.00 50.00 DPR awaited. Cost of DWA Budget 2019-20 Remarks CA1090 Re-placement of 1x6.3MVA,66/11kV Power transformer by 1x12.5MVA, 66/11kV power Transformer at 66/11kV Magge Sub station in Alur Taluk, Hassan District CB1058 Kulashekara: Providing additional 1X20MVA, 110/11 KV Power Transformer at Dakshina Kannada 110/33/11kV Kulashekar SubStation in Mangaluru Taluk, Dakshina Kannada District. CE1046 Muthinakoppa:Replacement of 1X10MVA 110/11kV Power Transformer by 1x20MVA,110/11kV Muthinakoppa substation Narasimharajanagara (N.R.Pur)Taluk. Chikkamagalur BCR 0.7 266.30 & 06.09.18 0.00 50.00 Tendered CD1068 Kammaradi: Providing additional 1X10MVA 110/11kVPower Transformer at 110/11kV kammaradi substation in thirthahalli Taluk Shivamogga BCR 0.58 269.16 & 20.09.18 0.00 10.00 Tender to be invited. (Rs. In Lakhs) Sl. No. 15 16 17 18 19 District Energy Savings & BCR CD1069 Thirthahalli: Replacement of 1X10MVA Power Transformer by 1x20MVA,110/11kV power transformer at 110/11kV Thirthahalli substation Shivamogga BCR 0.58 CA1091 Kandli: Replacement of 2 X 8 MVA, 66/11 KV power Transformer by 2 X 12.5 MVA @ Kandli S/S in Hassana Taluk Hassana BCR 0.59 CA1092 Chikkakondagola: Replacement of 1x12.5MVA by 1x20MVA Power Transformer at 66/11kV S/s Chikkakondagola in Hassan Taluk, Hassan District. Hassan BCR 0.69 CA1093 Rampura: Augmentation of 1x6.3MVA, 66/11kV Power Transformer by 1x12.5MVA, 66/11kV @ 66/11 kV Rampura S/s in Channarayapatna Taluk, Hassan District Hassan CD1072 Sagara: Replacement of 1 x 10MVA ,110/33kV Transformer by 1x20MVA, 110/33KV transformer at 110/33/11kV Sagara Sub-Station in Sagar Taluk, Shivamogga District. Shivamogga Work Code Name of the Work Cost of Original / Date of Revised LOI DPR & Date 289.64 & 16.10.18 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 50.00 tendered 0.00 1.00 to be tendered 200.58 & 20.01.19 0.00 1.00 to be tendered BCR 0.83 141.01& 01.02.2019 0.00 1.00 to be tendered BCR 0.83 228.25 18.03.19 0.00 50.00 DPR to be approved 279.73 & 01.02.19 (Rs. In Lakhs) Sl. No. 20 21 22 23 24 Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 10.00 Estimate submitted CE1047 Mugulavalli: Providing additional 1 x 8MVA transformer at 220/66/11KV Mugulavalli sub-station in Chikkamagaluru Taluk & District. CD1073 MRS Shivamogga: Providing 1 x 100MVA, 220/66KV Transformer and construction of 66kV Terminal Bays at MRS Shivamogga sub-station in Shivamogga Taluk & District. Shivamogga BCR 1.00 1916.98 & 08.04.19 0.00 100.00 DPR to be approved CE1048 Yagati: Replacement of 1 x 10MVA, 110/11kV transformer by 1 x 20MVA, 110/11kV Transformer at 110/11kV Yagati sub-station in Kadur Taluk, Chikkamagaluru District. Chikkamagalur BCR 0.61 300.29& 25.01.19 0.00 10.00 To be tendered CA1094 C.R. Patna: Replacement of existing 1x12.5 MVA 66/11 kV Transformer by 1 x20 MVA, 66/11 kV Transformer at 66/11 kV Channarayapatna sub-station in Channarayapatna Taluk, Hassan District Hassan BCR 0.68 204.36 & 27.04.2019 0.00 50.00 CA1095 Singapura: Replacement of 1 x8MVA, 66/11kV Transformer by 1 x 12.5 MVA, 66/11kV Transformer at 66/11kV Singapura Sub-station in Holenarasipura Taluk, Hassan District. Hassan BCR 0.63 140.49 & 09.04.2019 0.00 1.00 Chikkamagalur (Rs. In Lakhs) Sl. No. 25 26 27 District Cost of Original / Date of Revised LOI DPR & Date CA1096 Hallymysuru: Replacement of 1 x 6.3 MVA, 66/11kV Transformer by 1 x 12.5 MVA, 66/11kV Transformer at 66/11kV Hallymysuru Substation in Holenarasipura Taluk, Hassan District. Hassan BCR 0.82 141.66 & 16.04.2019 0.00 20.00 CD1074 Jade:Providing additional 1X10 MVA, 110/11 kV Transformer at existing 110/11 kV Jade Sub-station in Sorabs Taluk , Shivamogga District. Shivamogga BCR 0.64 288.28 & 08.04.2019 0.00 50.00 CD1075 Ripponpete: Providing additional 1X10 MVA, 110/11 kV Transformer at existing 110/11 kV Ripponpete Substation in Hosanagara Taluk , Shivamogga District. Shivamogga BCR 0.64 286.15 & 08.04.2019 0.00 50.00 0.00 1116.00 0.00 50.00 Work Code 27 1 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Energy Savings & BCR Name of the Work Total of Augmentation CA1088 Atthichowdenahally: Providing 66kV LILO to 66kV Channarayapatna-Malali line Hassan at66/11kVAttichowdanahally Substation with 66kV Terminal Bay, CR patna Taluk Cost of DWA 0.00 154.75 & 17.11.18 0.00 0.00 Budget 2019-20 Remarks Tendered Published on 06.03.2019 (Rs. In Lakhs) Sl. No. 2 3 4 Work Code CA1033 CA1048 CA1071 Name of the Work Gendehally - Arehally: Construction of 66kV DC line from 66kV Arehalli Substation to LILO the existing 66kV SC line between BelurGendehally Sub-station along with two Nos of 66kV TB's at 66kV Arehalli Sub-station S K Pura to Arehall: Stringing of 2nd Circuit with Coyote ACSR Conductor on existing 66KV SC line onDC towers between 66/11KV S/s at Sakaleshpura and 66/11 KV S/s at Arehally with TB at both Sakaleshpura and Arehalli S/s. Reconstruction of 66kV SC line in existing corridor of 66kV SC MBT(FTS MysuruBhadra) line on DC towers from Hassan to H.N.Pura and reconstruction of 66kV sC line in the existing 110kV SC SMT(Shimoga-Mysuru) line corridor on DC towers from HN Pura to Hootagalli District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Hassana 444.11 & 24.11.09 Hassana Hassan Cost of DWA 0.00 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 0.00 200.00 NIT Issued 857.92 & 13.06.17 0.00 0.00 100.00 Re tendered 2108.42 & 02.04.08 0.00 0.00 100.00 To be tendered (Rs. In Lakhs) Sl. No. 5 6 Work Code Name of the Work District CB1030 Vitla Sub-Station : Construction of 1 No. of 110KV Terminal Bay at exiscting 110KV Vittla substation for making LILO of Dakshina Kannada the proposed 110KV Line from existing 110KV NetlamandurSalethur SC Line for a Distance of 0.55 with 110KV MC towers. CE1028 Shimoga Station to 220kV Kadur Station: Construction of 110kV SBT2DC line on DC tower for a distance of 60.281 kms in the existing Corridor of 110 KV SBT-2 SC line from 220/110/66/11 KV M.R.S Shivamogga to 220/110/11KV Kadur Station along with Construction of 110KV TB at 220KV M.R.S Shivamogga and 220KV Kadur Sation Chikkamagaluru Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 262.38& 28.03.18 2134.06 & 08.06.17 Budget 2019-20 0.00 80.00 0.00 10.00 Remarks Tendered To be tendered 0.00 (Rs. In Lakhs) Sl. No. 7 8 9 9 Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Work Code Name of the Work District CC1034 Re-conductoring of the existing Lynx conductor by drake conductor of 110kV Kemar-Hiriyadka-Mudabidare DC line between Khemar 220kV substation and Kuntalpady village limits (from Loc 01 to Loc 16) for a distance of 1.727Kms in Karakala Taluk. Udupi 84.59& 28.05.18 0.00 70.00 Tendered CD1067 Linganamakki to Iduvani: Re-construction of two numbers of 110kV Dc lines from iduvani limits to Linganamakki power House in the existing corridor of 110kV JLT-3&4 DC line(4.6 Kms) and 110kV LST-3 &4 DC line (4.7Kms) using Lynx conductor for a distance of 9.28kms in Shimoga District. Shimoga 566.76& 01.06.18 0.00 10.00 To be tendered CD1076 Balligavi limit to 110KV anvatti MUSS : Stringing of 110kV 2nd Circuit using vacant cross arms of existing 110kV DC towers from balligavi limits to 110kV Anavatti (Kotipura) substation for a distance of about 27 Kms along with construction of 110kV TB at 110kV Anavatti(Koti Pura) S/S Shivamogga 250& 05.02.19 0.00 10.00 To be tendered 0.00 630.00 Total of Lines 0.00 0.00 0.00 Remarks (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Dakshina Kannada BCR 0.55 1 CB1022 Kulashekar: 1) Re-arranging of existing 110kV lines at 110/33/11kV Kulashekara S/S inview of R&M works of S/S. 2) R&M of 110/33/11kV Kulashekara S/S and providing additional 1X20MVA, 110/33kV Tr at 110/33/11kV Kulashekara S/S 2 CB1023 Kavoor: R & M Works at Kavoor 220kV Dakshina Kannada Station. 3 CC1028 Formation of 220KV rigid bus at 220KV RS, Kemar 4 CC1033 CE1031 5 Cost of Original / Date of Revised LOI DPR & Date 716.04 & 18.02.11 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 Budget 2019-20 Remarks 0.00 0.11 1.00 To be tendered. 1948.23 & 30.04.11 0.00 0.00 1.00 To be tendered. Udupi 236.89 & 04.12.09 0.00 0.00 1.00 Revised DPR awaited. Formation of 110KV rigid bus at 220KV RS, Kemar Udupi 236.89& 04.12.09 0.00 0.00 70.00 Tender invited Chikkamagalur: Providing of 2Nos. of 66kV SF6 CB to Incoming lines from 220kV R/S Mugluvalli (Chikkamagalur) & 2Nos of 66kV SF6 CB to Incoming lines from Bhadra including 2Nos. bay at Chikkamagalur Sub-Station Chikka-magalur 211.33 & 15.06.17 0.00 0.00 10.00 To be tendered 5 Total of TB's & Others 0.00 0.00 0.00 0.11 83.00 46 Total of Hassana Zone 0.00 0.00 0.00 22.41 2734.00 MYSURU TRANSMISSION ZONE (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Sl. No. Work Code Name of the Work District Energy Savings & BCR 1 DA1044 Kampalapura: Establishing 1x8MVA, 66/11kV SubStation with associated line for a distance of 1.837Kms Mysuru ES 1.067 & BCR 1.29 562.89 13.06.17 DA1118 Chamalapura (B.Seehalli): Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 3.835Kms Mysuru ES 1.152 & BCR 1.29 3 DD1047 Arkalavadi: Establishing 1x8MVA, 66/11kV Sub-Station with associated line for a distance of 10.368Kms Chamarajanagar 4 DD1053 Ajjipura: Establishing 1x8MVA, 66/11kV SubStation with associated line. 2 5 6 6 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Remarks 0.00 0.00 200.00 Approved in 70th TCCM 618.08 & 06.03.17 0.00 0.00 200.00 DPR Received, To be ReTendered. ES 2.10 & BCR 1.71 736.13& 1.9.18 0.00 0.00 200.00 Chamarajanagara Es 0.850 BCR 0.98 645.20 & 20.09.18 0.00 200.00 DA1125 Yerahally Hand post : Upgadation of 33/11KV SS to 1x8MVA,66/11kV Substation at Yarahalli(handpost) with associated line. Mysuru Es 1.130 BCR 1.22 699.18 & 11.12.18 0.00 200.00 CESC Land Handed over to KPTCL DB1110 Talagawadi / Nelamakanahally limits : Establishing 1x12.5MVA, 66/11kV Sub-Station at Talagavadi (Nelamakanahalli) with associated line. Mandya Es 1.946 BCR 1.84 781.35 & 18.12.18 0.00 100.00 DPR Approved 0.00 1100.00 Total of Sub-stations 0.00 Budget 2019-20 0.00 0.00 0.00 (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date District Energy Savings & BCR Bhogadhi: Providing Spare 1x20 MVA 66/11kV Transformer Mysuru BCR 2.15 225.70 & 12.09.14 DA1092 Jayapura: Replacing 2nd 8MVA, 66/11kV by 12.5MVA, 66/11kV Transformer Mysuru BCR 0.74 134.19 & 27.09.14 3 DA1094 KHB Colony: Replacing 1x6.3MVA, 66/11kV by 1x12.5MVA, 66/11kV Transformer Mysuru BCR 0.89 138.86 & 03.11.14 4 DA1099 Hebbal : Replacement of 2 X 12.5 MVA, 66/11 KV Power Transformer by 2 X 20 MVA . Mysuru BCR 0.98 371.90 & 27.02.15 5 DB1106 Mandya KIADB: Replacing 1x12.5MVA, 66/11kV by 1x20MVA, 66/11kV Transformers with SWGs Mandya BCR 0.53 6 DD1042 Hanur : Replacement of 1 X 8 MVA by 1 X 12.5 MVA, 66/11kV Transformer. Chamarajanagar DD1054 Madhuvanhalli : Replacement of 1X6.3 MVA,66/11 KV Power transformer by 1X12.5 MVA, 66/11kV Power transformer at Madhuvanhalli Chamarajanagar Sl. No. Work Code 1 DA1091 2 7 Name of the Work Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 0.00 1.00 To be Tendered. 0.00 0.00 10.00 Tender Evaluation under process 0.00 0.00 10.00 Tender Evaluation under process 230.66 0.00 10.00 Estimate submitted for inviting tender to SEE, T(W&M)Circle, Mysueru on 07.07.2018. 272.30& 21.11.17 0.00 0.00 10.00 BCR 1.05 158.64 & 16.11.15 0.00 0.00 10.00 BCR 0.74 141.91 & 08.06.18 0.00 10.00 27.09. 14 02.07. 16 84.18 146.48 To be tendered (Rs. In Lakhs) Sl. No. Work Code Name of the Work Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Chamarajanagar BCR 0.49 149.29 & 01.06.18 0.00 10.00 Cost of DWA Budget 2019-20 Remarks 8 DD1055 Yelandur : Replacement of 1x 8 MVA,66/11 KV transformers2 by 1X12.5 MVA,66/11kV Power transformers at 66/11kV Yelandur S/s. 9 DA1137 Antharasanthe: Providing additional 1x8MVA, 66/11kV Power Tr at Antharasanthe S/s Mysuru BCR 0.74 228.85 & 27.09.18 0.00 10.00 NIT Issued DA1138 Bilikere: Replacement of 1x8 MVA 66/11kV Power Tr. By 1x12.5 MVA , 66/11kV Power Tr at Bilikere S/s Hunsur Taluk Mysuru BCR 0.57 161.53 & 03.09.18 0.00 10.00 To be Tendered DA1139 B.Matakere: Providing additional 1x8MVA, 66/11kV Power Tr at 66/11kV B.Matakere S/s in H.D Kote Taluk Mysuru BCR 0.74 228.85 & 29.09.18 0.00 10.00 NIT Issued 12 DA1140 Chidravalli : Providing additional 1x8MVA 66/11KV Power Transformer at Chidravalli 66/11KVSub Station in TN Pura Taluk & Mysuru Dist. Mysuru BCR 0.70 239.897 22.10.18 0.00 10.00 To be Tendered 13 DA1141 Mirle: Providing additional 1x8MVA, 66/11kV Power Trat 66/11kV Mirle S/s . Mysuru BCR 0.73 232.25 & 20.09.18 0.00 10.00 To be tenderd 10 11 (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date District Energy Savings & BCR DA1142 Nanjanagud: Replacing 1st 1x12.5 MVA, 66/11kV Tr. by 1x20 MVA 66/11kV power Tr. At 66/11kV Nanajanagud S/s Mysuru BCR 0.70 240.31 & 18.07.18 15 DA1143 Talakadu: Replacement of 2x8 MVA 66/11kV Power Transformer by 2x12.5 MVA 66/11kV Talakadu S/s Mysuru BCR 0.59 16 DA1144 Chunchanakatte: Providing additional 1x8MVA, 66/11kV at Chunchankatte S/s Power Tr. Mysuru 17 DA1145 Bherya: Providing additional 1x8MVA, 66/11kV Power Transformer at 66/11kV Bherya substation . 18 DC1016 19 DC1017 Sl. No. 14 Work Code Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 10.00 To be Tendered 315.63 & 27.10.18 0.00 10.00 DPR Approved;To be Tendered BCR 0.59 225.66 & 03.02.18 0.00 10.00 To be Tendered Mysuru BCR 0.792 231.09 & 18.01.18 0.00 10.00 To be Tendered Suntikoppa: Providing additional 1x8MVA, 66/11kV Power Tr at 66/11kV Suntikoppa Sub station Kodagu BCR 0.62 235.19 & 11.10.18 0.00 10.00 NIT Issued Alur-Siddapura: Providing additional 1x8MVA, 66/11kV Power Transformer at 66/11kV Alur Siddapura. Kodagu BCR 0.58 250.64 & 18.12.18 0.00 10.00 DPR approved; To be tendered Name of the Work Cost of DWA (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 20 DA1128 DMG Halli : Providing additional 1 X 8 MVA, 66/11 KV Power Transformer at DMG Halli 66/11KV Sub Station in Mysuru Taluk & Mysuru Dist. 21 DA1146 Gejjaianavaddaragudi : Replacement of 1 X 8 MVA, 66/11 KV Power Transformer by 1 X 12.5 MVA. Mysuru DA1147 Sinduvallipura:Replacement of 2x8MVA,66/11kV Power Transformer by 2x12.5MVA, 66/11kV Power Transformer at 66/11kV Sinduvallipura Substation in Nanjangud Taluk, Mysuru District Mysuru DA1148 Thandya:Repl of 1x12.5MVA by 1x20MVA Transformer at 66/11kV Thandya sub-station in Nanjanagudu Taluk, Mysuru District. Mysuru BCR 0.66 238.05 & 16.04.19 0.00 1.00 DD1056 Begur (66kV S/S):Repl of 2nd 8MVA, Transformer by 12.5MVA, Transformer at 66/11kV Begur sub-station in Gundlupet Taluk, Chamarajanagara District. Chamarajanagara BCR 0.48 142.10 & 26.04.19 0.00 1.00 0.00 204.00 22 24 25 24 Total of Augmentation Mysuru 0.00 10.00 0.00 10.00 304.57 0.00 1.00 84.18 146.48 230.66 Remarks To be Tendered (Rs. In Lakhs) Sl. No. 1 2 3 4 Energy Savings & BCR Work Code Name of the Work District DA1051 Hootagalli - Bherya Limits: Replacing of H - Frames by Reconstruction of 66kV SC line between Hootagalli - Bherya Limits to a distance of 54 km Mysuru DA1059 Bettadapura Sub-station: Reconstruction of 66 kV SC line on SC towers by LILO line from existing 66 kV Chunchanahatti-Kushalnagar line to 66/11 kV Bettadapura S/S for a distance of 2.457 km in Periyapatna Taluk,Mysuru District for a distance of 2.46 kms Mysuru NA DA1060 Jayapura : Providing additional 1 No. of 66 kV TB and LILO of Kadakola - Sargur 66kV line by constructing additional Circuit on existing towers for a distance of 6.0 kms along with Terminal Bay at Jaipura for a distance of 6 kms Mysuru NA DA1080 Hootgalli-Kanayanbetta upto Bavali limit: Re-Construction of 220kV Hootgalli-Kanayanbetta line upto Bavali limit for a distance of 81kms as per Southern Grid instruction. Mysuru Cost of Original / Date of Revised LOI DPR & Date 1025.04 22.04.16 22.04. 16 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 0.00 10.00 To be re-tendered 94.25 & 18.08.12 0.00 0.00 1.00 To be Re- tendered 58.00 & 06.09.11 0.00 0.00 1.00 To be Re- tendered 415.2 & 26.03.15 0.00 0.00 10.00 To be Re- tendered (Rs. In Lakhs) Sl. No. 5 6 7 8 Work Code DA1081 DB1024 DB1053 DB1090 Name of the Work K R Nagar to Chunchanakatte: Re-Construction of existing 66kV line between K R Nagar Sub-Station to Chunchanakatte Sub-Station for a distance of 5.8kms Shimsha - Mandya: Construction of 66kV SC link line in the existing corridor for a distance of 44.57KMs. Hampapura : LILO of Kadakola Santhesaguru 66kV line by constructing additional Circuit on existing towers for a distance of 6.5km along with Terminal Bay at Hampapura (HD Kote) for a distance of 6.5 kms Anegola LILO: Construction of 2nd circuit on existing 66kV DC towers for a distance of 2.965 Kms for Making LILO arrangement to Anegola Sub-Station District Energy Savings & BCR Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 155.96 & 23.11.15 Mysuru Mandya Cost of Original / Date of Revised LOI DPR & Date NA 431.53 & 13.10.09 0.00 31.07. 