Substation BOQ

advertisement
Abstract of Total Capital Budget for the year 2019-20
(Rs. In lakhs)
Bengaluru
Sl.
No.
Particulars
Nos.
Tumakuru
Budet
19-20
Budet
19-20
Nos.
Hassana
Nos.
Budet
19-20
Mysuru
Nos.
Bagalkote
Budet
19-20
Nos.
Kalaburagi
Budet
19-20
Nos.
Total
Budet
19-20
Nos.
Budet
19-20
A
MAIN CAPITAL WORKS
1
List-I : Commissioned
Works
13
10709.00
22
3691.51 21
2205.50
36
2233.20
47
5653.00
11
5983.00
150
30475.21
2
List-II : Ongoing Works
54
124483.00
35
31751.00 60
21193.00
47
15123.00
26
12476.00
34
14323.00
256
219349.00
3
List-III : Works proposed
to be taken up
this year
90
5748.00
84
3411.00 46
2734.00
45
1381.00
60
7460.00
39
591.00
364
21325.00
4
Sub-Total
5
List-IV
Total of Works
157
60
217
140940.00 141
38853.51 127
0.00 100
140940.00 241
0.00 85
38853.51 212
26132.50 128
0.00
64
26132.50 ####
18737.20
133
25589.00
84
20897.00
770
271149.21
0.00
119
0.00
67
0.00
495
0.00
18737.20
B
GENERAL CAPITAL
WORKS
C
Total
D
a) Civil Budget (at the disposal of CEE (P&C) for meeting the budgetary requirement for Civil works).
5000.00
217
145940.00 241
2200.00
41053.51 212
2500.00
28632.50 ####
252
3122.66
21859.86
25589.00
151
6585.98
252
32174.98
20897.00 1265
3039.98
151
23936.98
0
1265
b) Construction of office complex at A.R Circle Bangaluru
c)Construction of multipurpose auditorium , Amphi theatre executive hostel block and addtion hostel block at HRDC hudi Bangaluru.
E
271149.21
22448.62
293597.83
4000.00
10000.00
2500.00
LDC / SCADA (at the disposal of CEE LDC for procurement of materials for Telecommunication Division and for meeting Expenditure for SCADA works
only).
a) SCADA Phase-I
1690.00
b) New works
4199.00
c) GCB in respect of SADA and Telecomunication Divisions
5889.00
F
Transport for meeting expenditure for procurement of Vehicles.
G
T&P, Computers and RT and R&D (at the disposal of CEE (P&C) for meeting budgetary requirment for procurement of Tools & Plants, Computers, office
equipments and RT and R & D equipments
5000.00
H
Contingency Budget : (to be held by CEE (P&C) for releasing budgetary requirement for taking up unforeseen and urgent works/Expenses.
4000.00
I
GRAND TOTAL (Rs.in Lakhs)
50.00
330925.83
List - I : Abstract of Commissioned works for the year 2019-20
Rs. in Lakhs
Sub-Stations
Sl. No.
Name of the
Zone
Augmentations
Exclusive Lines
TB's & Others
Total
Nos.
Budget
18-19
Revised
Budget
18-19
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
1
Bengaluru
9
2353.00
2164.30
10299.00
1
25.00
2
185.00
1
200.00
13
10709.00
2
Tumakuru
7
580.00
638.33
1733.13
10
419.05
5
1539.33
0
0.00
22
3691.51
3
Hassana
7
1431.20
1582.55
1360.00
5
91.00
8
604.50
1
150.00
21
2205.50
4
Mysuru
16
1129.00
1190.00
1641.00
16
444.20
3
98.00
1
50.00
36
2233.20
5
Bagalkote
15
399.00
425.17
4041.00
23
625.00
8
827.00
1
160.00
47
5653.00
6
Kalaburagi
5
1589.51
1190.82
793.00
2
60.00
2
4700.00
2
430.00
11
5983.00
59
7482
7191
19867.13
57
1664.25
28
7953.83
6
990.00
150
30475.21
Total
List - I
List - II : Abstract of Ongoing works for the year 2019-20
Rs.in Lakhs
Sub-Stations
Augmentations
Exclusive Lines
Total
TB's & Others
Sl. No. Name of the Zone
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
1
Bengaluru
26
111575.00
11
2793.00
10
4990.00
7
5125.00
54
124483.00
2
Tumakuru
11
21225.00
12
1656.00
10
7870.00
2
1000.00
35
31751.00
3
Hassana
16
12723.00
34
5570.00
9
2700.00
1
200.00
60
21193.00
4
Mysuru
11
10530.00
32
4108.00
3
210.00
1
275.00
47
15123.00
5
Bagalkote
8
5966.00
10
1469.00
6
4001.00
2
1040.00
26
12476.00
6
Kalaburagi
9
9518.00
21
3847.00
3
458.00
1
500.00
34
14323.00
81
171537.00
120
19443.00
41
20229.00
14
8140.00
256
219349.00
Total
List - II
List - III : Abstract of Works Proposed to be taken up during 2019-20
Rs.in Lakhs
Sub-Stations
Sl. No.
Name of the
Zone
Augmentations
Exclusive Lines
TB's & Others
Total
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
1
Bengaluru
15
2443.00
57
2898.00
18
407.00
0
0.00
90
5748.00
2
Tumakuru
3
300.00
72
2750.00
9
361.00
0
0.00
84
3411.00
3
Hassana
5
905.00
27
1116.00
9
630.00
5
83.00
46
2734.00
4
Mysuru
6
1100.00
24
204.00
15
77.00
0
0.00
45
1381.00
5
Bagalkote
9
1804.00
37
2561.00
12
2757.00
2
338.00
60
7460.00
6
Kalaburagi
9
280.00
20
248.00
8
43.00
2
20.00
39
591.00
47
6832.00
237
9777.00
71
4275.00
9
441.00
364
21325.00
Total
List - III
List - IV : Abstract of Works which have been cleared by either TAC/TCCM. Or
administrative sanction has been accorded for the DPR (in the absence of
TAC/TCCM clearance) and are not intended to be taken up during the year 2019-20
Rs. in Lakhs
Sub-Stations
Augmentations
Exclusive Lines
TB's & Others
Total
Nos.
Nos.
Nos.
Nos.
Nos.
Bengaluru
10
20
24
6
60
Tumakuru
32
35
33
0
100
Hassana
41
20
21
3
85
Mysuru
35
23
0
6
64
Bagalkote
59
26
31
3
119
Kalaburagi
37
12
18
0
67
214
136
127
18
495
Name of the Zone
Total
List - IV
GENERAL CAPITAL BUDGET FOR 2019-20
Rs. In Lakhs
Category
Particulars
Bengaluru
Zone
Tumakuru
Zone
Hassana
Zone
Mysuru
Zone
Bagalkote
Zone
Kalaburagi
Zone
TOTAL
Budget
19-20
Budget
19-20
Budget
19-20
Budget
19-20
Budget
19-20
Budget
19-20
Budget19-20
A
Providing new 11kV Switch Gears
2562.11
580.44
674.8
1135.39
608.71
156.97
5718.42
B
Providing new EHV breakers & C&R
panels
1620.34
176.60
234.27
385.00
706.16
169.72
3292.09
C
Spare Transformers
54.00
100.00
314.00
194.50
164.39
1115.54
1942.43
D
Survey & Investigation
100.00
169.43
257.59
213.00
581.96
303.92
1625.90
E
Land acquisition, levelling and area
fencing
200.00
725.00
516.30
784.93
3413.55
1165.25
6805.03
F
Protection Equipments & Metering
189.04
97.86
130.00
342.85
493.01
0.00
1252.76
G
Budgetary grant for procurement of
materials for Minor Capital Works.
274.51
350.67
373.04
66.99
618.20
128.58
1811.99
Total
5000.00
2200.00
2500.00
3122.66
6585.98
3039.98
22448.62
Zone Wise Abstract of all Works 2019-20
Rs inLakhs
Sub-Stations
Sl.
No.
Augmentations
Exclusive Lines
TB's & Others
Total
Name of the
Zone
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
Nos.
Budget
19-20
1
Bengaluru
50
124317.00
69
5716.00
30
5582.00
8
5325.00
157
140940.00
2
Tumakuru
21
23258.13
94
4825.05
24
9770.33
2
1000.00
141
38853.51
3
Hassana
28
14988.00
66
6777.00
26
3934.50
7
433.00
127
26132.50
4
Mysuru
33
13271.00
72
4756.20
21
385.00
2
325.00
128
18737.20
5
Bagalkote
32
11811.00
70
4655.00
26
7585.00
5
1538.00
133
25589.00
6
Kalaburagi
23
10591.00
43
4155.00
13
5201.00
5
950.00
84
20897.00
187
198236.13
414
30884.25
140.00
32457.83
29.00
9571.00
770
271149.21
Total
List I - Commissioned Works 2019-20
Rs. in Lakhs
Sl.
No.
Work
Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
BENGALURU TRANSMISSION
ZONE
1
2
3
AA1038
AA1131
AA1161
Vikas Tech Park:
a) Establishing 2x150MVA,
220/66kV Station with line.
b) Vikas Technical
Park_Evacuation line 1: Running
66kV 630 sqmm UG cable from
Vikas Technical Park 220kV S/s
to 66 kV Shobha Developers S/s
3.5 Kms
c) Vikas Technical
Park_Evacuation line 2:
66kV 1000 sq. mm SC UG cable
line from the proposed 220 kV
Vikas Tech Park S/s to
Devarabeesanahalli for a route
length of 3.5 ckt. Kms
Koramangala:
Establishing 220/66/11kV GIS
substation at Kormangala with
220 kV 1000 sqmm LILO UG
cable from existing HSRNIMHANS UG cable with
associated 66kV lines.
Hulimangala :
Establishing 2x12.5MVA,
66/11kV Keonics (ElectronicCity)
Sub-Station for a route length of
3.789Kms.
Bengaluru
Urban
ES 42.81
BCR 2.67
7587.86 &
31.10.09
a) 28.04.10
b) 04.11.11
c) 09.03.11
a) 3123.78
b) 1064.93
c) 1794.96
0.00
7789.43
600.00
Budget 18-19
STN FQV-20L & LINE fqv-150L
Stn Rtn -200L.
Stn Rtn-100L
Cable : Rtn Bills 368.41L
Total: 838.41
FY 19-20
UG cable FQV-100L
Bengaluru
Urban
Bengaluru
Urban
ES.8.75 & 37339.12 &
BCR 1.334
24.11.15
ES 1.39 &
BCR 0.27
06.05.17
Stn14.03.1
4531.08 &
8
23.12.16
cable4278.
98
18047.93
0.00
18047.93
13188.28
3500.00
Budget 18-19
Cable: Supply Rtn -1400L
Erection & civil -200L
Stn: Erection and civil -100L
Total: 1700.00
Budget 19-20
Supply - 3000L
erection/civil - 500L
Total: 3500L
Budget 18- 19
Supply rtn -334L
Stn713.26
cable2760.87
0.00
3474.13
3187.70
350.00
Budget 19-20
Supply Rtn - 354L
swg -120L
Total -474L
Sl.
No.
4
5
6
Work
Code
Name of the Work
AB1009
Dobbaspet (Nelamangala):
a) Establishing 2x100MVA,
220/66kV Station with 220kV
LILO of Kadur-Nelamangala
b) 66kV lines to Nelamangala &
Kolala Sub-Station upto loc 65
c) Construction of 66kV SC line
on DC towers from Dabaspet to
Kolala from location 66 to 99 for a
distance of 5.856 kms
AB1014
AC1056
Jigani :
Establishing 2x31.5MVA &
2x150MVA, 220/66KV Station b)
Jigani line:Construction of 220KV
DC line with drake Conductor for
a route length of 5.714 Kms to
LILO Somanahalli Yerandanahalli
line using MONOPOLE on the
road median.
B. V. Halli :
Establishing 1x12.5MVA,
66/11kV Sub-Station with
associated line for a distance of
18.40Kms
District
Bengaluru
Rural
Energy
Savings &
BCR
ES 38.7
BCR 4.72
Cost of
Original /
Date of LOI
Revised
DPR & Date
5259.00 &
05.05.12
a) 25.04.07
b) 05.09.07
c) 02.02.13
Cost of DWA
a) 2555.42
b) 993.54
c) 380.98
Cost of
Deptly.
Supplied
Materials &
others
1487.00
Total Work
Cost
5416.94
Cum Exp up to
31/03/19
4646.58
Budget
2019-20
37.00
Remarks
FY 18-19
Final 10% Bill against Handing over:
Supply: 31Lakhs
Erection: 2Lakhs
Civil: 15Lakhs
Total : 48 L
FY 19-20
FQV BILLS: 17L
LS: 20L
Bengaluru
Rural
Ramanagar
ES 9.93
BCR 2.54
ES 1.32
BCR 1.421
6491.35 &
20.07.09
797.16 &
05.12.15
FY-18-19
Workslip: 518.18 L
08.10.07
14.02.17
9301.38
953.29
1300.21
43.00
10601.59
996.29
7622.33
984.34
200.00
1000.00
FY-19-20
Stn & Line FQV:- 200L
FY 18-19
Line civil & erection-40L
Tree cut-348L
Land compension-150L
Total-538
FY 19-20
Land compensation-150L
QV-50L
Total-200L
Excess due to tree cut & land
compensation of 700L
Sl.
No.
7
8
Work
Code
AC1060
AE1026
Name of the Work
Srigiripura :
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 8.6Kms
Mittemari:
Establishing 2x100MVA,
220/66/11kV Station with
associated lines for a distance of
220kV 91 kms & 66kV 80.36 kms
District
Ramanagara
C.B.Pura
Energy
Savings &
BCR
ES 3.05
BCR 1.96
ES 25.38
BCR 1.46
Cost of
Original /
Date of LOI
Revised
DPR & Date
761.87 &
08.09.15
7564.79 &
10.07.15
13.06.16
10.07.15
Cost of DWA
780.78
8858.74
Cost of
Deptly.
Supplied
Materials &
others
30.00
38.64
Total Work
Cost
810.78
8897.38
Cum Exp up to
31/03/19
878.73
8128.38
Budget
2019-20
290.00
4300.00
Remarks
FY 18-19:
Land compn-110L
Rtn-93L
TB erection & civil-10L
Line Civil-25L
Total-238L
FY -19-20
QV-30L
tree cut-125L
Total-155L
Excess due to tree cut and land
compensation - 360L
Workslip-1 approved for Rs.10559.9L
FY-18-19:
10% retention supply, civil, erection:
1060L
Land / tree cut comp:723L
Railways payment:17L
Total-1800L
FY-19-20:
Retention bills: 1100L
Amount for the execution of NON DWA
civil and electrical works & other minor
works:200L
Land compensation:1000L
Total:2300L
Sl.
No.
9
Work
Code
AB1008
Name of the Work
Sarjapura :
a) Est 2x100 MVA, 220/66/11 kV
S/S with 220kV LILO of SomanahalliMalur line
b) Const. of 66KV LILO line from
Sarjapura station to 66 kV S/C
Hoody-Chandapura line near
Muttenallur Village limits for a
distance of 8.5 Kms and Const. of
66KV S/C line from 220/66/11KV
Sarjapura station to the CTT for
running 66KV 630 sqmm UG Cable
to 66/11KV S/s at Attibele for a
distance of 11.1 Kms and Terminal
Bay at Attibele.
a) 5.885 Kms
b) 8.5 & 11.1 Kms
9
Total of Sub-stations
1
Malur Industrial Area:
Replacing of 2X8 MVA, 66/11kV by
2X20 MVA Transformer at 66/11KV
S/S Malur Industrial Area
AD1040
1
Total of Augmentation
1
Tubagere Sub-station:
Stringing of 2nd circuit for
Providing LILO arrangement
2
AB1046
AD1041
Malur- Malur I/A: Construction
of 66kV SC line for a distance of
10.77Kms partly on MC towers
and partly on DC towers from
220/66kV Malur S/s to 66/11kV
Malur Industrial area S/s
District
Energy
Savings &
BCR
Bengaluru
Rural
ES 21.13
BCR 2.38
Kolar
6855.93 &
06.10.08
435.98 &
10.06.15
KOLAR
Bengaluru
Rural
Cost of
Original /
Date of LOI
Revised
DPR & Date
NA
61.41 &
24.01.12
a) 26.04.07
b) 05.09.07
24.08.17 &
18.12.17
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
a)4339.33
b) 342.86
1200.67
5882.86
5000.58
22.00
56012.05
4100
54128
51426
10299
Cum Exp up to
31/03/19
Budget
2019-20
4.83
298.00
302.83
308.23
25.00
4.83
298.00
302.83
308.23
25.00
Remarks
FY 19-20
22L - Balance works payment
FY 18-19
PV Bill : 16.18 L
10% Rtn: 0.95 L
MEI bill: 18.65 L
Adopter Panel: 1.73 L
1AP: 2.2 L
Brk Erection: 2.5L
Total: 42.23 L
FY 18-19
Erection & retention - Rs.24.68L
05.12.13
74.13
0.00
74.13
49.31
15.00
FY 19-20
Erection & retention - Rs.15L
NA
569.61 &
23.09.15
05.09.17
619.75
0.00
619.75
477.62
170.00
Work slip approved for Rs.665.6L
FY- 18-19:
Suppply:80L
Erection:20L
Civil: 27L
Crop/ tree cut comp:15L
Total: 142L
FY-19-20:
Retention bills: 40L
Tree cut comp:10L
construction of 66KV TB at Malur R/s 38L
Total: 88L
Sl.
No.
Work
Code
2
1
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
Total of Lines
AA1057
1
400kV R/S Hoody:
Providing 63MVAR Bus Reactor
at 400/220kV Station.
Bengaluru
Urban
NA
895.98 &
01.07.09
06.01.11
Total Work
Cost
693.88
0.00
693.88
526.93
185.00
726.20
0.00
726.20
267.82
200.00
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
Budget 18-19
Erection-100L
Budget 19-20
erection & civil - 200L
Total of TB's & Others
13
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total for Bengaluru Zone
726.20
0.00
726.20
267.82
200.00
57436.96
4397.52
55850.81
52529.33
10709.00
Tumakuru transmission zone
1
2
3
4
BB1048
Shyagale(Lokikere): Establishing
1x8MVA, 66/11kV Sub-Station
with associated line for a distance
of 6.04 Kms.
Davanagere
ES 2.56
BCR 1.93
455.42 &
13.01.12
06.09.13
530.52
50.82
581.34
526.73
76.00
BA1034
Pavagada:
Establishing 2x100MVA,
220/66kV Station with associated
lines for a distance of 120.00
Kms.
Tumakuru
ES 81.5
BCR 4.00
7160.37 &
17.10.11
16.01.13
7661.00
1812.37
9473.37
7887.75
1400.00
BB1078
Nallur :
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
Davangere
ES 4.633 &
BCR 4.83
BC1070
Neeragunda Gate: Establishing
1x8MVA, 66/11kV Sub-Station in
Neeraguda gate in Hosadurga
Taluk, Chitradurga Dist.by
constructing 66kv SC tap line on DC
towers from existing 66kv
Hosadurga-Bagur line for a distance
of 10.205 kms
Chitradurga
ES 14.05
BCR 2.95
566.96 &
09.02.17
646.70 &
07.12.15
20.03.18
534.75
22.58
557.33
364.80
80.00
20.01.16
663.00
24.60
687.60
600.60
25.50
40.00 Lakhs budget surrendered during
2018-19 and 40.00 lakhs required for FY2019-2020 for LD and crop compensation
Tree/Crop- Rs 348.08L , Retention-Rs625L,
FY 2018-19 Split up
Crop: 15.25 lakhs
PV: 40.00 Lakhs
Supply: 40.00lakhs
Rentation: 64.00 lakhs
Total-159.25 Lakhs
FY-2019-20
QV: 28.00 Lakhs
LD: 8.27 Lakhs
Total: 36.27 Lakhs
Sl.
No.
Work
Code
Name of the Work
5
BA1119
Theriyur:
Establishing 1 x 8 MVA 66/11 KV
S/S with associated line in
Madhugiri Taluk, Tumakuru
District.
6
BA1120
Thippur:
Establishing 1 x 8 MVA 66/11 KV
S/S with associated line
7
BC1054
Madadakere :
Establishing 2x8MVA, 66/11kV
Sub-Station with associated lines for
a distance of 13.33Kms
Cost of
Original /
Date of LOI
Revised
DPR & Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
District
Energy
Savings &
BCR
Cum Exp up to
31/03/19
Tumakuru
ES 1.008 &
BCR 1.25
488.65 &
28.01.17
20.09.17
498.41
31.50
529.91
513.63
42.00
Tumakuru
ES 2.091 &
BCR 3.20
442.5 &
01.07.16
27.09.17
509.60
31.50
541.10
514.30
54.00
Chitradurga
ES.224.72
BCR 1.289
777.14 &
03.07.15
21.12.16
851.34
49.34
900.68
914.49
55.63
11248.62
2022.71
13271.33
11322.30
1733.13
16.09.17
621.73
0.00
621.73
718.68
200.00
Retention Bill Rs 173.59 Lakhs
Surrender - 100.00 Lakhs
Retenation-57.91Lakhs
Budget
2019-20
7
Total of Sub-stations
1
BA1091
K.B. Cross:
Providing Spare 1 x 100 MVA
220/110/11 KV Power
transformer
Tumakuru
ES
14040.5
BCR 3.903
2
BA1116
Huliyar:
Providing Additional 1x10MVA,
110/11kV Power Transformer at
110/11kV Station.
Tumakuru
BCR 1.69
253.85 &
03.03.15
23.07.18
107.26
40.00
147.26
10.00
85.00
3
BA1117
Ankasandra:
Providing Additional 1x8MVA,
66/11kV Power Transformer at
66/11kV Station.
Tumakuru
BCR 1.01
112.36 &
03.11.14
11.07.18
92.20
32.20
124.40
110.38
10.00
4
BA1127
Kallur:
Replacing 1x10 MVA,110/11kV
by 1x 20 MVA, 110/11kV
Transformer.
Tumakuru
BCR 1.14
204.53 &
11.05.17
0.00
190.33
20.00
5
BA1063
Chowdanakuppe: Providing
additional 1x8MVA, 66/11kV
Transformer
Tumakuru
ES 1.36
BCR 1.15
168.49 &
12.10.11
03.10.13
75.00
98.00
173.00
67.38
11.00
6
BC1034
BG Kere:
Providing additional 1x6.3MVA,
66/11kV transformer
Chitradurga
ES NA
BCR 0.76
201.58 &
05.03.11
23.01.12
92.53
78.55
171.08
85.17
3.29
7
BC1040
Rangenahalli:
Providing additional 1x8MVA,
66/11kV Transformer
Chitradurga
ES NA
BCR 1.14
170.97 &
12.10.11
16.03.17
92.58
32.00
124.58
116.32
16.40
621.73 &
12.02.14
Remarks
Retention-25 & FQV = Rs 57.50 Lakhs
Sl.
No.
Work
Code
8
BA1118
9
BA1122
10
BC1041
10
1
2
3
4
Name of the Work
Halukurke:
Providing Additional 1x10 MVA,
110/11 kV Power Transformer at
110/11kV Station.
Yadavani:
Providing additional 1x12.5 MVA,
66/11kV Power Transformer
Transformer
Dyavaranahalli:
Providing additional 1x8MVA,
66/11kV Transformer
Cost of
Original /
Date of LOI
Revised
DPR & Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
District
Energy
Savings &
BCR
Tumakuru
BCR 1.058
229.41 &
02.09.14
04.07.17
275.50
33.00
308.50
116.33
13.00
Tumakuru
BCR 2.19
ES 160.48
224.28 &
13.01.16
23.12.17
88.26
153.00
241.26
203.01
22.00
Chitradurga
ES NA
BCR 1.14
170.97 &
12.10.11
16.03.17
89.52
0.00
89.52
120.18
38.36
1534.58
466.75
2001.33
1737.78
419.05
Total of Augmentation
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
BA1094
Vasanthanarasapura to
Anthrasanahally:
Construction of 220kV DC line
from PGCIL station at
Vasanthanarasapura to existing
220kV station at
Anthrasanahally along with
terminal bays for a distance of
18.8 kms.
Tumakuru
NA
2241.56 &
28.06.14
18.05.15
2799.00
1466.39
4265.39
3941.00
150.00
FQV -128.96Lakhs
BB1056
220kV SRS, Davangere to 66kV
MUSS Davangere:
Construction of 66kV DC Line on
DC Narrow Based Towers in the
existing corridor for a distance of
3.263 Kms.
Davanagere
NA
258.00 &
30.03.12
17.10.12
248.50
0.00
248.50
284.73
42.00
27.00 Lakhs budget surrendered during
2018-19 and 27.00 lakhs required for FY2019-2020 for LD
BC1052
Tumakuru to Rampura limits:
Construction of 400kV DC with
Quad Moose ACSR from V.N.pura
to Rampura Limits
(Kelaginakanive) for distance of
188.74Kms
BA1121
HAL Project: a) Construction of
220/220KV MC line for Shifting
of Existing 220KV B1,B2 &
B3,B4 Lines at proposed
HALpremises
b) Construction of 110KV D/C
line with NBT for the
shifting of existing 110KV S/C
Nittur-Doddaguni line at Prposed
HAL premises
near Bidarehalli Kaval village
limits in Gubbi taluk in
Tumakuru District.
Chitradurga
NA
43277.77 &
08.04.14
24.12.14
54347.73
8980.00
63327.73
61657.34
1000.00
The budget will be booked subject to
approval of Time extension proposal.
40.5 Crores for 2nd Retension.
If not approved.40.5Crores is required for
FY-19-20
Tumakuru
NA
5764.00
31.05.16
3645.52
3279.80
6925.32
5308.89
300.00
FQV-300Lakhs, Retention-96.13Lakhs,
Compension-100Lakhs, Surrendor200Lakhs
b. Commissioned on 29.12.2018
Sl.
No.
Work
Code
5
BC1038
5
22
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
575.96
45.00
620.96
658.18
47.33
Total of Lines
61616.71
13771.19
75387.90
71850.14
1539.33
Total of Tumakuru Zone
74399.91
16260.65
90660.56
84910.22
3691.51
Name of the Work
Thallak-Hanagal:
Construction of 66kV D/C Thallak Hanagal line in the existing corridor
for a distance of 33.52 Kms.
District
Energy
Savings &
BCR
Chitradurga
NA
Cost of
Original /
Date of LOI
Revised
DPR & Date
543.28 &
18.07.11
28.01.12
Cum Exp up to
31/03/19
Budget
2019-20
HASSANA TRANSMISSION
ZONE
1
2
3
CA1037
CD1034
CD1055
Arasikere:
Establishing 2x100MVA,
220/110kV and 1x10MVA,
110/11kV Station Arasikere
Taluk,with associated lines for a
distance of 9.883 Kms.
Jade:
Establishing 1x10MVA, 110/11kV
Sub-Station at Jade in Soraba
Taluk, Shivamogga District along
with associated line for a
distance of 11.850 Kms.
Rippenpete:
Establishing 1x10MVA, 110/11kV
Sub-Station at Ripponpet in
Hosanagara Taluk, along with
associated line for a distance of
10.16Kms
Hassana
ES 29.5
BCR 3.67
3526.17 &
06.09.11
24.11.12
3251.50
193.00
3444.50
2868.93
460.00
Remarks
Probable for Mar-19 :
Bills on hand: Rtn:7.11
bills to receive:
Rtn:22.00
work Bills:20.00
For fy-19-20 LD:325.15
FQV: 130.00
Total:455.15
Shimoga
ES 0.97
BCR 0.62
792.16 &
22.08.13
26.12.14
780.27
50.62
830.89
778.05
10.00
Bills on hand :
1) BR No: 517/06.09.2018 Rs.0.98 Lakhs.
2) BR No: 1239/27.02.2019 Rs.7.97
Lakhs.
Budget FY 2019-20
Line Civil FQV difference amount Rs.10.00
Lakhs.
Shimoga
ES 0.571
ES 0.82
916.38 &
18.02.15
21.01.16
975.42
51.95
1027.37
909.71
40.00
LD Rs.48.34 Lakhs. Bills on hand: 1) BR
No: 1298/10.03.2019 Rs.3.72 Lakhs. 2)
BR No: 1296/10.03.2019 Rs.0.85 L 3) BR
No: 1291/10.03.2019 Rs.13.42 L. 4) BR
No: 1297/10.03.2019 Rs.4.47 L. 5) BR No:
1299/10.03.2019 Rs.2.90 L. 6) BR No:
1300/10.03.2019 .4.01 L. 7) BR No:
1301/10.03.2019 Rs.7.89 L. 8) BR No:
1302/10.03.2019 Rs.7.99 L. 9) BR No:
1292/10.03.2019 Rs.7.00 L. 10) BR No:
1293/10.03.2019 Rs.2.76 L. 11) BR No:
1295/10.03.2019 Rs.2.20 L. 12) BR No:
1294/10.03.2019 Rs.2.62 L. Total
Rs.59.83 Lakhs.
Probable Expenditure:
Retention Rs.28.00 Lakhs
Crop compensation Rs.5.82Lakhs
Total Rs.33.82 Lakhs
Sl.
No.
4
5
6
Work
Code
CE1008
CD1039
CD1060
Name of the Work
District
Shivapura:
Establishing 1x10MVA, 110/11kV
Sub-Station at Shivapura in
Chikkamagal
Tarikere Taluk, Chikkamagaluru
uru
District along with associated
line for a distance of 0.03 Kms.
Santhekadur:
Establishing 1x8MVA, 66/11kV
Sub-Station at Santhekadur in
Shivamogga Taluk & District
along with associated line for a
disance of 0.095Kms.
Kortigere:
Establishing 1x10MVA, 110/11kV
Sub-Station at Koratigere in
Shikaripura Taluk , Shivamogga
District along with associated
line for a distance of 7.139Kms
Shimoga
Shimoga
Energy
Savings &
BCR
ES 1.116
BCR 1.6
ES 1.25 &
BCR 2.047
ES 1.87 &
BCR 0.61
Cost of
Original /
Date of LOI
Revised
DPR & Date
520.34 &
05.03.09
395.99 &
22.06.16
692.42 &
22.06.16
23.05.07
12.02.18
04.01.18
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
318.64
140.90
459.54
422.08
683.76
0.00
0.00
422.08
683.76
Cum Exp up to
31/03/19
305.67
272.71
520.90
Budget
2019-20
50.00
185.00
265.00
Remarks
Budget FY 2019-20
civil-40Lakhs
T&P - 10Lakhs
LD Rs.2.25 Lakhs
Bills on hand :
BR No: 1277/08.03.2019 Rs.17.64 Lakhs.
BR No: 1278/08.03.2019 Rs.1.02 Lakhs.
BR No: 1303/10.03.2019 Rs.6.95 Lakhs.
BR No: 1304/10.03.2019 Rs.2.19 Lakhs.
Total Rs.27.80 Lakhs.
Probable expenditure:
Power Transformer supply Rs.75.00
Lakhs. Erection Rs.20.00 Lakhs.
Civil Rs.5.00 Lakhs.
Total Rs.100.00 Lakhs.
Budget for 2019-20
Supply Rs.125.00 Lakhs
Erection Rs.10.00 Lakhs
Civil Rs.20.00 Lakhs
Retention Rs.30.00 Lakhs
Total Amount Rs.185.00 Lakhs
Bills on hand:
BR No: 1276/08.03.2019 Rs.14.96 Lakhs.
BR No: 1279/08.03.2019 Rs.2.80 Lakhs.
BR No: 1288/08.03.2019 Rs.2.26 lakhs.
BR No: 1280/08.03.2019 Rs.13.55 Lakhs.
BR No: 1286/08.03.2019 Rs.15.26 lakhs.
BR No: 1287/08.03.2019 Rs.2.39 Lakhs.
BR No: 1283/08.03.2019 Rs.56.98 Lakhs.
BR No: 1284/08.03.2019 Rs.5.18 lakhs.
Total Rs.113.38 Lakhs. LD Rs.20.78
Lakhs.
Retention Rs.57.53 Lakhs.
Probable Expenditure: Rs.40.00 Lakhs
Budget for 2019-20
Supply Rs.40.00 Lakhs.
Erection Rs.30.00 Lakhs
Retention Rs.50.00 Lakhs
Civil Rs.70.00 Lakhs
Land/crop Rs.75.00 Lakhs
Total Rs.265.00 Lakhs
Sl.
No.
7
Work
Code
CA1063
Name of the Work
Rudrapatna:
Establishing 1 X 8 MVA ,66/11
KV S/S at Rudrapatna in
Arkalgud Taluk, Hassana District
along with associated line for a
disance of of 4.8Kms.
7
Total of Sub-stations
1
Netlamadnur 220kV R/S:
Replacement of 1x10MVA,
110/11kV Transformer by
1x20MVA, 110/11kV Transformer
at existing 220/110/33/11kV
Netlamudnur sub-station in
Bantwal Taluk.
2
CB1045
CD1057
Balligavi:
Providing additional 1x10MVA,
110/11kV Transformer at
110/11kV Balligavi sub-station in
Shikaripura Taluk.
District
Hassana
Dakshina
Kannada
Shimoga
Energy
Savings &
BCR
ES 1.64
BCR 1.37
BCR 1.43
BCR 0.78
Cost of
Original /
Date of LOI
Revised
DPR & Date
467.64 &
31.10.07
274 &
18.11.15
284.42 &
18.07.14
12.03.18
09.02.17
05.07.16
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up to
31/03/19
Budget
2019-20
527.13
31.85
58.98
320.88
350.00
6958.80
468.32
6927.12
5976.85
1360.00
103.98
60.58
164.56
155.61
6.00
126.89
50.94
177.83
171.28
40.00
Remarks
On Hand Bills:8.55
MEI:31.85
Bills to receive:15.66
Total:56.06
For Fy 19-20
Work bills to receive:
S:82.51
E:15.91
C:50.91
Subtotal:149.36
Compensation:25
Workslip2:40
Rtn:
S:63.96
E:0.14
C:11.54
Subtotal:75.64
LD:52.7
FQV:12.52
Total:355.22
Probable Expenditure for 2018-19 :
Erection - 3 L, Retention(MEI) - 2 L
Bills on hand:
1) BR No: 1235/25.02.2019 Rs.2.17 lakhs.
2) BR No: 1236/24.02.2019 Rs.10.53
Lakhs. 3) BR No: 1237/24.02.2019
Rs.1.16 Lakhs.
Total Rs.13.86 Lakhs.
Budget 2019-20
Supply Rs.28.00 Lakhs
Erection Rs.6.00 Lakhs
Civil Rs.5.00 Lakhs
Retention Rs.1.00
Total Rs.40.00 Lakhs
Sl.
No.
3
4
5
Work
Code
Name of the Work
Cost of
Original /
Date of LOI
Revised
DPR & Date
CE1039
Kadur:
Providing additional 1 X10MVA,
110/11kV Spare Transformer at
220/110kV Kadur Station in
Kadur Taluk .
CA1057
CR Patna:
Replacement of 1 X 12.5MVA,
66/11 KV power Transformer by 1
X 20 MVA, 66/11kV Power
Transformer at CR Patna S/S
Hassana
BCR 0.951
174.86 &
16.03.15
CB1054
Bantwala:
Replacement of existing
1x10MVA,110/33KV Transformer
by 1x20MVA,110/33KV
Transformer at 110/33/11kV
Bantwala sub-station in Bantwal
Taluk.
Dakshina
Kannada
BCR 0.46
204.02&
12.06.17
5
Total of Augmentation
1
CA1034
Hagare Sub-Station: Providing
LILO arrangement to Hagare S/S
by stringing of 2nd ckt on existing
DC towers from 66kV HassanaChikkamagalur line to Hagare
S/S with TB at Hagare S/s for a
distance of 0.7Kms
CA1035
Balupete:
Providing LILO arrangements to
66/11kV Balupete Sub-Station by
stringing the 2nd ckt line on the
existing DC towers from 66kV
Hassana-S.K.Pura 2nd Ckt line to
66/11kV Balupet S/S with TB at
66/11kV Balupet S/s for a
distance of 0.6Kms
2
District
Energy
Savings &
BCR
Chikkamagal
BCR 1.660
uru
236.14 &
12.06.15
27.08.16
Cost of DWA
Hassana
32.77 &
22.03.13
33.31 &
11.02.13
23.05.16
23.05.16
Total Work
Cost
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
Budget 2019-20
Retention Bill Rs.30.00 Lakhs
Total Rs.30.00 Lakhs
88.95
25.63
114.58
111.14
30.00
0.00
155.00
155.00
158.39
10.00
20MVA, power transformer commissioned
on 12.12.2018 remaining works under
progress.
0.00
180.43
5.00
Probable expenditure for 2018-19: PV - 20
L, Work Cost - 8 L.
Award Cost: Supply - 1.76L, Erection 9.16L, Civil - 1.54; Total - 12.47L.
611.97
776.85
91.00
319.82
Hassana
Cost of
Deptly.
Supplied
Materials &
others
28.46
38.38
292.15
2.66
2.66
31.12
41.04
26.78
36.72
3.00
Work is combined package
For probable Fy 2018-19
Workslip3:2.00
Fro Fy-19-20
FQV:2.00
LD:1.00
Total:3.0
3.50
Work is combined package
For probable Fy 2018-19
Workslip3:1.00
Fro Fy-19-20
FQV:2.00
LD:1.50
Total:3.50
Sl.
No.
3
4
5
6
7
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
Work
Code
Name of the Work
CA1043
Doddahally:
Stringing of 66kV 2nd circuit on
existing 66kV DC towers from tap
point of 2nd circuit of 66kV
Kadavinakote-Hootagally line to
the existing 66/11kV Doddahally
S/S with TB at Doddahally SubStation for a distance of
0.315Kms
CA1047
Hangarahally:
Construction of 66kV D/C line
for providing LILO arrangement to
66/11kV Hangarahalli S/S with
TB at 66/11kV Hangarahalli
S/S.for a distance of 0.35 kms
CB1008
Varahi - Khemar & Khemar Kavoor:
Construction of 220kV DC line
in the existing corridor of 110kV
SC SK line for a distance of 113.3
Kms
Dakshina
Kannada
CB1028
Gurupura Sub-Station:
Construction of 110kV LILO line
from the proposed (under
Construction) 220/110kV VarahiKavoor DC line (b/n Loc no.30 &
31) to 110kV S/s at Gurupura for
a distance of 1.50Kms.
Dakshina
Kannada
72.32 &
06.07.13
CA1054
Shravanabelagola:
Providing metering and protection
to 66kV YachenahalliShravanabelagola at 66/11kV sub
station at Shravanabelagola
Hassana
21.47 &
30.07.14
District
Hassana
Hassana
29.05 &
07.11.12
52.93 &
03.04.13
ES 57.812 10082.99 &
BCR 2.71
05.03.09
23.05.16
23.05.16
Cost of DWA
37.50
39.48
Cost of
Deptly.
Supplied
Materials &
others
2.80
29.34
Total Work
Cost
40.30
68.82
Cum Exp up to
31/03/19
37.52
71.41
Budget
2019-20
3.00
Work is combined package
For probable Fy 2018-19
Workslip3:1.00
Fro Fy-19-20
FQV:2.00
LD:1.00
Total:3.0
25.00
Bills to be received :
Workslip-3 :6.65
For Fy 19-20
LD:4.06
Rtn:20.48
Total:24.54
Time extension agenda received at this
office on 11.12.2018, to be cleared in CPC.
07.02.07
8317.16
2221.76
10538.92
9752.92
450.00
19.08.16
113.21
8.25
121.46
105.00
3.00
06.01.17
22.70
22.70
19.34
Remarks
7.00
FQV for an amount of Rs. 91,21,70,297.19
which is 9.67% excess over the DWA
amount Rs. 83,17,16,150.26 submitted
CEE, T&P vide letter no 13207-10 Dated
13.02.2019 of CEE,TZH.
Retention - Rs.282.19Lakhs.
Bills on FQV - Rs. 70Lakhs.
Bills to be received; Rtn: 0.25
LD-3.00, Supply-0.68
Bill to receive:
S:1.42
E:0.67
Rtn:3.03
LD:1.84
Sl.
No.
8
Work
Code
CD1059
Name of the Work
110/11KV MUSS Thirthahalli
LILO:
1) Construction of 110kV,
0.523KM LILO Line tapping from
110kV SK line to the existing
110/11kV Thirthahalli Substation in Thirthahalli Taluk,
Shivamogga District.
2) Construction of 110kV line
Terminal bay at 110/11kV
Thirthahalli S/s.
8
Total of Lines
1
Providing Capacitor Bank and
allied equipment’s in KPTCL Substations of Hassana Zone.
CA1056
District
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
155.43 &
19.12.15
Shimoga
762.72 &
09.09.14
Hassana
17.03.18
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up to
31/03/19
Budget
2019-20
200.29
0.00
200.29
140.69
110.00
8797.18
2267.47
11064.65
10190.38
604.50
Remarks
Bills on hand:
1. BR No: 1170/08.02.2019 Rs.9.00 Lakhs
2. BR No: 1171/08.02.2019 Rs.0.42 Lakhs
3. BR No: 1172/08.02.2019 Rs.3.53
Lakhs. 4. BR No: 1173/08.02.2019
Rs.2.14 Lakhs. 5. BR No:
1269/08.03.2019 Rs.1.56 lakhs. 6. BR No:
1268/08.03.2019 Rs.9.30 Lakhs.
7. BR No: 1267/08.03.2019 Rs.1.56 lakhs.
8. BR No: 1266/08.03.2019 Rs.0.42
Lakhs. 9. BR No: 1265/08.03.2019
Rs.0.16 Lakhs.
Total Rs.28.09 Lakhs
Budget for 2019-20
Retention Rs.20.00 Lakhs
Supply Rs.51.00 Lakhs
Erection Rs.20.00 Lakhs
Civil Rs.15.00 Lakhs
Total Rs.106.00 Lakhs
Probable expenditure from Nov to Mar-19:
Hsn Circle: On Hand: 23.96
07.08.15
517.05
301.67
818.72
559.97
150.00
Budget required for the FY19-20:
Hsn Circle: Retention & LD 149.51
1
Total of TB's & Others
517.05
301.67
818.72
559.97
150.00
21
Total of Hassana Zone
16592.85
9859.32
10625.28
17504.05
2205.50
15.02.14
12.09.16
3880.29
390.00
4270.29
3901.15
193.00
09.06.17
476.57
31.27
507.84
493.18
50.00
MYSURU TRANSMISSION ZONE
1
DA1043
Kalamandir Campus:
a) Establishing 2x12.5 MVA,
66/11kV Gas Insulated (GI) SubStation near Dhobighat in
Mysuru with associated line
b) Running of 66 kv single core,
630 sq mm XLPE copper UG cable
LILO line for a route length of
3.08 kms from the existing 66 kv
bogadi-mysuru south line to the
proposed Kalamandir GIS Station.
2
DA1106
Kanagalu
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
Mysuru
ES 4.38
BCR 0.52
Mysuru
ES 1.61 &
BCR 2.4
3521.03 &
15.05.14
410.20 &
17.03.16
Physically & Financially will be Closed
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
12.06.17
422.61
39.88
462.49
442.36
54.00
Physically & Financially will be Closed
628.76 &
11.05.17
20.03.18
563.00
100.00
663.00
613.32
60.00
Amount required for payment of FQV Bills
ES 1.048 &
BCR 1.14
651.24 &
06.03.17
26.09.17
605.71
64.50
670.21
567.04
62.00
Physically & Financially will be Closed
Mysuru
ES 1.318 &
BCR 1.23
716.11 &
10.04.17
16.02.18
627.00
160.00
787.90
468.00
245.00
11kV Switchgear to be supplied by KPTCL,
Madavadi (Parinamipura) :
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 1.153Kms
Mysuru
ES 1.29 &
BCR 1.46
570.79 &
06.03.17
26.09.17
527.00
45.00
572.00
530.14
50.00
DA1123
Hemmargala:
Establishing 1x8MVA, 66/11kV
Substation with associated line
for a distance of 3.905Kms
Mysuru
ES 1.609 &
BCR 1.62
645.90 &
20.03.17
26.09.17
588.70
65.00
653.70
605.80
57.00
9
DB1047
Tumbekere:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 6.596 Kms.
Mandya
ES 12.84
BCR 1.34
504.98 &
24.01.12
12.03.18
638.96
140.00
778.96
615.75
100.00
10
DB1098
Vadakepura Limits:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 0.356Kms
Mandya
ES 1.313
BCR 1.72
520.20 &
11.05.17
20.03.18
505.91
80.00
585.91
363.56
140.00
Cost of
Original /
Date of LOI
Revised
DPR & Date
Sl.
No.
Work
Code
Name of the Work
District
Energy
Savings &
BCR
3
DA1107
Kittur :
Establishing 1 x 8 MVA,66/11 KV
sub-station with associated lines
Mysuru
ES 1.93 &
BCR 2.78
398.43 &
28.12.15
4
DA1115
Bannikuppe
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 3.575Kms
Mysuru
ES 0.99 &
BCR 1.12
5
DA1119
Maliyur:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 2.809Kms
Mysuru
6
DA1120
Chandalli (Madapura) Village:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 5.668Kms
7
DA1121
8
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
Amount required for payment of FQV bills
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
14.03.18
761.84
120.00
881.84
779.09
50.00
Amount required for payment of FQV bills
783.36 &
10.08.16
16.09.17
654.68
125.00
779.68
653.43
80.00
Physically Closed; Amt required for FQV
payments
833.18 &
10.01.17
15.11.17
853.49
119.00
972.49
649.75
180.00
Amount required for payment of Non DWA
items after approval of FQV
Agara mamballi : Establishing 1
x 8 MVA,66/11 KV sub-station
Chamarajan ES 1.005 &
BCR 1.02
with associated line for a distance
agar
of 3.047Kms
690.70 &
12.06.17
20.03.18
638.98
90.00
728.98
526.79
200.00
Amount required for payment of Non DWA
items after approval of FQV
DA1116
Ranganathapura(Tumbla) Village
Establishing 1x8MVA, 66/11kV SubStation with associated line for a
distance of 0.597Kms
Mysuru
ES 1.72 &
BCR 2.05
544.15 &
11.01.17
26.05.17
563.00
30.11
593.11
517.70
20.00
Physically & Financially will be Closed
DB1100
(Thirumalapura) Vaderahalli
Establishing 1 x 8MVA, 66/11 KV
Sub-Station with associated line for
a distance of 3.869Kms
Mandya
ES 1.321 &
BCR 1.4
635.59 &
13.04.17
01.09.17
591.38
39.69
631.07
545.20
100.00
Physically & Financially Closed
12899.12
1639.45
14539.47
12272.26
1641.00
Cost of
Original /
Date of LOI
Revised
DPR & Date
Work
Code
Name of the Work
District
Energy
Savings &
BCR
11
DB1101
Devalapura Handpost
(Kasalagere)
Establishing 1 x 8MVA, 66/11 KV
Sub-Station with associated line
for a distance of 7.65Kms
Mandya
ES 1.523
BCR 1.16
849.21 &
11.05.17
12
DD1043
Bargi:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
for a distance of 10.864Kms
Chamarajan
agar
ES 2.03 &
BCR 1.77
13
DD1044
Kothanoor:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line.
Chamarajan
agar
ES 1.1 &
BCR 0.91
14
DD1049
15
16
Sl.
No.
16
Total of Sub-stations
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
1
DA1046
Kadakola:
Replacing 2x8MVA, 66/11kV Tr.
by 2x12.5MVA, 66/11kV
Transformer
2
DA1104
Vajamangala:
Providing additional 1X20 MVA ,
66/11 KV transformer .
Mysuru
BCR 2.589
331.59 &
29.06.15
03.09.16
144.79
189.00
333.79
300.49
31.00
Physically Closed.
3
DB1082
Seelenere:
Providing additional 1 X 12.5
MVA ,66/11 kV Transformer
Mandya
ES NA
BCR 1.22
226.74 &
12.02.14
28.03.15
89.00
147.00
236.00
186.67
20.00
DPR to be approved
Mysuru
ES NA
BCR 0.92
237.08 &
03.08.11
08.01.13
19.27
210.20
229.47
220.75
5.00
• Final Variation submitted to SEE,
T(W&M) Circle, Mysuru on 07.11.2018
Sl.
No.
Work
Code
Name of the Work
District
DA1098
R.K Nagar :
Replacement of 2 nd 12.5 MVA
NGEF Power Transformer by 20
MVA, 66/11kV Power
Transformer
Mysuru
5
DA1108
Hampapura :
Providing Additional 1x12.5MVA
66/11kV Transformer and
Replacement of 1 X 8 MVA by 1 X
12.5 MVA, 66/11kV with
additional SWG
Mysuru
6
DA1109
Hanagodu :
Replacement of 1 X 8 MVA by 1 X
12.5 MVA 66/11kV Transformer.
7
DB1070
8
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
198.75 &
16.03.15
30.06.17
35.33
161.18
196.51
180.33
23.00
Amt required FQV payments
1.16
227.39 &
25.08.15
29.06.17
90.96
243.34
334.30
181.04
70.00
Physically Closed (Amt required for FQV &
PV Payments)
Mysuru
BCR 1.23
152.75 &
05.10.15
30.06.17
20.35
121.57
141.92
125.86
40.00
Physically Closed (Amt required for FQV &
PV Payments)
Huygonahalli 220kV:
Providing additional 1x12.5 MVA,
66/11kV at 220/66/11kV
Transformer
Mandya
ES NA
BCR 0.93
296.98 &
19.02.14
05.08.15
135.56
182.44
318.00
192.13
80.00
Physically Closed
DB1077
BG Pura:
Replacing 1x8MVA, 66/11kV by
1x12.5MVA, 66/11kV
Transformer
Mandya
ES NA
BCR 0.68
146.24 &
08.11.13
16.02.17
22.40
116.37
138.77
94.51
20.00
Physically Closed
9
DB1086
Hardanahally (Devalapura):
Provding Additional 1 X 8 MVA,
66/11kV Transformer
Mandya
ES NA
BCR 0.95
186.58 &
28.06.14
02.07.16
90.00
35.00
125.00
85.81
30.00
Amount required for payment of FQV Bills
10
DD1037
P.G.Palya :
Providing Additional 1X8 MVA,
66/11kV Transformer
Chamarajan
agara
BCR 0.84
186.91 &
03.11.14
03.11.14
75.45
45.00
120.45
84.94
11.00
Physically Closed ; Amt required for FQV
payments
11
DA1105
Haradanahalli :
Providing additional 1 X 8 MVA,
66/11 KV Transformer and
Replacing 1 X 6.3 MVA by 1 X 8 at
66/11 KV in Periyapatna taluk,
Mysuru District.
Mysuru
ES NA
BCR 2.10
270.38 &
18.08.15
12.05.17
85.00
224.16
309.16
73.34
14.00
Physically Closed
(FQV Balance amount to be paid)
12
DB1072
Kirugavalu:
Replacing 1x6.3MVA, 66/11kV by
1x12.5MVA, 66/11kV Transformer
Mandya
ES NA
BCR 0.78
193.40 &
05.12.13
28.03.15
38.95
30.86
69.81
58.02
10.00
4
Mysuru
BCR 2.1
233.05 &
22.06.15
02.07.16
84.18
146.48
230.66
174.45
40.00
Physically & Financially will be Closed
DA1103
Bylukuppe:
Providing Additional 1X8 MVA,and
replacing 1x8MVA by 1x12.5MVA
66/11kV Transformer.
Mysuru
BCR 3.24
232.28 &
29.06.15
04.06.16
85.79
146.48
232.27
172.22
40.00
Physically & Financially will be Closed
DD1031
Terakanambi:
Replacing 2X8MVA, 66/11kV by
2x12.5MVA, 66/11kV Transformers
Chamarajana
gara
BCR 0.96
226.51 &
27.12.12
13.05.16
12.22
239.78
252.00
193.17
10.00
Physically & Financially will be Closed
DB1088
Hardanahally (Devalapura):
Replacing the existing 1 X 8 MVA by
1 X 12.5 MVA at 66/11 KV in
Nagamangala taluk, Mandya
District.
Mandya
ES NA
BCR 0.64
155.78 &
08.04.15
125.00
125.00
92.35
0.20
Physically Closed
1029.25
2363.86
3393.11
2416.08
444.20
DA1102
14
15
16
2
Total Work
Cost
Ravandur :
Provding Additional 1X8 MVA,and
replacing 1x8MVA by 12.5MVA
66/11kV Transformer.
13
1
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
District
Work
Code
16
Cost of
Original /
Date of LOI
Revised
DPR & Date
Energy
Savings &
BCR
Sl.
No.
Name of the Work
Total of Augmentation
DA1072
Vajamangala-Varun limits:
Construction of 220/66KV MCMV
line from location 4(3) to 20 along
the proposed 66kV VajamangalaKadakola DC line corridor in
Varun limits and providing 2 Nos.
of 66kV TBs at Kadkola R/S for
a distance of 4.52 kms
DD1040
SFC-Madhuvanahalli to
Kollegala Limits: Reconstruction
of existing I BEAM 66kV line by
66kV D/C towers with
replacement of existing
deteriorated Coyote Conductor
/earth wire by new one for a
distance of 22.0KM
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
Mysuru
NA
556.67 &
04.05.13
13.08.14
705.03
55.00
760.03
728.21
25.00
Physically Closed
(FQV is approved.However LD has to be
approved from CPC)
Chamaraja
nagara
ES 1.81
BCR 0.296
564.2 &
23.06.15
09.11.16
510.00
125.00
635.00
564.62
23.00
Final variation is approved, revised price
schedule is to be approved.
Sl.
No.
3
Work
Code
DB1055
3
1
Sri Rangapatna LILO:
LILO Arrangement for the
Garudanaukkada - Metagalli
66kV line for a distance of
1.322Kms along with TBs at Sri
Rangapatna Sub-Station for a
distance of 1.322 kms
District
Cost of
Original /
Date of LOI
Revised
DPR & Date
136.5 &
31.10.12
Mandya
13.11.17
Total of Lines
DA1097
1
36
1
Name of the Work
Energy
Savings &
BCR
Providing 12.1kV 2.9MVAR
Capacitor Bank and allied
equipment’sto 14 Nos of existing
KPTCL Sub-stations in the
jurisdiction of Mysuru
Transmission Zone.
Total of TB's & Others
324.59 &
09.09.14
Mysuru
07.08.15
Total of Mysuru Zone
BAGALKOTE TRANSMISSION
ZONE
EE1118
Khadaklat:
Upgradation of 2x5MVA,33/11 kV
S/S to 2x10 MVA, 110/11 kV S/S
with associated line.
Belgaum
ES 3.064 &
BCR 1.96
920.69 &
05.02.16
23.08.16
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
179.19
20.00
199.19
74.85
50.00
1394.22
200.00
1594.22
1367.68
98.00
205.95
134.86
340.81
288.80
50.00
Cum Exp up to
31/03/19
Budget
2019-20
205.95
134.86
340.81
288.80
50.00
15528.54
4338.17
19867.61
16344.82
2233.20
923.41
79.01
1002.42
978.53
30.00
Remarks
Amount required for payment of FQV Bills
Physically Closed ; Payment required for
FQV & Retention amount
FY 2018-19:
CC: 17.00
Total: 17.00
2
EF1061
Halaki:
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 13.154Kms
Bagalkote
ES 4.72
BCR 1.94
767.97 &
06.01.15
12.09.06
882.02
39.75
921.77
954.82
38.00
3
EF1062
Tolamatti:(Anagawadi)
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line.
Bagalkote
ES 3.21
BCR 1.48
721.67 &
23.03.15
20.09.16
746.17
39.75
785.92
803.36
29.00
4
EF1066
Navalagi:
Establishing 2x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 1.906Kms
Bagalkote
ES 4.89
BCR 2.15
791.98 &
06.01.15
20.02.16
856.05
73.37
929.42
885.18
13.00
FY 2019-20:
Budget not required.
Excess due to veriation of CC bills in the
line and awaiting for the approval.
FY 2018-19:
FY 2019-20:
Budget not required
FY 2018-19:
FY 2019-20:
Budget not required
Sl.
No.
5
Work
Code
EG1030
Name of the Work
Devaragennur: Up-gradation of
33/11kV to 2x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 1.464Kms
District
Bijapur
Energy
Savings &
BCR
ES 6.252
BCR 4.18
Cost of
Original /
Date of LOI
Revised
DPR & Date
761.22 &
10.06.15
22.10.16
Cost of DWA
820.00
Cost of
Deptly.
Supplied
Materials &
others
82.53
Total Work
Cost
902.53
Cum Exp up to
31/03/19
914.65
Budget
2019-20
18.00
EG1050
Hiremasali:
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 6.955Kms
Bijapur
ES 1.64
BCR 1.6
625.40 &
13.08.15
16.08.16
660.00
39.75
699.75
691.70
55.00
7
EB1030
Garag (Shedabal):
Establishing 2x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 4.598Kms
Dharwad
ES.13.36
BCR 6.71
920.16 &
05.09.15
16.09.17
952.95
127.67
1080.62
997.47
90.00
9
EC1010
EC1018
FY 2018-19
CC : 9.00
Savings : 9.0
Total: 18.09
FY 2019-20:
Budget not required.
6
8
Remarks
Doni 400kV (Gadag):
Establishing 2x500MVA,
400/220kV Station with
associated 440kV & 220kV link
lines for a distance of 26.798Kms
Gadag
Belavanaki:
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 22.27Kms
Gadag
ES 12.39
BCR 2.1
13249.28 &
25.03.14
30.07.16
17638.35
100.00
17738.35
16007.74
1920.00
Fy2018-19
CC:6.11
PV29.05
LD8.79
INC9.90
Total53.85
Savings8.9
FY19-20
Budget not required
Budget break up for 2018-19:
Retention of station supply: Rs. 1296.00L
Line: Rs. 312.00L
Erection: Rs. 61.00L
Civil: Rs. 40.00L
Budget break up for 2019-20:
LD: Rs. 880.00L
PV: Rs. 150.00L
QV: Rs. 150.00L
ES 4.05
BCR 1.83
1071.11 &
13.08.15
07.06.17
1204.66
40.00
1244.66
1161.48
165.00
Sl.
No.
10
11
12
Work
Code
EE1048
EE1065
EE1114
Name of the Work
Islampur:
Establishing 2x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 7.875Kms
Kakamari:
Establishing 2x10MVA, 110/11kV
Sub-Station with associated line
& TB.
Morab:
Establishing 2x10MVA 110/11kV
Sub-Station with associated line
for a distance of 7.526Kms
District
Belagum
Belagum
Belagum
Energy
Savings &
BCR
ES 7.26
BCR 3.92
ES 4.870/
2.59
ES 6.83
BCR 2.37
Cost of
Original /
Date of LOI
Revised
DPR & Date
811.67 &
01.06.15
861.42 &
16.08.16
949.92 &
05.05.15
04.01.18
05.01.18
23.12.16
Cost of DWA
935.19
880.03
956.21
Cost of
Deptly.
Supplied
Materials &
others
63.62
42.00
81.43
Total Work
Cost
998.81
922.03
1037.64
Cum Exp up to
31/03/19
886.47
493.65
894.94
Budget
2019-20
92.00
415.00
154.00
Remarks
Budget required for the Remaining Year
18-19
Supply ( T& P , Aux Trf, Fire Fighting
Equpiments, Yard Lighting , Furniture for
Control Room , Mandatory Spares & Misc)Rs 19.00 Lacs
Ret - Rs 47.224 Lacs
Civil- Rs 56.685 Lacs
Erection- Rs 3.692 Lacs
CC- Rs 11.22 Lacs
Total - Rs 137.82 Lacs
Budget required for the Remaining Year
18-19
Supply ( Trf , Aux Trf , Battery charger ,
Fire Fightining Equpiments, Station Yard
Lighting ) - Rs 164.005 Lacs
Ret - Rs 126.645 Lacs
Civil - Rs 170.26 Lacs
Erection- Rs 19.084 Lacs
SWG Cost ( CGL) - Rs 42.00 Lacs
CC- Rs 25.00 Lacs
Total - Rs 546.995 Lacs
Say- Rs 547.00 Lacs
Budget Required For the Year 18-19
Ret - Rs 28.98 Lacs
CC- Rs 20.00 Lacs
Civil- Rs 65.18 Lacs
Erection- Rs 04.41 Lacs
Total - Rs 118 Lacs
Bagalkot required for the year 19-20
LD : Rs. 25.59
QV: Rs. 20.00
45.59
FY 2018-19:
13
EF1063
Hebballi:
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 14.18Kms.
Bagalkote
ES 2.2
BCR 1.02
769.06 &
02.01.15
03.06.17
914.21
40.00
954.21
848.41
326.00
LD: 46.00
Civil: 50.00
QV: 24.00
Ret: 90.00
PV: 30.89
Total: 240.89
FY 2019-20:
Ret: 90.00
LD: 46.00
PV: 30.89
Total: 166.89
Sl.
No.
14
15
Work
Code
Name of the Work
EG1049
Talikote:
Up-gradiation of existing 33/11kV
S/s to 2x10MVA, 110/11kV SubStation with associated line for a
distance of 17.557Kms
EG1051
Rodagi (Khedagi cross) :
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line
for a distance of 10.969
District
Bijapur
Energy
Savings &
BCR
ES 3.58
BCR 1.83
Cost of
Original /
Date of LOI
Revised
DPR & Date
1140.34 &
18.08.15
09.06.17
Cost of DWA
1323.29
Cost of
Deptly.