10 346.87 0.00 0.00 Budget 2019-20 Remarks 9.00 To be retenderd 346.87 42.29 1.00 After commissioning of 220/66/11 KV Shivasamudra (Hebbani) Station, the load of malavalli muss and mandya load will be bifurcated and feed from proposed 220 kv station for which fresh proposal for this work will be submitted for TCCM approval To be tendered Mandya 60.57 & 06.09.11 0.00 0.00 10.00 Mandya 74.09 & 12.06.15 0.00 0.00 10.00 (Rs. In Lakhs) Sl. No. 9 10 11 12 13 Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks DD1029 Santhemaranahalli Sub-station: Providing 66kV LILO arrangment to existing 66/11kV Santhemaranahally S/s along with 1 No TB Chamarajanagara 154.78 & 20.01.15 0.00 0.00 10.00 DD1036 Ramapura LILO: Construction of 66kV 2nd circuit line for a distance 1.5Kms. on existing D/C towers for making LILO arrangement to Ramapura Sub-Station along with Terminal Bay. Chamarajanagara 56.27 & 20.11.14 0.00 0.00 10.00 DB1111 Kadaballi LILO: Running of 2nd Ckt on Existing 66kV DC Tower from Tapping Point to Kadaballi S/s for a distance of about 1.5 Kms with TB at Kadaballi S/s Mandya 56.24& 05.02.19 0.00 1.00 DPR to be approved DB1112 Seelanere LILO: Running of 2nd Ckt on Existing 66kV DC Tower from Tapping Point to Seelanere S/s for a distance of about 1.75 Kms with TB at Seelanere S/s Mandya 62.74& 06.02.19 0.00 1.00 DPR to be approved DB1113 Yattambadi LILO: Running of 2nd Ckt on Existing 66kV DC Tower from Tapping Point to Yattambadi S/s for a distance of about 1.5 Kms with TB at Yattambadi S/s Mandya 56.68& 16.02.19 0.00 1.00 DPR to be approved (Rs. In Lakhs) Sl. No. 14 15 Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks DB1114 Kolakaranadoddi LILO: Running of 2nd Ckt on Existing 66kV DC Tower from Tapping Point to Kolakaranadoddi S/s for a distance of about 0.75 Kms with TB at Kolakaranadoddi S/s Mandya 54.64& 05.02.19 0.00 1.00 DPR to be approved DB1115 Shivalli (V.C.Farm) LILO: Running of 2nd Circuit on existing 66KV DC tower from Tapping Point to Shivalli (V.C.Farm) S/s for a distance of about 7.6Kms with TB at Shivalli (V.C.Farm) S/s. Mandya 94.61& 05.02.19 0.00 1.00 DPR to be approved 15 Total of Lines 346.87 0.00 346.87 42.29 77.00 45 Total of Mysuru Zone BAGALKOTE TRANSMISSION ZONE 431.05 146.48 577.53 42.29 1381.00 0.00 0.00 1.00 1 2 ED1008 Banavasi: Establishing 1x10MVA, 110/11kV Sub-Station with associated line & TB. EE1059 Mughalkod: Establishing 2x100MVA, 220/110kV & 1x10MVA, 110/11kV Sub Station at Mughalkod(Kabbur) village in Raibagh Taluk, Belagavi District Uttara Kannada Belagum 4.04/ 2.59 6.84/ 0.46 938.90 & 21.09.17 13600.36& 10.12.18 0.00 0.00 1000.00 For the Year 18-19 Token Budget- Rs 1.00 Lacs For the Year 19-20 budget of Rs. 5000lakh is sought as the work pertains to green energy corridar. (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 EE1127 Haliyal: Upgradation of 2x5MVA, 33/11kV Haliyal Sub Station to 2x10MVA, 110/11KV SubStation at Haliyal in Athani Taluk, Belagavi district Belagavi 4.28 3.06 961.02 & 16.11.18 0.00 100.00 4 EB1033 Alnavara: Up-gradiation of 2x5 MVA, 33/11KV Alnvara sub-station to 2X10MVA, 110/11KV & 1x20 MVA, 110/33 kV Substation at Alnvara in Dharwad Taluk, Dharwad District. . Dharwad 3.730 1.81 1757.08 & 01.10.18 0.00 100.00 5 EG1062 Aaheri: Establishing 2 x 100 MVA 220/110kV sub station at Aaheri in sindagi Taluk Vijayapura District. Vijayapura 5.3 1.51 10437.35 & 31.12.18 0.00 500.00 6 EG1064 Kambagi : Establishing 2x10MVA,110/11kV SubStation at Kambagi in Vijayapura Taluk, Vijayapura District. Vijayapura 7.9/ 5.78 927.4 & 11.02.19 0.00 100.00 7 EE1136 Diggewadi: Establishing 1x10MVA, 110/11kV Sub-Station at Diggewadi in Raibagh Taluk . Belagavi 6.93/3.57 1259.58& 29.04.19 0.00 1.00 3 Remarks For theYear 18-19 Token Budget of Rs 1.00 Lac ( as DPR approved ) Say Rs 1.00 Lac For theYear 19-20 Token Budget of Rs 1.00 Lac Say Rs 10.00 Lac Private Land identified in Diggewadi - Jalalpur Area Land Purchased on 14.08.2018 (Rs. In Lakhs) Sl. No. Work Code Name of the Work 8 EE1137 AEQUS 220kV : Establishing 2x100 MVA, 220/110 kV substation at AEQUS SEZ premises Hattaragi in Hukkeri Taluk, Belagavi District 9 EG1068 Jumnal: Establishing 2x10 MVA, 110/11kV sub-station at Jumnal in Vijayapura Taluk, Vijayapura District. District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Belagavi 1.15 8499.5& 26.03.19 0.00 1.00 Vijayapura 6.84 4.69 990.00& 11.03.19 0.00 1.00 0.00 0.00 1804.00 0.00 0.00 9 Total of Sub-stations 1 EC1019 Gadag: Providing additional 4th 1x100MVA, 220/110kV Transformer at 220kV Gadag station in Gadag Taluk Gadag BCR 2.3 786.94 & 29.12.16 0.00 0.00 100.00 EC1022 Konnur: Providing additional 1X10MVA, 110/11kV Power Transformer at 110kV Konnur S/s. Gadag BCR 0.59 281.4& 17.06.17 0.00 0.00 50.00 2 Remarks Land lease deed executed on 25.09.2018 ( For 15 acre 01 Gunta) Additional For theYear 18-19 Token Budget of Rs 1.00 Lac ( if DPR approved ) Say Rs 1.00 Lac For theYear 19-20 Token Budget of Rs 1.00 Lac Say Rs 1.00 Lac (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Name of the Work District Energy Savings & BCR EE1123 Shiragaon : Replacing 1x10MVA, 110/11kV by 1x20MVA, 110/11kV Transformer Belgaum BCR 0.45 286.82& 26.05.17 4 EE1124 Hirebagewadi: Augmentation of 10 MVA ,110/11 KV by 20 MVA, 110/11 KV Power Transformer at 110 KV S/S Hirebagewadi Belgaum BCR 0.44 295.05& 30.05.17 0.00 0.00 50.00 5 EF1068 Bagalkot: 3rd 1x100MVA Transformer at 220/110KV Bagalkote S/s Bagalkot BCR 1.99 728.87& 18.01.18 0.00 0.00 100.00 DPR cost requested for 2019-20. 6 EF1069 110 kV S/S Bisnal : Creating 33 kV reference by installing 1x20 MVA, 110/33 kV transformer at 110 kV Bisnal sub-station, in Bilagi Taluk, Bagalkot District Bagalkot BCR 0.87 320.29& 31.10.17 0.00 0.00 320.00 DPR cost requested for 2019-20. 7 EG1035 Muddebihal: Providing additional 1x10MVA, 110/33kV Transformer Bijapur BCR 1.09 179.3 & 14.10.10 0.00 5.75 50.00 DPR cost requested for 2019-20. 8 EG1052 Zalaki: Replacement of 10MVA, 110/11kV by 20MVA, 110/11kV Transformer Bijapur BCR 1.35 256.11 & 05.11.15 0.00 0.00 50.00 DPR cost requested for 2019-20. 9 EG1053 Chadachan: Providing additional 1x10MVA, 110/11kV Transformer Bijapura BCR 0.58 287.07 & 16.02.17 0.00 0.00 50.00 DPR cost requested for 2019-20. Sl. No. Work Code 3 Cost of DWA 0.00 0.00 0.00 Budget 2019-20 Remarks 50.00 For theYear 18-19 Token Budget - Rs 10.00 Lacs For theYear 19-20 Token Budget - Rs 10.00 Lacs For theYear 18-19 Token Budget - Rs 10.00 Lacs For theYear 19-20 Budget of 150lakh sought exculding cost of the transformer. (Rs. In Lakhs) Sl. No. 10 11 12 13 Work Code Name of the Work EE1128 Katkol: Replacement of 1x10MVA, 10/11 KV by 20 MVA, 110/11 KV Power Transformer by 1x20MVA, 110/11KV Power transformer at 110/33/11 KV S/S Katkol. EE1129 110 KV S/S Yalapharatti Creating 33 KV reference by providing 1X20 MVA ,110/33 KV Transformer at Yalapharatti Sub station in Raibag Taluk, Belagavi Dist EE1130 110 KV S/S Yalapharatti : Replacement of 1x10 MVA, 110/11kV transormer by 1x20 MVA, 110/11 KV transformer at 110 kV Yalaparahatti substation, in Raibag Taluk, Belagavi District. EE1131 110 KV Udyambagh Creating 33 KV Reference by providing additional 1X20 MVA 110/33 KV Transformer at 110 KV Udyambagh Sub Station in Belagavi Taluk, Belagavi Dist District Belagavi Belagavi Belagavi Belagavi Energy Savings & BCR BCR 0.4 0.76 Cost of Original / Date of Revised LOI DPR & Date 298.07 & 10.09.18 336.89 & 29.09.18 0.4 296.89 & 12.10.18 1.37 202.99 27.08.11 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 0.00 0.00 0.00 Budget 2019-20 Remarks 1.00 For theYear 18-19 Token Budget of Rs 1.00 Lac Say Rs 1.00 Lac For theYear 19-20 Token Budget of Rs 1.00 Lac Say Rs 1.00 Lac 50.00 For theYear 18-19 Token Budget of Rs 1.00 Lac For theYear 19-20 Token Budget of Rs 1.00 Lac 50.00 50.00 Additional For theYear 18-19 Token Budget of Rs 1.00 Lac For theYear 19-20 Token Budget of Rs 1.00 Lac For theYear 18-19 Token Budget of Rs 1.00 Lac For theYear 19-20 Token Budget of Rs 1.00 Lac (Rs. In Lakhs) Sl. No. 14 15 16 17 Work Code Name of the Work EE1132 110 KV S/S Sadalaga Providing spare 1X10 MVA,110/11 KV Power Transformer at existing 110/11 KV Sadalaga Sub Station in Chikkodi Taluk, Belagavi Dist EE1133 220 KV Chikkodi Providing 3rd 100 MVA ,at 220/110 KV power transformer at existing 220/110/11kV Chikkodi Sub Station in Chikkodi Taluk, Belagavi District District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date 203.61 16.10.18 Belagavi Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 Budget 2019-20 10.00 Belagavi 1.52 886.14 & 15.10.18 0.00 400.00 EA1025 Hosa Honnatti: Providing Addl 1X10MVA, 110/11KV Trfr at existing 110/11KV Hosa Honnatti Sub station in Ranebennur Taluk, Haveri District. Haveri 0.58 286.45 & 10.08.18 0.00 50.00 EA1026 110 kV S/S Tumminakatti : Creating 33 kV reference by Providing 1x20 MVA, 110/33 kV Power transformer at existing 110/11 kV Tumminakatti sub-station, in Ranebennur Taluk, Heveri District Haveri 0.96 336.04& 15.10.18 0.00 150.00 Remarks For theYear 18-19 Token Budget of Rs 1.00 Lac For theYear 19-20 Token Budget of Rs 1.00 Lac For theYear 18-19 Token Budget of Rs 1.00 Lac Say Rs 1.00 Lac For theYear 19-20 Budget ( Tender Cost excluding Trf Cost ) of Rs 400.00 Lac Say Rs 400.00 Lac Replaced Tr. Is already diverted. (Rs. In Lakhs) Sl. No. 18 19 20 21 District Energy Savings & BCR EA1027 Tiluvalli: Augmentation of 1X10MVA, 110/11KV Power Tr by 1X20MVA, 110/11KV Power Tr at 110/33/11KV Tiluvalli Sub station in Hanagal Taluk, Haveri District. Haveri 0.63 EC1023 Hirehal :Interchanging of 1X20MVA,110/33kV Power Tr at existing 110/33/11kV RON Sub-station and 1X10MVA,110/33kV Power Tr at 110/33/11kV Hirehal S/S in Ron Taluk, Gadag District. Gadag EC1024 Mundargi:Replacement of 1X10MVA,110/11kV Trf by 1X20MVA,110/11kV Trf at 110/33/11kV Mundargi S/S in Mundargi Taluk, Gadag District. Gadag EC1025 Sambapur Road: Providing spare 1X20MVA, 110/3311KV Power Tr at existing 110/11KV Sambapur Road Sub station in Gadag Taluk, Gadag District instead of 110kV Mundaragi station Gadag Work Code Name of the Work 0.55 Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 248.06 & 22.10.18 0.00 50.00 24.87 & 30.10.18 0.00 10.00 280.58 & 10.08.18 0.00 150.00 291.03 & 02.11.18 0.00 50.00 Remarks (Rs. In Lakhs) Sl. No. 22 23 24 25 26 Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Work Code Name of the Work District Energy Savings & BCR EG1058 Muddebihal:Replacement of 1x10MVA, 110/11kV transformer by 1x20MVA 110/11kV transformer at 110kV Muddebihal substation in Muddebihal taluk, Vijayapura District. Vijayapura 0.53 290.40 & 25.10.18 0.00 50.00 EG1059 Tikota: Replacement of 1x10 MVA, 110/11 kV transformer by 1x20 MVA, 110/11 kV Transformer at 110 kV Tikota sub-station, in Vijayapura Taluk, Vijaypura District. Vijayapura 0.48 315.39 17.11.18 0.00 150.00 EG1060 Almel: Replacement of 1x10 MVA, 110/11 kV transformer1 by 1x20 MVA, 110/11 kV transformer at 110 kV Almel sub-station in Indi Taluk Vijayapura District. Vijayapura 0.79 202.18 & 03.11.18 0.00 60.00 EF1070 Jambagi K.D.: Providing additional 1x10 MVA, 110/11 KV Transformer at 110 KV Jambagi K.D. S/S in Mudhol Tq. Bagalkot Dist. Bagalkote 0.43 278.75 & 01.09.18 0.00 150.00 EG1063 Aski :Creating 33kV reference by providing 1 x 20 MVA, 110/33 kV power transforemer at 110kV substation Aski in Sindagi Taluk, Vijayapura district Vijayapura 0.56 274.56 & 31.1.19 0.00 50.00 Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Sl. No. 27 28 29 30 31 Work Code Name of the Work Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR Belagavi 0.72 356.6& 18.1.19 0.00 250.00 Cost of DWA Budget 2019-20 EE1138 110 KV Taushi Creating 33kV reference by providing 1x20MVA,110/33 KV Power Transformer at 110kV Taushi(Balligeri) S/s in Athni Taluk. EC1026 Replacement of 1X10MVA, 110/33KV Tr by 1X20MVA, 110/33KV Tr at 110KV Dambal Sub station in Mundaragi Taluk, Gadag District. Gadag 0.85 203.11& 26.12.18 0.00 1.00 EA1028 110 kV S/S Aremallapura : Providing additional 1x10 MVA, 110/11 kV transformer at 110 kV Aremallapura substation, in Ranebennur Taluk, Haveri District Haveri 0.46 325.3& 26.12.18 0.00 1.00 EE1139 Uchagaon: Creating 33kV reference by providing 1x20 MVA, 110/33kV transformer along with 33kV bank & feeders bay at 110 kV Uchagaon Sub-station in Belagavi Taluk & District Belagavi 0.85 379.03& 09.01.19 0.00 1.00 EG1065 Vijayapur: Providing additional 1x10MVA, 110/11kV Power Transformer at 220/110/11 KV Vijayapur Sub-statuib ub vijayapur Taluk and District. Vijayapura 0.55 278.03& 21.03.19 0.00 1.00 Remarks (Rs. In Lakhs) Sl. No. 32 33 34 35 Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR EG1066 Hiremasali: Providing 1x10 MVA, 110/11kV Power transformer along with 1/C+5F+1AP3 switchgear at 110kV Hiremasali sub-station in Indi Taluk & Vijayapur District Vijayapura 0.53 287.19& 24.01.19 0.00 1.00 EE1140 Belagavi: Providing additional 3rd 100MVA 220/110kv transformer along with other renovation & modernisation works at existing 220/110/11kV Belagavi substation in Belagavi Taluk & District Belagavi 0.56 2227.42& 01.03.19 0.00 1.00 EF1071 BISNAL :Providing additional 1X10 MVA, 110/11 kV power transformer along with 11kV switchgears at existing 110/11 kV Bisnal Sub-station in Bilagi Taluk , Bagalkot District Bagalkote 0.41 289.17 & 09.04.18 0.00 1.00 EF1072 Augmentation of 1X10 MVA, 110/11kV power transformer by 1X20 MVA, 110/11kV power transformer at 110/11kV Kaladagi substation in Bagalkot Taluk and District. Bagalkot 0.4 289.27 & 16.4.19 0.00 1.00 Work Code Name of the Work Cost of DWA Budget 2019-20 Remarks (Rs. In Lakhs) Sl. No. 36 37 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Work Code Name of the Work District EF1073 Augmentation of 1X10 MVA, 110/11kV power transformer by 1X20 MVA, 110/11kV power transformer at 110/11kV Uttur sub-station in Mudhol Taluk and Bagalkot District. Bagalkot 0.4 306.9 & 27.4.19 0.00 1.00 EG1067 Babaleshwar : Augmentation of 1X10 MVA, 110/11kV power transformer-II by 1X20 MVA, 110/11kV power transformer along with 1I/C + 6F + 1CB at 110 kV Babaleshwar sub-station in B.Bagewadi Taluk, Vijayapur District. Vijayapura 0.52 294.56 /30.4.19 0.00 1.00 0.00 5.75 2561.00 0.00 0.00 2000.00 37 1 Cost of Original / Date of Revised LOI DPR & Date Energy Savings & BCR Total of Augmentation EB1032 220kV SRS Hubli -220kV Haveri Station: Conversion of existing S/C line on /SC Towers to SC line Dharwad / Haveri / on DC towers from UK 220/110kV SRS Hubli R/S to 220/110kV Haveri Station for a length of 78Kms Cost of DWA 0.00 2218.56& 28.03.18 0.00 Budget 2019-20 Remarks (Rs. In Lakhs) Sl. No. 2 3 4 5 Work Code Name of the Work District EB1029 110KV Kawalwad-Hubli Line: Replacing of Exisisting Dog/Wolf conductor by Lynx Conductor of 110kV NK1 & NK2 Line from 110kV Kavalavad S/s 220kV SRS Hubali S/s for a distance of 32kms along with strenghthening of line by replacing weakened Towers for a distance of 32Kms Dharwad EC1017 Gadag-Naregal-Ron: Conversion of 110kV SC line to DC line from 220kV Gadag S/s to 110kV Naregal S/s and Stringing of 110kV 2nd Circuit from 110kV Naregal S/s to 110kV Ron S/s for a distance of 28.57 & 16.795Kms Gadag ED1019 Jog-Sirsi: Replacement of Existing Towers Dog/Coyote Conductor by new towers and Lynx Conductor of 110kV NK1 & NK-2 DC line form MGHE PH Jog to 110kV Sirsi S/s for A distance of 49.71 Kms Shivamogga/Uttar Kannada ED1020 Sirsi and Kavalawada line Replacement of 110kV Dog/coyote ACSR conductor by Lynx conductor of NK-1 and NK-2 lines between Sirsi and Kavalawada for a distance of 67.376Kms North Canara Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date 869.92 & 15.04.15 Cost of DWA Budget 2019-20 0.00 0.00 1.00 1194.72 & 19.03.15 0.00 0.00 250.00 1534.87 & 02.02.15 0.00 0.00 1.00 0.00 0.00 1.00 1560.53 & 15.05.14 0.00 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Remarks (Rs. In Lakhs) Sl. No. 6 7 8 Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 ED1025 Ambewadi - Kawalwad Line: Replacement of Dog / Wolf conductor 110kV NK-1 & 2 Line between Ambewdai and Kawalwad by Lynx conductor along with line strengthning by replacing weakened towers Uttar Kannada 879.91 & 24.12.16 0.00 0.00 1.00 EF1049 Mudhol Tap line: Conversion of existing 110kV Mudhol tap line to D/C line along with 1 TB for a distance of 1.176kms. Bagalkote 88.16 & 17.05.14 0.00 0.00 1.00 EG1061 B.Bagewadi - ShahabadMoratagi line : Replacement of MS towers by GI towers along with conductor of 110KV and B.Bagewadi - Shahabad DC Line from 220kV S/S B.Bagewadi upto 110KV Moratagi Sub Station (Loc.No194 to 