Supplied
Materials &
others
80.00
Total Work
Cost
1403.29
Cum Exp up to
31/03/19
1069.48
Budget
2019-20
394.00
Remarks
FY 2018-19:
Supp: 90.00
Erc: 60.00
Civil: 23.57
Total: 173.57
FY 2019-20:
Budget required of Rs: 238.40
Bijapur
ES 1.52
BCR 1.26
758.09. &
05.10.15
06.06.17
863.25
40.00
903.25
628.07
302.00
FY 2018-19:
Sup: 150.00
Erc:
10.00
Civil:
50.81
Total: 210.81
FY 2019-20:
Budget required Carry forward: 166.00
15
1
2
Total of Sub-stations
EE1095
Ugar:
Replacement of 1x10MVA,
110/11kV by 1x20MVA,
110/11kV transformer
EF1056
110KV S/S Teradal:
Providing additional 1X10MVA,
110/11kV Power Transformer
3
EA1019
Haveri:
Providing spare 1x20MVA,
110/33-11kV Transformer
4
ED1021
ED1022
5
Belagum
Bagalkote
BCR 0.64
BCR 0.67
258.50 &
20.11.14
244.70 &
03.12.14
11.11.16
27.05.17
30555.79
968.88
31524.67
28215.95
4041.00
64.98
203.95
268.93
262.64
1.00
109.51
48.79
158.30
253.05
11.00
FY 2018-19:
LD: 1.29
Total: 3.32
FY 2019-20:
Budget not required.
Haveri
BCR 1.89
207.93 &
01.08.14
25.03.17
61.26
217.74
279.00
209.05
83.00
Karwar(Shejwad):
Providing additional 1x20MVA,
110/33-11kV Transformer
Uttar
Kannada
BCR 1.52
320.05 &
21.08.14
22.03.17
225.35
200.00
425.35
366.46
68.00
Haliyal:
Replacement of 1X10 MVA,
110/11kV by 1X20MVA,
110/11kV Power Transformer at
110kV S/s Haliyal
Uttar
Kannada
BCR 1.3
330.2 &
13.08.15
18.04.17
99.42
240.00
339.42
319.14
21.00
Sl.
No.
Work
Code
6
ED1023
7
8
EF1052
EF1064
Name of the Work
Sirsi:
Replacement of 1x10MVA by
1x20MVA 110/11KV Transformer
District
Energy
Savings &
BCR
Uttar
Kannada
BCR 1.51
110KV S/S Banahatti:
Replacement of 1x10MVA,
110/11kV by 1x20MVA,
110/11kV Transformer
Bagalkot
Rampur:
Replacement of 1x10MVA,
110/33kV by 1x20MVA,
110/33kV Transformer
Bagalkote
BCR 1.13
BCR 0.96
Cost of
Original /
Date of LOI
Revised
DPR & Date
284.66 &
10.07.15
23.05.17
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
99.99
220.77
320.76
Cum Exp up to
31/03/19
272.89
Budget
2019-20
Remarks
40.00
FY 2018-19:
Supply: 18.36
Ret:
9.14
QV:
8.38
Ere: 15.00
Civil: 7.00
Total: 57.88
257.56 &
17.11.15
22.03.18
171.55 &
21.08.14
30.03.17
58.60
16.37
240.50
200.00
299.10
216.37
258.15
324.01
70.00
30.00
FY 2019-20:
Supply: 18.36
Ret:
9.14
QV:
8.38
Ere: 15.00
Civil: 7.00
Total: 57.88
FY 2018-19:
LD: 17.00
Civil: 4.47
Erc: 8.00
Others: 5.85
PV : 18.80
Ret: 18.35
Total: 72.47
FY 2019-20:
Budget not required
9
EG1039
Hirebevanur:
Providing additional 1x10MVA,
110/11kV Transformer.
Bijapur
BCR 0.88
222.40 &
17.09.14
17.03.17
88.23
41.07
129.30
107.46
24.00
FY 2018-19:
LD: 12.89
Ere:
1.00
Civil: 2.00
QV: 8.04
Ret:
1.36
Total: 25.25
FY 2019-20:
Budget required of Rs: 7.00
Sl.
No.
10
Work
Code
EG1040
Name of the Work
Lachyan:
Replacing 1x10MVA, 110/11kV
by 1x20MVA, 110/11kV
Transformer.
District
Bijapur
Energy
Savings &
BCR
BCR 0.80
Cost of
Original /
Date of LOI
Revised
DPR & Date
245.85 &
27.10.14
27.03.17
Cost of DWA
63.89
Cost of
Deptly.
Supplied
Materials &
others
241.07
Total Work
Cost
304.96
Cum Exp up to
31/03/19
229.26
Budget
2019-20
15.00
Remarks
FY 2018-19:
Supply:
1.00
QV:
3.00
PV:
8.50
Total: 12.50
Savings: 43.50 (Due to cost of transformer)
FY 2019-20:
Budget required of Rs: 6.00
11
EG1044
110 KV S/S Malaghan:
Replacement of 1X10 MVA,
110/11 KV by 1X20 MVA, 110/11
KV transformer instead of
Providing additional 1x10MVA,
110/11kV Transformer
Bijapur
BCR 1.37
252.44 &
13.08.15
25.03.17
58.41
247.12
305.53
226.88
10.00
FY 2018-19:
QV:
00
Supply: 15.00
Erection: 1.00
Civil: 2.00
Total: 18.00
Savings: 15.00
FY 2019-20:
Budget required of Rs: 6.26
12
13
EG1046
EG1048
Moratagi:
Providing additional 1x10MVA,
110/11kV Transformer
B Bagewadi:
1x100MVA Transformer
220/110KV for arranging the
power supply to the Chimmalagi
LIS.
Bijapur
BCR 0.83
237.24 &
25.03.14
25.10.16
88.37
148.87
237.24
216.58
24.00
FY 2018-19:
Supply: 63.55
Ere: 1.74
Civil: 17.40
Total: 82.69
FY 2019-20:
Budget required for carry forward
QV: 8.00
Savings: 17.49
Bijapur
BCR 3.39
579.19 &
19.01.15
FY 2018-19:
Supply: 178.00
Ere:
7.85
Civil:
21.00
TOTAL: 206.85
16.09.17
847.00
0.00
847.00
787.37
115.00
FY 2019-20:
QV: 40.00
PV : 40.00
Total: 80.00
Sl.
No.
14
Work
Code
EG1054
Name of the Work
110/11kV Devanagaon:
Providing additional 1x10MVA,
110/11kV Transformer at
110/11kV Devanagaon Substation
District
Vijayapura
Energy
Savings &
BCR
BCR 0.61
Cost of
Original /
Date of LOI
Revised
DPR & Date
271.09 &
25.05.17
22.03.18
Cost of DWA
99.74
Cost of
Deptly.
Supplied
Materials &
others
41.63
Total Work
Cost
141.37
Cum Exp up to
31/03/19
119.87
Budget
2019-20
6.00
Remarks
FY 2018-19:
Supply: 20.00
Erec : 10.01
Ret: 10.00
Civil: 13.50
Total: 53.51
FY 2019-20:
Budget required of Rs: 19.00
15
16
EC1014
EG1042
Dambal:
Providing additional 1x10MVA,
110/11kV Transformer
110KV S/S Shirabur:
Replacement of 1x10MVA,
110/11kV by 1x20MVA,
110/11kV Transformer
Gadag
Bijapur
BCR 1.14
BCR 1.37
172.34 &
28.01.13
252.58 &
14.08.15
22.02.18
22.02.18
78.42
46.96
17.29
254.39
95.71
301.35
88.93
268.84
12.00
4.00
FY 2018-19:
Supply:
16.00
Ret:
3.50
QV:
2.00
PV: 22.98
Civl:
2.00
Others:
3.35
Total: 49.83
FY 2019-20:
Budget not required
17
EB1026
Gadag Road:
Providing additional 1x10MVA,
110/11kV Transformer
Dharwad
BCR 1.12
215.78 &
2.06.14
15.09.16
71.92
6.24
78.16
66.70
1.00
18
EB1027
Lakamanahalli:
Replacing 1x10MVA by 1x20MVA,
110/11kV Transformer
Dharwad
BCR 1.79
239.65 &
19.06.15
13.05.16
48.09
198.12
246.21
202.42
1.00
19
EF1067
110 KV S/s Badami: Replacement
of 1X10 MVA, 110/11 KV by 1X20
MVA, 110/11 KV transformer
Bagalkote
BCR 1.15
253.68 &
18.05.15
11.11.16
62.28
248.69
310.97
251.37
3.00
FY 2018-19:
LD: 1.30
FY 2019-20:
Budget not required.
Sl.
No.
20
21
22
23
Work
Code
EE1091
220KV Kudachi:
Providing additional 1x10MVA,
110/11kV Transformer
EE1109
M.K.Hubli:
Replacement of 1x10MVA,
110/11kV by 1x20MVA, 110/11kV
transformer at 110 KV S/S
M.K.Hubli
EE1111
Soundatti:
Providing spare 1x10MVA,
110/11KV Transformer at 110KV
S/S Soundatti
EE1112
23
1
Name of the Work
Nehru Nagar:
Replacing 2x10MVA, 110/11kV by
2x20MVA, 110/11kV Transformers
District
Belagum
Belagum
Belagum
Belagum
Energy
Savings &
BCR
BCR 0.68
Cost of
Original /
Date of LOI
Revised
DPR & Date
243.87 &
27.08.13
BCR 0.64
256.48 &
21.08.14
BCR 0.88
188.48 &
26.08.14
BCR 0.78
420.54 &
04.06.14
15.06.17
22.02.18
17.06.16
22.02.18
Total of Augmentation
EF1021
Gadag-Bagalkote :
Construction of 220kV DC line
for a distance of 95.295 Kms.
Dharwad
ES 16.23
BCR 1.016
4869.82 &
21.09.11
31.01.14
Cost of DWA
106.83
59.38
64.42
Cost of
Deptly.
Supplied
Materials &
others
35.00
41.63
20.99
Total Work
Cost
141.83
101.01
85.41
Cum Exp up to
31/03/19
162.46
72.03
75.45
Budget
2019-20
2.00
20.00
6.00
67.04
42.37
109.41
460.97
58.00
2586.46
3156.23
5742.69
5601.98
625.00
7624.00
81.66
7705.66
7660.45
433.00
Remarks
Budget for the Year 18-19
Supply- Rs 02.00 Lacs
Erection - Rs 04.00 Lacs
Ret- Rs 25.06 Lacs
SWG - Rs 42.41 Lacs
QV- Rs 12.00 Lacs
LD- Rs 1.15 Lacs
Transportation of 1X10 MVA - Rs 3.00
Lacs
Total - Rs 89.62 Lacs
Say Rs 90.00 Lacs
For theYear 18-19
Erection - Rs 12.18 Lacs, Transportation
of 20 MVA- Rs 4.00 Lacs
QV- Rs 1.00 Lacs
Civil Rs 11.44 Lacs
Ret- Rs 24.63
Total - Rs 53.25 Lacs
For the Remaining Year 18-19
Civil- Rs 2.72 Lacs
QV- Rs 3.00 Lacs
Ret - Rs 6.86
Total - Rs 12.58 Lacs
Budget required for the Remaining Year 1819
Supply - Rs 15.44 Lacs,Ret- Rs 11.42Lacs,
SD- Rs 15.56 Lacs,Civil- Rs 11.21 Lacs
Erection- Rs 20.00 Lacs
SWG- Ret- Rs 5.15 Lacs
Trf PV- Rs 40 Lacs ( 20 Lacs for each Trf )
QV- Rs 3.00 Lacs
Total - Rs 121.78 Lacs
Sl.
No.
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
Cost of
Deptly.
Supplied
Materials &
others
Name of the Work
EF1059
Mahalingapur-Mudhol :
Conversion of 110KV SC tap line
to LILO line at 110kV Uttur Substation by construction of 110kV
TB & 110kV SC line on DC towers
from 110kV MahalingapurMudhol station for a distance of
5.945Kms.
EG1037
Kudagi Ultra Mega Power Plant
Evacuation Lines:
Construction of 220kV MC Line
from proposed Kudagi 400kV
STPP to LILO existing 220kV
B.Bagewadi-Bijapur DC line for a
distance of 18.168 kms.
Bijapur
EA1021
Hirekerur - Rattihalli Line:
Stringing of 110kV 2nd Circuit on
existing D/C towers between
Rattihalli and Hirekerur SubStations for a distance of 12.34
Kms
Haveri
200.52 &
05.11.14
27.05.17
203.82
0.00
203.82
167.10
57.00
5
EB1028
Bidnal LILO:
Construction of 220kV DC line for
having LILO arrangement of
220kV Narendra-Haveri first
circuit to 220kV Station Bidnal
for a distance of 15.505Kms
Dharwad
1331.89 &
20.11.15
06.05.17
1713.67
0.00
1713.67
1751.94
238.00
6
ED1024
Siddapur LILO:
Providing LILO arrangement to
110kV Sub-Station Siddapur.
Uttar
Kannada
243.25 &
28.09.15
15.06.17
215.29
57.99
273.28
229.78
46.00
EE1026
Belgaum-Ghataprabha:
Re-construction of 110kV SC line on
DC towers in the existing 110kV
Ghataprabha line corridor from
Belgaum (6-pole structure near
Kanabargi) to 110kV Ghataprabha
Sub-Station for a distance of 49.045
Kms.
Belgaum
863.65 &
08.08.06
17.07.07
812.74
40.00
852.74
681.56
1.00
2
3
4
7
District
Cost of DWA
Total Work
Cost
Cum Exp up to
31/03/19
Work
Code
Budget
2019-20
Remarks
FY 2018-19:
LD : 26.37
CC: 12.65
Total: 40.00
Bagalkote
240.75 &
28.02.15
2143.75 &
23.05.13
22.07.15
04.03.14
263.70
3161.88
15.26
255.85
278.96
3417.73
194.20
3512.10
50.00
1.00
FY 2019-20:
Budget not required.
(If dicision of LD is accorded within this
F/Y 2018-19, if not it will be spill over
2019-20)
FY 2018-19:
QV: 12.00
Others: 3.00
Total: 15.00
FY 2019-20:
Budget not required.
Sl.
No.
8
Work
Code
EG1026
Name of the Work
Atharga LILO:
Conversion of 110kV tap line to LILO
line for a distance of 10.705 kms.
District
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
94.76 &
24.01.12
Bijapur
08.01.16
Cost of DWA
102.82
Cost of
Deptly.
Supplied
Materials &
others
5.14
Total Work
Cost
107.96
Cum Exp up to
31/03/19
108.40
Budget
2019-20
1.00
Remarks
FY 2018-19:
QV: 4.00
Total: 4.00
Savungs: 10
FY 2019-20:
Budget not required.
8
1
Total of Lines
EB1015
1
47
14097.92
455.90
14553.82
14305.53
827.00
1714.71
0.00
1714.71
1648.51
160.00
Total of TB's & Others
1714.71
0.00
1714.71
1648.51
160.00
Total of Bagalkote Zone
48954.88
4581.01
53535.89
49771.97
5653.00
SRS Hubli :
R & M Works at 220kV SRS Hubli
Station
Dharwad
0.00
1789.35 &
03.03.11
13.09.11
KALABURAGI TRANSMISSION
ZONE
1
2
3
FA1032
Mallat (Manvi): Establishing
2x100MVA, 220/110/11kV and
1x10MVA, 110/11kV Station with
associated 220kV and 110kV
lines.
220KV line: 2.80Kms.
110KV lines:39.727 Kms
FB1039
Bachigondanahalli:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
or a distance of 6.85Kms
FB1081
Harivi :
Establishing of 66/11kV Substation with installed capacity of
1x8MVA 66/11kV Transformer or
a distance of 6.638Kms
Raichur
Bellary
Bellary
ES 34.22
BCR 3.48
ES1.883
BCR 1.49
ES 1.36 &
BCR 1.20
3948.94 &
17.07.12
474.36 &
23.09.14
467.78 &
05.11.14
12.02.13
23.12.16
16.03.16
4093.00
549.00
561.06
39.86
36.00
24.33
4132.86
585
585.39
3356.27
522.67
392.53
650.00
28.00
95.00
Budget for FY 19-20
Supply: 20.00 Lakhs
Erection: 10.00 Lakhs
Civil: 60.00 Lakhs
RTN: 450.00 Lakhs
QV: 80.00 Lakhs
PV: 30.00 Lakhs
Budget Surrendered:Rs- 150.0 Lakhs
Probable Expenditure for 2018-19
Total : 41.66 Lakhs
Budget reqd for 2019-20
Crop bills:22.0 Lakhs
Retention Amt: 5.5 lakhs
Total:27.50 Lakhs
Expenditure to be booked in 2018-19
Work completed bills: 181.1 Lakhs
QV:39.5 LakhsPV 25.0 Lakhs( Subject to Approved by
Corporate office for brought out items)Crop bills:12.0 LakhsLD: 26.0 Lakhs (Subject to approval of
delay condonation)
Total :283.5 Lakhs.
Budget is required for FY2019-20- 95
lakhs. retention amount 60 lakhs
crop compensation 20 lakhs
QV civil 15 lakhs.
Sl.
No.
4
5
Work
Code
FD1015
Yeradona:
Establishing of 1x10MVA,
110/11kV Sub-Station with
associated line for a distance of
4.964 Kms.
FD1026
Bennur:
Establishing 1x10MVA, 110/11kV
Sub-station with associated line
for a distance 8.647Kms
5
1
2
2
Name of the Work
District
Energy
Savings &
BCR
Koppal
ES 3.58
BCR 2.32
Koppal
ES 1.94
BCR 1.39
Cost of
Original /
Date of LOI
Revised
DPR & Date
528.71 &
06.04.11
802.56 &
28.09.15
02.11.11
28.02.17
Total of Sub-stations
FB1050
BislaHalli :
Creating 33kV reference by
Providing 1x20MVA, 110/33kV
Transformer.
FB1085
Siruguppa :
Replacing 1x10MVA, 110/11kV
by 1x20MVA, 110/11kV
Transformer
Total of Augmentation
Bellary
Bellary
BCR 1.517
292.46 &
03.08.13
BCR 1.123
197.51 &
12.09.14
24.10.17
28.10.17
Cost of DWA
413.29
Cost of
Deptly.
Supplied
Materials &
others
36.20
Total Work
Cost
449.49
Cum Exp up to
31/03/19
624.57
Budget
2019-20
15.00
Budget of Rs.41.83 Lakhs has been
proposed for surrender.
Utilisation of Balance Budget for year
2018-19
LD - 67 Lakhs
Retention - 3 Lakhs
PV
- 25 Lakhs.
Total 95 Lakhs
Subject to Approval of LD, PV during this
FY-2018-19
If PV OM for the project is not placed
during 2018-19 budget of Rs32Lkahs is
required for 2019-20 and the same needs
to be retained in List-I.
Subject to Approval of PV bills during FY2018-19
895.90
32.00
927.90
828.28
5.00
6512.25
168.39
6680.64
5724.32
793.00
189.58
146.34
335.92
250.68
Remarks
28.00
10.78
151.98
162.76
162.29
32.00
200.36
298.32
498.68
412.97
60.00
Expenditure for FY-2018-19
Supply - 69.74 Lakhs
Erection -9.42Lakhs
Civil - 47.19 Lakhs.
Dept Supply:a)110kV Breakers: 6.31Lakhs
b) 33kV Breakers:8.65Lakhs(Gescom)
c) Power Trf : 9.5515Lakhs (
Total - 150.86 Lakhs
Proposed Budget Required- 27.60 Lakhs
for FY-2019-20
LD: 18.6Lakhs
Supply & Erection - 4Lakhs
Civil - 5Lakhs
Departmentally supply portion:
for supply of 2 No's of 11KV MCVCB +1AP
PO placed to MEI. Material not yet
received. So for payment of supply bills
and labour bills budget is required
Sl.
No.
1
2
Work
Code
Name of the Work
FB1080
Bellary 400kV pooling station
to Ramapura limits:
Construction of 400kV MC Line
with Quad Moose Conductor from
Proposed Bellary 400kV pooling
station (BPS to Ramapura limits
(Kelagina kanavi) to connect to
400kV Madhurgiri &
Chikkanayakan Halli DC Lines for
a distance of 43.018Kms
Bellary
FA1036
YTPS to 400kV Bellary pooling
station (BPS):
Construction of 400kV DC Line
with Quad Moose Conductor from
YTPS to Proposed 400kV Bellary
pooling station (BPS) for a
distance of 142.49Kms
Raichur
2
Total of Lines
1
Lingapur 220kV switching
station :
R & M Works at 220kV Lingapur
Station
FB1063
District
Bellary
Energy
Savings &
BCR
NA
NA
Cost of
Original /
Date of LOI
Revised
DPR & Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up to
31/03/19
Budget
2019-20
25819.26 &
26.02.15
24.12.14
34190.82
0.00
34190.82
32100.43
4100.00
39439.25 &
26.02.15
19.10.15
51500.42
0.00
51500.42
42995.44
600.00
85691.24
0.00
85691.24
75095.87
4700.00
1488.04 &
16.02.13
04.03.14
1768.92
12.83
1781.75
1439.32
410.00
Remarks
Final 10% retention amount pending for
approval of FQV which is submitted to
CEE/T&P on 05.06.2018.
Rtn.: 3251.86 Lakhs
QV:851.56
Probable Exp for FY-2018-19
Total:4103.42 Lakhs.
Additional Budget Required - 118.58
Lakhs for FY-2018-19 subject to Approval
of FQV pending at Corporate offfice.
Budget for FY-2019-20 is Nil : Subject to
approval of QV by Coprporate office in
2018-19 else same budget shall be
escalated to 2019-20.
Subject to Approval of FQV
Budget of Rs.237.17 Lkahs has been
surrendered for FY 2018-19
Budget requirement fro FY2019-20
For payment of RetentionFinal Bills,QV
Bills and LD bills
Retention-& QV: 237.35 Lakhs
LD : 172.00Lakhs
Total 409.35
Sl.
No.
2
2
11
150
Work
Code
FC1055
Name of the Work
Providing 12.1KV, 2.9MVAR
Capacitor Bank and other allied
equipment’s in KPTCL Substations of Kalaburagi Zone.
Total of TB's & Others
Total of Kalaburagi Zone
Total of List-I for All Zones
District
Energy
Savings &
BCR
Cost of
Original /
Date of LOI
Revised
DPR & Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up to
31/03/19
Budget
2019-20
Remarks
Probable Exp. upto 31.03.2019
Supply: 30
Lakhs
Erection: 6.23
Lakhs
Rtn: 5
Lakhs
Kalaburagi
577.83 &
02.09.14
07.08.15
387.00
232.45
619.45
294.14
20.00
2155.92
245.28
2401.20
1733.46
430.00
94559.77
711.99
95271.76
82966.62
5983.00
307472.91
40148.66
325811.91
304027.01
30475.21
Budget required for the year 19-20
Supply: 0.00
Lakhs
Rtn: 20
Lakhs
Erection: 0.00
Lakhs
Civil:
0.00
Lakhs
List-II Ongoing Works 2019-20
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
BENGALURU TRANSMISSION
ZONE
1
2
3
AA1129
Samanduru :
a)Establishing 2x8MVA, 66/11kV
Sub-Station.b) laying of 3cx300
Sqmm UG Cable from Anekal S/s
to Samanduru s/S for a Route
length of 8.64 Kms.
AA1132
ITI :
Establishing 2x150 MVA,
220/66/11kV GIS substation at ITI
with 220kV DC 1200 sq mm Copper
single core XLPE UG cable from
existing Hoody-Hebbal for a route
length of 2.607Kms along with
associated 66kV line.
AA1154
Brindavan alloys:
Establishing 220/66/11kV GIS
Sub-station along with
construction of 220kV DC line for a
distance of 0.52 kms
FY-18-19
498L - Surrender
Bengaluru Urban
Bengaluru Urban
Bengaluru Urban
ES 0.40
BCR 0.72
764.24 &
24.02.14
ES.32.31 & 14429.10 &
BCR 1.203
15.04.15
ES 21.86
BCR 2.95
7710.86 &
05.09.15
27.08.14
06.05.17
30.12.17
735.60
19711.21
10570.24
0.00
0.00
0.00
735.60
19711.21
10570.24
522.97
14080.58
5250.89
2500.00
3500.00
4500.00
Budget 19-20
Supply -1000L
Erection & civil- 1000L
Total-2000L
Budget 2018-19
BTS-378.0L
RTn bills -1171.00
supply: 416.83L
erection : 300L
Erection and civil -400L
Total -2665.83L
Budget 19-20
Supply - 3000L
erection / civil - 500L
Total -3500L
FY 18-19
Supply: 205.42
Erection : 50L
Civil 365.08L
TR cost: 1900 L
Total: 3450.50 L
FY- 19-20
Supply retention - Rs.2100L
Erection retention - Rs.200L
Civil - Rs. 500L
Total Rs.3400L
Rs.in Lakhs
Sl.
No.
4
5
6
7
Work Code
Name of the Work
AA1156
Kumbalgodu:
Establishing 2x150MVA,
220/66/11 kV sub-satation at
Kumbalagodu with 220kv
1200sqmm UG Cable between
400/220kv Bidadi and
Vrishabhavathi Valley
AA1162
Huskuru : Establishing
2x12.5MVA, 66/11kV Sub-Station
with Cable from existing 66/11 KV
Malgudi(Elecrtronic City sector-II,
Phase-II) Substation for a Route
length of 6.885Kms
AA1163
Kumbaranahalli : Establishing
2X12.5MVA, 66/11kV Power
Transformer at Kumbaranahalli
AA1166
Mylasandra (Near Electronic
City): Establishing 3 X 500 MVA,
400/220kV GIS Sub-Station at
Mylasandra (Near Electronic City) in
Bengaluru South Taluk, Bengaluru
Urban District along with
associated transmission lines and
providing additional terminal bays
(3 Nos) at 220/66/11Kv S/s at
Yerandanahalli (Short closed work
code AA1043)
District
Bengaluru Urban
Bengaluru Urban
Bengaluru Urban
Bengaluru Urban
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 24.33
BCR 0.65
ES 8.11 &
BCR 0.96
ES 0.85 &
BCR 0.4
ES 124.88
BCR 2.58
37339.12 &
24.11.15
5140.00 &
22.12.16
2662.00 &
06.02.17
36730 &
30.02.17
15.03.18
Cost of DWA
48981.49
Stn:05.01.1
Stn759.21
8
cable:4278.9
cable:15.03.
8
18
06.02.17
24.03.18
694.61
44017.63
Cost of
Deptly.
Supplied
Materials &
others
0.00
Total Work
Cost
48981.49
Cum Exp up
to 31/03/19
20363.50
Budget
2019-20
21990.00
Remarks
Budget 18-19
Supply-3000L
Erection and civil-225L
FY 19-20
Supply - 15000L
Erection/civil - 13900L
Budget 18- 19
5L -Surrender
0.00
0.00
0.00
5038.19
694.61
44017.63
0.00
1617.29
10794.71
2500.00
Budget 19-20
Supply - 1500L
Erection / civil -1000L
900.00
Budget 18-19
Station: 1) Supply-367L 3)
Supply rtn=100L 4) CIVIL &
Erection-33.00L Cable:
200L
Total:700L Budget 19-20
Supply - 600L erection/Civil
- 300L Total: 900L
28000.00
FY2018-19
Supply-1000.00L
Total: 1000L
FY 2019-20
SUPPLY=25000.00 L
ERECTION/CIVIL=12016.50
L
Total: 37016.5L
Rs.in Lakhs
Sl.
No.
8
9
10
Work Code
AB1007
Name of the Work
Hoskote:
a) Establishing 2x100MVA,
220/66kV Station with 220/66kV
MC line from BIAL with 220kV TB
at BIAL
b) Hoskote 220KV LILO line from
Hoody-Kolar line
c) 66KV SC line from Hoskote to
Mandur, Pillaguppa-sulibele line to
Nandagudi, 66 kV TB at Nandagudi
& BIAL
d) Hoskote to Tower no5 of existing
Pillagumpa-Sulibele 66kV line and
Tower no5 of existing PillagumpaSulibele 66kV line to Hoskote s/s
1) 21.03 Kms
2) 13.12 Kms
3) 10.25 Kms
4) 10.28 Kms.
AB1018
Mandur:
Establishing 1x12.5MVA, 66/11kV
Sub-Station with 66kV D/C line
from Budigere for a distance of 9.00
Km.
AB1019
Sondekoppa:
Establishing 2x8MVA, 66/11kV
Sub-Station with 66kV tap from
Dobbaspet - Nelamangala SBT line
for a distance of 12.50 Kms.
District
Bengaluru Rural
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 61.72
BCR 4.05
5249.00 &
05.07.06
a) 220kV
S/s & 220kV
MCMV line
23.4.07
b) 23.04.07
c) &d)
08.06.07
Cost of DWA
(a) & (b) :
5057.5
Cost of
Deptly.
Supplied
Materials &
others
(a) & (b):
1525.3
Total Work
Cost
7475.45
Cum Exp up
to 31/03/19
6686.78
Budget
2019-20
900.00
(c) 892.65
Remarks
FY 19-20
1000L for land
comp,erection & civil for
220kV Hoskote - Hoody Kolar line
FY - 18-19
9L- Surrender
Bengaluru Rural
Bengaluru Rural
ES 1.26
BCR 1.10
ES 2.09
BCR 1.49
724.54 &
12.05.08
848.02 &
28.04.08
03.10.07
16.03.07
486.10
647.27
129.00
177.00
615.10
824.27
439.72
598.78
50.00
120.00
FY 19-20
Rs.80L for balance station
portion work.
FY - 18-19
Nil FY- 2019-20:
93L Supply Retention Bills
1L Erection Bills
6L Civil Bills
20L- Treec Cut Bills(Approx)
TOTAL==> 120L
Rs.in Lakhs
Sl.
No.
11
12
Work Code
AB1057
AC1015
Name of the Work
Devanahalli Hardware Park:
Establishing 2 X 500 MVA,
400/220kV Sub-Station (400KV
GIS & 220KV AIS) at KIADB
Hardware Park, Devanahalli,
Bengaluru Rural District and also
for creation of required 220kV
Terminal Bays at the receiving
220/66kV sub-stations for
evacuation of power.
Kothipura (Ramanagara):
Establishing 2x100MVA,
220/66kV Station with 220/66kV
MC lines from Bidadi & SC line
from Tubinakere.
220 KV DC line -68.82 Kms,
MCMV 18.117 Kms
District
Bangalore Rural
Ramanagara
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 98.39 &
BCR 2.60
ES 27.22
BCR 2.02
36815 &
04.02.17
10501.25 &
05.01.09
16.03.18
13.2.07
Cost of DWA
43939.54
7637.98
Cost of
Deptly.
Supplied
Materials &
others
0.00
1323.00
Total Work
Cost
43939.54
8960.98
Cum Exp up
to 31/03/19
4392.60
13480.51
Budget
2019-20
30000.00
1900.00
Remarks
FY2018-19
Bills on hand- 808.79lakhs
supply- 940.01 lakhs
Erection & civil1107.94lakh
Total: 2856.74
FY 2019-20
SUPPLY=20900.00
ERECTION=12034.25
CIVIL=4000.00
Total: 36934.25L
FY 18-19
Land and tree cut
compensation-1423L
Supply Rtn-850L
Erection -50L
Civil-50L
Isolators - 88L
Breaker-75L
CTR-14.5L
Total-2552.33L
FY 19-20
Land compensation-800L
MCMV line portion-1000L
TB portion-100L
Total-1900L
Rs.in Lakhs
Sl.
No.
13
14
15
Work Code
AC1029
AC1055
AC1065
Name of the Work
a) Magadi:
Establishing 2x100MVA,
220/66/11kV Station with
associated line.
b) Evacuation of 66kV lines from
Magadi station:
1. Construction of 66KV MC and
D/C towers to link 66KV Magadi &
T.G.Halli 66KV Gudemaranahalli
sub-station
2. Construction of 66KV S/C line on
D/C towers from Magadi station to
Hulikatte
3. Construction of 66KV Terminal
Bay at the 66KV Hulikatte
Vandaraguppe: Establishing
1x8MVA, 66/11kV Sub-Station
with associated line for a distance
of 0.926Kms
Hegganur: Establishing 1X8 MVA,
66/11 kV s/s with construction of
SC line DC towers from
Doddalahalli S/s for a distance of
12.238 kms.
District
Ramanagara
Ramanagar
Ramanagara
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 40.39
BCR 1.77
ES 1.40
BCR 1.568
ES 1.82
BCR1.011
7659.56 &
02.08.14
531.57 &
29.08.15
991.51 &
21.03.16
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
FY - 18-19
Supply - Rs.50L
Erection - Rs.15.21L
Civil - Rs.50L
Total Rs.115.21 L
24.09.07
8660.00
0.00
8660.00
8773.65
800.00
FY 19-20
Supply - Rs.300L
Erection - Rs.400L
Civil - Rs.300L
Total - Rs.1000L
18.05.16
14.02.17
573.42
1064.61
30.00
35.00
603.42
1099.61
496.72
853.78
190.00
300.00
FY 18-19
Forest payment-20L
FY 19-20:
Rtn: 120L
Tree Cut: 3L
Civil & Erection : 7L
QV& PV-30L
Other bills-30L
Total-190L
FY18-19:
Line supply & erection-85L
Total -85L
FY19-20
Forest-100L ,
Rtn-200L
QV-30L
Line Civil & erecn-50L
Total-380
Rs.in Lakhs
Sl.
No.
16
17
18
Work Code
AC1068
AC1069
AC1070
Name of the Work
Channapatna:
Establishing 1x100 MVA,
220/66/11KV Sub-station (220kVPartial Hybrid/ Partial AIS, 66kV
AIS) in the premises of existing
66/11kV Sub station Channapatna
, Ramanagara District.
Uragahalli:
Establishing 2x8MVA, 66/11kV
Sub-Station with associated line.
Kunur: Establishing 1x12.5MVA,
66/11kV S/s at Kunur
District
Ramanagara
Ramanagara
Ramanagara
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 5.29 &
BCR 1.13
ES 5.87 &
BCR 2.52
ES 1.262 &
BCR 1.06
9342.30 &
10.10.17
1412.15&
01.03.17
822.65 &
11.07.17
16.03.18
20.03.18
21.03.18
Cost of DWA
8910.88
1193.12
703.77
Cost of
Deptly.
Supplied
Materials &
others
0.00
0.00
0.00
Total Work
Cost
8910.88
1193.12
703.77
Cum Exp up
to 31/03/19
2222.42
597.52
315.04
Budget
2019-20
Remarks
3500.00
FY-18-19
Stn supply-808L
Stn Civil-101.55L
stn erection-68L
Line civil-139L
Line erection-101L
Total-1217.55L
FY 19-20
Stn supply- 994L
Stn Civil- 400L
stn erection - 70L
Line supply- 880L
Line civil- 337L
Line erection-666L
Tree cut-153L
Stn supply-700L
Total-4200
450.00
FY 18-19
Line supply-100L
Station civil-60L
Line civil-30L
Total-190L
FY 19-20
Retension-195L
Running bill-45L
Tree cut-100L
Land compensation-92L
QV-33L
Total-465L
500.00
FY 18-19
Erection stn & line -20L
Station civil-60L
Line civil-66L
Total-86L
FY 19-20
Trf-120L
Switch gear-60L
Retention-150L
Running bill-10L
Tree cut-70L
Land compensation-82L
QV-30L
Total-522L
Rs.in Lakhs
Sl.
No.
19
20
Work Code
AD1006
AB1034
Name of the Work
T.Gollahalli (Thimmasandra)
Establishing 2x100MVA,
220/66/11kV and 1x12.5MVA
66/11kV Station with associated
lines for a distance of 220kV 27.269
Kms & 66kV
(5.828+10.93+12.28)Kms
Channarayapattana: Establishing
2x8MVA, 66/11kV Sub-Station
with associated line.
District
Kolar
Bengaluru Rural
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 38.00
BCR 2.243
9106.29 &
19.09.15
992 &
10.05.17
07.09.16
Cost of DWA
9533.08
Cost of
Deptly.
Supplied
Materials &
others
46.16
Total Work
Cost
9579.24
0.00
Cum Exp up
to 31/03/19
6036.14
471.81
Budget
2019-20
5000.00
400.00
Remarks
FY- 18-19:
Suppply:150L
Erection:100L
Civil:41L
Total: 291L
FY-19-20:
Suppply:2000
Erection:400
Civil: 600
Retention bills(20%) Supply,
Civil, Erection:2200L
Land / tree cut comp to be
approved for :1300L
Total:6500L
Work slip was submiited to
appoval for 1700L,
considering WS amount the
budget is requested
FY 18-19
Bills under process Rs.170L
Land compensation Rs.100L
S/E/C/Rtn -130L
FY 19-20
Compensation - 200L
S/E/C/Rtn - 300L
21
AA1179
Bagganadoddi:
a)Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
b)Running of 3Cx300 sqmm , 66kV
(E) grade Copper conductor UG
cable
from proposed 66/11kV
Kumbaranahalli S/s to proposed
66/11kV Bagganadoddi S/S for
9.052Kms
Bengaluru Urban
2913.00 &
21.11.17
0.00
0.00
1500.00
FY 19-20
station & UG cable Supply 800L
Erection & Civil - 1200L
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
22
AC1073
Sathanur(Achalu):
Establishing 2x8MVA, 66/11kV
Sub-Station with associated line
Ramanagara
780.02 &
21.12.17
0.00
138.17
550.00
FY 18-19
Bills in hand
earthmat & Civil bills-75L
Station supply-75L
Total-150L
FY 19-20
Supply-450L
erection -15L
Civil-130L
Switch gear-55L
Total-650L
23
AE1049
Bommepalli cross:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
C.B.Pura
661.64 &
05.02.18
0.00
0.00
520.00
FY 18-19
Supply+Civil: 55 L
FY 19-20
S+E+C=600 L
24
AB1058
Sasalu(Sriramanahalli:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
Bengalulru Rural
1118 &
10.05.17
0.00
0.00
400.00
FY 19-20
500L - 50% of the DPR cost
25
AD1021
Tadigol Cross :
Establishing 2x8MVA, 66/11kV
Sub-Station with associated line.
C. B. PURA
0.00
0.00
500.00
FY 19-20
S+E+C=600 L
26
26
AA1042
Yelahanka (DG Plant):
a) Establishing 2x150MVA,
220/66kV Station b) 220-220 kV
MC line from NelamangalaD.B.Pura to Singanayakanahalli
10.33Kms c) Running of DC 220KV,
2000 Sq mm UG cable for a route
length of 5.875 Kms from
400/220kV Singanayakanahalli
station to 220/66/11kV DG Plant
Yelahanka station & Construction
of two numbers of 220 kV Terminal
Bay at 220/66KV/11kV DG Plant
sub-station. d) 220-66 kV MC line
from yelahanka to 8 pole structure
Chikkabettahalli 5.84k Kms e) 66
kV DC line from DG Plant to DG
Plant-Peenya 1 & 2.
1.07 Kms.
Total of Sub-stations
Bengaluru Urban
ES 30.68
BCR 4.05
9902.75 &
25.06.10
(a)28.04.10
a) 3346.95
(d) & (e)
2330.93
0.00
5677.88
31774.22
105.00
FY 18-19
Bills on hand RS 30.24L
Retention Rs.150L
LD Rs. 34L
FQV Rs.200L
Total: 414.24 L
FY 19-20
5 lacs nominal budget, the
work is to be shifted to list-1 &
to be deleted
224726.77
1740.16
227992.23
129907.80
111575.00
Rs.in Lakhs
Sl.
No.
Work Code
1
AA1168
2
AA1176
3
4
5
6
Name of the Work
Augmentation of 1x12.5 MVA,
66/11kV Power Transformer 1 by
1x20MVA at 220/66/11kV R/s
Somanahalli, Bengaluru.
66/11kV S/S Kodigehalli:
Replacing 2x8MVA, 66/11kV Power
Transformer by 2x20MVA,
District
Bengaluru Urban
BCR 1.00
340.27 &
17.05.17
27.03.17
3.08
0.00
3.08
0.00
150.00
FY-19-20
SWG cost: 150 L (If MEI
delays the supply of
Switchgear, the budget has
been provisioned)
Bengaluru Urban
BCR 1.72
397.72&
28.03.17
28.09.17
2.16
163.00
165.16
2.16
2.00
FY-19-20
Nominal Budget: 2 L
AB1028
Nelamangala 400kV:
Providing additional 3rd 500MVA,
400/220kV three phase Power ICT
with associated equipments for a
distance of 3.06 kms
Bengaluru Rural
AA1170
Somanahalli: Replacing
2x100MVA, 220/66/11kV Power
Transformer by 2x150MVA at
220/66/11kV R/s Somanahalli,
Bengaluru.
Bengalulru urban
1635.73 &
17.05.17
AA1164
Naganathapura:
Augumentation of 2x100 MVA,
220/66/11kV Power Transformer
by 2x150MVA, 220/66/11kV Power
Transformers at 220/66/11kV
Naganathapura Receiving Station,
Bangalore South Taluk, Bangalore
Urban District.
Bengaluru Urban
1616.20 &
28.01.17
AA1177
Army Welfare Housing
Organisation:
Providing Additional 1X31.5MVA,
66/11kV Power Transformer
Cost of
Deptly.
Supplied
Materials &
others
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Bengaluru Urban
BCR 3.06
4489.57 &
20.03.10
400.00 &
21.10.17
Cost of DWA
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
FY 2018-19:
83L for Handing Over of
220KV Bays.
04.02.11
4177.12
0.00
4177.12
4060.98
190.00
0.00
0.00
900.00
FY 2019-20
100L for Handing Over of
220KV Bays.
90L for 400KV Panel Works
FY 19-20:
Supply - 1000L
FY 18-19:
Supply TF -42L
0.00
0.00
0.00
900.00
FY 19-20:
Supply - 1000L
0.00
49.82
200.00
FY 18-19
Supply/Erection/Civil 30.41L
FY19-20
Transformer Cost - 220L
retention - 20L
Erection & Civil -10L
Rs.in Lakhs
Sl.
No.
Work Code
7
AB1061
8
9
AC1075
AC1076
Name of the Work
Providing additional 20 MVA TR at
220 kV KIADB Doddaballapura
Bidadi:
Providing additional 1x20 MVA
Power Transformer at 220/66/11
kV Bidadi Sub-station
Hukunda:
Providing additional 1x8MVA,
66/11kV Power Transformer at
66/11kV Hukunda Sub-station.
District
Bengaluru Rural
V.G.Doddi:
Providing additional 1x8MVA,
66/11kV Power Transformer at
66/11kV V.G.Doddi Sub-station.
Ramanagara
11
AC1087
Kanakapura : Providing 1X20MVA,
66/11kV Power transformer as a
SPARE at Kanakapura 66/11kV
S/s with associated bay equipments
Ramanagara
387.00&
12.02.18
Hebbal-ITI:
Replacing Coyote ACSR by HTLS
Conductor from the existing 66kV
line for a distance of 14.334 Kms.
0.00
225.17 &
25.05.17
0.00
225.30 &
10.05.17
0.00
307.00&
11.10.18
4182.36
Bengaluru Urban
Total Work
Cost
0.00
Total of Augmentation
AA1046
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
359 &
17.06.17
Ramanagara
AC1077
1
BCR 1.46
Ramanagara
10
11
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
NA
1780.46 &
21.06.11
07.02.12
1679.14
163
0.00
4345.36
1679.14
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
150.00
FY 19-20
50% of the DPR cost
including Tr. Su - 200L
200.00
FY 18-19
Supply-50L
Total-50L
FY -19-20
erection -6L
civil-19L
swith gear-45L
Transformer-160L
QV-5L
Rtn-15L
Total-250L
50.00
FY 18-19
DWA cost-70L
swith gear-30L
Total-100L
additional budget of Rs.95L
requested
FY -19-20
QV-5L
0.00
50.00
FY 18-19
DWA cost-70L
swith gear-30L
Total-100L
additional budget of Rs.95L
requested
FY -19-20
QV-5L
0.00
1.00
shifted as per approved dpr
0.00
0.00
21.43
4134.39
934.50
2793.00
100.00
FY 19-20
Rtn /erection/civil - 100L
Rs.in Lakhs
Sl.
No.
2
3
4
5
6
Work Code
AA1134
Name of the Work
BIAL toVidyanagar: Running 66kV
SC 1000Sq mm XPLE copper UG
Cable for a route length 9.5 Kms
from 220/66/11kV Sub-station to
66/11kV Vidyanagar S/s
AA1146
EPIP & Yerandanahalli:
Strenghtening of existing 66 kV line
between EPIP & Yerandanahalli
sub-station by replacing Coyote by
Drake ACSR
AB1017
Somanahally to Kolar via Malur:
Construction of 220kV DC line
(balance works).
AC1063
T.K Halli to Iggalur: Construction
of 66kV DC line for a distance of
9.924Kms from 220/66/11kV
T.K.Halli Station to 66kV Iggalur
Tap point in the existing corridor of
66kV T.K Halli-Akkurmole SC line
and Providing 66kV TB's at T.K
Halli
AD1042
Malur to Lakkur:
Construction of 66kV SC line on DC
towers and partly on DC towers
from 220/66kV Malur Sub-station
to 66/11kV Lakkur Sub-station
District
Bengaluru Urban
Bengaluru Urban
Bengaluru Rural
Ramanagara
Kolar
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
NA
NA
NA
NA
NA
5082.46 &
25.02.15
2202.46 &
13.08.15
3085.00 &
19.12.06
304.32 &
16.04.15
297.43 &
20.02.13
15.12.15
30.07.16
28.08.06
05.06.17
13.03.17
Cost of DWA
5947.00
2177.30
2739.09
326.26
410.00
Cost of
Deptly.
Supplied
Materials &
others
0.00
0.00
0.00
0.00
0.00
Total Work
Cost
5947.00
2177.30
2739.09
326.26
410.00
Cum Exp up
to 31/03/19
4364.20
1287.26
3381.37
143.88
233.33
Budget
2019-20
1250.00
800.00
800.00
100.00
285.00
Remarks
FY 19-20
Supply retention - 1000L
Erection - 30L
Civil - 220L
Final retention & FQV 700L
FY 18-19:
Probable : 170L
a) supply - 100L
2) Erection & civil - 70L
FY-19-20
Erection-400L
Civil-100L
Supply/Erection and Rnt
bills: 300L
Total:800L
Budget 18-19
Supply-100L
Budget 19-20
Supply -400L
erection/ civil -400L
Total: 800L
FY 18-19
Line supply - 27.63L
Total -27.63L
FY 19-20
Line erection-26L
Line supply-50L
Rtn-20L
Total-96L
FY- 18-19:
Suppply:50L
Erection:45L
Civil: 15L
Total:110L
FY- 19-20:
Suppply:80L
Erection:10L
Civil: 35L
tree/crop cut comp:10L
Additional Rs 80L required if
re-check survey gets
approval
Rs.in Lakhs
Sl.
No.
7
8
9
10
Work Code
District
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
AA1190
Kanteerava GIS Station:
Establishing link line between
220/66/11kV Sir.M.V.GIS
station(East Division Compound)
and 66kV Kanteerava GIS station
by laying kV SC 1000Sqmm UG
cable for a route length of
2.488Kms
AC1080
66kV Mattikere- Jalamangala
Line: Construction of 66kV Line
from 66/11kV Mattikere to
Jalamangala for a distance of
10.78Kms
AA1171
Somanahalli :
Replacing 66 kV North and South
Strung bus by rigid bus at
220/66/11 kV Somanahalli substation
Bengalulru urban
657 &
26.09.17
0.00
0.00
500.00
AC1036
Ramnagara Sub-Stn. :
Constructing additional 66kV
circuit from Bidadi - Bevoor line to
provide LILO arrangements for a
distance of 0.65 kms.
Ramanagara
34.13 &
11.01.13
0.00
0.00
55.00
13278.79
10344.54
4990.00
10
1
Name of the Work
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
FY 18-19:
10L - Surrender
Bengaluru Urban
Ramanagara
NA
1782.00 &
24.01.18
0.00
0.00
1000.00
564.07&
05.05.18
0.00
0.00
100.00
Peenya :
R & M works at Peenya 220/66kV
Station.
FY 19-20
Supply/Erection/Civil 100L
FY 19-20
Supply/Erection - 100L
FY 18-19
Supply: 300 L
Total of Lines
AA1050
Remarks
13278.79
Bengaluru Urban
NA
3539.98 &
17.02.11
12.11.13
4093.35
0.00
0.00
4093.35
3306.63
800.00
FY 19-20
Supply+Erection+Civil: 500
L
FY-19-20
supply, erection and civil
bills-55L
FY2018-19
SUPPLY=50 L
ERECTION=100.00
CIVIL=100.00
Total : 250 L
FY 2019-20
SUPPLY=100.00
ERECTION=200.00
CIVIL=200.00
Total: 500 L
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
2
AA1054
SRS Hoody :
R & M Works at SRS Hoody
220/66kV Station
Bengaluru Urban
NA
3
AA1150
Providing Capacitor Bank and
allied equipment’s in KPTCL Substations of Bengaluru Zone.
Bengaluru Urban
NA
2779.67 &
13.01.15
AA1153
Renovation and upgradation of
protection systems of 220 kV
substations (26 Nos.) & 400 kV (2
Nos) in Bengaluru Transmission
Zone
NA
1353.30 &
20.06.14
4
5
6
AA1073
Somanahalli:
R&M works at Somanahalli
220/66kV Station
AB1030
Nelamangala:
Providing 63MVAR Bus Reactor at
400/220kV Station.
Bengaluru Urban
Bengaluru Urban
Bengaluru Rural
1807.71 &
27.08.11
NA
2286.04 &
04.09.10
NA
859.04 &
20.07.09
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
07.11.13
2452.88
0.00
2452.88
1599.78
500.00
12.12.16
2308.36
0.00
2308.36
2170.07
800.00
Remarks
Probable expenditure for
remaining FY2018-19
Bill on hand -158.00L
Supply: 150.00 L
FY 2019-20
SUPPLY & RETN=250.00
ERECTION=100.00
CIVIL=50.00
FY 18-19:
Supply+Erection: 2375 L
FY 19-20
Supply+Erection: 560
FY 18-19:
Supply+Erection: 835 L
26.12.15
1573.21
0.00
1573.21
1031.14
2000.00
FY 19-20
Supply+Erection: 240 L
08.03.12
06.01.11
2016.71
641.73
0.00
0.00
2016.71
641.73
1617.38
232.94
355.00
170.00
FY-19-20
a) supply-65L & Erection 50L
FY-19-20
rtn -308L
Erection -100L
FY 19-20
149L Balance Supply &
Retention Bills
7L Balance Erection Bills
14L Balance Civil Bills
TOTAL==> 170Lakhs
FY 18-19
Bills on hand -35.00L
7
7
AB1048
KIADB DB Pura:
R & M works at 220/66kV KIADB
DB Pura Station for a distance of
0.56
Total of TB's & Others
Bengaluru Rural
BCR 1.67
2488.00 &
08.11.12
04.03.14
3072.66
0.00
3072.66
2738.98
500.00
16158.90
0.00
16158.90
12696.92
5125.00
FY 19-20
supply retention( 10 %) : 250
L
Erection & civil : 50 L,
work slip: 200 L
Rs.in Lakhs
Sl.
No.
Work Code
54
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Total for Bengaluru Zone
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
258346.82
1903.16
261775.28
Cum Exp up
to 31/03/19
157083.65
Budget
2019-20
Remarks
124483.00
Tumakuru transmission zone
1
2
3
BB1042
BB1049
BC1053
Benkikere (Channagiri):
Establishing 2x100MVA, 220/66kV
Station with associated 220kV line
for a distance of 47.43Kms
Jagalur (Hiremallanahole):
a) Establishing 2x500MVA,400/220
KV partly GIS S/S i.e., 400kV GIS
and 220kV AIS with associated
400kV lines.
b) 220kV DC Line to Thallak,
Chitradurga & Kudligi along with
220kv TB's
Malladihalli : Establishing
2x8MVA, 66/11kV Sub-Station
with associated line for a distance
of 11.467 Kms.
Davanagere
Davanagere
Chitradurga
ES.1.39
BCR 0.518
ES.13.68
BCR 2.83
ES 4.3
BCR 2.56
8341.82 &
20.11.14
31.05.17
a) 14186.67
& 19.11.15 29.07.16&6.
b) 8142.88
5.17
& 28.04.16
622.98 &
19.10.12
06.02.13
9763.96
18597.43&
9434.43
670.64
0.00
408.63
32.11
9763.96
18597.43
702.75
7652.82
20402.31
666.03
3000.00
FY 2018-19 Split up
Supply Rentation, Erection
and Civil : 400.00 lakhs
Total- 400.00 Lakhs
FY 2019-20 Split up
Supply Retension-1975.93
Lakhs
Civil: 823.30 Lakhs
erection: 493.98 lakhs
Total- 3293.22 Lakhs
10000.00
Surrender of Rs. 1800.00 lakhs for
FY-2018-19 Split up for FY-2018-19
Supply and rentation :1500 Lakhs
Civil: 400.00 lakhs Erection: 153.34
lakhs FY 19-20: Supply & etension1800 Lakhs PV : 530.00 Work Slip:
124.00 Lakhs Total - 1800.00
Already surrender of Rs. 151.72
Lakhs Surreder of Rs. 1560.00 due
to Forest clearnace FY 2018-19
Split up Supply and Rentation:
1195.00 lakhs erection: 200.00
Lakhs Civil: 255.00 Lakhs
Crop: 50.00 Lakhs
Total-2200.00 Lakhs
FY 2019-20 Split up
Supply Retension- 2106.04 Lakhs
Erection : 412.68 Lakhs Civil:
753.77 Laksh Crop-400Lakhs
Total-3672.49 Lakhs
150.00
Additional Rs.50.00 lakhs
required
FY-2018-19
Crop: 175.00 lakhs
Retantion: 25.00 lakhs
FY-2019-20
Retantion: 75.00 Lakhs
Civil: 25.00 Laksh
QV: 40.00 lakhs
LD: 10.00 lakhs
Rs.in Lakhs
Sl.
No.
4
Work Code
BC1055
Name of the Work
Visveswarapura: Establishing
1x8MVA, 66/11kV Sub-Station
with associated line
District
Chitradurga
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 3.377 &
BCR 3.87
528.33 &
26.04.17
20.03.18
Cost of DWA
517.10
Cost of
Deptly.
Supplied
Materials &
others
32.00
Total Work
Cost
549.10
Cum Exp up
to 31/03/19
236.38
Budget
2019-20
275.00
Remarks
Splitup for 2018-19 Rs. In
Lakhs
Supply:-130.00
Erection:-30.00
Civil:- 32.70
Total - 192.70 Lakhs
Splitup for 2019-20
Supply:-130.00
Erection:-20.00
Civil:- 09.24
QV :-10.00
Total - 169.24
5
BC1068
Hosadurga:
Establishing 2x100MVA, 220/66
KV S/s with associated 220kV &
66kV lines
Chitradurga
Surrender 2000.00 Lakhs
Splitup for 2018-19
Supply - 3200
Erection - 200.5
Civil - 496 Lakhs
Total - 3896.5 Lakhs
ES 18.225
& BCR
1.22
7468.00
15.03.18
10034.77
652.28
10687.05
439.47
5000.00
Splitup for 2019-20
Supply& Rtn-:5000.00
Civil:600.00
Erection: 150.00
Crop comp:250.00
Total: 6000.00 Lakhs
6
BA1131
Karadi:
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line
Tumakuru
BCR 1.05
590.73 &
23.01.18
7
BC1073
Godabanalu :
Establishing 2x12.5MVA, 66/11kV
Sub-Station with associated line in
Chitradurga Taluk & Dist.
Chitradurga
ES 5.032
BCR 3.18
8
BC1074
Neralagunte:
Establishing 1x12.5MVA, 66/11KV
substation with associated line in
Challakere Taluk ,Chitradurga dist
Chitradurga
9
BC1072
Mallapanahalli:
Establishing 2x8MVA, 66/11kV
Sub-Station with associated line
Chitradurga
0.00
0.00
0.00
600.00
Rs.1053.64
&
21.04.18
0.00
500.00
ES 2.067
BCR 1.89
Rs.745.54&
21.04.18
0.00
400.00
ES 4.499
BCR 3.16
Rs.900.93&
05.05.18
0.00
400.00
Rs.in Lakhs
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Sl.
No.
Work Code
10
BA1134
Changawara:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line
Tumakuru
ES 1.3484
BCR 1.48
612.50 &
28.03.18
11
BA1048
Sira(Kallukote) :
Establishing 2x100MVA,
220/66/11kV Sub-station with
associated line
Tumakuru
BCR 2.78
6800.90
&16.03.18
11
Name of the Work
District
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
0.00
Total of Sub-stations
49018.33
1125.02
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
0.00
0.00
400.00
0.00
0.00
500.00
40300.29
29397.01
21225.00
Remarks
Transformer Cost - 604
Lalhs
Other works - 112 Lakhs
Total - 716 Lakhs
1
BB1031
Davanagere:
Replacing 2x60MVA, 220/66kV by
2x100MVA, 220/66kV transformers
Davanagere
NA
2
BA1130
Heggere:
Providing additional 1x8MVA Power
Transformer at 66/11kV Substation
Tumakuru
BCR 0.65
273.12 &
21.11.17
3
BB1051
Kattige:
Providing additional 1x8MVA,
66/11kV Transformer
Davanagere
ES NA
BCR 0.90
173.45 &
12.10.11
4
BB1052
Kundur:
Providing additional 1x8MVA,
66/11kV Transformer
Davanagere
ES NA
BCR 0.90
174.69 &
24.09.11
5
BB1082
Bennihalli:
Replacing 1x6.3 MVA, 66/11kV by
1x 12.5 MVA, 66/11kV Tranformer.
Davangere
BCR 0.75
140.08 &
11.05.17
1203.66 &
27.10.10
248.41
1050.00
1298.41
65.50
680.00
Power Transformer allotted.
Hence, to book the
expenditure towards
transformer cost 500 Lakhs
addl budget required
during18-19
109.94
32.05
141.99
29.33
100.00
Retention-63 & surrendor
70Lakhs
31.12.18
103.40
148.50
251.90
22.86
100.00
Additional Rs. 45.00 Lakhs
28.12.18
102.21
148.50
250.71
22.86
100.00
Additional Rs. 45.00 Lakhs
0.00
0.00
100.00
Rs. 100 Lakhs to be
surrendered
Rs.in Lakhs
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
274.74 &
25.05.17
8.51
226.14
234.65
0.00
100.00
BCR 0.78
272.75 &
12.06.17
6.40
226.14
232.54
0.00
5.00
Davanagere
BCR 0.66
273.90&
29.05.17
6.50
126.00
132.50
0.00
1.00
Davangere
BCR 0.59
223.52 &
20.05.17
82.22
148.50
230.72
0.00
150.00
Surrender of Rs. 50.00
lakhs
0.00
100.00
Additional 80.00 required
for FY-2018-19
Supply: 74.00 lakhs
Erection: 1.00 lakhs
Civil: 10.00 lakhs
Total : 85.00 lakhs
FY-2019-2020
Supply: 46.00 lakhs
Erection: 1.00 lakhs
Civil: 10.00 lakhs
Total: 57.00 lakhs
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 0.77
Davangere
Sl.
No.
Work Code
Name of the Work
District
6
BB1083
Halavagalu:
Replacing 2x6.3MVA, 66/11kV by
2x 12.5MVA, 66/11kV Transformer.
Davangere
7
BB1084
Telagi:
Replacing 2x6.3 MVA, 66/11kV by
2x12.5MVA, 66/11kV Transformer.
8
BB1085
Sasuvehalli :
Replacing of 1x6.3 MVA 1x8MVA
by 2x12.5MVA 66/11kv Power
Transformer
9
BB1087
Savalanga:
Providing additional
1x8MVA,power Transformer at
66/11kV Savalanga S/S.
10
BC1071
Kanchipura:
Providing Additional 1x8 MVA,
66/11kV Power Transformer.
11
BA1149
BC1081
12
27.12.18
Cum Exp up
to 31/03/19
Budget
2019-20
Chitradurga
ES 112.36
BCR 1.87
183.72 &
21.07.15
Gubbi:
Replacing 2x10 MVA, 110/11kV by
2x 20 MVA, 110/11kV Transformer
Tumakuru
BCR 1.13
411.61 &
22.05.18
206.19
70.00
JG Halli:
Replacing 2x6.3MVA, 66/11kV
power transformer by 2x 12.5 MVA,
66/11kV power at 66/11kV J.G
Halli S/s.
Chitradurga
BCR 1.00
285.90 &
19.09.18
0.00
150.00
31.12.18
82.22
1485.00
1567.22
Remarks
Rs. 100 Lakhs to be
surrendered
Augmentation of one
transformer completed and
another transformer to be
allotted.
Rs.in Lakhs
Sl.
No.
Work Code
12
1
2
3
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Total of Augmentation
BA1024
Kibbanhalli - CN Hally - Huliyar :
Construction of 110kV DC line in
the new corridor from 220kV
K.B.Cross to Thimmanahally
tapping point for a distance of
26.00 Kms.
Tumakuru
BA1096
Vasanthanarasapura to
Madhugiri:
Construction of 220kV DC line with
Moose ACSR from PGCIL Station at
Vasanthanarasapura to existing
220kV station at Madhugiri along
with terminal bays for a distance of
44.481KMS.