415) in Vijayapura Taluk, Vijayapura District and Conversion of 110KV tap line of 110KV Sindagi Sub Station to LILO arrangement in Sindagi Taluk, Vijapura District. Vijayapura 3187.58 & 18.12.18 0.00 300.00 Remarks (Rs. In Lakhs) Sl. No. 9 10 11 Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Work Code Name of the Work District EE1134 110kV Mahalingpur – Athani: Conversion of 110 KV SC Line on SC Towers (Partially MS and Partially GI) to new SC line on DC towers of 110kV Mahalingpur - Athani SC line from Loc No-1 to 117 for a distance of 33.184 Km in Bagalkot and Belagavi Dist Bagalkote & Belagum 1273.1 & 09.01.19 0.00 100.00 EB1034 Tarihal Akshaya Colony: Construction of 110 kV link line between 110 kV Tarihal and 110 lV Akshaya Colony sub-stations using 110 kV EHV 630 sq.mm UG cable for a distance of 7.922 kms along with TBs at Hubli Taluk. Dharwad 4236.16 & 23.02.19 0.00 100.00 EE1141 Construction of 110 KV SC Link Line on DC Towers between proposed 110 KV Shiraguppi and existing 110 Kagwad Sub Station in Athani taluk Belagavi 463.88 09.01.19 0.00 1.00 -- Remarks >Proposed to be completed subject to award (Rs. In Lakhs) Sl. No. 12 Work Code EE1142 12 1 2 Name of the Work Mahalingapura-Kudchi: Conversion of 110kV SC line on SC towers to new SC line on DC towers in the existing corridor from Loc 07 to Loc 90 of 110 KV MahalingapuraKudchi line for a distance 27.205 Kms in Jamakhandi & Athani Taluks of Bagalkot & Belagam Districts. District Belagum Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date EC1013 EE1093 Chikkodi 220kV R/S: Construction of 2 Nos of 220kV TBs at 220kV Chikkodi S/s for Terminating 220kV Ghataprabh-Chikkodi DC line. Gadag Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 986.64 & 22.02.19 Total of Lines Mundaragi Sub-station: Providing 1No of 110kV TB at Mundaragi station for providing independent control to 110kV Betagera Line. Cost of DWA 37.73 & 26.10.11 Budget 2019-20 0.00 1.00 0.00 0.00 0.00 0.00 2757.00 0.00 6.03 6.03 11.56 38.00 For theYear 18-19 Token Budget of Rs 1.00 Lacs Say Rs 1.00 Lacs Belagum 362.32 & 01.01.14 0.00 0.00 0.00 300.00 2 Total of TB's & Others 0.00 6.03 6.03 11.56 338.00 60 Total of Bagalkote Zone 0.00 6.03 6.03 17.31 7460.00 KALABURAGI TRANSMISSION ZONE Remarks For theYear 19-20 Budget DPR Cost- Rs 362.00 Lacs Say Rs 362.00 Lacs (Rs. In Lakhs) Sl. No. 1 2 3 4 5 Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Work Code Name of the Work District Energy Savings & BCR FA1054 Bayappur: Upgradation of 2x5 MVA, 33/11kV sub-station to 2x10 MVA, 110/11kV substation at Bayapur by constructing 110 kV SC line on DC towers for a distance of 14.450 Kms and by constructing 110KV terminal bay at 110/33/11 KV substation at Mudgal in Lingasugur Taluk, Raichur District. Raichur ES 2.50 BCR 1.44 1286.94& 17.12.18 0.00 0.00 50.00 FC1050 Ghanagapura: Establishing 2x100MVA, 220/110/11kV Station with associated 220kV and 110kV lines. Kalaburagi BCR2.83 6911.68 & 25.05.17 0.00 0.00 5.00 FC1052 Kalaburagi switching station - 400kV: Establishment of 400/220 kV Sub Station at Kalaburagi Kalaburagi ES 55.120 BCR 1.10 47401.63& 09.03.18 0.00 0.00 5.00 FE1022 Manhalli:(Yakatpur) Up-gradation of 3x5MVA, 33/11kV Manhalli sub-station to 2x10MVA, 110/11KV SubStation at Manhalli(Yakatpur) in Bidar Taluk, Bidar District. Bidar ES 3.386 BCR 1.82 1286.65 & 06.12.18 0.00 100.00 FA1058 Gandhinagar : Establishing 1x10MVA, 110/11kV SubStation at Gandhi nagar in Sindhanur Taluk, Raichur District. Raichur ES 1.390 BCR 1.14 870.66 & 14.01.19 0.00 50.00 Cost of DWA Budget 2019-20 Remarks DPR approved ,tender under process Approved in 75th TCCM dated 4.11.2017 (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District Energy Savings & BCR FD1038 Chilkmukhi:Up-gradation of 2x5 MVA, 33/11KV S/s to 2x10 MVA, 110/11kV S/s with construction of 110kV line from existing 110kV Bevoor S/s for a distance of 12.709kms in Koppal Taluk & District. Koppal ES 2.160 BCR 1.25 1302.04 & 16.02.19 0.00 10.00 7 FA1059 Jawalgera:Establishing 1x10MVA, 110/11kV SubStation at Jawalagera in Sindhanur Taluk, Raichur district. Raichur ES 1.204 BCR 1.48 606.96 & 22.02.19 0.00 25.00 8 FD1039 Hiresindhogi: Upgradation of 2x5 MVA 33/11kv S/S to 2x10MVA 110/11kV S/S Koppal ES 2.610 BCR 1.66 1164.46 & 18.03.19 0.00 10.00 FA1060 Valaballari Upgradation of existing 2X5MVA 33/11KV to 2X10MVA 110/11KV Subststion at Valaballari by Constructing 110KV Sindhnoor- Raichur Line -2 and constructing 110KV DC line on DC Towers for a distance of 15.142 Kms in Sindhnoor Tq, Raichur Dist Raichur ES 2.720 BCR 1.24 1586.07& 23.02.19 0.00 25.00 0.00 280.00 Sl. No. 6 9 9 Work Code Name of the Work Total of Sub-stations Cost of DWA 0.00 0.00 0.00 Budget 2019-20 Remarks Approved in 74th TCCM, Dated: 20.06.2017. Approved in 74th TCCM, Dated: 20.06.2017. (Rs. In Lakhs) Sl. No. 1 2 3 Cost of Original / Date of Revised LOI DPR & Date District Energy Savings & BCR FA1051 Manvi: Enhancement of 1x10MVA by 1x20MVA 110/11KV Power Transformer at 110KV S/S Manvi and providing 3 Nos of 1x1000Sqmm XLPE cable to 11kV bank II at 110/11kV manvi station Raichur BCR 0.80 213.52& 16.4.18 FB1092 66/11KV S/S Ujjini: Construction of new control room building along with shifting of equipments from existing control to the proposed control with providing protection for the existing equipment . Providing LILO arrangement for 66KV incoming Line (66KV Kottur-Kudigi-Ujjini) along with Constuction of TB at Ujjini. Bellary NA 131.46 & 28.03.18 FB1094 Venkatapura: Repl of 1X8MVA by 1X12.5MVA, 66/11KV Trf at 66/11KV S/S Venkatapura Work Code Name of the Work Bellary BCR 0.56 155.46 & 03.04.18 Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 0.00 Budget 2019-20 Remarks 0.00 10.00 Budget for FY-2019-20 Tfr cost : 160.73 Lakhs Erection cost: 17.79 Lakhs Total :178.52 Lakhs 0.00 10.00 4 Lakhs to be Surrendered 5.00 Budget for FY-2019-20 Tfr cost: 117.13 Lakhs Switchgear: 5.3 Lakhs Erection cost:13.15 Lakhs Total : 135.63 Lakhs Rs. 10.00 Lakhs to be surrendered. 0.00 (Rs. In Lakhs) Sl. No. Work Code Name of the Work District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date FB1098 Hampasagara: Enhancement of 1X6.3MVA, 66/11KV Power Transformer by 1X12.5MVA, 66/11KV Power Transformer at 66/11KV Hampasagara Sub-station in H.B.Halli Taluk, Bellary District. Bellary BCR 0.82 151.78 & 01.06.18 FC1059 Yedrami: Replacement of 1 x 10 MVA 110/33 KV Transformer by 1 x 20 MVA 110/33 KV Transformer at 110 kv Yedrami Sub-Station Kalaburagi BCR 1.190 196.66 & 20.03.17 6 FC1061 Creating 33 KV reference by providing additional 1 x 20 MVA 110/33kV Transformer along with construction of 33kV Terminal Bay at 110/11 kv Kalaburagi (South) SubStation Kalaburagi BCR 1.187 379.12 & 03.07.17 7 FC1063 Providing additional 1x10MVA, 110/33kV Power Transformer at 110/11kV Mandewal Sub Station. Kalaburagi BCR 0.76 287.72 & 18.01.18 FD1033 Koppal: Providing spare 20 MVA, 110/33/11 kV Power Transformer at 110 kV S/S Koppal 4 5 8 Koppal 287.27 & 01.04.19 Cost of DWA 0.00 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 0.00 5.00 0.00 0.00 5.00 0.00 0.00 100.00 0.00 5.00 0.00 5.00 0.00 Remarks Budget for FY-2019-20 Tfr cost : 117.13 Lakhs Switchgear: 4.30 Lahs Erection cost:10.97 Lakhs Total : 132.43 Lakhs Approved in 75th TCCM,Dtd: 04.11.2017. (Rs. In Lakhs) Sl. No. 9 10 11 12 District Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Work Code Name of the Work FD1035 Venkatagiri : Enhancement of 1X10 MVA, 110/11kV Power Transformer by 1X20 MVA 110/11kV Power Transformer at 110/11kV S/s Venkatagiri. Koppal BCR 0.62 267.46& 16.04.18 0.00 0.00 5.00 FD1036 Enhanncement of 10MVA, 110/11kV power Transformer NGEF Make by 20MVA, 110/11KV POWER Transformer at 110/33/11kVkV MUSS Koppal in Koppal Tq, District. Koppal BCR 0.55 279.13 & 09.01.19 0.00 0.00 5.00 FD1037 110KV Sriramnagar: Replacement of 1X10 MVA, 110/11kV by 1x20MVA 110/11KV Power Transformer at 110/11kV Sriram Nagar S/s. Koppal BCR 0.60 265.75 & 03.06.17 0.00 0.00 5.00 FF1005 Enhancement of 1x10MVA, 110/11kV Power Transformer No. 1 by 1x20 MVA 110/11kV Power Transformer at 110/11kV Shorapur. Yadgir BCR 0.76 294.34& 21.02.18 0.00 0.00 5.00 Remarks Budget for FY-2019-20 Tfr cost : 160.73Lakhs switchgear : 32.0 Lakh Erection cost:37.28 Lakhs Total : 230. Lakhs Budget for FY-2019-20 Tfr cost : 160.73Lakhs switchgear : 32.34 Lakh Erection cost:37.28 Lakhs Total : 230.35 Lakhs (Rs. In Lakhs) Cost of Original / Date of Revised LOI DPR & Date District Energy Savings & BCR FF1006 Enhancement of 1x10MVA,110/33kV power transformer No.III by 1X20MVA 110/33kV Power Transformer at 110/33/11 kV Shahapur S/S Yadgir BCR 1.1 207.60& 12.02.18 FB1099 66KV S/S Huvina Hadagali: Enhancement of 1x6.3MVA 66/11kV Power TransformerIII by 1x12.5MVA 66/11kV Power Transformer at 66/11kV Huvinahadagali S/s. Bellary BCR 0.81 15 FE1021 110/11kv Chidri :Replacement of 1x10MVA, 110/11kV Power Transformer1 by 1x20 MVA, 110/11kV Power Transformer at 110/11kV Chidri S/s . Bidar 16 FB1101 Sanklapura-Providing Spare 1x10MVA ,110/33-11kV Transformer at 110/11kV Sanklapura. FB1100 Bellary( North) :Providing Spare 1x10MVA, 110/33-11 Power Transformer at existing 110/11kV Bellary(North) SubStation in Hospet taluk, bellary District. Sl. No. 13 14 17 Work Code Name of the Work Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 Budget 2019-20 0.00 5.00 153.68& 28.06.18 0.00 1.00 BCR 0.45 287.81& 30.07.18 0.00 50.00 Bellary BCR 0.845 238.81 & 21.06.18 0.00 1.00 Bellary BCR 0.857 235.71 & 27.06.18 0.00 1.00 Remarks (Rs. In Lakhs) Sl. No. 18 19 20 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others District FA1061 Mukunda: Replacement of 1x10MVA by 1x20MVA 110/11KV Power Transformer at 110KV S/S Mukunda Raichur BCR 0.69 228.00 & 19.01.19 0.00 10.00 FA1062 Turvihal: Providing additional 1x10MVA ,110/11KV Power Transformer at 110KV S/S Turvihal. Raichur BCR 0.57 271.38 & 24.01.19 0.00 10.00 FD1040 Kanakagiri: Augumentation of 1x10 MVA 110/11kV Power Transformer 2 by 1x 20MVA 110/11KV power Transformer at 110/33/11kV Sub-station, Kanakagiri Koppal BCR 0.69 227.52 & 26.03.19 0.00 5.00 0.00 0.00 248.00 0.00 0.00 1.00 Work Code 20 1 Cost of Original / Date of Revised LOI DPR & Date Energy Savings & BCR Name of the Work Total of Augmentation FB1057 Alipur to Bellary(South): Stringing of 110kV 2nd Circuit on exisitng DC towers from Alipur Station to Bellary (South) Sub-Station for a distance of 8.00 Km. Cost of DWA 0.00 Bellary ES 0.3 BCR 1.62 51.95 & 13.08.12 0.00 0.00 Budget 2019-20 Remarks DPR Approved DPR approved (Rs. In Lakhs) Sl. No. 2 3 4 Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Work Code Name of the Work District FB1096 a) Construction of 110KV LILO line to 110/11KV Kamalapura sub-station on the existing DC towers from the tapping point for a distance of 5.8Kms along with Construction of 110KV terminal bay at existing 110/11KV Kamalapura substation in Bellary Taluk and District. Bellary 86.33 & 18.05.18 0.00 1.00 FB1097 a) Construction of 110KV LILO line to 110/11KV Bisilahalli sub-station on the existing DC towers from the tapping point for a distance of 1.906Kms along with Construction of 110KV Terminal Bay for the proposed line to 110KV/11KV Bisilahalli Substation in Bellary Taluk & District. Bellary 57.37& 21.04.18 0.00 1.00 FC1051 Jewargi Sub-station: Construction of 110kV LILO line from existing ShahabadShahapur line to 110/3311kV Jewargi sub-station in the existing corridor for a distance of 0.86Kms Kalaburagi 128.83 & 16.06.17 0.00 10.00 0.00 Remarks (Rs. In Lakhs) Sl. No. 5 6 7 8 Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Work Code Name of the Work District FD1030 Betagera to proposed 220kV Station at Koppal: Construction of 110kV SC line on DC towers from proposed 220/110/11kV Halavarthy(Koppal) S/s to the existing 110/33/11kV Betagera S/s for a distance of 23.836Kms along with construction of TB's at both end Koppal 1029.46 & 07.06.17 FB1102 Construction of 110KV LILO line to 110KV Somasamudra S/s on the existing D/c tower from the tapping point 110KV Allipura-Ballari(North) Line for a distance of 4.1KM pertaining to TLM SubDivision Munirabad in TL&SS Division Munirabad. Bellary FF1007 Construction of 2nd circuit line from 220/110/11kV Shahapur S/s to 110/33/11kV Khanapur S/s on existing DC tower for a distance of 19.261 Kms along with Construction of TB at both ends. FB1103 Conversion of existing 400kV SC line to 400KV DC Quad Moose line between BTPS ( Excluding Jindal LILO line) to Guttur around for a route length of 137 Kms. Cost of DWA Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others Budget 2019-20 Remarks 0.00 10.00 Budget to be surrendered for FY 18-19 Rs. 9.0 Lakhs 112.58 & 09.04.19 0.00 5.00 Estimates ( Cost Rs. 101.60 ) submitted for techincal sanction . Shahapur 446.20 & 15.03.19 0.00 5.00 Approved in 74th TCCM,Dtd: 20.06.2017. Ballari 62964.14 & 12.10.12 0.00 10.00 As per DPR Report included in APW 12-13 with work code FA1035(b) 0.00 (Rs. In Lakhs) Sl. No. Work Code Name of the Work District 8 Total of Lines 1 FD1021 Munirabad Power House Station: Shifting of exisiting Control Room at 220kV Munirabad Power House to existing work shop building at 220kV Munirabad Power House yard Koppal FD1031 Guddadahalli: Providing Bus Bar protection to 220kV KPTCL Bays at 400/220kV, Guddadahalli, PGCIL Sub-station in Koppal Taluk and District Koppal 2 2 39 364 Energy Savings & BCR Cost of Original / Date of Revised LOI DPR & Date Cost of DWA 0.00 315.78 & 06.07.13 Cost of Cum Exp Deptly. Total up to Supplied Work Cost 31/03/19 Materials & others 0.00 0.00 160.37 & 26.09.17 Budget 2019-20 0.00 0.00 43.00 0.00 1.00 10.00 0.00 0.00 10.00 Total of TB's & Others 0.00 0.00 0.00 1.00 20.00 Total of Kalaburagi Zone 0.00 0.00 0.00 1.00 591.00 8410.33 292.26 8702.59 603.01 21325.00 Total of List-III for All Zones Remarks List-IV : Projects which have been cleared either by Technical Advisory Committee/Technical co-ordination committee but administrative sanctions are still to be obtained. Sl. No. Name of the Work District BENGALURU TRANSMISSION ZONE 1 Establishing 2x100 MVA, 220/66 kV sub-station at Srinivasapura in Kolar District. 2 Establishing 2x8 MVA, 66/11 kV sub-station at Kodambally in Channapatna Taluk, Ramanagar District. 3 Establishing 2 X 500 MVA, 400/220kV Dommasandra GIS station, at Dommasandra, Bengaluru with revised 400 kV scheme and associated 220kV evacuation lines along with additional 400 kV incoming line to proposed 3 X 500 MVA, 400/220kV Mylasandra sub-station (Revised scheme for 75th TCCM appoval held on 04.11.2017). 4 5 Ratification to 69th TCCM proposal held on 17.08.2016): Establishing 220/66 kV sub-station in the premises of existing 66/11 kV sub-station at Nelamangala, Bengaluru Rural District AND Modification to the proposal approved in 70th TCCM held on 20.12.2016:- Conversion of existing 66KV SC Coyote line to DC Drake line between 66/11KV Nelamangala sub-station to 66/11KV MEI sub-station – Modification in scheme. Establishing 2x 31.5 MVA, 66/11 kV sub-station at Sorahunse in Bengaluru East Taluk, Bengaluru Urban District Kolar Ramnagar Bengaluru Urban 6 Establishing 2x8MVA, 66/11kV Sub-Station at Rayalapadu in Srinivasapura Taluk, Kolar District 7 Establishing 1x12.5MVA, 66/11kV Sub-Station at Guluru in Bagepalli Taluk, Chikkaballapura District 8 Establishing 1x12.5MVA, 66/11kV Sub-Station at Chikkaballapu Buradagunte in Chintamani Taluk, Chikkaballapura ra District 9 Establishing 2x150 MVA, 220/66/11 kV sub-station at Nagarabhavi, Bengaluru North Taluk, Bengaluru Urban District - Revision of 66 kV line connectivity for the proposal approved in 76th TCCM held on 05.03.2018. Establishing of 2x12.5 MVA, 66/11kV station at 10 Dodderi in Bengaluru South Taluk, Bengaluru Urban District. Kolar Chikkaballapu ra Bengaluru Urban 10 Total of Sub-stations 1 Replacement of 1x20 MVA, 66/11 kV transformer by 1x31.5 MVA transformer at 66/11 kV Pottery Road sub-station. 2 Replacement of 1x20 MVA, 66/11 kV transformer by 1x31.5 MVA transformer at 66/11 kV Yellar Bande (L.R. bunde)sub-station. 3 Augmentation of existing 1x8 MVA, 66/11 kV transformers by 1x20 MVA transformers at 66/11 kV Vidurashwatha sub-station in Gowribidanur Taluk, Chikkaballapura District. 4 Proposal for errection of 1X20MVA , 66/11KV Spare Power Transformer by extending existing 66KV bay at 66/11 kV Bommasandra I/A sub-station in TL&SS Division, Yerandanahalli. 5 Proposal for errection of 1X12.5MVA,66/11KV Spare Power Transformer at 66/11 kV 'D' Cross sub-station in TL&SS Division Doddaballapura. 6 Providing spare 1X100MVA, 220/66kV Power transformer at 220/66kV Malur sub-station. 7 Providing additional 1X500 MVA, 400/220 kV power transformer at proposed 400/220 kV Devanahalli Hardware Park sub-station. 