Tumakuru
BA1112
400 KV BTPS from Rampura
Limts to Chikkanayakanahalli:
a) Construction of 400 KV Quad
Moose DC Line from 400 KV
Rampura Limits to Jagaluru Limits
for 65Kms
b) Construction of 400 KV Quad
Moose DC Line from 400 KV
Jagaluru Limits to
Chikkanakanahalli for 123.69Kms
Tumakuru
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
749.81
3,590.83
Total Work
Cost
4,340.64
Cum Exp up
to 31/03/19
346.74
Budget
2019-20
Remarks
1,656.00
NA
966.15 &
01.12.09
15.09.10
733.50
242.00
975.50
681.97
300.00
Rs -100.00 Lakhs proposed
to be Surrender to (TL&SS
Division, Tumakuru)
Compensation Rs-86.39
Lakhs
NA
5678.46 &
15.09.14
07.07.15
6056.94
1889.00
7945.94
6694.52
500.00
Compensation Rs-510.00
Lakhs, Retention Rs-251.82
Lakhs,
NA
a) 49189.74
& 21.11.15
Splitup for 2018-19 Supply 2428.72 lakhs
Work slip: 600.00 lakhs
Erection - 200.00 lakhs
Civil - 200.00 lakhs
Crop - 130.53 lakhs
Total - 3559.25 Lakhs
29.07.16
17820.75
1264.57
19085.32
14733.69
4000.00
Splitup for 2019-20 Supply110.00
Erection-150.00
Civil- 150.00
Crop - 250.00
PV- 560.00
LD - 50.00
Total- 1270.00 lakhs
Rs.in Lakhs
Sl.
No.
4
Work Code
BB1018
Name of the Work
Davanagere - Chitradurga No. 1 :
Re-construction of 66kV S/C line
on D/C towers in the existing
corridor for a distance of 55.70
Kms.
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
Surrender of Rs. 41.33
Lakhs
Split up for 2018-19
Errection-10.88 Lakhs
Civil-4.00Lakhs
Crop - 15.00.
Total - 19.88 Lakhs
Davanagere
NA
771.90 &
27.07.09
28.04.10
570.24
75.00
645.24
501.35
100.00
Split up for 2019-20
Supply & Retension-128.00
Lakhs
Errection-10 Lakhs
Civil-7 Lakhs
Crop - 15
Total - 160 Lakhs
Excess due to Work slip, PV
and Crop compensation
Split up for 2018-19 Supply
& Retension-6.44 Lakhs
Errection-5 Lakhs
Civil-5 Lakhs
Total - 16.44 Lakhs
5
BB1019
Davanagere - Chitradurga No. 2:
Re-construction of 66kV S/C line
on D/C towers in the existing
corridor for a distance of 53.84
Kms.
Davanagere
NA
649.58 &
14.07.09
28.04.10
453.79
86.00
539.79
447.47
70.00
Split up for 2019-20
Supply & Retension-73
Errection-22 Lakhs
Civil-10 Lakhs
Crop - 15
Total - 120 Lakhs
Excess due to Work slip, PV
and Crop compensation
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
Split up for 2018-19
Supply & Retension-48.66
lakha
Total - 48.66 Lakhs
6
BB1039
Davanagere to Harapanahalli:
Construction of new 66kV SC line
on DC towers for a distance of
45.40 kms.
Davanagere
NA
737.11 &
28.03.11
14.07.14
955.31
0.00
955.31
794.86
100.00
Supply & Retension-175.81
lakha
Split up for 2019-20
Total - 175.81 Lakhs
Excess due to Work slip
69.59 Lakhs and crop31.37 lakhs
7
8
BC1017
Tallak:
Construction of Balance 220kV DC
line from LILO Point of 220kV
Hiriyur-Chitradurga to 400/220kV
PGCIL Hiriyur station for a distance
of 20.90 kms
Chitradurga
NA
7359.37 &
21.04.08
22.09.09
5082.28
1312.24
6394.52
5718.56
25.00
Rs.19.00 lakhs Surrender
for FY-2018-19
Fy-2019-2020
Short close proposal of
Rs.50.00 lakhs
Work stoped by agency.
BC1025
Pandarahalli - Holalkere:
Construction of 66kV DC line in the
existing corridor of 66kV S/C line
with TBs for a distance of 25.34
Kms.
Chitradurga
NA
512.08 &
10.08.06
22.05.07
646.00
0.00
646.00
444.91
25.00
Fy-2019-2020
Short close proposal of
Rs.50.00 lakhs
Work stoped by agency.
Rs.in Lakhs
Sl.
No.
9
10
Work Code
BC1069
Construction of 220KV link lines:
1. Hiriyur PGCIL to Hiriyur:
Construction of 220kV SC line on
DC towers for a length of 15.168
Kms from existing 400/220KV
PGCIL station at Beerenahalli(
Hiriyur) to existing 220/66/11KV
Hiriyur S/s in existing Corridor of
220KV S/C line from Hoysala Katte
to 220/66/11 KV Station
Hiriyur(Partly in new Corridor
i.e.from PGCIL point to link 220KV
S/C line from Hoysala Katte to
220/66/11 KV SRS at Hiriyur)
including re-arrangement of
existing 220KV lines near
Beernahalli 400KV Station &
dismantling of existing 220KV line
Tower.
BB1090
Honnalli -Lingadahalli: Stringing of
66 2nd circuit from loc 98 on
Honnalli -Lingadahalli line to 66kv
Lingadahalli S/s for a distance of
2.215 in the existing corridor along
with formation of 4 Nos of terminal
bays at 66 kV Lingadahalli S/s in
Channagiri taluk,Davangere district
10
1
2
2
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
For the FY-2018-19
Supply:-200.00 lakhs
Erection:-100.00 lakhs
civil:-100.52 lakhs
Crop comp:-77.00 lakhs
Total: 477.52 lakhs.(274.55
budget booked)
4944.26 &
24.11.16
Chitradurga
26.01.18
5548.55
534.00
6082.55
3736.76
2500.00
For the FY-2019-20.
Supply:-1301.55 lakhs
Erection:-200.00 lakhs
civil:-350.00 lakhs
Crop comp:-442.00 lakhs
Total: 2293.55 lakhs.
surrendered Rs.600.00
Lakhs
PC Approved. Work to be
taken up.
240.46 &
30.08.18
Davangere
Total of Lines
BA1109
Providing 12.1kV 2.9MVAR
Capacitor Banks and Other allied
equipments to 57 Nos of existing
KPTCL Sub-station in the
jurisdiction of Tumakuru
Transmission Zone
Tumakuru
BA1115
Renovation and Up gradation of
Protection systems of 220kV
substations(11 Nos) & 400kV Substations(1 No) in Tumakuru
Transmission Zone
Tumakuru
Total of TB's & Others
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
NA
0.00
250.00
37867.36
5402.81
43270.17
33754.09
7870.00
Rs. 290.00 lakhs required
for the work of Stringing of
2nd circuit using coyote
ACSR conductor on existing
DC towers of 66kv line from
loc 98 of Honnalli Lingadahalli proposal
submitted
1430.00 &
23.09.14
07.08.15
1000.00
600.00
1600.00
754.84
500.00
Rs 200L required for
payment of Rtn amount and
Civil * erection.
1283.10 &
20.06.14
26.12.15
1505.46
0.00
1505.46
883.63
500.00
WS-2 submitted for
approval.
2505.46
600.00
3105.46
1638.47
1000.00
Rs.in Lakhs
Sl.
No.
35
Work Code
Name of the Work
Total of Tumakuru Zone
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
90140.96
10718.66
91016.56
Cum Exp up
to 31/03/19
65136.31
Budget
2019-20
31751.00
Remarks
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
HASSANA TRANSMISSION ZONE
1
2
3
CA1027
Kadavina Kote:
Establishing 2x100MVA, 220/66kV
Station at 220/66kV Kadavinakote
sub-station in Hassan Taluk &
District along with associated
220kV & 66kV lines.
220kV 16.355 Kms
66kV 36.39 Kms.
Hassana
CA1036
Shettihalli:
Establishing 1x8MVA, 66/11kV
Sub-Station at Shettihalli in
Bantwal Taluk, D.K. District along
with associated line for a distance
of 2.34 Kms.
CB1012
Jeppu:
Establishing 1x20MVA, 110/33kV
& 2x10MVA, 110/11kV Sub-Station
Dakshina Kannada
at Jeppu in Mangaluru Taluk, D.K.
District along with associated line
for a distance of 10.00 Kms.
Hassana
ES 35.66
BCR 3.91
ES 3.59
BCR 2.55
ES 2.95
BCR 1.06
Stn 5026.21
& 23.9.08
220kV Line
796.98
66kV Line
1428.32
465.60 &
17.12.09
1518.53 &
20.12.06
220kV
15.06.06
66kV
14.06.07
30.04.10
6137.07
280.72
168.76
135.79
6305.83
416.51
6201.81
278.60
300.00
LOI Supply:265.36
LOI Erection:29.46
LOI Civil:20.07
Total
DWA cost:316.89
170.00
For 2019-20
Rtn: S:42.82
E:0.26
C:7.35
Subtotal:50.43
LD: S:14.71
E:5.05
C:11.30
Subtotal:31.06
Balance Work:
S:20.56
E:1.35
C:27.85
Subtotal:49.76
Compensation as per DC
order:37.9
Final :169.15
Shortclosed on 07.05.2016.
To be tendered for balance
works
29.01.08
901.68
436.15
1337.83
1007.15
450.00
Balance works estimate
amount Rs. 1094.05L (60%
Budget asked for next year)
Rs.in Lakhs
Sl.
No.
4
5
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
CB1013
Karaya:
Establishing 2x10MVA, 110/11kV
Sub-Station at Karaya in
Belthangadi Taluk, D.K. District
along with associated line for a
distance of 15.00 Kms.
Dakshina Kannada
ES 2.367
BCR 0.60
1761.26 &
20.12.06
CB1015
Mulky:
Up-grading 2x5MVA, 33/11kV substation to 1x10MVA, 110/11kV SubDakshina Kannada
Station at Mulky in Mangaluru
Taluk, along with associated line
for a distance of 11.00 Kms.
ES 13.326
BCR 4.20
937.43 &
11.12.06
07.02.08
29.01.08
Cost of DWA
1097.16
598.00
Cost of
Deptly.
Supplied
Materials &
others
476.89
143.76
Total Work
Cost
1574.05
741.76
Cum Exp up
to 31/03/19
1401.82
408.14
Budget
2019-20
50.00
500.00
Remarks
Probable expenditure for
2018-19: Tree cut
compensation - 7 L
Balance works Supply - 6 L,
Errection -1.5 L, Civil works
Road & TB - 35 L; Total 42.5 L. Additional budget
will be sought after
awarding the work.
Savings due to agency has
not taken up TB work at
Puttur and balance
revetment work.
Probable expenditure for
2018-19: Station civil - 10 L,
Line Erection - 20L,
Compensation - 20L.
Probable expenditure from
18-19: Supply & Civil - 250
L
6
CB1017
Madavu:
Establishing 2x20MVA, 110/3311kV & 1x10MVA, 110/11kV SubDakshina Kannada
Station at Madavu in Puttur Taluk,
along with associated line for a
distance of 27.00 Kms.
ES 9.273
BCR 1.2
2414.24 &
23.09.09
Stn:07.07.1
8
Stn:1438.13
Line:18.01.1 Line:778.91
0
219.52
333.72
1863.72
1500.00
Station(DWA): S-1055.91L E38.33L C-343.89L
Switchgear: Rs.65.84Lakhs
Probable expenditure for
2018-19:
Tree cut compensation 150L
Line(DWA):S-627.26L, E49.03L, C-102.61L.
For 2019-20: RetentionRs.200.63L, Tree cut-500L
Budget required for FY19-20
is:
Retention-Rs.200.63L,
Tree cut-500L
Rs.in Lakhs
Sl.
No.
7
8
9
Work Code
Name of the Work
CB1024
Mangalore SEZ:
Establishing 2x100MVA,
220/110kV and 2x20MVA,
110/11kV Station at MSEZ near
Bajpe in Mangalore taluk , along
with associated lines for a distance
of 6.854Kms
CC1016
Karkala:
Up-gradation of 2x5MVA, 33/11kV
Sub-station to 2x10MVA, 110/11kV
Sub-station at Karkala in Karkala
Taluk along with associated line for
a distance of 1.10Kms
CD1022
Konandur:
Establishing 1x10MVA, 110/11kV
Sub-Station at Konandur in
Thirthahalli Taluk, along with
associated line for a distance of
11.83 Kms.
District
Dakshina Kannada
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 0.9
Udupi
ES 1.58
BCR 0.909
Shimoga
ES 1.05
BCR 0.71
4375.96 &
21.10.10
1127.95 &
18.02.15
875.98 &
29.08.08
13.5.11
Cost of DWA
3726.98
Cost of
Deptly.
Supplied
Materials &
others
128.64
Total Work
Cost
3855.62
Cum Exp up
to 31/03/19
3852.01
Budget
2019-20
350.00
24.06.16
921.80
115.50
1037.30
1061.38
130.00
Stn:07.01.0
6
Line:07.07.1
8
631.22
396.26
1027.48
976.20
530.00
Remarks
Substation commissioned
on 05.03.2015
Probable Expenditure for
2018-19: Bill on Work slip 34 L
Budget for 2019-20: Land
compensation and treecut
compensation appx - 200
Lakhs
Work cost- 50 Lakhs
Budget for 2019-20:
(Department supplied
Material Cost- 48Lakhs),
Civil: 50Lakhs, LD29.5lakhs(supply-15.02,
erection-2lakhs, civil12.12lakhs) Total127.5Lakhs. say 130lakhs
Budget FY 2019-20
Retention Rs.43.00 Lakhs
Supply Rs.12.00 Lakhs
Erection Rs.20.00 Lakhs
Civil Rs.45.00 Lakhs
Total Rs.120.00 Lakhs
Budget FY 2019-20:
Retention Rs.6.00 lakhs
Supply Rs.184.00 Lakhs
Erection Rs.40.00 Lakhs
Civil Rs.80.00 Lakhs
compensation Rs.100.00
Lakhs
Total Rs.410.00 Lakhs
Rs.in Lakhs
Sl.
No.
10
Work Code
CD1062
Name of the Work
Mcgann Hospital;
Establishing 1x10MVA,110/11KV
S/S at McGann Hospital premises
in Shivamogga Taluk along with
associated line for a distance of
2.123Kms.
District
Shivamogga
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 1.51 &
BCR 0.75
1655.35 &
09.03.17
Stn:15.03.1
8
Line:12.03.1
8
Cost of DWA
1540.20
Cost of
Deptly.
Supplied
Materials &
others
0.00
Total Work
Cost
1540.20
Cum Exp up
to 31/03/19
958.83
Budget
2019-20
600.00
Remarks
Bills on hand:
1) BR No: 1285/08.03.2019
Rs.18.35 Lakhs.
2) BR No: 1284/08.03.2019
Rs.3.38 lakhs.
3) BR No: 1282/08.03.2019
Rs.25.90 Lakhs.
4) BR No: 1281/08.03.2019
Rs.3.99 Lakhs.
Total Rs.51.62 Lakhs.
Prbable: Rs. 8.40 Lakhs
LD Rs.42.27 Lakhs.
Retention Rs.4.02 Lakhs.
Probable Expenditure:
Rs.60.00 Lakhs (11KV
switchgear)
Budget for 2019-20
Supply Rs.180.00 Lakhs
Erection Rs.46.00 Lakhs
Civil Rs.60.00 Lakhs
11
CE1009
Chikkamagalur: Part A:
Establishing 2 x 100MVA,
220/66KV Substation & 1 x 12.5
MVA 66/11 KV Sub Station at
Chikkamagalur and
Construction of 220KV DC line for
a length of 28.55 Kms from 220KV
Shimoga-Mysuru DC line to the
proposed 220/66KV S/S at
Chikkamagalur on PTK Basis
Part B:Construction of 66KV
Evacuation lines from the proposed
220KV Station at Chikkamagalur 1)
Chikkamagalur to Hassana DC line:
0.6 Kms 2) Chikkamagalur MC line
: .74Kms. 3) 66KV DC line from
proposed 66KV MC line to
Balehonnur (Mattavara Limits): 7.8
Kms
Chikkamagaluru
ES 71.43
BCR 3.38
5935.32 &
29.11.06
220KV S&L
27.03.08
Eva-line
14.06.0714.
06.07
3974.94
1311.80
5286.74
4465.32
150.00
FQV is being prepared & will
be submitted. Budget 201920 (As per estimate)
Supply Rs.120.00 Lakhs
Erection Rs.20.00 Lakhs
Civil Rs60.00 Lakhs
Total Rs.200.00 Lakhs
Rs.in Lakhs
Sl.
No.
12
13
14
15
Work Code
CE1016
Name of the Work
Yemmedoddi:
Establishing 2x10MVA, 110/11kV
Sub-Station at Yemmedoddi in
Kadur Taluk & District, along with
associated line for a dist of
8.731Kms
Heggunje :
Establishing 2x100 MVA, 220/110
kV , 1x10 MVA 110/11kV Sub
Station at Heggunje in Udupi Taluk
& District along with associated
lines and TB's
District
Chikka-magalur
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 1.87 &
BCR 0.61
1016.17 &
02.05.16
05.01.18
Cost of DWA
1104.30
Cost of
Deptly.
Supplied
Materials &
others
0.00
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
1104.30
614.33
650.00
Remarks
Bills on hand:
1) BR No: 1178/13.02.2019
Rs.4.79 Lakhs. 2) BR No:
1289/08.03.2019 Rs.24.46
Lakhs. 3) BR No:
1290/08.03.2019 Rs.15.06
Lakhs. LD Rs.11.01 Lakhs.
Budget for 2019-20
Supply/ Rs.250.00 Lakhs
Erection Rs73.00 Lakhs
Civil Rs.92.00 Lakhs
Retention Rs.135.00 Lakhs
Land/Crop Rs.100.00 Lakhs
Total Rs.650.00 Lakhs
Budget surrendered in the
year 2018-19 Rs.150 Lakhs.
Udupi
8651.63 &
04.04.17
0.00
38.88
6000.00
CC1031
Belman(Nandalike):
Establishing 1x10MVA, 110/11KV
sub-station at Belman(Nandalike)
in Karkala Taluk, along with
associated line for a distance of
1.031 Kms.
Udupi
878.75 &
05.02.18
0.00
0.00
650.00
LOI issued to M/s Sri
Vinayaka Electricals,
CA1066
Nagarthi:
Establishing 1x8 MVA,66/11kV
Sub-station at Nagarthi in
Holenarasipura Taluk, along with
Associated Line for a distance of
4.343kms
Hassana
680.67 &
17.09.18
0.00
0.29
600.00
LOI issued
CC1020
ES 1.67&
BCR 1.5
Rs.in Lakhs
Sl.
No.
16
Work Code
CA1055
16
1
2
3
Name of the Work
Hettur:
Establishing 1x8MVA, 66/11kV
Sub-Station at Hettur in S.K.Pura
tq & Hassana District along with
associated line for a distance of
12.67kms
District
Hassana
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 0.05
BCR 0.3
642.98 &
01.10.14
14.08.15
Total of Sub-stations
CB1049
Vittla:
Replacing 1x10MVA,110/11kV &
1x10MVA, 110/12.1kV
Transformer by 2x20MVA,
110/11kV Transformer at
110/11kV Vittla S/s in Bantwala
Taluk .
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
738.78
156.77
895.55
655.58
93.00
23869.89
3689.84
25456.89
23784.06
12723.00
136.80
345.19
481.99
320.71
125.00
Remarks
For Fy 2018-19
Tree cut compensation:20.00
Horticulture:17.00
Coffee board:15.00
cropcomp: 9.00
subtotal:61.0
MEI Rtn:3.96
On hand bills: 16.12
Rtn: S:106.12
E:22.48 C:40.01
Subtotal:168.61
Balance work bills: S:61.16
E:52.25 C:36.9
SubTotal: 150.31 Total:400.00
For FY-2019-20 LD:
S:44.10 E:3.3
C:26.50 Subtotal:73.9
FQV:18.67
Total for 19-20 :92.57
Probable Exp for 2018-19:
Work cost - 15 L, PV - 19L.
Budget for 2019-20:
Balance work cost - 125L
Dakshina Kannada
BCR 1.4
489.27 &
17.07.15
CA1068
Salagame:
Replacement of 2 X 8 MVA, 66/11
KV power Transformer by 2 X 12.5
MVA, 66/11kV Power Transformer
at Salagame S/S in Hassana Taluk
Hassana
BCR 2.018
275.27 &
23.03.17
0.00
0.00
200.00
2X12.5MVA, 66/11kV class
power transformer is
required for copletion of the
work.
CA1069
Shanthigrama:
Replacement of 2 X 8 MVA, 66/11
KV Transformer by 2 X 12.5 MVA ,
66/11kV Transformer at 66/11kV
Shanthigrama sub-station in
Hassana Taluk & District
Hassana
BCR 2.018
275.27 &
20.03.17
0.00
80.65
150.00
1X12.5MVA, 66/11kV class
power transformer is
required for copletion of the
work.
14.09.17
Rs.in Lakhs
Sl.
No.
4
Work Code
CA1070
Name of the Work
Juttanahally:
Providing Additional 1x8MVA,
66/11kV Trnasformer at 66/11kV
Juttanahlly sub-station in C.R.
Patna Taluk, Hassan District
District
Hassana
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 1.77
222.54 &
28.03.17
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
0.00
Cum Exp up
to 31/03/19
24.11
Budget
2019-20
95.00
Probabl for 18-19:
MEI:27.20
Transformer to be diverted
For Fy 19-20
DWA:88.21
Transportation of
Transformer:3.00
FQV:5.00
Total:96.21
90.00
Tr diverted from Singapura
For Fy 19-20
DWA:86.01
Transportation of
Transformer:3.00
FQV:5.00
Total:94.01
8MVA releeased
Transformer from
Singapura is alloted to
Chikkabomenahally.
11kV Switchgear received at
MWD stores.
CA1072
Chikkabommenahally:
Augmentation of 1 X 8 MVA, 66/11
KV Transformer by 1 X 12.5 MVA
,66/11kV Transformer@ 66/11kV
Chikkabommenahally S/S in
Arkalgud Taluk.
6
CA1073
Bychanahally: Providing additional
1x8MVA transformer @ 66/11kV
sub-station Bychanahally, in
Arkalagud Taluk.
Hassan
BCR 0.78
232.09 &
17.05.17
0.00
73.82
90.00
7
CA1074
K.Byrapura: Providing additional
1x8MVA, 66/11kV transformer at
66/11kV K.Byrapura sub-station in
C. R. Patna Taluk.
Hassan
BCR 0.88
209.30 &
12.06.17
0.00
19.71
90.00
CA1075
Kallusadarahally
:Providing
additional 1x10 MVA, 110/11 kV
power transformer at 110/11 kV
Kallusadarahally Sub station in
Arasikere Taluk.
Hassan
BCR 0.84
271.33 &
12.06.17
0.00
0.00
200.00
5
8
Hassana
BCR 0.74
244.09 &
12.06.17
0.00
0.00
Remarks
For fy-2018-19
DWA:81.94
MEI:31.86
For Fy 19-20
Pending Bills:10.00
FQV:5.00
Total:15.00
For fy-2018-19
MEI:22.22
For Fy 19-20
DWA:82.13
FQV:5.00
Tr diverted from Bagur
Transportation:3.00
Total:90.13
For Fy 19-20
DWA:100.85
Trfr :126.56
MEI:32.61
Total:260.02
Rs.in Lakhs
Sl.
No.
9
10
Work Code
Name of the Work
CA1076
Arehalli :Providing additional 1x8
MVA, 66/11 kV power transformer
at 66/11 kV Arehalli Sub station in
Belur Taluk.
CB1050
Salethur:
Providing additional 1X10 MVA
110/11kV Transformer at
110/11kV Salethur sub-station in
Bantwala Taluk, D.K. District.
District
Hassan
Dakshina
Kannada
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 0.47
BCR 0.8
277.26&
21.11.17
285.78 &
16.06.17
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
0.00
0.00
Cum Exp up
to 31/03/19
0.00
7.66
Budget
2019-20
150.00
For fy-2018-19
Work bills to receive:10.00
For Fy 19-20
DWA:111.83
MEI:51.99
100.00
Probable expenditure for
2018-19: Supply+Civil - 25L
Award Cost: Supply 62.94L, Erection - 15.64L,
Civil - 20.01; Total - 98.59L.
Cost of switchgear(DPR):
Rs.47.65L
11
CB1051
Netlamudnur: Providing additional
1x20 MVA, 110/33 kV transformer
at 220 kV Netlamadnur station, in
Bantwal Taluk.
Dakshina Kannada BCR 0.996
335.86 &
31.10.17
0.00
0.00
300.00
12
CB1052
Bantwala:Providing additional 1x20
MVA, 110/33 kV transformer at
Dakshina Kannada BCR 0.988
110 kV Bantwal sub-station, in
Bantwal Taluk .
338.10 &
23.10.17
0.00
15.57
300.00
CB1053
Gurupura:
Replacement of 1x10MVA,
110/11kV transformer by
1x20MVA, 110/11kV Transformer
at 110/11kV Gurupura sub-station
in Mangaluru Taluk.
249.52&
30.10.17
13
Dakshina Kannada
BCR 0.65
0.00
0.00
Remarks
150.00
Probable expenditure for
2018-19: Supply - 20L.
Cost of LOI: Supply113.49L, Erection - 20.41L,
Civil - 16.37L; Total 150.27L
Cost of Power Transformer:
Rs.191L
20 MVA, Transformer
required
Probable expenditure for
2018-19: Civil - 10L.
Cost of LOI: Supply- 97.83L,
Erection - 24.35L, Civil 39.50L; Total - 161.68L
Cost of Power Transformer:
Rs.191L
20 MVA, Transformer
required
Award Cost: Supply 19.15L, Erection - 13.89L,
Civil - 1.72; Total - 34.76L.
Transformer cost - 191L,
Switchgear - 14.52L (PO)
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
14
CC1030
Madhuvana:Providing
additional
1x20 MVA, 110/11KV Transformer
at 110/11KV Madhuvana Substation in Udupi Taluk and District.
Udupi
BCR 0.75
256.44 &
05.07.17
0.00
7.92
100.00
Cost of LOI 87.6Lakhs,
Transformer cost122.17Lakhs, Switchgear
Cost- 17.77Lakhs.
Budget required for FY 201920, Supply-43.56Lakhs,
Erection-17.17Lakhs, Civil6.86Lakhs, Dept.
Switchgear - 22.75Lakhs,
Total- 90.34Lakhs, Budget
required is 100Lakhs. Since
released Power Transformer
at 110kV S/s Vitla is
proposed to be diverted to
Madhuvana. Savings in new
Power Transformer cost.
15
CC1032
Hiriyadka: Replacement of existing
1x10MVA, 110/33KV Transformer
by 20MVA, 110/33KV Transformer
at 110/33/11kV Hiriadka Substation in Udupi Taluk & Dist.
Udupi
BCR0.79
212.13&
26.09.17
0.00
0.00
180.00
Cost of LOI 14.27Lakhs,
Transformer cost160.73Lakhs, NFE cost8.3Lakhs.
CD1063
Thogarsi: Providing additional 1 x
10MVA, 110/11KV Transformer at
110/11kV Thogarsi sub-station in
Shikaripura Taluk, Shivamogga
District
Shivamogga
BCR 0.55
289.70 &
11.10.17
0.00
0.00
150.00
LOI issued
CD1064
Tyvarachatnalli: Replacement of
existing 6.3MVA 66/11KV
transformer to 12.5 MVA, 66/11kV
transformer at 66/11KV
Tyavarechatnahalli sub-station in
Shivamogga taluk & District
Shivamogga
BCR 0.56
176.10 &
07.10.17
0.00
0.00
150.00
CE1040
Mudigere:
Replacement of 2x6.3MVA,
66/11kV Transformers by
2x12.5MVA, 66/11kV Transformer
at 66/11kV Mudigere sub-station
in Mudigere Taluk.
Chikkamagaluru
BCR 0.74
574.31 &
01.03.18
0.00
6.06
150.00
16
17
18
LOI issued
Rs.in Lakhs
Sl.
No.
19
20
21
22
23
24
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Work Code
Name of the Work
District
CE1042
Chikkamagalur:
Replacing 2X12.5MVA, 66/11kV
Transformer by 2X20MVA, 66/11kV
transformer at 66kV
Chikkamagaluru Substationin
Chikkamagaluru Taluk & District.
Chikkamagalur
BCR 1.21
647.00&
09.03.18
CA1077
Javagal:
Replacement of 1 X 10 MVA,
110/11 KV power Transformer by
1 X 20 MVA 110/11KV power
transformer at 110/11KV Javagal
S/S in Arasikere Taluk
Hassana
BCR 0.52
204.20&
08.06.18
CA1078
Ramnathapura:
Augmentation of 1x6.3MVA
66/11kV power transformer by
1x12.5 MVA 66/11 KV Power
Transformer at 66/11 KV
Ramanathapura S/s in Arakalagud
Taluk, Hassan District.
BCR 2.76
207.38&
02.05.18
CA1079
Bagur:
Replacement of 1 X 8 MVA, 66/11
KV Power Transformer by 1 X 12.5
MVA, 66/11 KV Power Transformer
at 66/11 KV Bagur S/S in C. R.
Patna Taluk
Hassana
BCR 0.52
166.89&
27.06.18
CA1080
Belur:
Replacement of 1x6.3MVA,
66/11kV Power Transformer-2 by
1x12.5MVA, 66/11 KV Power
Transformer at 66/11KV Belur S/s
in Belur Taluk, Hassan District
Hassan
BCR 0.82
CA1081
Rameshwaranagara:
Replacement of 2x8MVA, 66/11kV
Power Transformer by 2x12.5MVA ,
66/11KV Power Transformer at
66/11 KV Rameshwaranagara
S/s in Hassan Taluk, Hassan
District
Hassan
BCR 0.6
Hassan
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
0.00
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
0.00
300.00
LOI to be issued
0.00
150.00
LOI issued
30.00
12.5MVA, 66/11kV class
power transformer
Comissioned on 22.12.2018.
Switchgear work under
progress
0.00
10.00
12.5MVA, 66/11kV class
power transformer
Comissioned on 20.12.2018.
Switchgear work under
progress
152.68&
08.06.18
0.00
150.00
work to be takenup
292.35&
08.06.18
0.00
200.00
2X12.5MVA, 66/11kV class
power transformer is
required for copletion of the
work.