8 Providing 3rd 100 MVA, 220/66 kV power transformer at 220/66 kV TK Halli sub-station at Malavalli taluk, Mandya District. 9 Augmentation of 2x20MVA Power Transformers by 2x31.5MVA Power Transformer at 66/11KV Brigade Metropolies Sub-station in Bengaluru. 10 Augmentation of 1x12.5MVA Power Transformer by 1x20MVA Power Transformer at 66/11KV Vijayapura Sub-station in Devanahalli Taluk , Bengaluru Rural district. Chikkaballapu ra Mandya Bengaluru Rural Augmentation of 1x12.5MVA Power Transformers-2 by 11 1x20MVA Power Transformer at 66/11KV Shidalgatta Sub-station in Chintamani. 172 List-IV Sl. No. 12 Name of the Work Augmentation of 1x8MVA Power Transformer-2 by 1x20MVA Power Transformer at 66/11KV Gundamanagere Sub-station at D.B.Pura Tq in Bengaluru Rural Dist. District Bengaluru Rural Augmentation of 2x20MVA Power Transformers by 13 2x31.5MVA Power Transformer at 66/11KV Dommasandra Sub-station in Bengaluru. Augmentation of 2x8MVA Power Transformers by 14 2x12.5MVA Power Transformer at 66/11KV N. G. Hulkur Sub-station at Bangarupete Tq in Kolar. Kolar Providing additional 1x31.5MVAPower Transformer at 15 66/11KV Prestige Shanthinikethan Sub-station in Bengaluru Providing additional 1x12.5MVA Power Transformer at 16 66/11KV Mallanayakanahalli Sub-station at Mulabagilu in Kolar Kolar Providing additional 1x31.5MVA Power Transformer at 17 66/11KV Provident Housing Ltd Sub-station in TL & SS Division of Subramanyapura. Providing additional 1x20MVA Power Transformer along 18 with associated Tr. bay at 220/66/11KV Gowribidanur Sub-station in TL & SS Division of Gowribidanur . 19 Augmentation of 1x12.5MVA 66/11kV Power Transformer-2 by 1x20MVA Power Transformer at 66/11kV Jadigenahalli Sub-station in Hosakote taluk, Bengaluru Rural District. Bengaluru Rural 20 Augmentation of 1x12.5MVA 66/11kV Power Transformer-1 by 1x20MVA Power Transformer at 66/11kV Hejjala Sub-station in Ramanagara taluk and, Ramanagara District. Ramnagar 20 Total of Augmentations 1 Conversion of existing 220 kV SC line to DC line from Peenya to proposed 400 kV Mylasandra Station. 2 Re-submission of subjects:- Strengthening of 66 kV Doddaballapura–DG Yalahanka- Line II by replacement of 1/0 Copper Conductor by HTLS Conductor with double circuit towers from 66 kV ‘D’Cross sub-station to DG plant for a distance of 29 kMs using the existing corridor as per the list-3 of Annual Program of Works 14-15. 3 Construction of 220 kV DC line between Chintamani & Mittemari with a new corridor from the proposed 220 kV Mittemari R/s to Dibburahalli limits and upgradation of existing corridor having 66 kV SC to MCMV towers for extending 220 kV and 66 kV circuits upto 220 kV Chintamani R/s from Dibburahalli limits via Ganjigunte. 4 Conversion of existing 220 kV Gowribidanur - D.B.Pura SC to DC line to an extent of 40km for taking supply directly from 400 kV Devanahalli s/s 5 Conversion of existing 220 kV Gowribidanur Madhugiri SC to DC line 6 Replacement of Coyote ACSR Conductor of 66kV Doddaballapura-Chikkaballapura I & II DC line by Drake ACSR conductor with intermediate tower from 220/66 kV NRS Doddaballapura to 66 kV Chikkaballapura Industrial Area sub-station for a circuit length of approximately 23.6 kMs. 7 LILO arrangement from 66/11 kV Somenahalli substation by stringing second circuit on existing 66 kV Somenahalli DC towers upto tap point of the 66 kV Gowribidanur - Peresandra line (7.87 kMs). 8 Construction of new 66kV SC line on DC towers from existing 66/11KV Solur (Gudemaranahalli) substation to 66/11KV Kudur with additional TB at 66/11KV Solur (Gudemaranahalli) and Kudur substations 9 Providing Alternate Source to 66/11 kV Harobele substation by tapping existing 66 kV KanakapuraT.K.Halli Line -2 in TL&SS Division, Kanakapura, Kanakapura Taluk, Ramanagara dist. Ramnagar 10 Proposal for strenghthening of 66 KV Jigani-2A & 2B circuit lines from ACSR coyote to ACSR drake in the existing corridor from RBI tapping point to Jigani substation in Anekal Taluk, Bengaluru Rural District. Bengaluru Rural 173 List-IV Sl. No. Name of the Work 11 Contruction of 220 kV multi-circuit, multi-voltage line between 400/220 kV Somanahalli and 220/66 kV Subramanyapura s/s in the existing 66 kV line corridor. 12 Providing alternate 66 kV source to 66 kV Vidyanagar sub-station by running 1000sqmm UG Cable from 220 kV Devanahalli Hardware Park sub-station for a distance of 9.1 km District Providing 66KV Alternate Source to 66/11 kV Anjanapura sub-station by tapping existing 66 kV 13 Somanahalli-J2 Line by laying 66KV SC line with 630/1000Sqmm XLPE UG cable in TL&SS Division, Subramanyapura. 14 Revision of approved Scheme :Providing 66KV Alternate Source to 66/11 kV Muddenahalli (Nandi) sub-station by construction of 66KV LILO line from 66KV DC Doddaballapura- Chikkaballapura line for a distance of 3.46Kms in Chikkaballapura Taluk & District. 15 66 kV connectivity from proposed 2 X 100 MVA, 220/66 kV and 2 X20 MVA, 66/11 kV sub-station at Harohalli TL&SS Division, Kanakapura, Kanakapura Taluk, Ramanagara District. Work of running of 66kV 1000sq mm UG cable from 220kV HBR Layout station to 66/11kV Pottery Road sub-station for a distance of 3.75kms and replacement of existing 66kV line circuit breaker by Hybrid 16 Switchgear and replacement of existing station bus of coyote/lynx conductor by drake conductor at 66/11kV Pottery Road substation in Bengaluru North Taluk, Bengaluru District –Reg Proposal for the work of providing 66kV alternate source to 66/11kV Brigade Metropolis by tapping existing 66kV HAL-1 or 2 line (Bagmane 1 or 2 17 feeding from 220/66kV Hoody) by laying 66kV, 1000sq mm single circuit XLPE insulated copper UG cable -Reg 18 66 kV connectivity from proposed 2 X 100 MVA, 220/66 kV and 2 X20 MVA, 66/11 kV sub-station at Harohalli TL&SS Division, Kanakapura, Kanakapura Taluk, Ramanagara District- Ratification 19 Providing 66KV alternative source line by UG cable from 66KV Bommasandra Industrail Area substation to 66/11KV Jigani Industries Area Sub-station Submission of TCCM Proposal Regarding. Reconductoring of existing DC line from Coyote ACSR to 20 HTLS Conductor for a length of about 3 kMs from 66KV Austin Town to Koramangala LILO Point. Reconductoring of existing SC line on SC towers with Coyote ACSR to DC line on DC towers with HTLS 21 Conductor between Tapping point upto K&C Velley substation for a length of about 1.5 kMs for LILO arrangement. 22 Conversion of existing 66KV DC line with Coyote ACSR to HTLS Conductor between 220KV Hebbal substation to 66KV Gokul substation for a length of about 3.546 kMs Conversion of 220 kV Gowribidanur-DB Pura SC line with Drake ACSR conductor to 220 kV DC line with AAAC Moose conductor by terminating one of the 23 circuits at D.B.Pura and other circuit at proposed 400 kV Devanahalli Hardware Park by using 1000sqmm single circuit 220 kV UG Cable for a distance of 2.4km Construction of 66 kV SC line partly by laying 1000/630Smm UG cable over a length of about 580 Mtrs towards 220/66/11KV Dobbaspete sub-station out of approved 21KMs overhead line (using DRAKE 24 conductor) between 220/66/11KV Dobbaspete substation and 66/11KV Doddbelavangala sub-station; partly in the existing 66 kV Dabespet-Kolala Corridor –Modification /Revised proposal for the proposal approved in 71st TCCM held on 17.01.2017. 24 Total of Lines 1 Providing additional switchgars at various sub-station coming under Somanahalli & T.K.Halli Division. 2 Proposal for replacement of old regid bus with new Aluminium BUS at 220/66KV NRS sub-station, Rajajinagar, Bengaluru North Taluk 3 Providing 2 Nos. of 66KV Terminal bays with protection control system including the Breaker control for the I/C lines and equipment of GowribidanurBagepalli line-1 & Somanathapura tap line in 66KV Yenegadele- Chakavelu line at 66/11 kV Somanatthapura sub-station 174 List-IV Sl. No. Name of the Work 4 Construction of 66KV TB at 220/66KV Sarjapura substation for connecting 2nd circuit with Coyote ACSR line on DC towers of Sarjapura- Attibele line from 220/66KV Sarjapura substation 5 TCCM Proposal Strengthening of 220KV Bus and connected Renovation & Modernization works at 220/66/11KV Kolar substation in TL&SS Divison, KPTCL, Kolar -Regarding. 6 Replacement of 3X167 MVA, 1 phase auto transformer of ICT-1 bank by 500MVA, 3 phase power transformer at 400 kV R/S Hoody 6 Total of TB's & Others District 60 Total for Bengaluru Zone TUMAKURU TRANSMISSION ZONE 1 Establishing 400/200kv Sub station at Huliyurdurga in Tumakuru District Tumakuru 2 Establishing 1x8 MVA, 66/11 kV Sub-station at Madikehalli with constructing 66 kV SC tap line from proposed 66 kV Jiddigere SC line to the proposed substation for a distance of 8 km in Kunigal Taluk, Tumakuru District. Tumakuru 3 Establishing 2x8 MVA, 66/11 kV sub-station at Nandigavi in Harihara Taluk, Davanagere District with 66 kV LILO line from existing 66 kV Harihara-HospetBanuvalli line for a distance of 6.0 km. Tumakuru 4 Establishing 1x10 MVA, 110/11kV sub-station at Haridasanahally Turuvekere Taluk, Tumakuru District. Tumakuru 5 Establishing 2x8 MVA, 66/11kV sub-station at Arsikere, Harapanahalli Taluk, Davangere District. Tumakuru 6 Establishing 2x8 MVA, 66/11 kV sub-station at Konanatale (Gonigere) in Honnali Taluk, Tumakuru District Tumakuru 7 Establishing 1x8 MVA, 66/11 kV sub-station at Alappanagudde in Kunigal Taluk, Tumakuru District Tumakuru 8 Establishing 1x8 MVA, 66/11 kV sub-station at Senabaghatta in Kunigal Taluk, Tumakuru District. Tumakuru 9 Establishing 1x8 MVA, 66/11 kV sub-station at J N Kote (Jampanna Nayakana Kote) in Chitradurga Taluk, Chitradurga District by constructing 66 kV Tap line from existing 66 kV Chitradurga-Hiriyur line for a distance of 7.0 km. Tumakuru 10 Establishing 1x12.5 MVA, 66/11 kV sub-station at N.G.Halli in Holalkere Taluk, Chitradurga District. Tumakuru 11 For Establishing 1x12.5 MVA, 66/11kV Sub-station, Konasagara in Molkalmuru Taluk, Chitradurga District Tumakuru Establishing 1x10 MVA, 110/11 kV sub-station at Bidaregudi in Tiptur Taluk, Tumakuru District by 12 constructing 110 kV LILO line from existing 110kV Gandasi-DM Kurke SC line for a distance of 2 km with Lynx Conductor. Establishing 1x10 MVA, 110/11 kV sub-station at Belavaththa (Gangakshetra) in Gubbi Taluk, 13 Tumakuru District by constructing 110 kV LILO line from existing 110kV Nittur-Kadaba SC line for a distance of 4 km with Lynx Conductor. Tumakuru Tumakuru Establishing 1x12.5 MVA, 66/11 kV sub-station at Doddabeeranahalli in Challakere Taluk, Chitradurga 14 District by constructing 66 kV single LILO line from existing 66kV Parashurampura-Hiriyur DC line for a distance of 2 km with Coyote Conductor. Tumakuru Establishing 1x8 MVA, 66/11 kV sub-station at Baragur (Pujar Muddanahalli) in Sira Taluk, 15 Tumakuru District by constructing 66 kV SC line on DC towers from existing 66kV HiriyurPattanayakanahalli line for a distance of 11Kms Tumakuru Ratification: Establishing 1x8 MVA, 66/11 kV sub-station at Daginakatte in Channagiri Taluk, Davanagere District 16 by constructing 66 kV LILO line from existing 66kV Honnali-Lingadahalli line-1 for a distance of 7 km with Coyote Conductor. Tumakuru 17 Establishing 2x100MVA 220/66kV Sub-station at P.D.Kote in Hiriyur taluk, Davanagere district Tumakuru 18 Establishing 2x100MVA 220/66kV Sub-station near 66/11 kV Hangal sub-station, Davanagere district Tumakuru 175 List-IV Sl. No. Name of the Work District Establishing 2x8 MVA, 66/11 kV Sub-station at Kanchikere in Harapanahalli Taluk, Davanagere Districtby constructing 66 kV LILO line from existing 19 66kV Neelagunga-Punabaghatta SC line for a distance of 1 km with Coyote Conductor.Approved subject to completion of the work of stringing of 66kV 2nd circuit from 220/66kV Neelagunda to Punabhaghatta LILO point Tumakuru Establishing 1x8 MVA, 66/11 kV Sub-station at Talagunda in Sira Taluk, Tumakuru Districtby 20 constructing 66kV SC line (tap line) on DC towers from existing 66kV Madhugiri-Sira Line-1 for a distance of 8kms using Coyote conductor Tumakuru Establishing 2x8 MVA, 66/11 kV Sub-station at Kyasinkere (Chennenahalli) in Honnali Taluk, 21 Davanagere District by constructing 66kV LILO line on DC towers from existing 66kV Honnali-Sasuvehalli line for a distance of 2kms using coyote conductor Tumakuru Establishing 1x8MVA 66/11kV Sub-station at Sirivara in Tumakuru Taluk, Tumakuru District by 22 constructing 66 kV LILO line from existing 66kV Anchepalya Line-1 for a distance of 7 km with Coyote Conductor. Tumakuru Establishing 1x10MVA 110/11kV Sub-station at Karadalu in Tiptur Taluk, Tumakuru District by 23 constructing 110 kV LILO line from existing 110kV KB Cross-Tiptur Line for a distance of 6 km with Lynx Conductor. Tumakuru 24 Establishing 2X100 MVA, 220/66 kV sub-station at Bharamasagara in Chitradurga district Tumakuru Establishing 1x10 MVA, 110/11 kV sub-station at Torehalli in Gubbi Taluk, Tumakuru District by 25 constructing 110 kV LILO line on DC towers from existing 110kV Nittur-Gubbi SC line for a distance of 4 kms with Lynx Conductor. Tumakuru Establishing 1x10 MVA, 110/11 kV sub-station at MMA Kaval in Gubbi Taluk, Tumakuru District by 26 constructing 110 kV LILO line on DC towers from existing 110kV Nittur-Gubbi SC line for a distance of 4 kms with Lynx Conductor. Tumakuru Establishing 2x 8MVA, 66/11KV Sub-Station at (Irakasandra Colony) I. K. Colony (Mannurathimmanahalli) in Koratagere Taluk, Tumkur 27 District by constructing 66 KV LILO line on DC towers to a distance of 10 Kms from existng 66kV KoratagereBeladara SC line with Coyote conductor. Tumakuru Establishing 2 X 100 MVA , 220/66/11 kV sub-station 28 at Sirivara (Kodithimmanahalli) in Tumkur taluk, Tumkur District. Tumakuru 29 Establishing 2x8 MVA, 66/11 kV sub-station at Hosahalli Gummanuru in Davanagere Taluk & district. Establishing 1x8 MVA, 66/11 kV sub-station at 30 Bramhadevarahalli Madhugiri Taluk, Tumakuru district.-Ratification 31 Establishing 1X8 MVA, 66/11 kV sub-station at Garani Gate in Madhugiri taluk, Tumkur dist.-Ratification Establishing 1X8 MVA, 66/11 kV sub-station at 32 Kavanadala (Girigowdanahalli) sub-station in Madhugiri taluk, Tumkur dist.-Ratification Tumakuru Tumakuru Tumakuru Tumakuru 32 Total of Sub-stations 1 Providing additional 1x12.5 MVA, 66/11 kV Transformer at 66/11 kV Challakere Sub-station in ChallakereTaluk, Chitradurga District. Tumakuru 2 Replacement of 1x12.5 MVA, 66/11 kV Power Transformer by 1x20 MVA,66/11 kV Power Transformer at 66 kV Hosadurga sub-station in Chitradurga District. Tumakuru 3 Replacement of 1x10 MVA Power Transformer by 1x20 MVA 110/11kV Power Transformer at 110/11kV Tiptur substation in TipturTaluk, Tumakuru District. Tumakuru 4 Replacement of 1x8 MVA Power Transformer by 1x12.5 MVA 66/11kV Power Transformer at 66/11kV Honnali substation in Honnali Taluk, Davanagere District. Tumakuru 5 For Providing additional 1x8 MVA, 66/11kV Substation Hindasaghatta. Tumakuru 6 For Replacement of 1x6.3 MVA Power transformer by 1x20 MVA Power transformer at 66/11kV sub-station Chikkajajuru. Tumakuru 176 List-IV Sl. No. Name of the Work District 7 For Augmentation of existing 2x8 MVA power tranformer by 2x12.5 MVA power transformer at 66/11kV Sub-station, SASALAHALLA Tumakuru 8 Replacement of 1x12.5 MVA power transformer 1 by 1x20 MVA power transformer at 66/11 kV Basavapatna sub-station in Channagiri Taluk, Davanagere District. Tumakuru 9 Replacement of 1x12.5 MVA power transformer 1 by 1x20 MVA power transformer at 66/11 kV Lingadahalli sub-station in Chennagiri Taluk, Davanagere District. Tumakuru Replacement of 1x8 MVA power transformer-2 by 10 1x12.5 MVA power transformer at 66/11 kV Bagur substation in Hosdurga Taluk, Chitradurga District. Tumakuru Replacement of 1x12.5 MVA power transformer-2 by 11 1x20 MVA power transformer at 66/11 kV H.D.Pura sub-station in Holalkere Taluk, Chitradurga District. Tumakuru Providing additional 1x12.5 MVA, 66/11 kV Power 12 Transformer at 220/66/11 kV Station Neelagunda in Harapanahalli Taluk, Davanagere District Tumakuru 13 Replacement of existing 1x8 MVA power transformer 2 by 1x12.5 MVA power transformer with 2 No.s of additional 11 kV Switchgears at 66/11 kV Garaga substation in Hosadurga Taluk, Chitradurga District.Approved subject to commissioning of 3rd 100 MVA at 220kV Hiriyur Station Tumakuru Replacement of existing 1x8 MVA power transformer by 14 1x12.5 MVA power transformer at 66/11 kV Nyamathi Sub-station in Honnali Taluk, Davanagere District. Tumakuru Replacement of existing 1x8 MVA power transformer-1 by 1x12.5 MVA power transformer at 66/11 kV substation Mavinakatte in Davanagere Taluk, Davanagere District. Tumakuru 15 For replacement of existing 1x6.3 MVA power transformer-1 by 1x12.5 MVA