0.00
Rs.in Lakhs
Sl.
No.
25
26
27
28
29
30
Cost of
Deptly.
Supplied
Materials &
others
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
CA1082
Basavaghatta
Replacement of 2x8MVA, 66/11kV
Power Transformers by 2x12.5MVA
66/11KV Power Transformers at
66/11KV Basavaghatta S/s in
Hassan Taluk, Hassan District
Hassan
BCR 0.63
278.63&
27.06.18
0.00
200.00
2X12.5MVA, 66/11kV class
power transformer is
required for copletion of the
work.
CA1083
Halebeedu:
Replacement of1x12.5MVA,
66/11kV Power Transformer by
1x20 MVA 66/11KV Power
Transformer at 66/11KV Halebeedu
S/s in Belur Taluk, Hassan District
Hassan
BCR 0.63
229.09&
28.06.18
0.00
200.00
20 MVA, 66/11kV class
power transformer is
required for copletion of the
work.
CA1084
Singapura:
Enhancement of 1x8MVA,
66/11kV Power Transformer-2 by
1x12.5MVA 66/11 kV power
transformer at 66/11kV Singapura
S/s in Holenarasipura Taluk,
Hassan District
Hassan
BCR 3.34
186.75&
08.05.18
80.65
30.00
12.5 MVA, power
transformer commissioned
on 28.12.2018. Switchgear
under progress.
CA1085
Shanivarsanthe:
Providing additional 1X8MVA,
66/11kV Power Transformer at
66/11kV at Shanivarasanthe
Substation Somavarpet Taluk.
Work Code
Name of the Work
Cost of DWA
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
Kodagu
BCR 0.87
234.92&
01.06.18
0.00
130.00
For Fy 19-20
DWA:90.42
MEI:52.43
FQV:5.00
Transportatio:3.00
Total:150.85
Power transformer to be
diverted.
CC1035
Nittur:
Replacement of 1x10MVA,
110/11KV Power Transformer by
1x20MVA, 110/11KV Power
Transformer at 110/11kV Nittur
S/s .
Udupi
BCR 2.321
355.16&
07.04.18
0.00
200.00
Tendered
CC1036
Kundapura:
Providing additional 1X10MVA,
110/11KV Power Transformer at
existing 110/33/11kV Kundapura
substation in Kundapura Taluk.
Udupi
329.45&
07.04.18
0.00
200.00
Cost of LOI 143Lakhs,
Transformer cost126.56Lakhs, Switchgear
Cost- 28.68Lakhs.
Rs.in Lakhs
Sl.
No.
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Name of the Work
CC1037
Manipal:
Providing additional 1X20 MVA,
110/11KV Power Transformer at
110/33/11KV Manipal Sub-station
in Udupi Taluk and District.
CB1057
Karaya:
Creating 33KV reference by
installing 1x20MVA, 110/33KV
Power Transformer at 110/11k
Karaya S/s in Belthangudi Taluk
Dakshina
Kannada
BCR 1.08
323.41&
08.06.18
0.00
300.00
33
CD1066
Holaluru:
Replacement of 1x 8 MVA, 66/11KV
Power transformer by 1x
12.5,66/11kV power transformer at
66/11kV Holalur S/s in
Shivamogga taluk .
Shimoga
BCR 4.21
148.84&
05.04.18
0.00
100.00
work to be takenup
34
CB1059
Puttur: Providing additional 1x20
MVA, 110/33kV Transformer at 110 Dakshina Kannada
kV Puttur Sub-station in puttur
District
Taluk, Dakshina Kannada District.
BCR 1.05
301.27 &
23.1.19
0.00
200.00
Tendered
636.86
5570.00
32
34
1
Udupi
BCR 0.769
440.70&
09.03.18
0.00
Total of Augmentation
CA1031
Hassana:
a) Re-orientation of 220kV & 66kV
lines from Hassana 220kV Station.
b) Shifting of 220kV B-4 LILO line
passing through Airport Land near
Bhoovanahalli Cross.
c) Providing 2Nos of 66kV TB's for C
R Patna 66kV DC line at
220kV/66KV R/S Hassana for a
distance of 66kV 7.8/220kV
17.68Kms
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Work Code
31
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
136.80
Hassana
2092.57 &
11.7.07
21.09.07
1569.93
345.19
280.25
481.99
1850.18
1176.34
400.00
800.00
Remarks
Cost of LOI 222.03Lakhs,
Transformer cost160.73Lakhs, NFE cost8.3Lakhs, Switchgear Cost48.24Lakhs.
Probable expenditure for
2018-19: Supply - 35L.
Award Cost: Supply 112.11L, Erection - 16.47L,
Civil - 27.33; Total 155.91L.
Transformer cost - 191L
For Fy-19-20
pending work bills to
receive:
S:16.00
E:15.11
C:10.56
Subtotal:41.67
Rtn:
S:267.18
E:10.66
C:33.84
Subtotal:311.68
LD;
S:133.59
E:5.33
C:16.92
Subtotal:155.84
Land compensation:440.00
Total for Fy 19-20:949.19
Rs.in Lakhs
Sl.
No.
2
3
4
5
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
CA1032
Shanthigrama:
Construction of
1) 2 Nos of 220kV DC lines from
400KV PGCIL Station to LILO the
existing Shimoga-Mysore 220KV DC
M1& M2 lines near Melgodu limits7.14 Kms
2) 220KV DC line from
Shanthigrama Station to existing
B4 line near Hedanahalli limits7.76 Kms.
Hassana
2266.14 &
16.08.08
CB1007
Kavoor - Kulashekar :
Construction of 110kV DC line from
Kavoor to Kulashekara in the
Dakshina Kannada
existing 33kV line corridor for a
distance of 8.50 Kms
CB1018
Puttur:
Construction of 110-110kV MC and
110kV DC lines from loc no.28
(Kabaka Railway Crossing limits) to
the 110/33/11kV Puttur S/S for a Dakshina Kannada
dist of 4.5Kms & Construction of
2nos of 110kV TBs at
110/33/11kV Puttur S/S for a
distance of 4.5 Kms
CB1020
Kavoor-Baikampady:
Strengthening of 110kV-KavoorBaikampady line converting SC line
by DC line with TB at Kavoor for a
distance of 3.885 Kms
ES 2.4332
BCR 1.18
13.03.09
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
1050.11
72.00
1122.11
Cum Exp up
to 31/03/19
767.23
Budget
2019-20
Remarks
250.00
1099.36 &
14.10.08
05.04.07
906.92
10.50
917.42
475.48
100.00
562.43 &
17.12.09
07.09.10
431.30
8.17
439.47
199.46
50.00
Shortclosed on 04.10.2017.
To be tendered for balance
works. Balance works
estimate amount Rs.
386.55L. Additional budget
will be sought after
awarding the work
Budget for 2019-20: Supply10 Lakhs, Erection-10
Lakhs, Civil-30 Lakhs.
Probable Exp from 18-19:
Pending Bills-40 Lakhs
Dakshina Kannada
517.94 &
28.01.10
23.10.10
345.65
12.43
358.08
210.95
110.00
Budget required for FY 1920:
Retention - 83.32L , Civil 15.00L, Others-12L
Rs.in Lakhs
Sl.
No.
6
7
8
Work Code
Name of the Work
CC1029
Brahmavara-Nittur:
Stringing 2nd circuit in the existing
110kV Brahmavara-Nittur line and
creating 110kV TB at Brahmavara
& Nittur Sub-Stations.
CD1058
MRS to Lingadahalli:
Construction of new 66kV SC line
on DC towers for a distance of
46.039Kms in the existing corridor
of 66kV DVG-2 SC line From MRS
Shivamogga to Lingadahalli
(Channagiri Taluk) in Shivamogga &
Davanagere Districts.
CE1013
Chikamagalur-Balehonur:
Construction of 66kV DC line with
coyote ACSR in the existing corridor
of 66kV SC line from
chikkamagalur to Balehonnur
(43.74 Kms)
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
173.11 &
05.05.15
Udupi
823.01 &
11.09.15
Shimoga
Chikka
magaluru
ES 19.13
BCR 9.38
517.94 &
06.07.04
14.09.17
20.03.18
13.07.06
Cost of DWA
157.32
864.20
945.96
Cost of
Deptly.
Supplied
Materials &
others
12.32
0.00
0.00
Total Work
Cost
169.64
864.20
945.96
Cum Exp up
to 31/03/19
108.02
236.56
1068.04
Budget
2019-20
50.00
Remarks
Budget required for FY 1920: Supply : 10.1Lakhs,
Supply ret : 27.9Lakhs,
Erection: 4.5Lakhs, Erection
Retn: 0.4Lakhs, Civil:
2.3Lakhs, Civil Retn: 0.7
Lakhs, LD: 0.10Lakhs Total46Lakhs. Budget required
50Lakhs.
450.00
Bills on hand:1) BR No:
1245/02.03.2019 Rs.4.05
Lakhs. 2) BR No:
1248/05.03.2019 Rs.13.11
lakhs. Total Rs.17.16 Lakhs.
Budget for 2019-20
Retention Rs.50.00 lakhs
Supply Rs.250.00 Lakhs
Erection Rs.50.00 Lakhs
Civil Rs.100.00 Lakhs
Total Rs.450.00 Lakhs
800.00
Bills on hand:
1. BR No: 950/09.01.2019
Rs.68.59 Lakhs 2. BR No:
1229/22.02.2019 Rs.67.73
Lakhs 3. BR No:
1230/22.02.2019 Rs.16.69
lakhs. 4.BR No:
1273/08.03.2019 Rs.83.42
Lakhs. 5. BR No:
1272/08.03.2019 Rs.3.95
Lakhs. 6. BR No:
1271/08.03.2019 Rs.14.51
Lakhs. 7. BR No:
1270/08.03.2019 Rs.17.11
Lakhs. Total Rs.272.00 Lakhs.
Budget for 2019-20 Supply &
Erection Rs.296.00 Lakhs
Civil Rs.180.00 Lakhs
Retention Rs.324.00 Lakhs
Total Rs.800.00 Lakhs
Rs.in Lakhs
Sl.
No.
Work Code
9
CB1056
Name of the Work
Baikampady: Providing
110KV,20MVAR Capacitor Bank
Dakshina Kannada
along with associated TB at existing
110/33/11KV Baikampady S/s
9
Total of Lines
1
Renovation and upgradation of
protection system of 220kV Substations (10Nos) & 400kV SubStation (1No) in Hassana
Transmission Zone
CA1059
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
85.30&
04.11.17
6271.39
1257.03 &
20.06.14
Hassana
395.67
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
0.00
0.00
90.00
6667.06
4242.08
2700.00
Remarks
Tendered
Budget required for the
FY19-20:
26.12.15
1449.82
0.00
1449.82
822.76
200.00
Hsn Circle: 79.46
Mng Circle: 138
1
Total of TB's & Others
1449.82
0.00
1449.82
822.76
200.00
60
Total of Hassana Zone
31727.90
4430.70
34055.76
29485.76
21193.00
MYSURU TRANSMISSION ZONE
1
DA1117
Chandravadi
(Nallitalapura):Establishing
1x8MVA, 66/11kV Sub-Station with
associated line for a distance of
1.290Kms
2
DB1089
220kV Shivanasamudra:
Establishing 2x100MVA, 220/66kV
Station with assosiated lines
3
DD1041
66kv Badanakuppe Industrial
area : Establishing 2 X 31.5 MVA,
66/11kV Station with MCMV with
220kv at top x arm provision &
66kv at bottom assosiated d/c
lines
Chamarajanagar
ES 2.06 &
BCR 0.51
3408.19 &
11.01.17
11.01.18
3069.48
302.00
3371.48
1834.36
800.00
Awaiting for 1* 31.5 MVA
Transformer
4
DD1046
Jannur:
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line for
a distance of 8.63Kms
Chamarajanagar
ES 1.13
BCR 1.11
700.9 &
23.10.17
20.03.18
709.66
110.00
819.66
406.09
400.00
Awating for 8MVA power
Transformer & Switch gear
& Amount required for
payment of Non DWA items
after approval of FQV
Mysuru
ES 1.16 &
BCR 1.54
523.98 &
06.03.17
24.03.18
504.00
100.00
604.00
264.80
280.00
Amount required for regular
payment
Mandya
ES 48.94
&
BCR 3.45
9252.27 &
03.06.17
15.03.18
9653.72
520.00
10173.72
8852.77
2000.00
Amount required for
payment of FQV bills
Rs.in Lakhs
Sl.
No.
Work Code
5
DD1045
220kV Begur:
Establishing 2X100MVA,
220/66kV Station with assosiated
lines
6
DB1102
7
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Chamarajanagar
ES 30.680
& BCR
1.72
12499.11&
27.02.2018
Hariyaldamma Temple
Establishing 1 x 8MVA, 66/11 KV
Sub-Station with associated line for
a distance of 8.591Kms
Mandya
ES 1.973 &
BCR 1.52
815.94 &
05.07.17
DB1099
Kadukothanahalli
Establishing 1x 8MVA, 66/11 KV
Sub-Station with associated line for
a distance of 0.08Kms
Mandya
ES 1.473 &
BCR 1.86
526.11 &
06.10.17
8
DA1126
Vyasarajapura
Establishing 1x8 MVA 66/11kV
Sub-Station with associated line for
a distance of 3.498Kms
Mysuru
ES 1.883 &
BCR 2.03
9
DA1136
Gargeshwari:
Establishing 1x8MVA, 66/11kV
Sub-station with associated line for
a distance of 0.543Kms
Mysuru
10
DA1112
Kaggere (Hampapura)
Establishing 1x8MVA, 66/11kV
Sub-Station with associated line for
a distance of 1.0Kms
Mysuru
11
11
DA1124
Mandakalli(Koppaluru):
Establishing 1x8 MVA, 66/11 KV
Sub-station at
Mandakalli(Koppaluru) and
construction of 66kV LILO line from
existing 66kV Kadakola-Mysore SC
line to proposed 66/11kV substation at Mandakalli (Koppaluru)
for a distance of 2.261Kms
Total of Sub-stations
Mysuru
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
0.00
0.00
4000.00
Remarks
767.05
118.00
885.05
420.02
300.00
Awaiting for transformer
and switchgear
4.7.18
507.56
47.00
554.56
268.07
250.00
Physically & Financially will
be Closed
593.80 &
06.01.18
5.11.18
575.68
120.00
695.68
0.00
600.00
Work Under Progress
ES 0.96 &
BCR 1.008
780.89 &
23.02.18
14.1.19
737.51
60.00
797.51
0.00
600.00
Work under progress.
ES 0.841 &
BCR 1.19
528.36 &
15.05.17
0.00
0.00
450.00
DPR Approved vide
NO.B19/69664/17-18
Dtd:15.05.2017.
LOI to be Issued.
Koppalur (Srinagar):
Establishing 1x12.5MVA,
66/11kV Sub-Station with
associated line deleted
instead added mandakallikoppaluru
ES 1.187 &
BCR 0.96
885.21&
09.03.18
18.01.19
847.82
70.00
917.82
0.00
850.00
17372.48
1447.00
18819.48
12046.11
10530.00
Rs.in Lakhs
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
13.05.16
13.72
231.00
244.72
97.66
145.00
Awaiting for 2nd 12.5 MVA
Power Transformer which is
to be supplied by KPTCL .
156.76 &
12.05.14
09.03.18
196.97
115.00
311.97
107.53
26.00
Awaiting for 11kV
Switchgear to be supplied
by KPTCL
270.57 &
12.11.14
09.03.18
20.96
250.00
270.96
110.09
150.00
Awaiting for 2nd 12.5 MVA
Transformer
348.82 &
19.11.14
29.06.17
33.22
318.22
351.44
155.33
190.00
Awaiting for 2nd 20 MVA
Transformer
BCR 0.93
390.20 &
20.11.14
25.02.17
38.60
330.72
369.32
313.67
35.00
Awaiting for 2 Nos. of 11kV
MCVCB Breaker from MEI
to be supplied by KPTCL.
Mandya
ES NA
BCR 2.11
131.00 &
25.10.10
04.03.14
50.93
80.00
130.93
56.75
15.00
Physically Closed
Mandya
ES NA
BCR 0.97
288.31 &
05.05.15
02.07.16
62.00
270.00
332.00
186.07
100.00
Awaiting for switchgear
Koppa:
Replacing 2x8MVA, 66/11kV by
2x12.5MVA, 66/11kV Transformers
Mandya
ES NA
BCR 0.67
298.36 &
21.11.13
02.07.16
62.00
248.00
310.00
119.11
130.00
Awaiting for 2nd
Transformer
DB1085
Jakkanhalli:
Replacing 1x6.3MVA, by
1x12.5MVA, 66/11kV Transformer
Mandya
ES NA
BCR 0.78
176.36 &
24.07.14
29.06.17
46.19
132.89
179.08
20.36
130.00
Awaiting for Transformer
DB1092
Basaralu :
Replacement of 1 X 6.3 MVA by 1 X
12.5 MVA 66/11kV Transformer.
Mandya
BCR 0.81
203.87 &
16.10.15
30.06.17
59.16
132.47
191.63
24.60
145.00
Awaiting for Transformer
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
1
DA1076
Suttur :
Replacing 2x8MVA, 66/11kV by
2x12.5MVA, 66/11kV Transformers
Mysuru
ES NA
BCR 0.71
279.99 &
23.12.13
2
DA1089
Megalapura :
Replacing 1x8MVA, 66/11kV by
1x12.5MVA, 66/11kV Transformer
Mysuru
BCR 0.70
3
DA1093
Santhesargur:
Replacing 2x6.3MVA, 66/11kV by
2x12.5MVA, 66/11kV Transformers
Mysuru
BCR 1.112
4
DA1095
H.D.Kote:
Replacing 2x12.5MVA, 66/11kV by
2x20MVA, 66/11kV Transformers
Mysuru
BCR 1.04
5
DA1096
Hunsur:
Replacing 2x12.5MVA, 66/11kV by
2x20MVA, 66/11kV Transformers
Mysuru
6
DB1039
7
DB1080
8
DB1083
9
10
Tubinakere 220kV R/S:
Providing Spare 1x12.5MVA,
66/11kV Transformer
Kolkaranadoddi:
Providing Additional 1X8 MVA,and
replacement 8MVA by 12.5MVA
66/11kV Transformer.
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
Rs.in Lakhs
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
30.06.17
94.36
160.46
254.82
62.77
145.00
Awaiting for Transformer
136.76 &
15.08.15
09.05.17
13.66
113.07
126.73
0.00
127.00
Awaiting for 12.5 MVA
66/33 KV Transformer
BCR 0.72
168.61 &
18.02.15
30.06.17
60.69
117.83
178.52
28.49
150.00
11kV Power Transformer /
Switchgear to be supplied
by KPTCL
Mysuru
BCR 0.65
426.97 &
20.06.14
14.09.18
90.92
320.00
410.92
12.57
200.00
Work Under Progress
Hullahalli :
Replacement of 2 X 8 MVA by 2 X
12.5 MVA, 66/11kV Transformer.
Mysuru
BCR 1.11
285.16 &
05.05.15
210.00
210.00
112.28
125.00
Awaiting for 2nd 1x12.5
MVA Power Transformer &
11kV Switchgear to be
supplied by KPTCL.
DA1127
Dattagalli:
Replacing 1x5 MVA, 66/11kV by
1x12.5MVA, 66/11kV Transformer
Mysuru
BCR 0.76
168.51 &
23.05.17
0.00
0.00
145.00
Tender Evaluation under
process
DB1068
Hadli :
Providing additional 1x12.5MVA,
66/11kV Transformer
Mandya
ES NA
BCR 1.11
248.71 &
23.12.13
251.70
27.71
160.00
Awaiting for transformer
and switchgear
DB1078
Addihalli:
Replacing 1X6.3MVA & 1X8MVA,
66/11kV Trs. by 2x12.5MVA,
66/11kV Trs. at Addihalli along
with stringing of 2nd ckt 66kV line
b/w 220kV K.R.Pet-Santhebachally
and linking by 66kV SC line to
Addihally Sub-station with
construction of 2Nos of 66kV TBs at
Santhebachahalli, One TB at
Addihalli Sub-station and One TB
at 220kV K.R.Pet station
Mandya
0.00
0.00
100.00
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Yethambadi :
Providing additional 1 X 12.5 MVA,
66/11 KV Power Transformer.
Mandya
BCR 1.84
235.30 &
19.12.15
DC1010
Kushalanagara :
1 X 8 by 1 X 12.5 MVA, 66/33/11
KV
Kodagu
BCR 0.96
13
DD1038
Begur MUSS:
Replacing 1x6.3MVA, 66/11kV by
1x12.5MVA, 66/11kV Transformer
Chamarajanagara
14
DA1090
T.N.Pura :
Repl 2X12.5MVA by 2X20 MVA
66/11kV Transformer
15
DA1110
16
17
Sl.
No.
Work Code
11
DB1096
12
18
Name of the Work
1216.71 /
13.06.16
28.08.18
91.70
160.00
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
Rs.in Lakhs
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
28.08.18
26.46
135.00
161.46
0.00
150.00
Awaiting for transformer
and switchgear
28.08.18
35.12
150.00
185.12
0.00
150.00
Awaiting for transformer
and switchgear
0.00
0.00
150.00
Awaiting for transformer
and switchgear
246.13
0.00
160.00
Awaiting for transformer
and switchgear
0.00
0.00
150.00
160.00
244.71
22.80
150.00
Awaiting for transformer
and switchgear
160.00
245.70
39.43
150.00
Awaiting for transformer
and switchgear
168.14 /
20.03.17
0.00
0.00
150.00
LOI Issued
BCR 0.51
144.89 &
20.03.17
0.00
0.00
150.00
LOI Issued
Chamarajanagara
BCR 0.69
290.17 &
16.03.15
Kunthur: Providing additional
1x8MVA, 66/11kV Power Tr.
Chamarajanagara
BCR 0.56
235.25&
26.09.17
Bandalli: Providing additional
1x8MVA, 66/11kV Power Tr.
Chamarajanagara
BCR 0.49
265.14&
11.10.17
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 0.87
158.85 &
14.09.15
BCR 0.99
178.62 &
19.09.15
BCR 1.06
166.97 &
10.09.15
BCR 0.40
257.18 &
03.10.17
Sl.
No.
Work Code
19
DB1093
Guddenahalli : Replacement of 1 X
6.3 MVA by 1 X 12.5 MVA
66/11kV Transformer.
Mandya
20
DB1094
Akkihebbal :
Replacement of 2 nd 8 by 12.5
MVA, 66/11kV Transformer.
Mandya
21
DB1095
Gamanahalli : Replacement of 1 X
8 MVA by 12.5 MVA, 66/11kV
Transformer.
Mandya
22
DB1104
Mandagere :
Providing additional 1 X 12.5 MVA,
66/11 KV Power Transformer.
Mandya
23
DB1107
Chinakurali :
Replacement of 1 X 8 MVA, 66/11
KV Power Transformer by 1 X 12.5
MVA, 66/11 KV.
Mandya
BCR 0.56
156.19&
21.11.17
24
DB1108
Kadaballi :
Providing additional 1 X 12.5 MVA,
66/11 KV Power Transformer.
Mandya
BCR 0.86
254.93&
26.09.17
28.08.18
84.71
25
DB1109
Adichunchangiri: Additional
1X12.5MVA 66/11kV Power
Transformer
Mandya
BCR 0.40
257.06&
03.10.17
28.08.18
85.70
26
DC1013
Ponnampet:
Replacing 1 X 8MVA, 66/11kV by
1x12.5MVA, 66/11kV transformers
Kodagu
BCR 0.43
27
DC1014
Ponnampet :
1 X8 by 1 X 12.5, 66/33/11 KV
Kodagu
28
DD1039
Chandakavadi : Replacing 2X8
MVA,66/11 KV transformers by
2X12.5 MVA transformers .
29
DD1051
30
DD1052
Name of the Work
District
28.08.18
05.11.18
17.09.18
86.13
160.00
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
33.15
245.00
278.15
0.00
150.00
Work Under Progress
86.33
0.00
86.33
0.52
80.00
Work Under Progress
114.46
0.00
114.46
33.94
100.00
Work Under Progress
Rs.in Lakhs
Sl.
No.
Work Code
31
DA1129
DA1133
32
32
Cost of
Deptly.
Supplied
Materials &
others
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Hosur Gate :
Providing additional 1x8MVA,
66/11 KV Power Transformer at
Hosur Gate S/s at Hunsur Taluk &
Mysuru Dist.
Mysuru
BCR 0.57
230.75
27.03.18
0.00
0.00
100.00
LOI to be issued
Gavadagere:
Providing additional 1x8MVA,
66/11kV Power Transformer at
Gavadagere substation Hunsur
Taluk Mysuru District.
Mysuru
BCR 0.57
230.26
16.04.18
0.00
0.00
100.00
LOI to be issued
Name of the Work
Total of Augmentation
Cost of DWA
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
1487.14
4199.66
5686.80
1531.68
4108.00
Remarks
DA1028
Kadakola - Vajamangala:
Construction of 220kV D/C line
from Kadakola to Vajamangala with
TB's for a distance of 19.64Kms
Mysuru
ES 6.08
BCR 1.40
1217.40 &
24.08.09
12.03.10
964.67
88.00
1052.67
446.05
100.00
tender to be called for
remaining pending works
DC1005
Virajpet - Madekeri: Construction
of 66kV SC Link line on DC towers
between 66kV Virajpet & Madekeri
Sub-Stations for a distance of
36.16kms.
Kodagu
ES 17.49
BCR 7.15
687.13 &
25.05.10
02.02.11
655.71
186.66
842.37
262.48
50.00
Short closure of this work is
approved in CPC, tendering
is under process for balance
work.
DB1087
Kiragavalu LILO:
Converstion of 66kV S/C Line on
SC Tower to 66kV LILO line on DC
Towers from the existing 66kV SFCVajamangala DC line.
Mandya
132.38 &
01.10.14
26.06.18
187.51
187.51
65.39
60.00
3
Total of Lines
2082.55
773.92
210.00
1
DA1101
Renovation and upgradation of
protection system of 220kV Substations (8 Nos) ) in Mysuru
Transmission Zone
828.72
711.93
275.00
1
2
3
1807.89
Mysuru
965.39 &
10.05.13
26.12.15
274.66
828.72
1
Total of TB's & Others
828.72
0.00
828.72
711.93
275.00
47
Total of Mysuru Zone
21496.23
5921.32
27417.55
15063.64
15123.00
BAGALKOTE TRANSMISSION
ZONE
Rs.in Lakhs
Sl.
No.
1
2
Work Code
EE1066
EE1117
Name of the Work
Aratagal(Kitadal):
Establishing 2x10MVA, 110/11kV
Sub-Station with associated line &
TB for a distance of 8.574Kms
Koganolli
Up-gradiation 33/11kV S/s to
2x10MVA, 110/11kV Sub-Station
with associated line for a distance of
17.192Kms
District
Belagum
Belgaum
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 10.522
BCR 5.25
ES 3.644
BCR 1.72
908.81 &
17.06.15
1182.71 &
23.09.15
08.06.17
06.01.18
Cost of DWA
922.44
1376.54
Cost of
Deptly.
Supplied
Materials &
others
80.00
84.00
Total Work
Cost
1002.44
1460.54
Cum Exp up
to 31/03/19
942.84
694.11
Budget
2019-20
236.00
780.00
Remarks
Budget required for the
Remaining Year 18-19
Supply( 1X10 MVA Power Trf
approx Cost - Rs 125 Lacs),
Mandatory Spares- Rs 134.96
Lacs
Ret - Rs 22.89 Lacs ,Civil- Rs
72.26 Lacs
Erection- Rs 14.05 Lacs
SWG Cost- 5.1Rs Lacs,CCRs20.00 Lacs
Total - Rs 289.26 Lacs
Excess due to
Due to QV ( Approx)- Rs
20.00 Lacs
CC ( approx) - Rs 20.00 Lacs
Budget under Utilized for the
Year 18-19
Delay in supply of 1X10 MVA
IInd Trf
Budget of the Year 19-20
QV- Rs 20.00 Lacs
Budget required for the
Remaining Year 18-19
Supply ( 2X10 MVA Trf, 110
KVBreaker, Control Cable,Line
Conductor and Insulators ) - Rs
209 .54 Lacs Civil- Rs 141.00 Lacs
Erection- Rs 26.5 Lacs
SWG Ret- Rs 3.44 Lacs
CC- Rs 08.00 Lacs
Ret ( for Trf ) - Rs 75.51 Lacs
Total- Rs 463.99 Lacs For the Year
19-20
Supply -Rs 256.00 Lacs
Civil- Rs 133.78 Lacs
Erection- Rs 33.81 Lacs
CC- Rs 25.00 Lacs
QV- Rs 20.00 Lacs
Total- Rs 468.59
Say- Rs 469.00 Lacs
Excess due to
Due to QV- ( approx )- Rs 20.00
Lacs,
CC ( Approx) - Rs 40.00 Lacs
CC is more due to highly irrigated
Land
Rs.in Lakhs
Sl.
No.
3
4
5
Work Code
EE1121
EG1029
EE1064
Name of the Work
G.Hosakoti:
Establishing 2x10MVA, 110/11kV
Sub-Station with associated line.
Inchageri:
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line &
TB for a distance of 19.759 Kms
Shiraguppi:
Up-gradation of 33kV MUSS to
1x10MVA, 110/11kV Sub-Station
with associated line for a distance
of 16.7 kms & TB.
District
Belgaum
Bijapur
Belgaum
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 3.478 &
BCR 2.13
ES 0.57
BCR 0.6
ES 5.665 &
BCR 2.37
948.89 &
28.03.17
958.08 &
05.11.15
1075.44 &
24.09.16
15.02.18
06.02.18
27.10.18
Cost of DWA
943.11
1188.60
1228.95
Cost of
Deptly.
Supplied
Materials &
others
0.00
4.00
41.67
Total Work
Cost
943.11
1192.60
1270.62
Cum Exp up
to 31/03/19
381.29
771.77
35.54
Budget
2019-20
Remarks
600.00
For the Year 18-19
Supply ( 1X10 MVA Trf, 110 KV CB,
Isolators,33/11 Station structure,
Aux Trf , battery Set and Charger ,
Control Cable, Yard Lightining
Fixture, furnitures, T & P , 220 KV
Towers, Conductor and Earthwire )Rs 151.01 Lacs
Ret - Rs 13.18 Lacs,Civil- Rs 71.3
Lacs
Erection- Rs 25.87 Lacs
SWG- Rs 42.00 Lacs (divereted from
110 KV S/S Islamapur to be
booked for this project )
Total - Rs 303.36 Lacs
For the Year 19-20
Ret -Supply- Rs 182.77 Lacs
Civil- Rs 197.49 Lacs
Erection- Rs 05.31 Lacs
CC- Rs 20.00 Lacs
QV- Rs 55.00 Lacs
Total - Rs 460.57 Lacs
Say Rs 461.00 Lacs
450.00
FY 2018-19:
Sup: 186.00
Erc: 17.01
Civil: 81.00
Total: 284.01
FY 2019-20:
Budget required of Rs.
230.23
1300.00
Budget required For the
Year 18-19
Supply ( Line
Towers/Station Structure
/Earthmat Work) - Rs
200.00 Lacs
For the Year 19-20
Remaining DWA Cost- Rs
Supply+ Erection+ Civil- Rs
1028.95 Lacs
SWG- Rs 41.67 Lacs
QV- Rs 10.00 Lacs
Total- Rs 1080.62 Lacs
say Rs 1081 Lacs Excess
due to
QV (approx ) is Rs 10.00
Lacs
Rs.in Lakhs
Sl.
No.
6
7
8
Work Code
EG1056
EG1057
EC1021
8
1
Name of the Work
Ukkali :
Establishing 1x10MVA, 110/11KV
S/s at Ukkali & Contruction of
110KV LILO Line from 110KV B
Bagewadi-Vijayapura SC line for a
distance of 7.165 in B Bagewadi
taluk.
District
Vijayapur
Ronihal:
Establishing 2x10MVA 110/11KV
S/s at Ronihal and Construction of
110KV LILO line from B Bagewadi Mamadapura SC line to proposed
110KV s/s at Ronihal for a distance
of 5.897Kms in Vijayapura Dist.
Bijapur
Singatalur :
Up-gradiation of existing 33/11kV
MUSS to 110/11kV Sub-Station
with associated line.
Gadag
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
40.5
2.63
904.02
07.04.18
Ambevadi:
Replacing 2x55MVA, 220/110kV by
2x100MVA, 220/110kV
Transformer with R&M works.
North Canara
10.01.19
Budget
2019-20
Remarks
942.51
50.00
992.51
0.00
800.00
FY 2018-19:
Budget required for Sup:
25.00
1097.31&
16.4.18
10.01.19
3.879MU/
2.35
1046.60&
09.03.18
23.01.19
1682.70 &
17.02.11
Cum Exp up
to 31/03/19
FY 2019-20:
Budget required of Rs:
800.00
7.55
4.10
BCR 1.30
Total Work
Cost
FY 2018-19:
Budget required for Sup:
25.00
1122.52
100.00
1222.52
0.00
1000.00
FY 2019-20:
Budget required of Rs:
800.00
Total of Sub-stations
ED1007
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
12.09.11
1027.85
0.00
1027.85
0.00
800.00
8752.52
359.67
9112.19
2825.55
5966.00
722.32
744.04
1466.36
847.64
1.00
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
2
EE1120
Kittur:
Swapping of 1x20MVA, 110/33KV
& 1x10MVA, 110/11KV Power
Transformers at 110KV Sub-Station
Kittur with additional 11KV switch
gear
3
EA1023
Hangal:
Providing additional 1X10MVA,
110/11kV Power Transformer at
110kV S/s Hangal
4
EB1023
5
EC1015
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Belgaum
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
95.50 &
27.09.14
22.02.18
60.05
49.32
109.37
67.23
43.00
22.03.18
83.72
0.00
83.72
60.18
65.00
203.55
203.55
203.35
266.00
23.87
79.87
62.81
22.00
Haveri
BCR 1.74
199.5 &
10.07.15
Navanagar:
Replacement of exisiting 1x10MVA
by 1x20 MVA , 110/11 KV
Transformer
Dharwad
BCR 1.06
227.96 &
11.02.14
Naregal:
Providing spare 1x10MVA, 110/3311kV Transformer
Gadag
BCR 1.084
181.41 &
07.12.13
22.03.18
56.00
Remarks
For the Remaining Year 1819
SWG- Rs 06.79 Lacs
Supply- Rs 2.00 Lacs
Erection - Rs 5.00 Lacs
Civil- Rs -5.00 Lacs
Total - Rs 18.79 Lacs For
the Year 19-20 ( Subject to
allotment of 20 MVa Trf )
Supply ( Balance Cable,
Conductor and Hardware )Rs 3.55 Lacs,Erection Rs
10.01 Lacs
Civil- Rs 06.45 Lacs
QV- Rs 3.00 Lacs
Ret- Rs 8.03Lacs ,
Total - Rs 31.04 Lacs
Rs.in Lakhs
Sl.
No.
6
7
8
Work Code
EE1100
Name of the Work
110KV S/S
Nagaramunnoli/Kabbur
Replacement of 1x10MVA,
110/11kV by 1x20MVA, 110/11kV
Transformer
EE1122
110 kV S/S Sulthanpur :
Replacement of 1x10 MVA, 110/11
kV transformer by 1x20 MVA,
110/11 kV transformer at 110 kV
Sulthanpur sub-station, in Raibag
Taluk, Belagavi District
EE1125
110 kV S/S Satti : Providing
additional 1x10 MVA, 110/11 kV
transformer at 110 kV Satti substation, in Athani Taluk, Belagavi
District
District
Belagum
Belagavi
Belgaum
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 0.67
BCR 0.46
BCR 0.44
247.71 &
02.12.14
283.46 &
28.06.17
289.84&
09.06.17
02.01.18
22.03.18
Cost of DWA
42.50
43.72
Cost of
Deptly.
Supplied
Materials &
others
0.00
49.40
Total Work
Cost
42.50
93.12
0.00
Cum Exp up
to 31/03/19
0.00
59.88
0.00
Budget
2019-20
290.00
230.00
154.00
Remarks
For theYear 18-19
( supply of Mounting
Structure, Control Cable )
15.00 lakh For theYear 1920
Remaining Cost of the
Tender -27.18 Lacs
Cost of new 20 MVA- Rs
160.00 Lacs
SWG- Cost- Rs 42.00 Lacs
QV- Rs 3.00 Lacs
Say - Rs 232.00 Lacs
Additional Budget Required
for theYear 18-19
Supply- Rs 11.89 Lacs
Erection-6.10 Lacs
Civil - Rs 5.99 Lacs
SWG Cost- Rs 4.78 Lacs
Total - Rs 28.76 Lacs
Says - Rs 29.00 Lacs For
theYear 19-20
Erection+ Dec - Rs 05.10
Lacs
New 1X20 MVA Trf- Rs 200
Lacs
Total - Rs 205.10Lacs
Says - Rs 205.00 Lacs
Excess due to
Due to Cost of New 1X20 Trf
( approx )- Rs 200.00 Lacs
For theYear 18-19
Token Budget - Rs 10.00
Lacs
For theYear 19-20
Budget of 150lakh sought
exculding cost of the
transformer.
Rs.in Lakhs
Sl.
No.
9
10
Work Code
EE1126
EG1043
10
1
Name of the Work
110 kV S/S Itnal : Replacement of
1x10 MVA, 110/11 kV transformer
by 1x20 MVA, 110/11 kV
transformer at 110 kV Itnal substation, in Raibag Taluk, Belagavi
District
220KV Station, Indi:
Providing Additional 1x10MVA,
110/11kV transformer
District
Belgaum
Bijapur
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 0.46
BCR 1.36
281.98&
20.06.17
255.13 &
19.06.15
02.01.19
EF1029
23.00
03.11.18
120.13
Bagalkote
0
23.00
Cum Exp up
to 31/03/19
0.00
Budget
2019-20
Remarks
281.00
For theYear 18-19
Tender Cost ( approx )- Rs
10.00 Lacs
( supply of Mounting
Structure, Control Cable )
For theYear 19-20
Remaining Cost of the
Tender -33.00 Lacs
Cost of new 20 MVA- Rs
200.00 Lacs
SWG- Cost- Rs 42.00 Lacs
QV- Rs 3.00 Lacs
Total- Rs 278.00 Lacs
Say - Rs 278.00 Lacs
53.24
173.37
56.02
117.00
FY 2019-20
Supply: 120.00
Ere: 15.00
Civil: 15.00
Total: 150.00
1151.44
758.25 &
04.12.10
Total Work
Cost
FY 2018-19:
Supply: 80..00
Civil: 10.00
Ere:
10.00
Total: 100.00
Total of Augmentation
Guledgud - Ilkal:
Construction of 110kV S.C. link line
on D/C towers from 110kV SubStation Guledgudda to 110kV SubStation Ilkal for a distance of
34.575 Kms.
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
30.08.11
619.68
1123.42
0.00
2274.86
619.68
1357.11
159.28
1469.00
460.00
FY 2019-20:
Supply: 300.00
Ere:
80.00
Civil:
79.35
Total: 459.35
Rs.in Lakhs
Sl.
No.
2
3
4
5
Work Code
EF1050
EG1047
EE1113
EG1055
Name of the Work
Mahalingpur to Jamkhandi:
construction of 110 kV DC line from
220 kV Mahalingapur S/S to 110
kV Jamakhandi S/S in the existing
110 kV SC line corridor along with
110 kV Terminal bays at both ends
for a distance of 23.897 kms.
Kudagi to Vajaramatti:
Construction of 220kV DC Line
from proposed Kudagi 400kV STPP
to 220kV Sub-station Vajramatti for
a distance of 79.42Kms
Nehru nagar-6 Pole Struture:
conversion of 110 kV Nehrunagar-6
pole structure SC line constructed
on 110 kV SC towers(MS towers)to
110 kV SC line on DC towers for a
distance of 2.3 kms
Shifting and Re-routing of 110 kV
line from Loc 125-145 of BagalkotB.Bagewadi DC line in TLM section
B.Bagewadi jurisdiction in
Vijayapura District
District
Bagalkote
Bijapur
Belagum
Vijayapur
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
917.86 &
19.04.14
5002.81 &
08.01.15
82.19 &
15.05.14
583.23 &
10.11.17
03.02.17
Cost of DWA
1089.71
Cost of
Deptly.
Supplied
Materials &
others
40.00
Total Work
Cost
1129.71
Cum Exp up
to 31/03/19
671.53
Budget
2019-20
200.00
Remarks
FY 2018-19:
Supply: 145.05
Ere: 65.00
Civil: 35.49
Ret: 198.90
CC: 36.61
Total: 481.05
F`Y 2019-20:
Supply: 145.05
Ere: 65.00
Civil: 35.49
Ret: 198.90
CC: 36.61
Forest: 200.00
Total: 681.05
(Forest clearance awaited. If
clearance obtained work will
be executed in forest area as
there is no ROW issues if not,
Budget will be spill over to FY19-20)
FY 2018-19:
Erec: 58.00
Civil: 70.00
Ret: 120.52
CC: 60.00
Total: 308.52
26.11.15
5782.67
606.00
6388.67
3835.47
2500.00
FY 2019-20
Erec: 200.00
Civil: 150.00
Ret: 1786.00
CC: 375.43
Rs: 2511.43
0.00
0.00
140.00
0.00
0.00
700.00
For theYear 18-19
Token Budget of Rs 10.00
Lacs
For the Year 19-20
Token Budget of Rs 10.00
Lacs
DPR cost requested for 201920.
Rs.in Lakhs
Sl.
No.
6
Work Code
Name of the Work
District
EF1013
a) B.Bagewadi - Bagalkote (46KM)
b) Mahalingapur - Mudhol-Vajramati
- Katarki (110kV SC line 67Km):
Re-conductoring of existing wolf ACSR
by LYNX ACSR conductor for a
distance of 113.00 Kms.
Bagalkote
6
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
1341.96 &
19.05.08
24.02.07
Total of Lines
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
1957.59
0.00
1957.59
1112.80
1.00
9449.65
646.00
10095.65
5779.08
4001.00
Cum Exp up
to 31/03/19
Budget
2019-20
1
EF1058
Providing 12.1kV 2.9MVAR
Capacitor Bank and other allied
equipment’s in KPTCL Sub-stations
of Bagalkote Zone.
Bagalkote
1612.78 &
27.08.14
07.08.15
1116.65
667.18
1783.83
990.95
100.00
2
EF1065
Renovation and up-gradation of
protection systems of 220KV Sub
Stations(22 Nos) in Bagalkot
Transmission Zone
Bagalkote
1481.29 &
20.06.14
26.12.15
1818.29
0.00
1818.29
1111.65
940.00
2
Total of TB's & Others
2934.94
667.18
3602.12
2102.60
1040.00
26
Total of Bagalkote Zone
22288.55
2796.27
25084.82
12064.34
12476.00
Remarks
Proposed for short close and it
is under process.
KALABURAGI TRANSMISSION
ZONE
Probable Expenditure for
2018-19 SupplyRs.150.00Lakhs
1
FA1013
Raichur town:
Establishing of 110kV Ring Mains
& associated 110kV Sub-Stations
viz Malayabad and Vadavatti with
1x10MVA, 110/11kV Trs for a
distance of 37.00 Kms.
Raichur
NA
1883.00 &
30.06.06
14.02.07
2297.11
282.00
2579.11
2543.66
250.00
Budget required for the year
19-20
Supply: 150.00 Lakhs
Erection: 10.00 Lakhs
Civil: 60.00 Lakhs
PV: 20.00 Lakhs
RTN: 10.0 Lakhs
Total:250.0 Lakhs
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
Probable Exp. upto
31.03.2019
Supply: 36.81 Lakhs
Erection: 10.0 Lakhs
Civil: 40.0 Lakhs
Total: 86.81 Lakhs
2
3
4
FA1049
Adavi Amareshwara:
Establishing 1x10MVA, 110/11kV
Sub-Station with associated line
FB1035
Kudligi:
Establishing 2x100MVA,
220/66/11kV & 1x12.5MVA,
66/11kV Station at Kudligi
(Badeladaku) along with associated
lines & TB's for a distance of
(220kV 32.63Kms & 66kV M/C
5.36Kms)
Bellary
ES 36.23
BCR 2.94
4967.70 &
21.09.11
20.11.12
4565.69
38.00
4603.69
2756.65
1800.00
FC1048
Chowdapura:
Up-gradation of 33/11kV MUSS to
1x10MVA, 110/11kV and
1x20MVA, 110/33kV Sub-Station
with associated line for a distance
of 20.30 Kms.
Kalaburagi
ES 6.46
BCR 1.79
1284.94 &
27.05.11
29.11.11
912.79
36.20
948.99
748.62
378.00
Raichur
ES 1.447
BCR 1.22
493.50
06.06.07
541.76
0.00
541.76
279.35
280.00
Budget required for the year
19-20
Supply: 140.0 Lakhs
Civil: 10.00 Lakhs
PV: 10.00 Lakhs
QV: 10.00 Lakhs
RTN: 100.00 Lakhs
crop:10.0 Lakhs
Total: 280.0Lakhs
Expenditure for FY-201819.
On Hand Bills- 173Lakhs.
Bills to be submitted
(Supply & Erection) - 18.34
Total - 191.34Lakhs
Budget required for FY-201920 is 1800Lakhs.
retention amount- 880
supply amount- 600
Short closed by
no:CEE/TZ/GLB/SEE(O)/A
EE-3/2016-17/6771-79
Dtd:19.09.2016 Work was
awarded to AR
Construction. Work under
Progess.
To be Surrendred Rs.185.48 lakhs
Rs.in Lakhs
Sl.
No.
5
Work Code
FD1016
Name of the Work
Koppal :
Establishing 2x100MVA,
220/110kV and 1x10MVA,
110/11kV Station at Koppal
(Halavarthi) along with associated
lines & TB's.
11.06 (11KM-110KV&0.06KM220KV)
6
FD1018
Thavaragera: Establishing
1x10MVA, 110/11kV and
1x20MVA, 110/33kV Sub-Station
with associated 110kV line for a
distance of 26.495 Kms.
7
FF1003
Ramsamudra:
Establishing 220/110kV Sub
Station with associated 220kV and
110kV lines
District
Koppal
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
ES 15.9
BCR 2.435
3759.87 &
25.06.11
14.08.12
Cost of DWA
2997.91
Cost of
Deptly.
Supplied
Materials &
others
0.00
Total Work
Cost
2997.91
Cum Exp up
to 31/03/19
3340.02
Budget
2019-20
1500.00
Remarks
Budget Utilisatin for 2018-19
Supply
-218.35
Dep Supply- 57.28
Erection/Civil -24.37
Total300 lakhs
Further the budget of Rs.
197.46 proposed for
surrender.
Budget requirement for 201920
Supply-709.55
Erection- 121.64
Civil482.51
Tree/Crop cut- 21
statutory- 4
Work slip- 8
Total- 1346.64
Koppal
ES 4.17
BCR 1.21
1433.55 &
16.05.13
09.03.17
1974.90
43.50
2018.40
1504.25
610.00
Budget of Rs.150 Lakhs is
required for payment of
Crop cut ,Line Erection and
Retention Bills for the FY
2018-19 it self.
Budget Requirement for
2019-20
Suplly 304.49 Lakhs
Erection 18.72 lakhs
Civil 89.27Lakhs
Dep.Ret 2.17 Lakhs
Work Slip 22.36 Lakhs
Statutory 3.75 Lakhs
Tree/Crop 20.00 Lakhs
PV 60.00 Lakhs
Total 520.80 Lakhs
Yadgir
ES 0.706
MU&BCR
0.86
5831.49 &
03.11.17
15.03.18
6284.13
47.63
6331.76
0.00
3000.00
Supply bills : 100 Lakhs
Work under Progess.
Rs.in Lakhs
Sl.
No.
8
9
9
Work Code
Name of the Work
FD1029
Mangalore:
Up-gradation of 33/11kV MUSS to
2X10 MVA,110/11kV Sub-Station
with associated lines for a distance
of 7.426 Kms.
FD1032
Kukanoor(Dyamapura) :
Upgradation of 2x5MVA,33/11KV
Sub-station to 2x10MVA, 110/11kV
and 1x20MVA 110/33kV Substation Kukanoor(Dyamapura) in
Yelburga Taluk.
Total of Sub-stations
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
1076.00 &
27.04.17
Koppal
Koppal
ES6.540
BCR2.67
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
0.00
0.00
1600.13&
21.4.18
19574.29
Total Work
Cost
447.33
Cum Exp up
to 31/03/19
419.03
Budget
2019-20
500.00
0.00
6.04
1200.00
20021.62
11597.62
9518.00
Remarks
Budget Utilisatin for 201819
Supply -128 Lakhs
Erection -24 Lakhs
Civil -63 lakhs
Total -215 Lakhs
Further the budget of Rs.
61.43 lakhs proposed for
surrender.
Budget requirement for
2019-20
Supply- 349.5
Erection- 8.19
Civil- 107.52
Tree/Crop Cut:30.00
Statutory 02.00
Dep Ret 05.01
Total 502.31 Lakhs
Budget requirement for
2019-20
Supply-920
Erection-62
Civil218
Total-1200 Lakhs
Rs.in Lakhs
Sl.
No.
1
2
Work Code
FA1045
FA1046
Name of the Work
Alkod:
Providing additional 1 x 10 MVA,
110/11 kV Power Transformer at
Alkod S/s
Maliyabad :
Providing additional 1 x 10 MVA,
110/11 kV Power Transformer at
Maliyabad S/s
District
Raichur
Raichur
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 1.44
BCR 1.43
241.17 &
10.06.15
241.97 &
10.06.15
26.03.18
26.03.18
Cost of DWA
124.78
124.83
Cost of
Deptly.
Supplied
Materials &
others
101.95
101.95
Total Work
Cost
226.73
226.78
Cum Exp up
to 31/03/19
64.04
60.60
Budget
2019-20
Remarks
215.00
Probable Expenditure for
2018-19
Supply : 15.70 L
Erection : 10 Lakhs
Civil :
15.0 Lakhs
Total :
40.7 Lakhs
Budget required for 2019-20
Supply: 170.0 Lakhs
Erection : 10 Lakhs
Civil :
5.0 Lakhs
Retn:
25 Lakhs
QV:
5.0 Lakhs
Total :
215.0 Lakhs
Transformer, 110 KV
Breaker & 11 KV
Switchgears are to be
Supplied by KPTCL
215.00
Expenditure for 2018-19
Supply : 15.36 L
Erection: 10.0 L
Civil:
15.0 L
Total :
40.36Lakhs
Addl Budget Reqd for 18-19
: 27.0 L
Budget for 2019-20
Supply:
170.0 L
Erection: 10.0 Lakhs
Civil:
5.0 Lakhs
QV
5.0 Lakhs
Retn :
25.0 Lakhs
Total :
215.0Lakhs
Transformer, 110 KV
Breaker & 11 KV
Switchgears are to be
Supplied by KPTCL
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
3
FA1048
Gurugunta:
Providing additional 1 x 10 MVA,
110/11 kV Power Transformer at
Gurugunta S/s
4
FC1037
Chincholi:
Providing additional 1x10MVA,
110/33kV Transformer
FA1052
Raichur:
Enhancement of 1x10MVA,
110/11KV Power Transformer by
20MVA ,110/11kV power
transformer & providing 3 no's of
1x1000sq.mm XLPE CABLES TO
11V Bank III at 220KV S/S
Raichur.
Raichur
BCR 0.75
227.84&
16.04.18
FA1053
Valkamdinni:
Replacement of 1x10MVA by
1x20MVA 110/33KV Power
Transformer at 110KV S/S
Valkamdinni.
Raichur
BCR 0.85
202.25&
11.04.2018
FA1055
Sindhanoor:
Replacement of 1x10MVA by
1x20MVA 110/11KV Power
Transformer at 110KV S/S
Sindhanoor
BCR 0.75
217.63&
03.06.17
5
6
7
Raichur
BCR 1.43
Kalaburagi
BCR 1.41
243.44 &
08.01.16
157.75 &
01.08.11
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
Remarks
26.03.18
124.33
101.95
226.28
17.56
215.00
Expenditure for the FY 201819
Supply :
15.41 L
Erection:
10.0 L
Civil:
15.0 L
Total :
40.41 L
Addl budget rqd: 12.0 L
Budget for 2019-20
Supply:170.00 L
Erection: 10.0 Lakhs
Civil:
5.0 Lakhs
QV :
5.0 Lakhs
Retn :
25.0 Lakhs
Total :
215 Lakhs
Transformer, 110 KV
Breaker & 11 KV
Switchgears are to be
Supplied by KPTCL
19.01.18
68.49
98.16
166.65
37.14
110.00
Supply, Erection & Civil 136.65 Lakhs
Budget for FY-2019-20
Raichur
0.00
0.00
Tfr cost :
160.73 Lakhs
Erection cost: 34.54 Lakhs
Total : 195.27 Lakhs
Transformer to e Supplied
by KPTCL
0.00
200.00
0.00
200.00
Budget for FY-2019-20
Tfr cost:
160.73 Lakhs
Erection cost:7.0 Lakhs
Total
167.73 Lakhs
200.00
Budget for FY-2019-20
Tfr cost:160.73 Lakhs
Switchgear:37.7 Lakhs
Erection cost: 19.1 Lakhs
Total 216.63 Lakhs
0.00
Rs.in Lakhs
Sl.
No.
8
9
Work Code
FB1075
FB1076
Name of the Work
Kogali:
Providing additional 1x8MVA,
66/11kV Transformer
Sovenahalli:
Providing additional 1x8MVA,
66/11kV Transformer
District
Bellary
Bellary
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 1.00
BCR 0.994
178.18 &
20.08.13
178.52 &
20.08.13
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
0.00
0.00
Cum Exp up
to 31/03/19
0.00
0.00
Budget
2019-20
150.00
150.00
10
FB1077
Banavikallu:
Providing additional 1x8MVA,
66/11kV Transformer
Bellary
BCR 0.99
180.84 &
20.08.13
0.00
0.00
150.00
11
FB1084
HB Halli:
Replacement of 1X 8MVA,66/11KV
Transformer by
1X12.5MVA,66/11KV H.B.Halli
S/s.
Bellary
BCR 0.732
136.45 &
02.09.14
0.00
0.00
135.00
Remarks
Addl Budget for 18-19 is Rs
24.0 Lakhs
Budget for FY-2019-20
Tfr cost: 40.0
Lakhs(Released good)
Switchgear:28.75 Lakhs
Erection cost: 65.12 akhs
Total : 133.87 Lakhs
Budget required for FY 1920: 133.87 L
Addl Budget for 18-19 is Rs
24.0 Lakhs
Budget for FY-2019-20
Tfr cost: 40.0
Lakhs(Released good)
Switchgear:28.75 Lakhs
Erection cost: 59.87 Lakhs
Total 128.62 Lakhs
Addl Budget for 18-19 is Rs
24.0 Lakhs
Budget for FY-2019-20
Tfr cost:
40.0
Lakhs(Released good)
Switchgear:
28.75 Lakhs
Erection cost: 62.14 Lakhs
Total :
130.89 Lakhs
Budget for FY-2019-20
Tfr cost:
117.12 Lakhs
Erection cost: 16.08 Lakhs
Total :
133.21 Lakhs
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
FB1086
Somasamudra:
Providing additional 1x10MVA,
110/11kV Transformer
13
FB1089
Kamalapur (Hospet Tq.): Providing
additional
1 X10MVA, 110/11kV Power
Transformer at kamalapur in
Hospet Tq.
Bellary
BCR 1.62
268.92 &
01.06.15
0.00
0.00
174.00
14
FB1093
Sankalapura: Repl of 1X10MVA by
1X20MVA, 110/11kV Trf at
110/11kV S/S Sankalapura
Ballari
BCR 0.77
258.56 &
01.03.18
0.00
0.00
218.00
15
FC1062
Providing additional 1 x 20 MVA
110/33 kv Transformer along with
construction of 33kV Terminal Bay
at existing 110/33/11kV at
Kalaburagi (West) Sub-Station
Kalaburagi
BCR 1.267
356.58 &
10.05.17
0.00
13.49
200.00
16
FC1064
Providing additional 1 X 10MVA,
110kV Power Transformer at
110/33/11kV MUSS, Chowdapur.
Kalaburgi
BCR 0.73
298.07 &
05.01.18
0.00
200.00
FD1024
Bevoor :
Providing additional 1 x 10 MVA,
110/11 kV Power Transformer at
Bevoor S/s
BCR 1.42
243.72 &
01.06.15
12
17
18
FD1025
Ganadal :
Providing additional 1 x 10 MVA,
110/11 kV Power Transformer at
Ganadal S/s
Bellary
Koppal
BCR 1.06
209.74 &
15.05.14
0.00
0.00
0.00
28.18
135.00
200.00
Remarks
Addl Budget for 18-19 is Rs
24.0 Lakhs
Budget for FY-2019-20
Tfr cost:
40.0 Lakhs
Switchgear:
37.7 Lakhs
Erection cost:53.86 Lakhs
Total :
131.57 Lakhs
Addl Budget for 18-19 is Rs
25.0 Lakhs
Budget for FY-2019-20
Tfr cost :
40.0 Lakhs
Switchgear:
37.7 Lakhs
Erection cost: 96.0 Lakhs
Total : 173.70 Lakhs
Approved in 75th
TCCM,Dtd: 04.11.2017.
Budget of Rs.51.82Lakhs
has been proposed for
surrender.
Budget required for FY-201920 :227.08 Lakhs
Koppal
BCR 1.44
241.45 &
01.06.15
0.00
28.18
200.00
Budget of Rs.56.82Lakhs
has been proposed for
surrender.
Budget required for FY-201920: 231.25
Lakhs
Rs.in Lakhs
Sl.
No.
Work Code
Name of the Work
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
19
FD1034
Enhanncement of 1X10MVA,
110/33KV power Transformer
NGEF Make) by 1X20MVA,
110/33Kv POWER Transformer at
110/33/11kV MUSS Betegera S/s
in Koppal Tq, District.
20
FF1002
Konkal:
Providing additional 1x10MVA,
110/11kVTransformer
Yadgir
BCR 1.48
164.46 &
04.06.14
0.00
0.00
165.00
FF1004
Creating 33 KV reference by
providing additional 1 x 20 MVA
110/33 kv Power Transformer along
with construction of 33kv Terminal
Bay
at
Existing
110/11kV
Gurmitkal Sub-Station in Yadgir
Tq. yadgir Dist.
Yadgir
BCR 1.392
326.128 &
10.10.17
0.00
0.00
250.00
21
21
1
Koppal
BCR 0.85
200.50 &
05.02.18
0.00
0.00
165.00
Transformer to be Supplied
by KPTCL
To be Surrendred Rs.
163.46Lakhs
Total of Augmentation
FB1025
Munirabad - Ujjini:
Dismantling of existing 66kV
Munirabad-Sokke-Davangere line
emanating from Munirabad
Generating Station & Erecting a
new 66kV line with Coyote
conductor upto 66kV Ujjani SubStation in Kudligi Taluk for a
distance of 204.31 Kms
Remarks
Bellary
NA
991.18 &
24.10.09
28.08.10
442.43
404.01
846.44
249.19
3847.00
773.98
0.00
773.98
439.86
10.00
Work short closed. Estimate
is under preparation for the
balance work at MWD,
Ballari
Rs.in Lakhs
Sl.
No.
2
3
Work Code
1
34
District
FC1023
Chincholi-Mannekalli-Sedam:
i) Construction of 110kV DC link
line between 110kV Chincholi and
110kV Manna-E-Khelly SubStations 49.87Kms.
ii) Stringing Second circuit on
existing DC towers from 220kV
Sedam Station to 110kV
Chincholi Sub-Station for a
distance of 32kms.
Kalaburagi
FC1042
Shahapur - Hattigudar:
Re-construction of 110kV DC line
from 220kV Hattigudar(Shahapur)
S/s to 110kV Shahapur S/s for a
distance of 10.63kms using Lynx
conductors
Yadgir
3
1
Name of the Work
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
BCR 1.236
1128.89 &
07.01.11
11.07.11
494.34 &
05.05.15
Renovation and Upgradation of
Protection systems of 220kV
Substations (12 Nos) in Kalaburagi
Transmission Zone
Total of TB's & Others
Total of Kalaburagi Zone
924.99
1698.97
Kalaburagi
1384.05 &
20.06.14
0.00
0.00
Total of Lines
FC1057
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
26.12.15
1436.37
0.00
0.00
Total Work
Cost
Cum Exp up
to 31/03/19
Budget
2019-20
924.99
1134.68
310.00
0.00
489.57
138.00
1698.97
2064.11
458.00
1436.37
948.17
500.00
1436.37
0.00
1436.37
948.17
500.00
23152.06
851.34
24003.40
14859.09
14323.00
Remarks
Work Awarded to M/S
Deepak Cable Short closed
by vide ltr
No:CEE/GLB/AEE-3/662332 Dtd:16.09.2016 Supply :
835.67 L
Erection : 140 L
Civil : 130 L
Total : 1105.67 L
Balance work Awarded to
M/S AR Construction on
TTK basis Work under
Progess.
Addiitional Req.-Rs.431.41
Lakhs.