power transformer at 66/11 kV Benkikere sub-station in Channagiri Taluk, Davanagere District.Approved subject to commissioning of the 220kV Benkikere sub station along with associated 66kV lines Providing additional 1X10 MVA, 110/11 kV Power 17 transformer at 110/11 kV Tandaga sub-station in Turuvekere taluk, Tumakuru district 16 Providing additional 1X10 MVA, 110/11 kV Power 18 transformer at 110/11 kV Talkere sub-station in Turuvekere taluk, Tumakuru district Tumakuru Tumakuru Tumakuru 19 Augmentation of 1x2.5 MVA, 66/11 kV Power transformers-1 by 1x20 MVA Power Transformer at 66/11 kV Sub-station Bukkapatna in Tumakuru Division. Tumakuru 20 Augmentation of 1x8 MVA, 66/11 kV Power Transformer-2 by 1x12.5 MVA Power Transformer at 66/11 kV Sub-station Pattanayakanahalli in Tumakuru Division. Tumakuru Augmentation of 1x10 MVA, 110/11 kV Power Transformer by 1x20 MVA Power Transformer at 110/11 kV Sub-station Handanakere in K.B. Cross Division. Augmentation of 1x10 MVA, 110/11 kV Power Transformer by 1x20 MVA Power Transformer at 22 110/11 kV Sub-station Shettigere in K.B. Cross Division. Augmentation of 1x10 MVA, 110/11 kV Power Transformer by 1x20 MVA Power Transformer at 23 110/11 kV Sub-station Thimmanahalli in K.B. Cross Division. Replacement of 12.5 MVA, 66/11 kV Power 24 Transformer -1 by 20 MVA, 66/11 kV Power Transformer at 66/11 kV Parashuramapura 21 Tumakuru Tumakuru Tumakuru Tumakuru Replacement of 8 MVA, 66/11 kV Power Transformer 25 1 by 12.5 MVA, 66/11 kV Power Transformer at 66/11 kV Ranganathapura. Tumakuru Replacement of 6.3 MVA, 66/11 kV Power Transformer 26 1 by 12.5 MVA, 66/11 kV Power Transformer at 66/11 kV Rangenahalli. Tumakuru Augmentation of 1x12.5 MVA, 66/11 kV Power Transformer -1 by 1x20 MVA Power Transformer at 66/11 kV Sub-station Brahmasandra in Tumakuru Division. Tumakuru Providing additional 1x8MVA power transformer and 28 associated 11kV switchgears at 66/11kV Shyagale substation in Davanagere taluk, Davanagere District. Tumakuru Providing additional 1x8MVA Power Transformer and 29 associated 11kV switchgears at 66/11kV Jiddigere sub-station in Kunigal taluk, Tumakuru District. Tumakuru 27 177 List-IV Sl. No. 30 Name of the Work Providing additional 1x12.5MVA Power Transformer and associated 11KV switch gears at 66/11kV Nidasale sub-station in Kunigal taluk, Tumakuru District. District Tumakuru Providing additional 1x8MVA Power Transformer and 31 associated 11kV switch gears at 66/11kV Puravara sub-station in Kunigal taluk, Tumakuru District. Tumakuru Augmentation of 1x8MVA by 1x12.5MVA, 66/11kV 32 Power Transformer at 66/11kV Devarahalli substation, Channagiri taluk, Davanagere district. Tumakuru Augmentation of 1X6.3 MVA by 1X 20 MVA, 66/11 KV 33 power transformer at 66/11kV Sowlanga (Savalanga) Sub-station, Honnali Taluk Davanagere district. Tumakuru Augmentation of 2x12.5MVA by 2x20MVA, 66/11kV 34 Power Transformers at 66/11kV Malebennur substation, Harihara Taluk, Davanagere district. Tumakuru Augmentation of existing 1X8MVA by 1X12.5MVA 35 Power Transformer at 66/11kV Hiremallanahole substation, Jagalur Taluk, Davanagere District. Tumakuru 35 Total of Augmentations 1 2 3 Providing LILO arrangement to 66 kV Malebennur substation by constructing new 66 kV DC line in the existing corridor for a distance of 0.4 kMs along with a terminal bay. Replacement of existing 66 kV line with Rabbit conductor on fabricated tower by 66 kV DC line with coyote Conductor from tapping point of multi-circuit line of 66/11 kV Pavagada sub-station to 66/11 kV Venkatapura sub-station for distance of 20 km in the existing corridor. Ratification: Construction of 2nd circuit LILO of 220kV Davanagere-Shimoga DC line to 220kV Honnali Station Tumakuru Tumakuru Tumakuru 4 Construction of new 66 kV SC line on DC towers from 66 kV Kurubarahalli sub-station to 66 kV Guttur substation in the new corridor for a distance of 8 km along with terminal bay at both stations Tumakuru 5 Replacement of existing 66kV SC line with Rabbit conductor on RCC poles by 66kV DC line on DC towers with Coyote Conductor from 66/11KV Nagalamadike Sub station to tapping point at 66 KV PavagadaShylapura line with Terminal bay at 66KV Nagalamadike Sub station in existing corridor for a distance of 16 Kms. Tumakuru 6 Replacement of existing 66kV SC line with Rabbit conductor on fabricated lattice towers by 66kV SC line on DC towers with Coyote Conductor from tapping point of 66/11 kV Venkatapura Sub station to tapping point of proposed 220 kV Mittemari Substation in existing corridor for a distance of 49.44 Kms. Tumakuru 7 Conversion of 66kV SC line on SC towers to DC line on DC towers from 220kV Chitradurga Station to 66kV Turuvanur Station in the existing corridor for a distance of 22Kms along with construction of 1 No. of 66kV Terminal Bay at both stations. Tumakuru 8 Providing LILO arrangement to existing 66/11kV Bharamasagara Substation by conversion of SC line on SC towers to DC line on DC towers from tap point on 66kV Davanagere-Chitradurga Line-1 to Bharamasagara Sub-station for a distance of 3Kms along with Terminal Bay Bharamasagara Sub-station. Tumakuru 9 Providing LILO arrangement to existing 66/11kV Nyamathi Substation by conversion of SC line on SC towers to DC line on DC towers from tap point on 66kV Honnali-Savalanga line to Nyamathi Sub-station for a distance of 1.5 Kms along with construction of 66kV Terminal Bay Nyamathi Sub-station. Tumakuru Replacement of existing 66kV Davanagere- Harihara Hospete SC line on SC towers by new 66kV SC line 10 with coyote conductor on DC towers from Shamanur limits (Loc. No. 19) to Harihara Limits (Loc. No: 93) in the existing corridor for a distance of 15Kms. Tumakuru a) Stringing of 66kV Second circuit on existing 66KV Davanagere-Kukkawada line on DC towers from 220KV SRS Davanagere to 66KV Kukkawada Sub-station for a distance of 13.523 Kms in the existing corridor along with formation of 1 TB at Kukkawada Sub-station & 11 1TB at 220KV Davangere Station. b) Stringing of 2nd Circuit on exisiting DC tower from 66kV Kukkuwada station to 66kV Santhebennur TAP point (LOC:133) for a distance of 18.170 Kms in the exisiting corridor along with formation of 1-TB at 66kV Kukkuwada station Tumakuru 178 List-IV Sl. No. Name of the Work 1) Stringing of 66KV 2nd circuit from 220 KV Neelagunda to 66KV Punabgatta LILO point on existing DC tower. 2) Conversion of existing S/C line on SC tower to D/C line on DC tower from 66KV Punabgatta LILO point to 66KV Uchangiduga Tap point Loc No: 81. i.e 66KV Davanagere- Sokke line. 3) Conversion of SC line on DC tower from Loc No: 81 12 to 66KV Bilichodu LILO point Loc No: 117 & total distance of 46.5 Kms in the existing corridor ie., stringing of 2nd circuit on existing DC towers. 4) Providing LILO arrangements to 66KV Mellekatte Sub-Station by constructing New 66KV DC line for a distance of 0.25 Km.(loc no 69-70) 5) Formation of terminal bays at 220kV Neelagunda R/S & 66KV Mellekatte Sub-station. a) Stringing of 2nd Coyote circuit between 66kV P.D.Kote and 66kV Hariyabbe S/s on existing D/C towers for a distance of 12.25 Kms along with two nos of new terminal bays, one at P.D.Kote and one at Hariyabbe S/s. b) Replacement of existing "66kV S/C coyote line on S/C towers" between 66kV Hariyabbe S/s and 13 Hariyabbe tap point by "66kV D/C Drake line on D/C towers" for a distance of 10.25 Kms and creation of one termial bay at Hariyabbe S/s for providing LILO arrangement. c) Replacement of existing "66kV D/C coyote line on D/C towers" between 220/66kV Hiriyur S/s and Hariyabbe tap point by "66kV D/C Drake line on D/C towers" for a distance of 18.0 Kms. Ratification subjects:- A: Reconstruction of 66kV SC idle line on SC towers having Coyote conductor from 66kV Chitradurga old S/s to 66kV Pandrahalli substation for a distance of 17.5kms by 66kV SC line on DC towers using Drake conductor in the existing 14 corridor. B: Providing additional 66 kV circuit between H.D.Pura tap point and H.D.Pura Substation for a distance of 10kms with Coyote conductor to provide LILO arrangements at 66/11kV H.D.Pura substation along with construction of 1 No of 66kV terminal bay at H.D.Pura substation. Ratification subjects:- a) Construction of additional 66kV SC line having Coyote conductor from 66/11kV HangalS/s to 66/11kV RampuraS/s with LILO at 66/11 kV Nagasamudra S/s for a distance of 28kms 15 approxalong with one number of 66kV terminal bay at 66/11kV Hangal & RampuraS/s and two numbers of 66kV terminal bay at 66/11kV Nagasamudra S/s. b) Replacement of bus bar arrangement at 66/11 kV Rampura S/s from Coyote to Drake. Providing alternate source to existing 110/11kV Handanakere Sub-station (feeding from 220kV K.B. Cross Station) by constructing new 110kV SC line on DC towers from existing 110/11kV D.M. Kurke Sub16 station (feeding from 220kV Arasikere Station) for a distance of 18kms using Lynx Conductor along with construction of 110kV Terminal bays at 110kV Handanakere and D.M.Kurke Sub-stations Providing alternate source to existing 66/11kV Kunigal Sub-station by constructing new 66kV LILO 17 line from existing 66kV Yadiyur line for a distance of 2.5 kms in new corridor with new terminal bay at 66kV Kunigal Sub-station. Stringing of 66kV 2nd Circuit on existing 66kV DC towers from Loc. No: 33 on 66kV Honnali-Kundur 18 line to 66kV Kundur Sub-station for a distance of 6kms along with construction of 66kV Terminal Bay at 66kV Kundur Sub-station. Providing LILO arrangement to 66kV Banuvalli Substation by stringing 66kV new line on existing DC towers from Loc. No.2 on 66kV Honnali-Banuvalli19 Nandigudi line to 66kV Banuvalli Sub-station for a distance of 100 Mtrs using coyote conductor along with formation of new 66kV Terminal Bay at 66/11kV Banuvalli Sub-station Stringing 66kV DC line on MC towers for connecting 66kV Kattige and 66kV Malebennur Sub-stations to 20 66kV Honnali Sub-station along with construction of 2 Nos. of 66kV terminal bays at 66kV Honnali Substation. a) Re-Construction of 66kV Hiriyur-Sira SC line on SC towers by new 66kV SC line on DC towers/MC towers in the existing corridor upto 66kV Tavarakere Sub-station LILO point for a distance of 40Kms 21 b) Partial Re-Construction of 66kV HiriyurChitradurga SC line on SC towers by new 66kV SC line on DC towers/MC towers in the existing corridor up to Loc No: 18 at Sugar Factory Layout area near NH4 (Hiriyur) for a distance of 6Kms Replacement of existing 66kV SC line with rabbit conductor on fabricated lattice structures by 66kV SC line on DC towers with coyote conductor from 66/11kV 22 Sira Sub-station to 66/11kV Badavanahalli Substation in the existing corridor for a distance of 20kms in Sira Taluk, Tumakuru District. 179 District Tumakuru Tumakuru Tumakuru Tumakuru Tumakuru Tumakuru Tumakuru Tumakuru Tumakuru Tumakuru Tumakuru List-IV Sl. No. Name of the Work District Providing Alternate source to existing 66/11 kV Nagalamadike substation and to evacuate solar power at Nagalamadike sub-station by constructing new 66 kV DC line with Drake conductor from 220 kV 23 Pavagada substation (work under progress) to 66/11 kV Nagalamadike sub-station for a distance of 19 Km in the new corridor with new terminal bays at Nagalamadike & Pavagada 220 kV substation. Tumakuru Proposal for conversion of existing 220kV HiriyurMadhugiri SC line having Drake conductor on SC tower to 220kV DC line on DC towers with Drake conductor between 220kV Hiriyur receiving station 24 and tapping point of Antharasanahalli-Madhugiri 220kV line near Thonachagondanahalli (Madhigiri taluq) for a distance of 61kms in the existing corridor with new terminal bays at 220kV Hiriyur & Madhugiri receiving stations in Tumkuru TLM subdivision Tumakuru 25 Replacement of existing 66 kV SC line Rabbit conductor on fabricated Lattice structure tower by SC line on DC towers with Coyote conductor from 66/11 kV Badavanahalli sub-station to 66/11 kV Madhugiri substation in the existing corridor for a distance of 16 Kms in TLM sub-division Tumakuru. Tumakuru 26 Stringing of 66 kV second circuit line on DC towers from 220/66/11 kV Neelagunda receiving station to 66 kV Yaragunta station in the existing corridor for a distance of 32 Kms in Davanagere circle. Tumakuru Construction of new 66 kV SC line on DC tower from 66/11 kV Bukkapatna sub-station to 66/11 kV Hagalavadi sub-station for a distance of 18 Kms in the new corridor using coyote conductor with new terminal 27 bays at Bukkapatna and Hagalavadi sub-station in Tumakuru to Providing alternate source to existing 66/11 kV Sub-station at Bukkapatna (feeding from 220 kV receiving station Madhugiri) and 66/11 kV Hagalavadi. Tumakuru Replacement of old 66 kV SC line Owl conductor on old SC tower by SC line on DC towers (NBT) with Coyote ACSR conductor from 220/66 kV Antharasanahalli 28 receiving station to 66/11 kV Tumakuru sub-station in the existing corridor for a distance of 6 Kms in Tumakuru District. Tumakuru Construction of 66KV DC BG Kere line on DC towers with coyote conductor in the existing corridor of SC line 29 on SC towers with 66 kV extension of bay in 66/11 kV BG Kere sub-station for LILO arrangement for a distance of 1.2kms. Tumakuru Stringing of 2nd circuit of 66 kV DavanagereChitradurga-2 line from 220 kV SRS Davanagere to 66 30 kV Anagodu sub-station LILO point for a distance of 18 Kms in the existing corridor along with formation of terminal bay. Tumakuru Conversion of 66kV Thallak- Nayakanahatty SC line on SC towers by DC line on DC towers in the existing 31 corridor with 66KV bay formation at both 220kV Thallak and 66kV Nayakanahatty substation for a distance of 15.4kMs. Tumakuru 32 Stringing of 2nd circuit on existing 66kV Thallak Parashurampura SC line on DC towers with terminal bay formation at 66/11kV Parashurampura and at 220kV Thallak substation for a distance of 40kms Connecting existing 66kV Chitradurga –Thallak express line (line connecting directly from 220/66kV Chitradurga SRS to 220/66kV Thallak SRS) to Challakere 66/11kV substation with LILO arrangement 33 to Challakere line with constructing MC line on MC towers in the existing corridor for a distance of 1.5km with 66kV terminal bays in 66/11kV Challakere substation. Tumakuru Tumakuru 33 Total of Lines 100 Total of Tumakuru Zone HASSANA TRANSMISSION ZONE 1 Establishing 1x10 MVA, 110/11 KV sub-station at Antaragatta village in kadur Taluk, Chickmagaluru District 2 Establishing 2x10 MVA, 110/11 kV Udyavara substation in Udupi Taluk and District. 3 Up-gradation of 2x5 MVA, 33/11 kV sub-station to 2x10 MVA, 110/11 kV sub-station at Hosanagara by constructing 110 kV SC line on DC towers from 110 kV proposed Ripponpete sub-station for a distance of 30 kms. 4 Establishing 1x10 MVA, sub-station and construction of 0.3 KMS of 110 kV Single circuit line on DC Towers in Bejjavalli Thirthahalli Taluk, Shivamogga District. 5 Establishing 2x8 MVA, 66/11kV Sub-station at Nuggehalli village in Channarayapatna Taluk, Hassan District 180 List-IV Sl. No. Name of the Work 6 Subject A20: Re-Submission of establishing 1x10 MVA, 110/11 kV sub-station at Thyagarthi Village in Sagar Taluk, Shivamogga District by constructing 10kMs of 110kV SC line on DC towers from the existing 110 kV SS-2 line. 7 Establishing 1x20 MVA, 110/33kV and 1x10 MVA, at 110/11kV Alankar Sub-station in Puttur Taluk, D.K. District by constructing Appx. 12km 110kV SC line on DC Towers from proposed 110kV Madavu substation(Under Construction). 8 Establishing 1x10 MVA,110/11 KV Sub-Station at Kepu in Bantwal taluk, D.K.District, by constructing appx. 15 Km SC line on DC Towers from existing 110/11 KV sub-station at Vittla. 9 Establishing 1x10 MVA, 110/11kV Substation at Kunkanadu in Kadur Taluk, Chikkamagaluru District. 10 District Upgradation of 1X5 MVA, 33/11KV substation to 1 x 10MVA, 110/11KV substation at Sringeri, in sringeri taluk, Chikkmagaluru District, by Constructing 25KMs OF 110 kV SC Line on DC towers from existing 110/11 kV sub-station Kammaradi to 110/11kV sub-station at Sringeri, in Sringeri Taluk, Chikkamagaluru District. Establishing 1x10 MVA, 110/11KV Sub-station at Kuppagadde village in Soraba Taluk, Shivamogga 11 District by constructing 110KV SC tap line from the existing 110KV line near Togarsi Sub-station for a distance of 8 Kms Upgradation of 2x5 MVA, 33/11 kV substation at Neharu Maidan to 1x20 MVA, 110/33kV & 2x10 MVA, 110/11 kV Gas Insulated switchgear (GIS) substation at Nehru Maidan in Mangaluru Taluk by laying of 110kV, 630 sqmm XLPE Copper U.G.Cable SC line 12 (with one spare run) from existing 220/110/33/11kV Kavoor substation to the proposed 110/33/11 kV substation at Nehru Maidan for a distance of 12.0Km(approx) in Mangalore Taluk, Dakshina Kannada District. Revised TAC agenda for chnge of route of Proposed 110kV line from Nandikur to 1x10 MVA , 110/11 kV 13 Substation at Belapu in Udupi Taluk, Udupi District for a distance of 10kms Establishing 2X100MVA and 1 x 8 MVA, 220/66/11kV 14 Sub-Station near kaniyaru village in Arakalgud taluk, Hassan District. Establishing 2 x 20 MVA, 110/33kV and 1 x 10 MVA, 110/11kV substation at Panja in Sulya Taluk D.K. 15 District by constructing 21Kms 110kV SC line on DC Towers from the proposed 110kV Madavu substation ( Under construction) Establishing 2 X 10MVA, 110/11KV Sub-station at Kadalakere in Marpadi Village (near Moodabidri)in Mangaluru Taluk, and construction of 110KV LILO line on 110KV D/C Monopole towers with single sided cross 16 arms from existing 110KV D/C Moodabidri-Mannapitlu line of M/s.Soham Power Projects to the proposed 110/11 KV Sub-station at Kadalakere for a distance of 1.50Kms. (approx.) in Mangalore Taluk, Dakshina Kannada District. Establishing 2x10MVA, 110/11 kV sub-station at Ayanur in Shivamogga Taluk, Shivamogga District by 17 constructing 110 kV LILO line from existing 110 kV Sagara-Shivamogga No.1 line for a distance of 0.20Kms. Establishing 1x10MVA, 110/11KV Sub-station at Byndoor in Byndoor Taluk Udupi District by 18 constructing 13 Kms 110KV SC line from 110/33/11KV Sub –Station at Navunda and formation of 1 No 110kV TB at Navunda 19 Establishing 1x10 MVA, 110/11 kV sub-station at Kagodu in Sagar Taluk, Shivamogga District by constructing 09 kms 110kV SC line from existing 110kV Sagar-Talguppa LST-4 MC line at Tattekoppa. 20 Transmission scheme for proposed 1x 500 MVA, 400/220kV Arasapadavu sub-station 21 Establishing 2x8 MVA, 66/11kV sub-station at Heragu village, Hassan Taluk and District Establishing 1x8 MVA, 66/11 kV sub-station at 22 Santhemaruru Village in Arakalgud Taluk, Hassan District. Establishing 1x8 MVA, 66/11 kV sub-station at 23 Doddabemmathi Village in Arakalgud Taluk, Hassan District. 24 Establishing 1x8 MVA, 66/11 kV sub-station at Belavadi Village in Arakalgud Taluk, Hassan District. Establishing 1x8 MVA, 66/11 kV sub-station at 25 Mudibetta Kaval Village in Channarayapatna Taluk, Hassan District. 26 Establishing 1x8 MVA, 66/11 kV sub-station at Biccodu Village in Belur Taluk, Hassan District. 27 Establishing 1x8 MVA, 66/11 kV sub-station at Byrapura Village in Alur Taluk, Hassan District. 181 List-IV Sl. No. Name of the Work 28 Establishing 2x10MVA, 110/11kV Sub-station at Belapu in Kaup Taluk & Udupi District. 29 Establishing 1x8 MVA, 66/11 kV Sub-station at Somanahally Village in Hassan Taluk, Hassan District District Establishing 1x8 MVA, 66/11 kV sub-station at 30 Hanike(channapura) village in Belur Taluk, Hassan District 31 Establishing 1x10 MVA, 110/11 kV sub-station at Kolagunda Gate in Arasikere Taluk, Hassan District 32 Establishing 1x8 MVA, 66/11 kV Sub-station at Guddenahally village in Alur Taluk, Hassan District Establishing 1x10MVA, 110/11kV and 1x10MVA 33 110/33kV sub-station at Karje in Brahmavara Taluk & Udupi District Establishing 1x10MVA, 110/11 kV & 1X10MVA, 34 110/33 kV sub-station at Koteshwara in Kundapura Taluk, Udupi district 35 Establishing 2x10 MVA, 110/11 kV sub-station at Adyar in Mangaluru Taluk, D.K District Establishing 1x20 MVA, 110/33 kV and 2x10 MVA, 36 110/11 kV sub-station at Kaikara in Puttur Taluk, D.K.District Establishing 1x12.5 MVA, 66/11 kV sub-station at 37 Ganadalu in Chikkamagaluru Taluk, Chikkamagaluru District Establishing 2x8 MVA, 66/11 kV sub-station at 38 Jenugadde Village in Chikkamagaluru Taluk, Chikkamgaluru District a) Change in 110 kV line connectivity to the proposal of establishing 1x10MVA, 110/11 kV sub-station at Bejjuvalli Village in Thirthahalli Taluk,Shivamogga District by LILO of 110 kV V3 line instead of tapping. 39 b) Providing radial connectivity to proposed 1x10MVA, 110/11 kV sub-station at Konandur Village in Thirthahalli Taluk, Shivamogga District from proposed 110 kV Bejjuvalli sub-station 40 Change in 110 kV connectivity for the proposal for establishing 1x10MVA, 110/11 kV sub-station at Kuppagudde Village in Soraba Taluk, Shivamogga District Establishing 1x100 MVA, 220/66 kV & 1x100 MVA, 41 220/110 kV Sub-station at Dudda village in Hassan Taluk, Hassan District 41 Total of Sub-stations 1 Providing additional 1x20 MVA, 110/33 kV transformer with additional 1No. of 33 kV Bay at 110/33/11 kV Konaje sub-station, in Bantwal Taluk, DK District 2 Providing additional 1x20 MVA, 110/33kV Power Transformer along with one outgoing 33kV line Bay at the existing 110/33/11 kV Guruvayanakere substation in Belthangady Taluk, D.K.Dist. 3 Augmentation of 1x8MVA 66/11kV to 1x20 MVA 66/11kV Power Transformer at Hassan substation 4 Providing additional 1 x 8MVA Power Transformerat 66/11kV Mosalehosahally Substation in Hassan Taluk & District. 5 Augmentation of existing 2 X 100 MVA, 220/110 kV transformers by 2 X 150 MVA at 220/110kV Kemar sub-station in Mangalore district 6 Providing additional 1x8 MVA, 66/11 kV transformer at 220/66/11KV Receiving Station, Mugalavalli in Chikkamagalure Taluk, Chikkamagalure District. 7 Providing spare 1x12.5 MVA, 66/11 kV transformer at 220/66/11KV Receiving Station, Mugalavalli in Chikkamagalure Taluk, Chikkamagalure District. 8 Enhancement of 1x5MVA, 66/11kV Power Transformer1 by 1x8MVA, 66/11kV Power Transformer along with additional two numbers SWGs (one number in each 11kV Bank) with strengthening of 11kV ODS and Providing Metering & Protection to 66kV Incoming line and strengthening of 66kV ODS (replacement of existing coyote conductor by drake) with necessary civil works (viz replacement of un even and un-sized jelly as per standards and formation of Cable duct) at 66/11kV Hallymysore sub-station in Holenarasipura Taluk, Hassan District. 182 List-IV Sl. No. 9 Name of the Work District Providing additional 1 x 100MVA, 220/110kV Power Transformer at 220/110/11kV Netlamudnur Substation in Dakshina Kannada District Providing spare 1 x 20MVA, 66/11kV Transformer at 10 66/11kV Hassan Sub-Station in Hassan Taluk and District 11 Replacement of 1 x 10 MVA, 110/11kV Power Transformer by 1 x 20 MVA, 110/11kV Power Transformer at 110kV Moodabidri Sub-station, in Mangaluru Taluk, Dakshina Kannada District 12 Replacement of existing 1x10 MVA 110/11 kV Power Transformer-1 by 1 x20 MVA, 110/11kV power transformer at 110/33/11kV Sagar Sub-station in Sagar Taluk, Shivamogga District. Replacement of 1 x 8 MVA, 66/11 kV Transformer by 1 13 x 12.5MVA, 66/11 kV at 66 kV Panchanahalli substation, in Kadur Taluk, Chikkamagaluru District 14 Creating 33 kV reference by installing 1x20 MVA, 110/33 kV Transformer instead of 1x10 MVA, 110/33 kV Transformer at 110 kV Kammaradi sub-station in Thirthahalli Taluk, Shivamogga District Providing additional 1x8MVA, 66/11 kV transformer at 15 66/11 kV Attichowdenahally sub-station in Holenarasipura Taluk, Hassan District Providing additional 1x8 MVA, 66/11kV Transformer at 16 66/11kV Doddahally sub-station, in Holenarasipura Taluk, Hassan District Providing additional 1x8 MVA, 66/11kV Transformer at 17 66/11kV Doddakadanuru sub-station, in Holenarasipura Taluk, Hassan District Providing additional 1 x 8 MVA, 66/11kV Transformer 18 at 66/11kV Hariharapura sub-station, in Holenarasipura Taluk, Hassan District Providing additional 1x8 MVA, 66/11kV Transformer at 19 66/11kV Somanahally sub-station, in Holenarasipura Taluk, Hassan District Providing additional 1x100 MVA, 220/110 kV power 20 transformer at 220/110 kV Balligavi sub-station in Shivamogga District 20 Total of Augmentations 1 Resubmission of proposal : Running 110 kV, 400 Sq.mm. XLPE copper U.G cable double circuit line for the portion between 220 kV SRS Kavoor to location No. 5 of the proposed (under construction) 110 kV Kavoor–Kulashekara double circuit lines in 33 kV line corridor in Mangalore Taluk, D.K. District. 2 Providing LILO arrangements to 66kV DVG-1 line at 66/11kV Holaluru Sub-station Holalur in TL&SS Division Shivamogga. 3 Providing LILO arrangements to 110kV SS-2 line at 110/11kV Kumsi Sub-station in TL&SS Division Shivamogga. 4 Providing LILO arrangements and M&P equipment’s at 110/11kV Substation at Machenahalli in Bhadravathi Taluk, Shivamogga District. 5 Conversion of existing 110kV Bhadravathi-3 (BDVT-3) SC line to DC line from 220kV receiving station MRS to 110/11kV Sub-station Machenahalli for a distance of 8kms & construction of new 110kV SC line on DC tower from 110/11kV Sub-station Machenahalli to NRS VISL Bhadravathi for a distance 8 kms in existing corridor of TL&SS Division KPTCL, Shivamogga Jurisdiction. 6 Providing LILO arrangements to 110kV Bhadravathi-3 (BDVT-3) line at 110/33/11kV Bhadravathi Substation in TL&SS Division Shivamogga. 7 Construction of 110KV DC Line from the existing 110/11KV Karaya sub-station to the existing 110/33/11KV Guruvayanakere sub-station for a distance of 15 Kms in Belthangady Taluk, D K District. 183 List-IV Sl. No. Name of the Work 8 Construction of new 66kV SC line on DC towers in the existing corridor of 66kV Mild steel H-frame ShimogaMysore(SMT) from 220kV Receiving station Hassan to 66/11 kV Belur substation for a distance of about 35 kms with Terminal bay at Hassan and with LILO arrangement at Hagare substation 9 Conversion of 66kV single circuit line on mild steel single circui towers into 66kV double circuit line from 220kV sub-station Kadavinakote to 220kV substation Yachenhally duly providing 66kV TB’s at both sub Stations in Hassan district. District Construction of new 66kV SC line on DC towers in the existing corridor of the 66kV H-Frame ShivamoggaMysore-1(SMT from 66kV HNpura substation to tap point of Saligrama(Munjanahalli limits) line for a 10 distance of about 21Kms in HN Pura Taluk Hassan District by using conventional Dc towers and Coyote conductor with terminal bay at 66kV Holenarasipura substation. 11 Conversion of 66kV Single Circuit line on Mild steel single circuit towers to Double circuit line from 66kV Channarayapatna to Hirisave sub-station with Terminal bay each at both substation. Bifurcation of 66kV Hiremagalur-Chikkmagaluru line by constructing a new DC line from Mugulavalli 220/66kV Receiving Station to Hiremagaluru Substation for a distance of 1.5km by utilizing the 12 existing the existing spare line terminal bay (Bhadra bay at Mugalavalli 220/66kVreceiving station) and existing idle SMT line corridor in TL&SS division, KPTCL, Shivamogga Jurisdiction. Construction of 66kV SC line between 66/11kV 13 Substation at Rampura and Didiga duly providing 66kV TBs at both substation in Hassan Disrtict. 14 Providing LILO arrangement to 66 kV Hallimysore substation by stringing 66 kV 2nd circuit for a distance of about 4.55 kms along with one number of 66kV Terminal Bay in H.N.Pura Taluk, Hassan District 15 LILOing of 66 kV Hassan-C.R. Patna 2nd circuit line to 66 kV Udayapura sub-station for a distance of 75mtrs along with 2 Nos. of 66kV Terminal Bays in C.R. Patna Taluk, Hassan District Stringing of 66 kV 2nd circuit with coyote conductor on existing 66 kV DC towers from 220 kV MRS Shivamogga sub-station to Holalur tapping 16 point(tower no 230A) for a distance of about 18.20kms along with 66kV terminal bay at 220kV MRS Shivamogga sub-station 17 Construction of 66kV SC link line between 66 kV Attichowdanahally and 66 kV Hariharapura substations along with 66kV TBs at both sub-stations in C.R. Patna Taluk, Hassan District. 18 Providing LILO arrangement to 66 kV Singapura substation by stringing 66 kV 2nd circuit for a distance of about 6.128 Kms along with one number of 66kV TB in H.N. Pura Taluk, Hassan District Providing LILO arrangement to 66 kV Magge substation from one circuit of 66kV HassanSakaleshapura DC line duly converting 66kV SC tap 19 line having KEB make mild steel SC towers to DC towers for a distance of about 9.50Kms along with one no. of 66kV TB at 66kV Magge sub-station in Alur Taluk, Hassan District Conversion of existing 220 kV SC line from Kilara limits to Balligavi limits for a distance of 52.817 kms to 220 20 kV DC line and construction of one no. of 220 kV terminal bay at Sharavathi Generating station and one at 220 kV Balligavi station in Shimoga district 21 Realignment of 220kV Shantigrama(PGCIL)-Gopalpura M2 and Gopalpura-Kadavinkote-1 near 33/220kV Suzlon wind pooling station at Gopalpura in Holenarasipura Taluk 21 Total of Lines 1 Providing additional Terminal Bays at 66/11kV Belur sub-station in Hassan District. 2 Providing 125 MVAr bus reactor at 400/220kV Talaguppa Sub-station 3 Modification of the existing 220 kV Strung bus by Rigid bus at 220 kV Khemar sub-station in Udupi District 3 Total of TB's & Others 85 Total of Hassana Zone MYSURU TRANSMISSION ZONE 184 List-IV Sl. No. Name of the Work 1 Nagamangala: Establishment 2x100MVA, 220/66kV Station along with associated Transmission lines 2 Establishing 2x100 MVA, 220/66 kV sub-station at Maddur in Maddur Taluk, Mandya District 3 Establishing 1x8 MVA, 66/11 KV Sub station at Somarapete in Chamarajanagara Taluk & District 4 Establishing 1x12.5 MVA (66/11 kV) & 1x8 MVA (66/33 kV) 66/33/11kV sub-station at Hanagal Shettyhalli (Somawarapete) in Somawarapete Taluk, Kodagu District with construction of 66KV SC Line on DC Towers for a distance of about 27Kms. 5 Upgradation of 33/11kV sub-station to 66/11kV substation by providing 1X8 MVA, at Murnadu in Madikeri Taluk, Kodagu District 6 Establishing 2x8 MVA 66/11kV sub-station at Srimangala in Somvarpet Taluk, Kodagu District. 7 Establishing 1x8 MVA 66/11kV sub-station at Kudige in Somvarpet Taluk, Kodagu District. 8 Establishing 1x8 MVA 66/11kV sub-station at Lokkanahalli(Chennalinganahalli(C.N Halli)), Kollegala Taluk, Chamarajanagar District. 9 Up-gradation of 33/11kV Sub-station to 66/11kV Substation by providing 1X12.5MVA, at Siddapura(Beeticadu) in Virajpet Taluk, Kodagu District. 10 District Establishing 2 x 100 MVA, 220/66 kV Sub-Station at Adakanahalli, Nanjangud Taluk, Mysuru District Establishing 1x8 MVA, 66/11kV Sub-station at 11 Pandithanahalli(Bachanahalli) in Malavalli Taluk, Mandya District 12 Establishing 1x8 MVA, 66/11kV Sub-station at Sunkathonnur in Pandavapura Taluk, Mandya District Establishing 1x8 MVA, 66/11kV Sub-station at 13 Eechalagudda kaval(ganadahalli gate) at K.R.Pet Taluk, Mandya District 14 Establishing 1x8 MVA, 66/11kV Sub-station at Varuna in Mysuru Taluk, Mysuru District 15 Establishing 1x8 MVA, 66/11kV Sub-station at Honganuru in Chamarajanagara Taluk and District 16 Establishing 2x100MVA 220/66/11kV sub-station at Hunsur in Hunsur Taluk and Mysuru District. 17 Establishing 1x8 MVA, 66/11kV Sub-station at Hadinaru in Nanjangudu Taluk, Mysuru District 18 Establishing 1x8 MVA, 66/11kV Sub-station at Goluru in Nanjangudu Taluk, Mysuru District 19 Establishing 1x8 MVA, 66/11kV Sub-station at Volagere in Nanjangudu Taluk, Mysuru District Establishing 1x8 MVA, 66/11kV sub-station at 20 Bhagamandala(Kopatti) in Madikeri Taluk, Kodagu District. 21 Establishing 2x500 MVA, 400/220 kV sub-station at Kadakola in Mysore District Establishing 1x8 MVA, 66/11 kV sub-station at 22 Kodlipet(Handpost) in Somawarapete Taluk, Kodagu District 23 Establishing 1x8 MVA, 66/11 kV sub-station at Katte Malalavadi Gate in Hunsur Taluk, Mysuru District Establishing 1x8 MVA, 66/11 kV sub-station at 24 Maragowdanahally(Mavathur)in K.R.Nagar Taluk, Mysuru District 185 List-IV Sl. No. Name of the Work 25 Establishing 1x8 MVA, 66/11 kV sub-station at Meluru in K.R.Nagar Taluk, Mysuru District 26 Establishing 1x8 MVA, 66/11 kV sub-station at Kyatanahalli in Pandavapura Taluk, Mandya District 27 Establishing 1x8 MVA, 66/11 kV sub-station at Santhekasalagere in Mandya Taluk, Mandya District 28 Establishing 1x8 MVA, 66/11 kV sub-station at Beeruvalli in K.R.Pete Taluk, Mandya District 29 Establishing 1x12.5 MVA, 66/11 kV sub-station at Padukote in HD Kote Taluk, Mysuru District 30 Establishing 1x8 MVA, 66/11 kV sub-station at Seeguru Gate in Periyapatna Taluk, Mysuru District 31 Establishing 1x8MVA, 66/11kV sub-station at Hunasawadi in Periyapatna Taluk, Mysuru District 32 Establishing 1 x 8 MVA, 66/11 kV sub-station at Mullur in Saragur Taluk, Mysuru District 33 Establishing 1x8 MVA, 66/11 kV sub-station at Challahally in Hunsur Taluk, Mysuru District 34 Establishing 1x8 MVA, 66/11 kV sub-station at Rathnapuri in Hunsur Taluk, Mysuru District 35 Establishing 1x8 MVA, 66/11 kV sub-station at Dodde Koppalu Gate in Hunsur Taluk, Mysuru District District 35 Total of Sub-stations 1 Providing 1x100 MVA, 220/66 kV spare transformer at 220 kV Kadakola sub-station. 2 Re-submission: Replacing 1x 6.3 MVA, 66/11 kV transformer by 1x12.5 MVA transformer at 66 kV Devanur(Nanjangud) Sub-station in Mysore District. 3 Replacing 1x8 MVA, 66/11 kV Transformer by 1x12.5 MVA, 66/11 kV Transformer-2 at 66 kV Megalapura sub-station in Mysuru taluk and district 4 Replacing 2x8 MVA, 66/11 kV Transformer by 2x12.5 MVA, 66/11 kV Transformer at 66/11 kV K.Honnalagere sub-station in Maddur Taluk and 5 Providing additional 1x8 MVA, 66/11 kV Power Transformer at 66/11 kV Transformer Doora substation in Mysuru Taluk and Mysuru district 6 Providing additinal1x8 MVA, 66/11kV Power Transformer at 66/11KV Hura Sub-station in Nanjanagud Taluk, Mysuru District. 7 a. Providing additional 1x8 MVA, 66/11kV Power Transformer at 66/11kV Mugur Sub-station in T.N.Pura Taluk, Mysuru District. b. Shifting of 66kV Tapping point of 66/11kV S/s Mugur from existing 66kV Doddarayapet-KunthurMadhuvanahally Line to 66kV ChamarajanagarKollegala-Madhuvanahally Line by constructing SC line on DC Towers for 3Kms 8 Providing additional 1x8 MVA, 66/11kV Power Transformer at 66/11kV Martally Sub-station in Kollegala Taluk, Mysuru District. 9 a. Replacement of 2x8 MVA, Power Transformer by 2x12.5 MVA Power Transformer at 66/11 KV Ramapura sub- station in Kollegal Taluk, Chamarajnagara District. b.Construction of 66kV DC Line on DC Tower by replacement of existing SC Line on SC tower of 66kV Hanur-Cowdally line of 17.4Kms along with Radial SC line on DC towers from 66/11kV S/s Ramapura to Proposed 66/11kV s/s Ajjipura for about 13Kms for Ring main arrangement by replacing existing Radial arrangement at Kollegala taluk,Chamarajanagar district 10 Replacement of 2x8 MVA, Power Transformer by 2x12.5 MVA Power Transformer at 66/11 KV Doddinduvadi sub- station in Kollegal Taluk, Chamarajnagara District. 186 List-IV Sl. No. Name of the Work District Providing additional 1x12.5MVA, 66/11kV at 11 Ganjigere sub-station, K.R.Pete Taluk, Mandya District. Providing additional 1x8 MVA, 66/11 kV transformer 12 at 66 kV Ayarahalli sub-station, in Mysuru Taluk and District. Providing additional 1x8 MVA, 66/11 kV transformer 13 at 66 kV Kabballi sub-station, in Gundlupet Taluk and Chamarajanagara District Providing additional 1x20 MVA, 66/11 kV transformer 14 at 66 kV Doddarayapete sub-station, in Chamarajanagara Taluk and District Replacing 1x12.5MVA, Power Transformer by 1x20MVA 15 Power Transformer at 66/11kV Koppa sub-station in Maddur Taluk, Mandya District 16 Replacing 2x8MVA, 66/11 kV Transformers by 2x12.5MVA 66/11 kV Transformers at 66/11 kV Mahadeshwarapura sub-station in Pandavapura Taluk and Mandya District 17 Replacing 1x8 MVA, 66/11 kV Transformer by 1x20MVA 66/11 kV Transformer at 66/11 kV Guddenahalli sub-station in Nagamangala Taluk and Mandya District. 18 Replacing 1x8 MVA, 66/11 kV Transformer by 1x20MVA 66/11 kV Transformer at 66/11 kV Chikkamandya sub-station in Mandya Taluk and District. 19 Replacing 1x20 MVA, 66/11 kV Transformer by 1x31.5MVA 66/11 kV Transformer at 66/11 kV Maddur sub-station in Maddur Taluk and Mandya District 20 Replacing 2x12.5 MVA, 66/11 kV Transformers by 2x20MVA 66/11 kV Transformers at 66/11 kV Nagamangala sub-station in Nagamangala Taluk and Mandya District. 21 Replacing 1x12.5 MVA, 66/11 kV Transformer by 1x20MVA 66/11 kV Transformer at 66/11 kV Gundlupete sub-station in Gundlupete Taluk and Chamarajanagara District 22 Replacing 1x8 MVA, 66/11 kV Transformer-1 by 1x12.5MVA 66/11 kV Transformer at 66/11 kV Hangala sub-station in Gundlupete Taluk and Chamarajanagara District 23 Replacing 2x100 MVA, 220/66 kV Transformers by 2x150 MVA 220/66 kV Transformers at 220/66 kV Tubinakare sub-station in Mandya Taluk and Mandya District. 23 Total of Augmentations 1 Re-construction of 66 kV Vajamangala-SFC single circuit idle line in Mysore & Mandya Districts 2 (Resubmission)Strengthening of 66 KV coyote SC line on SC tower from Kadakola 220 KV sub-station to 66kV Devanur (Nanjangud) sub-station by Drake conductor on 110/66kv DC tower to a distance of 23 km. 3 Conversion of existing 220 kV SC HootagallyVajmangala-TK Halli to DC line with Drake ACSR conductor 4 a)Providing 66kV SC link line between 66kV Bhogadi sub-station and 66kV Santhebachahally Sub-station K.R.Pet Taluk, Mandya District. b) Providing radial connectivity for 66 kV Bhogadi substation from 66 kV Guddenahalli sub-station in K.R.Pet Taluk, Mandya District. 5 Providing 66kV DC link line with coyote conductor between 220kV Huygonahalli sub-station and 66kV Chinakurali sub-station for a distance of about 20 kms in K.R.Pet Taluk, Mandya District 6 Stringing of 66 kV 2nd circuit with coyote conductor on existing 66kV DC towers of 66 kV ChamarajanagaraHonnali SC line for a distance of about 17kms along with 66 kV TBs at both ends in Chamarajanagara Taluk and District 6 Total of TB's & Others 187 List-IV Sl. No. Name of the Work District 64 Total of Mysuru Zone BAGALKOTE TRANSMISSION ZONE 1 Establishing 2x100 MVA, 220/110 kV sub-station at Savalagi (Near Chikkalaki Cross), Bagalkot District Bagalkot 2 Establishing 1x10 MVA, 110/11 kV sub-station at Thabakadahonnalli in Kalaghatagi Taluk, Dharwad District Dharwad 3 Upgradation of 33/11 kV sub-station to 2x10 MVA, 110/11 kV sub-station at Haunsbhavi in Haveri Taluk, Haveri District 4 Establishing 1x10 MVA, 110/11 kV sub-station at Hiremural(Nalathawad) in Muddebihal Taluk, Vijayapura District 5 Establishing 1x10 MVA, 110/11 kV sub-station at Bagewadi in Mundaragi Taluk, Gadag District. Modification in 110 kV line scheme proposed for establishing 1x10 MVA, 110/11 kV Sub-station at Bagewadi in Mundaragi Taluk, Gadag District approved in 73 rd TCCM on 20.3.17 . 6 Establishing 2x10 MVA, 110/11 kV sub-station at Gosabal in Gokak Taluk, Belagavi District Belagavi 7 Establishing 1x10 MVA, 110/11 kV sub-station at Itnal in Soundatti Taluk, Belagavi District Belagavi 8 Establishing 1x10 MVA, 110/11 kV sub-station at Telagi in B.Bagewadi Taluk, Vijayapura District Vijayapura 9 Establishing 1x10 MVA, 110/11 kV sub-station at Hebballi in Dharwad Taluk, Dharwad District Dharwad 10 Establishing 1x10 MVA, 110/11 kV sub-station at Morab in Navalagund Taluk, Dharwad District Dharwad 11 Establishing 2x10 MVA, 110/11 kV sub-station at Nandagaon in Gokak Taluk, Belagavi District Belagavi 12 Establishing 2x100 MVA, 220/110 kV sub-station at Bilagi in Bilagi Taluk, Bagalkot District Bagalkot 13 Establishing 1 x 10 MVA, 110/11 kV sub-station at Kainakatti in Badami Taluk, Bagalkot District Bagalkot 14 Establishing 1 x 10 MVA, 110/11 kV sub-station at Suthagundar in Bagalkot Taluk, Bagalkot District Bagalkot 15 Establishing 2 x 10 MVA, 110/11 kV sub-station at Hebbal in Mudhol Taluk, Bagalkot District Bagalkot 16 Establishing 1 x 10 MVA, 110/11 kV sub-station at Hireharkuni in Kundagol Taluk, Dharwad District Dharwad Upgradation of 3x5 MVA,33/11 kV sub-station to 2 x 17 10 MVA, 110/11 kV sub-station at Kaginele in Byadagi Taluk, Haveri District Haveri 18 Establishing 1 x 10 MVA, 110/11 kV sub-station at Belur in Ranebennur Taluk, Haveri District Haveri 19 Establishing 2 x 10 MVA, 110/11 kV sub-station at Bellada Bagewadi in Hukkeri Taluk, Belagavi District Upgradation of 2x5 MVA, 33/11 kV sub-station to 2 x 20 10 MVA, 110/11 kV sub-station at Dhulkhed in Indi Taluk, Vijayapura District Haveri Vijayapura Gadag Belagavi Vijayapura 21 Establishing 2 x 10 MVA, 110/11 kV sub-station at Kodachawad in Khanapur Taluk, Belagavi District Belagavi 22 Establishing 1 x 10 MVA, 110/11 kV sub-station at Gubbewad in Sindagi Taluk, Vijayapura District Vijayapura 23 Establishing 2x100 MVA, 220/110 kV sub-station at Salahally in Ramadurga Taluk, Belagavi District Belagavi 24 Establihing 2x100 MVA, 220/110 kV Sub-station at Ramdurga Ramdurga Taluk, Belgavi District. Belgavi 188 List-IV Sl. No. Name of the Work Establishing 1x10 MVA, 110/11 kV sub-station at 25 Khanderayanahalli in Ranebennur Taluk, Haveri District Establishing 1x10 MVA, 110/11 kV sub-station at 26 Kulenur in Haveri Taluk, Haveri District District Haveri Haveri 27 Establishing 1x10 MVA, 110/11 kV sub-station at Kanasur in Siddapura Taluk, Uttara kannada District 28 Establishing 1 x 10 MVA, 110/11 kV sub-station at Honwad in Vijayapura Taluk, Vijayapura District Vijayapura 29 Establishing 1 x 10 MVA, 110/11 kV sub-station at Kannur in Vijayapura Taluk, Vijayapura District Vijayapura 30 Establishing 2 x 10 MVA, 110/11 kV sub-station at Jambagi in Vijayapura Taluk, Vijayapura District Vijayapura Upgradation of 2x5 MVA, 33/11 kV sub-station to 31 1X10 MVA, 110/11 kV & 1x20 MVA, 110/33 kV Sub Station at Akkialur in Hangal Taluk, Haveri District Uttara Kannada Haveri 32 Re-submission :- Establishing 2x100 MVA, 220/110 kV Sub-station at Byadagi, Byadagi Taluk, Haveri District. 33 Establishing 2 x 10 MVA, 110/11 kV sub-station at Bellubbi in Vijayapura Taluk, Vijayapura District Vijayapura 34 Establishing 2 x 10 MVA, 110/11 kV sub-station at Arjunagi in Vijayapura Taluk, Vijayapura District Vijayapura 35 Establishing 1 x 10 MVA, 110/11 kV sub-station at Hattaragi in Sirsi Taluk, Uttara Kannada District Uttara Kannada Establishg 2x500 MVA, 400/220 kV sub-station at 36 Yalwar (Tentative Loacation) in Basavana Bagewadi Taluk, Bijapur District. Haveri Vijayapura 37 Establishg 2x500 MVA, 400/220 kV sub-station at Lokapur in Mudhol Taluk, Bagalkot District. 38 Establishg 2x100 MVA, 220/110 kV sub-station at Ron in Ron Taluk, Gadag District. Gadag 39 220kV GIS station to replace existing 220kV Ambewadi SS , Haliyal Tq, North canara Dist north canara Establishing 1X10 MVA,110/11 kV Sub-station at 40 Navage Industrial Area in Belgavi Taluk and District. Bagalkot Belagavi 41 Establishing 2X10 MVA, 110/11kV sub station at Hullur, Muddebihal Taluk, Vijaypura district. Vijayapura 42 Establishing 1x10 MVA, 110/11 kV sub-station at Kerur in Indi Taluk, Vijayapura District. Vijayapura 43 Establishing 2x10 MVA, 110/11 kV Sub-station at Harugeri in Raibag Taluk, Belgaum District. Belagavi Establishing 2X10 MVA, 110/11 KV sub-station at 44 Chimmada in Jamakhandi Taluka, Bagalkot District. Establishing 2x100 MVA, 220/110 kV, 1x10 MVA, 45 110/11 kV Sub-station at Divagi in Kumta taluk, Uttara Kannada District. 46 Establishing 2x100 MVA, 220/110 kV Sub-station at Desur, Belagavi District. Establishing 2X10 MVA, 110/11 KV sub-station at Dindawar by making LILO arrangement from 110kV BagewadiSindagi line 47 for a distance of 1.5Kms in Basavan Bagewadi Taluk, Vijayapura District. Establishing 2X10 MVA, 110/11 KV sub-station at Yankanchi by making LILO arrangement from 110kV 48 Sindagi-Bagewadi line for a distance of 10Kms in Sindagi Taluk, Vijaypur District. Establishing 1X10 MVA, 110/11 KV sub-station at Machakanur by making LILO arrangement from 110kV Bagalkot-Lokapur line for a distance of 2.0 kms in Mudhol Taluk, Bagalkot District. Establishing 1X10 MVA, 110/11 KV sub-station at Kendur by making LILO arrangement from 110kV 50 Kerur-Badami line for a distance of 8 Kms in Badami Taluk, Bagalkot District. 49 189 Bagalkot Uttara Kannada Belagavi Vijayapura Vijayapura Bagalkot Bagalkot List-IV Sl. No. Name of the Work Establishing 2X10 MVA, 110/11 KV sub-station at Alagur by construction of 110kV SC line on DC towers from approved 220/110kV Chikkalaki cross (Savalagi) for a 51 distance of 15Kms in Jamakhandi Taluk, Bagalkot District. Establishing 1X10 MVA, 110/11 KV sub-station at Jigajevanagi by constructing S/C line on D/C towers for a distance of 10 Kms from existing 110 KV substation Inchageri in Indi Taluk, Vijayapur District. Upgradation of existing 2x5MVA, 33/11KV sub-station to 2x10MVA,110/11KV sub-station at Naad in Indi 53 Taluka, Vijayapur District with construction of 110kV SC line on DC towers from 110kV Hiremasali for a distance of 9 kms. Establishing 2X10 MVA, 110/11 KV sub-station at Umaraj village by constructing S/C line on D/C tower 54 with Lynx conductor for a distance of 18 km in Indi Taluk, Vijayapur District. 52 Establishing 2X500 MVA, 400/220kV SS at Bijapur 55 Bagewadi area at yalawar/ Shivanagi, Vijaypur Taluk & dist District Bagalkot Vijayapura Vijayapura Vijayapura Upgradation of 33 kV sub-station to 2x10 MVA, 56 110/11 kV sub-station at Aralimatti in Gokak Taluk, Belagavi District. Upgradation of 33 kV sub-station to 2x10 MVA, 57 110/11 kV sub-station at Hallur in Gokak Taluk, Belagavi District. Establishing 2X10 MVA, 110/33/11 KV sub-station at Madangeri near Gokarna by LILO arrangement from 58 110 Kumta – Karwar line for a distance of 0.03Kms in Kumta Taluk, Uttara Kannada District. 59 Establishing 2x100 MVA, 220/110 kV Sub-Station at Hungund, Hungund Taluk, Bagalkot district. 59 Total of Sub-stations 1 2 3 Replacement of MS and Deteriorated Towers and Lines of 110 kV Supa-Goa DC line by new 110 kV DC line with Lynx conductor using 110 kV GI towers in the existing corridor in Uttara Kannada District Providing additional 1x50 MVA, 220/11 kV Tr at 220 kV Sirsi (Esle) sub-station, in Sirsi Taluk, Uttara Kannada District Providing additional 1x100 MVA 220/110 kV Power transformer at 220/110/11 kV Ghataprabha substation in Belagavi District. Uttara Kannada Uttara Kannada Belagavi 4 Providing additional 1x10 MVA, 110/11 kV transformer along with 1I/C+5F switchgear at 110 kV Nidagundi sub-station in B.Bagewadi Taluk & Vijaypura District. Vijayapura 5 Creating 33kV reference by installing 1X20 MVA, 110/33 kV power transformer at 110kV Chadachan sub station in Indi Taluk, Vijaypura District. Vijayapura 6 7 8 9 10 Providing 1x100 MVA, 220/110 kV Power transformer at 220/110 /11 kV Kuduchi Sub-station in Raibhag taluk. Augmentation of existing 1x5 MVA, 110/11 kV Power Transformer by 1x10 MVA, 110/11 kV power transformer at 110kV Sub-station Siddapur in Sirsi Taluk, Uttar Kannada District Augmentation of 1X10 MVA, 110/11kV Power Transformer by 1X20 MVA, 110/11kV Power Transformer at 110/11kV Mamadapura Sub-station in Gokak Taluk and Belgaum District. Providing additional 1x10 MVA, 110/11 kV transformer along with (1+5) 11kV switchgear at 110 kV Ramankoppa sub-station in Kundagal Taluk , Dharwad District. Dharwad Providing additional 1x10 MVA, 110/33 kV transformer along with one No. 33kV feeder bay at 110 kV Akshay colony sub station in Hubli Taluk & District. Providing additional 1x10MVA, 110/11kV Power 11 Transformer at 110/11kV Kawalawad sub-station in Haliyal Taluk, Uttara Kannada District 12 Augmentation of 10MVA by 20MVA, 110/11KV power transformer No-02 with additional (1+7) PCVCB switch gears at 110/11KV Yallammanawadi sub station in Athani Taluk, Belgaum District. 13 Augmentation of 10MVA by 20MVA, 110/11KV Power transformer No-01 with additional (1+7) PCVCB switchgears at 110/11KV Balligeri sub station in Athani Taluk, Belgaum District 14 Augmentation of 10MVA, 110/11kV power transformer No-02 by 20MVA, 110/11KV power transformer with additional (1+7) MCVCB switch gears at 110/11KV Ainapur sub station in Athani Taluk, Belgaum District Augmentation of 10MVA, 110/11kV power transformer by 20MVA, 110/11KV power transformer with 15 additional 1I/C+2F+1AP3 MCVCB switch gears at 220/110KV Basavan Bagewadi sub station in B.Bagewadi Taluk, Vijaypura District. 190 Vijayapura List-IV Sl. No. Name of the Work Augmentation of 10MVA, 110/11kV power transformer16 2 by 20 MVA, 110/11kV power transformer at 110kV Yadwad sub station, in Gokak Taluk, Belagavi District District belagavi Providing additional 1x10 MVA, 110/11 kV transformer along with PCVCB switchgear at 110 kV 17 Shiraguppi sub-station in Bilagi Taluk , Bagalkot District. Augmentation of 1X10 MVA, 110/11kV Power Transformer –I by 1X20 MVA, 110/11kV Power 18 Transformer along with 11kV PCVCB switchgears at 110 kV Malaghan (Sindagi) sub-station in Vijayapur District. Augmentation of 10MVA, 110/11kv power transformer 19 1 by 20MVA, 110/11kV power transformer at 110kV station Mudalagi in Mudalagi Taluk & district. 20 Augmentation of 1X10MVA, 110/11KV Power Transformer –I by 1X20MVA, 110/11KV Power Transformer along with switchgears at 110/11KV SubStation, Mukarthihal in Vijayapur Dist. Augmentation of 1X10 MVA, 110/11kV Power Transformer-I by 1X20 MVA, 110/11kV Power 21 Transformer along with 11kV PCVCB switchgears at 110/11kV Devarhipparagi Sub-station in sindagi Taluk ,Vijayapur District. 22 Augmentation of 1X10 MVA, 110/11kV Power Transformer-I by 1X20 MVA, 110/11kV Power Transformer at 110/11kV Byadagi Sub-station in Haveri District. Providing additional 1x10 MVA, 110/11 kV transformer 23 along with switchgear at 110 kV Basavanakatti substation in Haveri Taluk & District 24 Augmentation of 1X10 MVA, 110/11kV Power Transformer-I by 1X20 MVA, 110/11kV Power Transformer at 110/11kV Rattihalli Sub-station in Haveri District. Providing additional 1x100 MVA, 220/110 kV power 25 transformer at 220/110 kV Vijayapura sub-station in Vijayapura district. Providing additional 1x100 MVA, 220/110 kV power 26 transformer at 220/110 kV Indi sub-station in Vijayapura district. 26 Total of Augmentations 1 220 kV Evacuation lines from the proposed 2400+1600 =4000 WM NTPC Super Critical TPS at Kudgi in Bijapur District - Modification reg. 2 Stringing of 110 kV 2nd circuit on existing 110 kV DC GI towers from 110 kV KIADB sub-station to Tikota S/S(from Loc 1 to 115) in Bijapur District 3 Conversion of 110 kV SC line to DC line from 220 kV Athani sub-station to 110 kV Athani sub-station for a distance of 3.7 kms with replacement of existing 110 kV SC line constructed on SC MS towers from location 125 to location 133 in Athani Taluk, Belagavi District Construction of 110 kV SC line on DC towers with Lynx conductor from 110 kV Shirabur to 110 kV Bisnal sub-stations for a distance of about 10 kms in Vijayapura/Bagalkot District Replacement of H frame towers by GI towers along with conductor and ground wire of 110 kV SRS Hubli5 Bidnal-Annigeri-Gadag SC line from Loc no 1 to 21, 27 to 182 and 182 to 304 for a distance of 54 kms in Dharwad/Gadag District Construction of 110 kV SC line on DC towers with Lynx conductor from 110 kV Mamadapur sub-station to 6 110 kV Yaragatti sub-station with Terminal bays at both ends in Belagavi District Construction of 110 kV SC line on DC towers with Lynx conductor from 110 kV Babaleshwara sub-station to 7 110 kV Tikota sub-station with Terminal bays at both ends in Vijayapura District Construction of 110 kV SC line on DC towers from 110 kV Nippani sub-station to proposed 110 kV Kugonalli sub-station for a distance of about 15 kms 8 and 110 kV Bhoj sub-station to 110 kV Boregaon substation for a distance of about 14 kms in Belagavi District Stringing of 110 kV 2nd circuit on existing 110 kV DC towers between 220 kV Belagavi sub-station to 110 9 kV Mache substation for a distance of about 29.54 kms in Belagavi District Replacement of MS Fabricated tower by GI lattice tower along with conductor from 66 kV Multi circuit 10 to 66 kV Harihar-Hospet sub-station & Poly Fiber station Harihar-Hospet in Haveri TLM section, Haveri District 4 Providing alternate source to 220 kV Ranebennur sub11 station by LILOing 220 kV Haveri-Guttur line-1 at Loc 94-95 in Ranebennur Taluk, Haveri District 191 Bijapur Vijayapura Belagavi Vijayapura Dharwad Belagavi Vijayapura Belagavi Belagavi Haveri Haveri List-IV Sl. No. Name of the Work Replacement of rusted GI lattice towers along with conductor and ground wire of 110 kV SRS Hubli12 Bidnal-Bagalkot DC line from loc no 01 to 15 & 18 to 250 in TLM sub-Division jurisdiction Dharwad and Gadag District Construction of 2nd circuit LILO of 220kV 13 Mahalingpura-Kudachi DC line to 220kV Athani substation Strengthening of 220 kV DC line between 220/110 kV Gadag and Lingapur switching station via proposed 14 400/220 kV Dhoni sub-station with Drake equivalent HTLS conductor. Replacement of partially MS towers by new DC GI towers along with conductor & ground wire from Loc 01 to Loc 127 and replacing SC MS towers by DC 15 Monopole towers from Loc 128 to Loc 147 of 110 kV B.Bagewadi-Bijapur city SC line for a distance of about 47.5 kms in Vijayapura District Stringing of 110 kV 2nd circuit from tapping point to 110 kV Mattihal sub-station for a distance of about 16 12.38 kms along with a TB at Mattihal sub-station in Vijayapura District Construction of 110 kV link line from 110 kV Hosa Honnatti sub-station to Aremallapura tap line for a distance of about 2.48 kms along with 110 TB at 110 17 kV Hosa Honnatti sub-station to have independent souce to 110 kV Aremallapura sub-station in Ranebennur Taluk, Haveri District Replacement of partially MS towers by new DC GI towers along with conductor & ground wire from Loc 170 to Loc 162, Loc 171 to Loc 237 and Loc 238 to Loc 18 244 of 110 kV Chikkodi-Sankeshwara-Hukkeri SC line for a distance of about 22.7 kms in Belagavi District Replacement of existing SC towers by DC towers with Drake conductor from 220kV Bidanal to 220kV 19 Soundatti to 220kV Mahalingpura in existing corridor from Location 13 to 431 from 220kV Bidnal-Soundatti line in Belgaum District. Construction of 110kV SC line on DC towers from 110/11kV Toravi sub station to location No 140 of Basavana Bagewadi- Vijayapura SC line and MC narrow based tower from location No 140 : 147 for 20 creating ring main circuit in Muncipal Corporation area in Vijayapura District. 21 Construction of 110kv SC line on DC towers with Lynx conductor from 110kv Kudal Sangam S/S in Bagalkot District to 110 kV Muddebihal S/S in Vijayapura Dist. Construction of 110 kV SC line on DC towers with Lynx 22 conductor from 110 kV Kaladagi to 110 kV Kataraki sub-stations in Bagalkot District. 23 District Gadag Belagavi Gadag Vijayapura Vijayapura Haveri Belagavi Belgaum Vijayapura Vijayapura Bagalkot Stringing of second circuit on existing DC tower from 220/110 kV Athani receiving station to 110/11kV MUSS Aigali for a distance of 21.08 kms in Athani Taluk , Chikkodi District. Replacement of existing 110kV MS SC line on SC towers by DC line on GI DC Towers, conductors and ground wires from 220KV Mahalingapur sub station 24 to 110kV Ghataprabha line from Loc No: 149 to 112 for a distance of 13 kms (up to 110kV Dawaleshwar sub station) with one number terminal bay at 220KV R/S Mahalingapur in Bagalkot District. Bagalkot Reconsidering the proposal of construction of 110kV SC link line on DC towers from 110kV Hanagal Sub25 station to 110 kV Tiluvalli Sub-station, along with 110kV Terminal Bays at both ends in Haveri District which was dropped in the 74th TCCM Replacement of drake / porcelin insulators by HTLS 26 drake of outgoing 220kV lines from Kali generating complex in uttara kannada Dist Construction of 110 kV SC line on DC GI towers from 27 110 kV Bailhongal station to 110 kV Hosur substation in Saundatti taluk, Belagavi district. Stringing of 2nd circuit on existing SC line on DC tower with Lynx conductor from 220 kV Ghataprabha to 28 110 kV Ankalagi and 110 kV Nehrunagar sub-station for a distance of 49 kms and new line for a distance of 7.5 kms in Belgaum district. 29 Stringing of 2nd circuit on existing SC line on DC tower with Lynx conductor from tower No. 53 near LILO point of Munavalli station to 110 kV Yargatti substation for a distance of 34 kms in Belgaum district. 30 Replacement of rusted GI Lattice SC towers along with conductor and ground wire from 110kV Narendra sub station to Kittur line with MC towers from tower No. 90 to 138 in Dharwad district. 192 List-IV Sl. No. Name of the Work District Modification for the already approved proposal : Replacement of 110 Lattice type SC towers along with Lynx conductor & ground wire by 110kV UG cable from 31 220 kV SRS Hubli sub-station to Anandanagar & upto 110kV UG cable terminating structure near Anandnagar from Loc : 01 to 11 in Dharwad District. 31 Total of Lines 1 2 3 3 Providing dedicated metering arrangement to 220 kV Mudashinge and 220 kV Talandage line TBs at 220 kV Chikkodi in Belagavi District Providing metering & protection to 5 MVA, 110/11 kV Transformer at 110/11 kV Anmod sub-station in Joida Taluk, Uttara Kannada District Replacement of age old MS towers by new GI towers along with conductor and ground wire of 220kV Bidnal sub station to 110kV Bagalkot sub station (old) from loc No:-251 to 388 for a distance of 44 kms in Bagalkot district. Total of TB's & Others Belagavi Uttara Kannada Bagalkot 119 Total of Bagalkote Zone KALABURAGI TRANSMISSION ZONE 1 Yadgir north: Establishing of 2X10 MVA,110/11kV Substation at Yadgir North in Yadgir Taluk & District. 2 Rudrawadi : Establishing of 1X10 MVA,110/11kV Substation at Rudrawadi village in Alanda taluk,Kalaburagi district. 3 Devapur Cross: Establishing of 2X10 MVA,110/11kV Substationat Devapur cross in Shorapur Taluk,Yadgir District. 4 Madana: Establishing of 1X10 MVA,110/11kV Substation at Madana village in Sedam taluk,Kalaburagi district. 5 Establishing 2 x 100 MVA, 220/110 kV Sub-Station at Gangavathi in Gangavathi Taluk, Koppal District. 6 Jawahar Nagar: Upgradation of 2X5MVA,33/11kV S/s to 2X10 MVA,110/11kV S/s at Jawahar Nagar in Raichur Taluk & District. 7 Aurad: Upgradation of 2X5MVA,33/11kV S/s to 1X10 MVA,110/33-11kV S/s at Aurad in Aurad Taluk,Bidar District. 8 Bhagyanagar: Establishing 2x10MVA, 110/11kV Sub-Station with construction of 110kV line from proposed 220kV R/S Koppal (Halavarthy) sub-station for a distance of about 10 kms in Koppal Taluk & District. 9 Kalbelgundi: Establishing 2x10MVA, 110/11kV Sub-Station near Banadeshwar temple ,Kalbelgundi village in Yadgir Taluk and District Azadpur: 10 Establishing 1x10MVA, 110/11kV Sub-Station at Azadpur in Kalaburagi Taluk & District. 11 Kadlur: Establishing 1x20MVA 110/33 kV & 1x10MVA 110/11 kV S/S along with construction of 110kV line at Kadlur village in Raichur Taluk & District. Udnoor cross: 12 Establishing 1x10MVA, 110/11kV Sub-Station at Udnoor cross in Kalaburagi Taluk & District. 13 Establishing 1x10 MVA, 110/11kV Sub-Station at Kollur village in Chincholli Taluk,Kalaburagi District. 14 Establishing 1x10 MVA,110/11kV Sub-Station at Tavaragera village in Kalaburagi Taluk and District. Establishing 1x20 MVA,110/33 kV and 1X10 15 MVA,110/11kV Sub-Station at Sagnoor in Afzalpur Taluk,Kalaburagi District. 193 List-IV Sl. No. Name of the Work 16 Establishing 2x10 MVA,110/11kV Sub-Station at Bankalga village in Afzalpur Taluk,Kalaburagi District. 17 Establishing 2x10 MVA, 110/11kV Sub-Station at Sirwal Village in Shahapur Taluk,Yadgir District. 18 Establishing 1x10 MVA, 110/11kV Sub-Station at MKollur in Shahapur Taluk,Yadgir District. 19 Establishing 2x10 MVA, 110/11kV Sub-Station at Honagera in Yadgir Taluk and District. 20 Establishing 1x10 MVA, 110/11kV Sub-Station at Ashapur Road in Raichur Taluk and District. District Chilkanahatti : 21 Establishing 1x8 MVA, 66/11kV Sub-Station at Chilkanahatti in Hospet Taluk,Ballari District. 22 Upgradation of 2X5MVA, 33/11kV Sub-station to 2X10 MVA,110/11kV and 1X10 MVA,110/33 kV SubStation at H.V.Kunta in Yelburga Taluk,Koppal District. Upgradation of 2X5MVA, 33/11kV Sub-station to 2X10 23 MVA,110/11 kV Sub-Station at Vajrabandi village in Yelburga Taluk,Koppal District. 24 Talakal : Up gradation of 2X5 MVA,33/11 kV Sub-station to 1X10 MVA,110/11 kV Sub-station at Talakal Village in Yelburga Taluk,Koppal District. Sridhara Gadda : Establishing 110/33/11 kV Substation by providing 25 2X10 MVA,110/11 kV and 1X20 MVA,110/33 kV at Sridhara Gadda Village in Siruguppa Taluk,Bellary District. Kawloor Village: 26 Establishing 1X10 MVA,110/11 kV Sub-station at Kawloor Village in Yadgir Taluk and District. Naganoor Village : 27 Establishing 1X10 MVA,110/11 kV Sub-station at Naganoor Village in Shorapur Taluk ,Yadgir District. 28 Establishing 2X100 MVA, 220/110 kV Sub-station at Yelburga in Yelburga Taluk, Koppal District 29 Establishing 2 X 100 MVA , 220/110 kV sub-station at Santhpur in Aurad taluk, Bidar District. Gaddesugur: 30 Establishing 1X10 MVA,110/11 kV Sub-station at Gaddesugur in Wadagera Taluk , Yadgir District 31 32 B Gudi: Establishing 1X10 MVA,110/11 kV Sub-station at B Gudi in Shahapur Taluk ,Yadgir District Hanwal: Establishing 1X10 MVA, 110/11 kV Sub-station at Hanwal in Gangavathi Taluk, Koppal District Nadavi Village : Establishing 1X20 MVA, 110/33 kV and 2X10 MVA, 33 110/11 kV Substation at Nadavi Village in Siraguppa Taluk, Ballari District Gunhadgi Village : Establishing 1X10 MVA, 110/11 kV Sub-station at 34 Gundhagi Village in Yadgir Taluk, and District 35 Kandakoor Village : Establishing 1X10 MVA, 110/11 kV Sub-station at Kandakoor Village in Gurmitkal Taluk,Yadgir District Yagapur : 36 Establishing 1X10 MVA,110/11 kV Sub-station at Yagapur in Chittapura Taluk , Kalaburagi District 37 Itagi : Up-gradation of existing 33/11 kV Sub-station to 2X10 MVA, 110/11 kV Sub-station at Itagi in Kampli Taluk, Ballari District 194 List-IV Sl. No. Name of the Work District 37 Total of Sub-Stations 1 110 kV Kolhar,20 MVA, 110 / 33-11 kV 2 110 kV Ladha,20 MVA, 110/ 33-11 kV 3 220kV Sedam, 20 MVA, 110/ 33-11 kV 4 110 kV Shahapur,20 MVA, 110/ 33-11 kV 5 110 kV Kalaburagi (South ),20 MVA,110/ 33-11 kV 6 110 kV Kavithal,20 MVA,110/ 33-11 kV 7 220 kV Raichur,20 MVA,110/ 33-11 kV 8 110 kV Rajeshwar,10 MVA,110/ 33-11 kV 9 220 kV Lingasugur,10 MVA,110/ 33-11 kV 10 110 kV Hiregonnagar,10 MVA,110/ 33-11 kV 11 220 kV Ittagi,12.5 MVA,66/ 11 kV 12 66 kV Chornur,12.5 MVA,66/ 11 kV 12 Total of Augmentations 1 Construction of new 66kV SC (Coyote) link line on DC towers from 66kV Sub-station Banavikallu to 66kV substation C.J.halli for a distance of 4 kms(Munirabad Div) 2 Reconstruction of 110kV SC line on SC towers having wolf/patridge conductor from 220kV Shahabad R/S to 110kV University SS for a distance of 27kMs by 110kV SC line on DC towers using LYNX conductor in the existing corridor 3 Re -Construction of 110kV Sedam -Chittapur H type tower SC line for a distance of 25 km in the existing corridor. 4 Re -Construction of 110kV Shahabad -Chittapur H type tower SC line for a distance of 33.7 km in the existing corridor. 5 Re -Construction of 110kV Shahapur-Shahabad DC line for a distance of 57km in the existing corridor. 6 Construction of 110kV SC link line on DC towers existing Kapnoor 220kV R/s to the existing 110/33/11kV Gulbarga (university) S/s via 110/3311kV Gulbarga (west),110/11kV Gulbarga(south) over a distance of 51 Kms circuit length with 01 number of Terminal Bay at 220kV R/S Kapnoor,02 number of Terminal Bay at 110/33-11kV Gulbarga (west) S/s,02 number of Terminal Bay at 110/11kV Gulbarga (south) and 01 number of terminal bay at 110/11kV Gulbarga(University) S/s in Gulbarga Taluk & District 7 Reconstruction of existing 110kV Gulbarga line-I SC line on SC tower by constructing 110kV DC new line on DC towers from 220/110kV R/s Kapnoor to 220kV substation Humnabad,LILO at 110/33-11kV Mahagaon substation and 110/11kV Margutti substation using the existing corridor over a distance of 56 kms circuit length with 04 no's of TB at 110kV Mahagaon substation in Kalaburagi Taluk & District. 195 List-IV Sl. No. Name of the Work 8 Reconstruction of existing SC lines on SC towers by new DC line on DC & MC towers from 220kV substation Kapnoor to 110kV Gularga North substation (08kms) and DC line on DC tower with connectivity to MC tower for LILOing 110kV University substation in the existing Corridor for a distance of 25Kms from center tap of MC towers from 220kV Kapnoor to 110kV University S/s with 01 no of TB at 220kV substation Kapnoor in Kalaburagi Taluk & District. 9 Re-conductoring of 110kV Munirabad-SindhanoorRaichur I & II lines by providing intermediate towers in Raichur District. 196 District List-IV Sl. No. Name of the Work 10 Re-conductoring of 110kV Raichur-Shahapur DC line by providing intermediate towers in Yadgir district. 11 Strengthening of 220 kV DC line between 220/110 kV Kushtagi and proposed switching station at the LILO point of Kushtagi-Lingapur-Lingasugur by replacing existing Drake by higher ampacity conductor District Ratification : Reconstruction of 110 kV SC line on SC towers having Lynx conductor from 220 kV Kushtagi Substation to 110 kV Yelburga Sub station for a 12 distance of 28 kms by 110 kV DC line on DC towers using Lynx conductor in the existing corridor along with two terminal bays one at 220 kV Kushtagi Sub station and one at 110 kV Yelburga Sub station Construction of 110kV SC link line on DC towers from existing 110/33-11kV Ladha sub-station to existing 13 110/33-11kV Kamalanagar sub-station for a distance of 30 kms length with construction of Terminal Bays at both stations Construction of 110kV SC link line on DC towers from existing 110/11kV Nirna sub-station to existing 14 110/33-11kV Mannaekheli sub-station for a distance of 20 kms length with construction of Terminal Bays at both stations Strengthening of 220 kV Lingapura-Ittagi-Neelagunda15 Guttur SC line by replacing SC line with Drake conductor by 220 kV DC line using Drake conductor Stringing of 2nd circuit between 110 kV Janwad and 110 kV Bidar (Kolhar) sub-station on existing DC 16 towers for a distance of about 17.5 kms with Lynx conductor along with two no's of new terminal bays,one at Janawad and one at Bidar (Kolhar) Sub-station Stringing of 2nd circuit between 110 kV P D Halli and 110 kV Bellary North sub-station on existing DC towers 17 for a distance of about 14.45 kms with Lynx conductor along with two no's of new terminal bays,one at P D Halli and one at Bellary North Sub-station Modification in scheme for catering 66 kV Hangal Substation load from 66/11 kV Kudligi sub station to 220/66 kV Badeladaku (Kudligi) sub-station Station 18 by dismantaling existing 66kV towers in Kudligi Taluk,Ballari District 18 Total of Lines 67 Total of Kalaburagi Zone 495 Total of List-IV for All Zones 197 List-IV