Munirabad Circle :
Total On hand Bills for
176.94 lakhs
220kV Allipura (WUP)- 2.38
lakhs
220kV Lingasugur- 98.50
lakhs
220kV Raichur- 8.87 lakhs
220KV Kustagi:(WUP)29.88 Lakhs
220KV Sindhanur:- 7.41
lakhs
220KV Ittigi:- 29.88 lakhs
Total 176.94 Lakhs
Gulbarga Cicrle :
Total On hand Bills for
Rs.in Lakhs
Sl.
No.
256
Work Code
Name of the Work
Total of List-II for All Zones
District
Cost of
Energy
Original /
Savings &
Date of LOI
Revised DPR
BCR
& Date
Cost of DWA
Cost of
Deptly.
Supplied
Materials &
others
Total Work
Cost
447152.53
26621.45
463353.38
Cum Exp up
to 31/03/19
293692.78
Budget
2019-20
219349.00
Remarks
List III Works which are proposed to be taken up during the present fiscal year 2019-20
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
BENGALURU TRANSMISSION
ZONE
Ramanagara
601.87 &
18.12.17
0.00
0.00
10.00
FY 18-19
civil-10L
Total-10L
FY 19-20
Supply-300L
erection -20L
Civil-140L
Switch gear-40L
Total-500L
EXORA Business park:
Establishing 2x150MVA,
220/66/11kV Station with
associated line.
Bengaluru Urban
10413 &
09.03.18
0.00
0.00
900.00
FY 18-19:
10L - Surrender.
FY 19-20
Supply+Erection+Civil: 5000 L
AA1165
S.Medehalli:
Establishing 2x12.5 MVA,
66/11kV sub-station at
S.Medehalli, in Anekal Taluk,
Bengaluru Urban District.
Bengaluru Urban
1978 &
09.03.17
0.00
0.00
1.00
FY-19-20
Nominal Budget: 5 L
4
AA1167
Muthanallur:
Establishing 2x31.5MVA,
66/11kV Sub-Station with
associated line at anekal
taluk.
Bengaluru Urban
1080.00 &
19.04.17
0.00
0.00
1.00
FY-19-20
Nominal Budget: 5 L
5
AA1183
Madappanahalli: Establishing
2x20MVA, 66/11kV SubStation with associated line
for a distance of 3.604Kms
Bengaluru Urban
1119.73 &
25.05.17
0.00
0.00
1.00
FY-19-20
Nominal Budget: 5 L
1
AC1074
Shivanahalli: Establishing.
1x8 MVA, 66/11kV S/s and
associated line
2
AA1075
3
ES 1.59 &
BCR 0.61
(Rs. In Lakhs)
District
Energy
Savings &
BCR
AE1027
Nandi (Muddenahalli):
Establishing 1x8MVA,
66/11kV Sub-Station with
associated line for a distance
of 3.466 Km.
C.B.Pura
ES 1.42
BCR 1.41
7
AA1199
400 kV Peenya: Establishing
2x500 MVA, 400/220 kV Sub
Station( 400 kVGIS &220kV
AIS) at existing 220kV SRS
Peenya premises
Bengaluru.Running of single
circuit 220kV single core
10000sqmm XLPE Copper UG
Cable fo aroute length of
10.265 Kms from proposed
400/200kV Peenya sub-sation
to existing 220/66kV "A"
station.
Bengaluru Urban
8
AA1193
Sahakarinagar:
Establishing 2x150 MVA,
220/66/11kV GIS sub station
9
10
Sl.
No.
6
Work Code
Name of the Work
Cost of
Original / Date of
Revised
LOI
DPR & Date
394.20 &
20.06.11
31.01.
12
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
99.07
10.00
FY-19-20
Nominal Budget: 15 L
43315.05 &
28.11.18
0.00
10.00
FY 19-20
Civil: 100 L
Bengaluru Urban
14960.67 &
19.07.18
0.00
500.00
FY 19-20
S/E/C - 7500L 50% of the DPR
cost
AA1202
Audugodi GIS: Conversion of
existing 66/11 kV Audugodi
substation(AIS) to GIS
substation in Bengaluru South
Taluk, Benglauru Urban
District.
Bangalore Urban
4442.40 &
18.12.18
0.00
10.00
FY 19-20
Supply+Erection+Civil: 1000 L
AD1047
Thorlakki:Establishing 1x12.5
MVA, 66/11kV Substation at
Torlakki with associated
line&Bay
Kolar
801.15&
26.12.18
0.00
100.00
FY 19-20
S+E+C : 500 L
320.96
104.75
425.71
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
AD1020
Talgunda:
Establishing 2x8MVA,
66/11kV sub -station at
Talagunda village in Kolar
Taluk &District.
12
AA1180
HBR:
Establishing 2x150 MVA,
220/66/11kV GIS sub station
at HBR Layout
13
AD1048
Gownpalli :Establishing
2x12.5MVA, 66/11kV SubStation with associated line
14
AE1025
Alipura:Estabilishing 1 x 12.5
MVA, 66/11kV Sub-Station at
Alipura in Gowribidanur
Chikkaballapura
Taluk, Chikkaballapura
District
15
AA1204
Establishing 2x150MVA Trf at
Sobha dreams balagere
varthur hobli Bangalore east
taluk.
11
15
1
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Kolar
789.26&
31.12.18
Bengaluru Urban
25149.10&
28.12.17
revised
/16718&
07.01.19
Kolar
1004.35&
14.01.19
Bengaluru Urban
Hoody: Providing 3rd
additional 1x31.5 MVA, 66/11
kV transformer.
7319.9 &
12.03.19
555 &
10.05.17
Remarks
100.00
FY 19-20
S+E+C=500L
0.00
500.00
Ratification to proposal
approved in 74th TCCM held on
20.06.17
0.00
100.00
FY 19-20
S+E+C : 500 L
0.00
100.00
FY 19-20
Supply: 100 L
0.00
100.00
425.71
99.07
2443.00
0.00
0.00
5.00
0.00
104.75
Budget
2019-20
0.00
0.00
320.96
Bengaluru Urban
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
1055.32&
25.02.19
Total of Sub-stations
AA1151
Cost of
DWA
FY-19-20
Nominal Budget: 5 L
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
AA1173
Rajarajeshwarinagar:
Replacement of 2X20MVA by
2X31.5MVA transformer at
66/11kV Rajarajeshwarinagar
S/s
Bengalulru urban
700.03 &
09.06.17
0.00
0.00
200.00
FY-19-20
Tr supply + Erection: 200 L
AA1174
Kumbalgodu:
Replacement of 1x12.5MVA by
1x31.5MVA 66/11kV
Transformer at 66/11kV
Kumbalagodu Substation
Bengalulru urban
276.38 &
09.06.17
0.00
0.00
200.00
FY-19-20
Nominal Budget: 3 L
AA1175
Prestige Shanthinikethan:
Replacing 1X20MVA by
1X31.5MVA 66/11kV Power
transformerat 66/11kV
Prestige Shanthinikethan
substation .
Bengalulru urban
248.90 &
15.07.17
0.00
0.00
200.00
FY-19-20
Tr supply + Erection: 2 L
AA1182
Attibele:
Replacement of 1x20 MVA,
66/11 kV transformer by
1x31.5MVA 66/11kV
Transformer
Bengaluru Urban
319.13 &
05.12.17
0.00
0.00
200.00
FY-19-20
Nominal Budget: 5 L
6
AA1184
Peenya:
Augmentation of 2x20MVA,
66/11kV power transformer
no.II & III by 2x31.5MVA,
66/11kV power transformer at
SRS Peenya 220/66/11kV
Substation
Bengaluru Urban
597.33 &
205.05.17
0.00
0.00
200.00
FY-19-20
Tr supply + Erection: 200 L
7
AA1185
Abbigere: Replacement of
2x12.5MVA, 66/11kV by
2x20MVA, 66/11kV
transformer
Bengaluru Urban
546.12 &
29.05.17
0.00
1.29
5.00
FY-19-20
Nominal Budget: 5 L
2
3
4
5
(Rs. In Lakhs)
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Work Code
8
AA1186
IISC: Replacing of 2x20MVA,
66/11kV power transformer
by 2x31.5MVA power
transformer
Bengaluru Urban
676.65 &
03.07.17
0.00
0.00
200.00
FY-19-20
Nominal Budget: 5 L
9
AA1187
Raj Mahal Vilas (RMV):
Augmentation of 2x20MVA,
66/11kV by 2x31.5MVA,
66/11kV transformer
Bengaluru Urban
530.00 &
13.11.17
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
10
AA1188
Byadarahally: Replacement of
1x20MVA, 66/11kV Power
Transformer by 1x31.5MV,
66/11kV power transformer
Bengaluru Urban
351.00 &
26.10.17
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
11
AA1189
Brindavaan: Replacement of
2x20MVA, 66/11kV Power
Transformer II & III by
2x31.5MVA, 66/11kV power
transformer
Bengaluru Urban
635.30 &
08.11.17
0.00
0.00
200.00
FY-19-20
Nominal Budget: 5 L
12
AA1194
Naganathapura : Replacing
2X20MVA by 2X31.5MVA
66/11kV Power transformer
Bengaluru Urban
530.00 &
30.11.17
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
13
AA1195
Adugodi: Replacing 3X20MVA
by 3X31.5MVA 66/11kV
Power transformer
Bengaluru Urban
10.01.07 &
13.03.19
0.00
0.00
200.00
FY-19-20
Tr supply + Erection: 200 L
14
AA1196
Nelagadaranahalli: Replacing
2x20MVA, 66/11kV by
2x31.5MVA, 66/11kV
transformer
Bengaluru Urban
668.45&
25.05.17
0.00
172.11
5.00
FY-19-20
Tr supply + Erection: 200 L
Name of the Work
District
BCR 0.951
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Sl.
No.
Budget
2019-20
Remarks
(Rs. In Lakhs)
Sl.
No.
Work Code
15
AB1059
Anekal.:
Replacing 1X20MVA by
1X31.5MVA , 66/11KV Power
transformer at 66/11KV S/S,
Bangalore rural
AB1060
66/11KV S/s Volvo:
Replacing of 1X6.3 MVA by
1X12.5 MVA Transformer at
66/11KV S/S Volvo
Bengaluru Rural
AB1062
Sulibele :
Replacing of 2 x 12.5MVA
Transformers by 2x 20MVA
transformers
16
17
18
19
20
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
282.61&
09.06.17
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
BCR 0.76
139.36&
13.07.17
0.00
0.00
120.00
FY-19-20
Nominal Budget: 5 L
Bengalore Rural
BCR 0.60
206.87&
05.12.17
0.00
0.00
5.00
FY 19-20
Tr supply+Erection: 175 L
AB1063
Nanadagudi :
Replacing 2 x12.5MVA
Transformers by 2x 20 MVA
Transformers
Bengalore Rural
BCR 0.63
397.39&
24.08.17
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
AB1064
CBPura(I/A):
Replacing 1x12.5MVA NGEF
make Tr-1, 66/11kV by
1x20MVA, 66/11kV
Transformer
Bengaluru Rural
BCR 0.61
264.07&
09.06.17
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
AB1065
220KV EKARAJAPURA:
a) Providing additional 1x100
MVA, 220/66 kV transformer
b) Providing additional 1x12.5
MVA, 66/11 kV transformer
and replacing the existing
1x20 MVA, 66/11 kV
transformer by 1x12.5 MVA
transformer at 220 kV
Hosakote(Ekarajapura) substation..
Bengalore Rural
BCR 2.24
1351&
09.04.18
0.00
0.00
50.00
FY-19-20
Nominal Budget: 5 L
(Rs. In Lakhs)
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Work Code
21
AC1049
Channapatna:
Augmentation of 1X12.5 MVA
66/11 kV Tr. By 1 X 20 MVA
at 66/11 kV Channapatna
Ramanagara
181.74 &
05.06.15
0.00
0.00
180.00
FY 19-20
Tr supply+Erection:180 L
22
AC1067
Magadi:
Replacing 1x12.5MVA by
1x20MVA, 66/11kV Pwer
Transformer at 66/11kV
Magadi
Ramanagara
175.95 &
17.02.16
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
23
AC1071
Gudemaranahalli:
Replacing 2x8MVA by
2x20MVA 66/11kV Power
Transformer
Ramanagara
394.72 &
16.06.17
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
24
AD1025
Dalasanur:
Replacing 1x8MVA, 66/11kV
by 1x12.5MVA, 66/11kV
Transformer
Kolar
BCR 0.72
121.55 &
26.10.11
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
AD1028
S.M.Mangala:
Replacing 1x8MVA, 66/11kV
by 1x12.5MVA, 66/11kV
Transformer
Kolar
BCR 0.72
0.00
0.00
5.00
FY-19-20
Labour portion: 5 L
26
AD1029
Masti:
Replacing 2nd 2x12.5MVA,
66/11kV by 2x20MVA,
66/11kV Transformer
Kolar
286.15 &
20.02.13
35.00
134.17
2.00
FY-19-20
Nominal Budget: 2 L
27
AD1039
Anderdsonpet :
Replacing 2x8MVA, 66/11kV
by 2x12.5MVA, 66/11kV
Transformer
Kolar
269.61 &
05.11.14
0.00
0.00
2.00
FY-19-20
Nominal Budget: 5 L
25
Name of the Work
District
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Sl.
No.
121.55 &
27.08.11
35.00
Budget
2019-20
Remarks
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Srinivasapura:
Replacing 1x12.5MVA,
66/11kV by 1x20MVA,
66/11kV Transformer
Kolar
BCR 0.61
205.12&
11.10.17
0.00
0.00
2.00
FY-19-20
Nominal Budget: 5 L
AD1045
Thayalur:
Replacing 1x8MVA, 66/11kV
by 1x12.5MVA, 66/11kV
Transformer
Kolar
BCR 0.52
142.06&
31.10.17
0.00
0.00
2.00
FY-19-20
Nominal Budget: 5 L
30
AD1046
Malasandra:
Replacing 1x8MVA, 66/11kV
by 1x12.5MVA, 66/11kV
Transformer
Kolar
BCR 0.52
140.87&
26.09.17
0.00
0.00
2.00
FY-19-20
Nominal Budget: 5 L
31
AE1017
M.G.Halli:
Replacing 1x8MVA, 66/11kV
by 1x12.5MVA, 66/11kV
Transformer
C.B.Pura
BCR 1.25
110.49 &
09.11.10
0.00
0.01
2.00
FY-19-20
Nominal Budget: 5 L
32
AE1031
Cheemangala:
Replacing 1x6.3MVA,
66/11kV by 1x12.5MVA,
66/11kV Transformer
C.B.Pura
BCR 0.97
143.26 &
16.12.17
0.00
0.43
2.00
FY-19-20
Nominal Budget: 5 L
33
AE1051
Talagavara:
Replacing second 1x12.5MVA,
66/11kV by 1x20MVA,
66/11kV transformer
CBPura
BCR 0.61
204.67&
12.02.18
0.00
0.00
2.00
FY-19-20
Nominal Budget: 5 L
34
AE1052
Cheemangala:
Replacing second 1x6.3MVA,
66/11kV by 1x12.5MVA,
66/11kV transformer
CBPura
BCR 0.51
142.26&
12.02.18
0.00
0.00
2.00
FY-19-20
Nominal Budget: 5 L
35
AE1053
Replacing of 2x8 MVA by
2x12.5 MVA at Manchenahalli
272.12&
05.06.15
0.00
0.00
2.00
FY-19-20
Nominal Budget: 5 L
Sl.
No.
Work Code
28
AD1043
29
Name of the Work
Chikkaballapura
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Sl.
No.
Work Code
36
AA1197
Widia S/s:
Providng addnl 1X20MVA,
66/11kV Power Transformer.
Bengaluru
555.00&
18.07.18
AA1200
BTM 4th Stage:Providing
1x31.5MVA, 66/11 kV Power
Transformer at existing
66/11 kV BTM 4th Stage Substation in Subramanyapura
TL&SS Division Bengaluru
Urban District.
Bengaluru Urban
AA1201
ELITA PROMENEDE:
Providing additional 1x20MVA,
66/11kV Power Transformer
at existing 66/11kV ELITA
PROMONEDE Sub-station in
Subramanyapura TL&SS
Division, Banaglore South
Taluk & Urban District.
Bengaluru Urban
39
AC1086
Gudemaranahalli:Providing
1X20MVA spare power
transformer as spare with
associated bay at 66/11kV ,
Gudemaranahalli S/s in
Magadi Taluk, Ramanagara
District
Ramnagara
40
AA1204
Koramangala: Replacing
2X20MVA by 2X31.5MVA
66/11kV Power transformer
Bengaluru Urban
37
38
Name of the Work
District
BCR 1.80
BCR 1.14
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
150.00
FY 19-20
S+E+C-250L
296.20 &
01.10.18
0.00
200.00
FY 19-20
Supply+Erection+Civil : 200 L
297.92 &
01.10.18
0.00
100.00
FY 19-20
Supply+Erection+Civil : 150 L
256.02 &
24.11.18
0.00
5.00
FY 19-20
S/E /C - 10L
527.18 &
24.12.18
0.00
200.00
0.00
(Rs. In Lakhs)
Sl.
No.
41
42
43
44
45
46
Work Code
Name of the Work
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Mandya
BCR 0.58
283.15 &
26.12.18
0.00
5.00
Cost of
DWA
Budget
2019-20
AB1070
Augmentation of 2 X 8 MVA
Power Transformer by 2 X
12.5MVA Power Transformer
at 220/66/11 kV Substation
T.K.Halli
AA1203
220/66kV
Hoody:Replacement of
2x100MVA Power Transformer
by 2x150MVA 220/66kV
Power Transformer at
220/66kV Hoody Sub-station.
Bengaluru Urban
BCR 1.06
1648.00
& 1.1.19
0.00
5.00
AC1088
Providing additional 1X 12.5
MVA, 66/11 kV Tansformer
at 66/11 kV MUSS
Sankalgere along with
Capacitor bank
Ramnagar
BCR 0.84
256.81 &
07.01.19
0.00
1.00
AB1069
DoddaballapuraProviding
additional (3rd)1X100MVA,
220/66kV Power Transformer
at 220/66kV NRS
Doddaballapura substation .
Bengaluru Rural
BCR 2.80
1035.61
& 5.2.19
0.00
10.00
AD1049
Enhancement of 66/11kV
power transformer 2 of
capacity 1x6.3MVA to
1x12.5MVA at 66/11kV substation, Byrakur
Kolar
BCR 0.71
0.00
2.00
AD1050
Enhancement of 66/11kV
power transformer 2 of
capacity 1x6.3MVA to
1x12.5MVA at 66/11kV substation, Mudiyanur.
Kolar
BCR 0.69
0.00
2.00
140.11 &
01.03.19
141.58 &
05.03.19
Remarks
FY 19-20
Nominal Budget : 5 L
FY 19-20
10L
(Rs. In Lakhs)
District
Energy
Savings &
BCR
AD1051
Lakkur: Replacing of 1X 8
MVA Power Transformer-2 by
1X12.5 MVA Power
Transformer at 66/11 KV S/S
Lakkur.
Kolar
BCR 0.47
AE1054
Providing 1X12.5MVA,
66/11kV Power transformer
as a SPARE at Ganjigunte
66/11kV S/s with associated
bay equipments
C.B.Pura
49
AD1052
Malur (Town): Augementation
of existing 1x8 MVA, 66/11 kV
(PTR No:2) by 1x12.5MVA,
66/11 kV transformer at
66/11 kV Malur (Town) substation.
50
AA1205
HSR Layout: Replacing
1X20MVA by 1X31.5MVA
66/11kV Power transformer
51
AD1053
Tamaka :
Replacing 1x12.5MVA,
66/11kV by 1x20MVA,
66/11kV Transformer
Kolar
52
AD1054
Bangarpet:
Replacing second 1x12.5MVA,
66/11kV by 1x20MVA,
66/11kV Transformer
Kolar
Sl.
No.
47
48
Work Code
Name of the Work
Kolar
Cost of
Original / Date of
Revised
LOI
DPR & Date
144.14 &
05.03.19
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
0.00
2.00
216.97 &
12.03.19
0.00
1.00
144.08 &
15.03.19
0.00
2.00
263.29 &
19.03.19
0.00
10.00
BCR 1.02
191.14 &
23.03.19
0.00
2.00
BCR 0.99
208.62 &
08.04.19
0.00
2.00
BCR 0.47
Bengaluru Urban
Remarks
(Rs. In Lakhs)
Sl.
No.
53
54
55
56
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
AD1055
Bangarpet:
augmentation of 1X12.5 MVA,
66/11 kV power transformer2 by 1X20 MVA, 66/11 kV
Kolar
power transformer at 66/11
kV Bangarpet sub-station in
Bangarpet Taluk, Kolar
District
BCR
0.55
208.62
&
08.04.2019
0.00
2.00
AD1056
Tekal:-augmentation of
existing 1X8 MVA, 66/11 kV
power transformer-2 by
1X12.5 MVA, 66/11 kV power Kolar
transformer at 66/11 kV
Tekal sub-station in Malur
Taluk, Kolar District
BCR
0.47
144.08 &
08.04.19
0.00
3.00
AD1057
KGF:-Replacing 1x8 MVA,
66/11 kV transformer by 1x20
MVA, 66/11 kV transformer at
Kolar
66 kV KGF sub-station in
Bangarpet Taluk, Kolar
District
BCR
1.10
210.81 &
09.04.19
0.00
2.00
AC1089
Ranganadoddi:-Replacement
of 2nd 1x12.5 MVA, 66/11 kV
power transformer by 1X20
MVA, 66/11 kV Power
Ramanagara
transformer at 66/11kV
Ranganadoddi sub-station in
Kanakapura taluk,
Ramanagara district
BCR
1.10
205.12 &
22.02.19
0.00
150.00
Remarks
(Rs. In Lakhs)
Sl.
No.
57
Work Code
AD1058
57
1
2
3
Name of the Work
Vemagal:Augmentation of
1x12.5MVA Power
Transformer-1 by 1x20MVA
Power Transformer at
66/11kV Vemagal Substation
in Kolar Taluk
District
Energy
Savings &
BCR
Kolar
BCR 1.04
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
191.55 &
27.03.19
Total of Augmentation
0.00
35.00
Budget
2019-20
0.00
2.00
35.00
308.01
2898.00
Remarks
AC1084
Construction of 66kV MC/DC
line in the existing corridor of
66kV Somanahalli Kanakapura - T.K.Halli DC
line B1 & B2 having old H
frame towers and cat
conductor
Ramanagara
NA
4157.00&
17.04.18
0.00
0.00
100.00
FY 19-20
Supply/Erection - 1000L
AC1081
66kV DC line to 66/11kV
Maralavadi S/s:
Replacing of existing 66 KV SC
Tower of 66KV Maralwadi line
by Constructing DC Tower,
Drake DC line from tapping
point of existing 66KV
Kanakapura-Chatra (TapppingMarlawadi Tapping)HanumanthanagaraYedamadu-Somanahalli line -1
Ramanagara
NA
656.00&
01.06.18
0.00
0.00
10.00
FY 19-20
Supply/Erection - 100L
AA1040
HAL-Amarjyothi:
Strengthening of existing 66kV
line by replacing Coyote by
HTLS Conductor for a
distance of 3.21 kms
Bengaluru Urban
481.6 &
21.06.11
0.00
0.00
5.00
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
AA1047
Somanahalli Subramanyapura :
i) Construction of 220kV 66kV MC - MV line from
Somanahalli in the Existing
corridor
ii) Rearrangement of existing
220kv lines around 220kV
Somanahalli Station.
iii) 220kV DC line using AAAC
Moose conductor in
Somanahalli- Peenya SC line
corridor upto Nagarabhavi tap
point.
Bengaluru Urban
4118.9 &
02.06.11
AA1139
Amarjyothi-Audugodi:
Replacement of Existing
Coyote ACSR Conductor by
HTLS Conductor for a route
length of 4.20Kms in the
existing 66kV DC AudugodiAmarjyothi line.
Bengaluru Urban
6
AA1181
Nelagadarenhalli to WIDIA:
Running of 66kV 1000sqmm
SC UG cable from existing
66/11kV Nelagadarenahalli
S/s to existing Widia S/s for a
route length of 3.540Kms
7
AB1066
66KV D.B.Pura -Devanahalli
line: Strengthening the 66KV
D.B.Pura -Devanahalli line by
Drake conductor 20KMS
4
5
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
6666.28
0.00
5.00
FY-19-20
Nominal Budget: 5 L
665.24 &
05.11.14
0.00
0.00
100.00
FY-19-20
Nominal Budget: 5 L
Bengaluru Urban
2359.00 &
25.05.17
0.00
0.00
100.00
FY 19-20
Supply+Erection+Civil - 1100L
Bengaluru rural
950&
28.11.17
0.00
0.00
10.00
FY 19-20
Supply/Erection - 100L
29.12.
14
6666.28
0.00
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
AB1067
D cross to Thondebhavi:
Strengthening of about 31
Kms 66kV line from D cross to Bengaluru Rural &
Thondebhavi limites (Existing
CBPura
fabricated small tower and
rabit conductor)
1177.04&
01.03.18
0.00
0.00
10.00
FY 19-20
Supply/Erection - 500L
9
AC1035
Ranganadoddi Sub-Station:
Providing 66kV LILO
arrangement to 66/11kV SubStation for a distance of 0.10
kms.
Ramanagara
41.00 &
24.01.12
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
10
AC1082
Conversion of existing 66kV
SC line to DC line from
Harobele station to
Kodihalli station
Ramanagara
142.00&
17.03.18
0.00
0.00
10.00
FY-19-20
Nominal Budget: 10 L
AE1034
Siddlaghatta Y.Hunasenahalli:
Running of 2nd Circuit on
existing DC Tower of
Siddlaghatta 66kV line upto
Tower No.51 and linking the
same to Y.Hunasenahalli line
with TB at 220kV R/S
Chintamani for a distance of
12.3 kms.
C.B.Pura
115.04&
05.05.12
529.93
0.00
5.00
FY-19-20
Nominal Budget: 5 L
AE1036
Jangamkote Sub-Station:
Providing 66kV LILO
arrangement to 66/11kV SubStation for a distance of 7.00
kms.
C.B.Pura
54.97 &
14.05.12
0.00
0.00
5.00
FY-19-20
Nominal Budget: 5 L
8
11
12
NA
529.93
(Rs. In Lakhs)
Sl.
No.
13
14
15
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Work Code
Name of the Work
District
AB1068
66KV D.B.Pura - Vijaypura
line :
Strengthening of 66kV
Doddaballapura-Vijayapura
SC line from 220/66 kV NRS,
Doddaballapura to 66/11 kV
Vijayapura sub-station by
replacing the existing SC
Coyote ACSR Conductor on SC
towers by SC Drake ACSR
Conductor on DC towers for a
distance of 28.211km.
Bengaluru Rural
1586.00 &
04.09.18
0.00
10.00
FY 19-20
Nominal Budget: Rs. 10 L
AA1198
Magadi-Byadarahalli:
Conversion of existing 66kV
Byadarahalli-Magadi S/C line
to DC line with Drake ACSR
conductor using proposed
110kV Narrow based DC
towers for a distance of
28.990Kms and 66Kv
1000sqmm, UG cable from
existing 66/11Kv Byadarahalli
station to U.G. cable
terminating tower for a route
length of 0.098 Kms.
Bengaluru Urban
Ramanagara
2232
19.07.18/
27.07.18
0.00
10.00
Fy-2019-20, Budget
S+E+C-1100
AC1083
66kV SC line from 220kV
Kanakapura to Kunur
station: Construction of 66kV
SC line partially cable and
partially overhead line from
Kanakapura to proposed
Kunur station for a distance of
7.481Km
Ramanagara
0.00
10.00
FY 19-20
Supply/Erection - 1000L
NA
3149.00&
31.07.18
0
0.00
Remarks
(Rs. In Lakhs)
Sl.
No.
16
17
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
AC1085
Construction of 220-66kV MC
line in the corridor of existing
66kV KanakapuraChikkenahalli-Channapatna
SC line for providing 220kV
source to proposed 220/66kV
Kothipura sub station in
kanakapura taluk
Ramanagara district with
construction of 2 nos of 220
kV terminal bays at 220kV
Kanakapura and 2 nos of
220kV terminal bays at
Kothipura substation.
Ramanagara
5798.00 &
09.08.18
0.00
1.00
AC1039
Somanahalli Station to
T.K.Halli Station: Conversion
of existing 220kV SC
Somanahalli-T.K Halli line to
DC line from existing 220/66
kV T.K.Halli substation to
existing 220/66kV
Somanahalli sub-station for a
distance of 62.221 Kms
Ramanagara
5000.00 &
02.02.19
0.00
10.00
Remarks
FY 19-20
Nominal Budget: Rs. 10 L
(Rs. In Lakhs)
Sl.
No.
18
Work Code
Name of the Work
District
AA1206
Sarjapura station to 66 kV
Lakkur : Construction of 66 kV
DC line from 220 kV Sarjapura
station to 66 kV Lakkur substation & construction of 66 kV
terminal bay at 220/66/11 kV
Sarjapura sub-station for
connecting already approved
ACSR line on existing 66 kV SC
line DC towers of SarjapuraLakkur line from 20/66/11kV
Sarjapura sub-station up to the
existing 66/11 kV Lakkur substation ; partly in the existing 78
kV line corridor using 66 kV NBT
KPTCL design towers for a route
length of 13.531 kMs
Bengaluru Urban
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
698.00 &
05.03.19
Budget
2019-20
0.00
1.00
18
Total of Lines
7196.21
0.00
7196.21
0.00
407.00
90
Total for Bengaluru Zone
7517.17
139.75
7656.92
407.08
5748.00
Remarks
Tumakuru transmission
zone
1
BC1083
Vijapura:
Establishing 1x12.5 MVA,
66/11kV at Vijapura S/S in
Chitradurga Taluk & Dist.
2
BA1145
3
BA1150
Chitradurga
ES
BCR 4.87
550.46 &
10.09.18
0.00
100.00
Honnenahalli:
Establishing 1 x 8 MVA 66/11
KV S/S with associated line in
Tumakuru Taluk & District.
Tumakuru
ES
BCR 1.66
716.84 &
15.10.18
0.00
100.00
Nandihalli:Estabilishing 1 x8
MVA, 66/11 kV sub-station at
Nandihalli cross in Gubbi
taluk Tumakuru district.
Tumakuru
ES
BCR 4.83
533.00 &
0.00
100.00
Tender under evaluation at
CEE.T&P.
(Rs. In Lakhs)
Sl.
No.
Work Code
3
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Total of Sub-stations
Cost of
DWA
0.00
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
Budget
2019-20
0.00
0.00
300.00
Remarks
BA1105
Kolala:
Replacing 1x8 MVA,66/11kV
by 1x 12.5 MVA, 66/11kV
Transformer.
Tumakuru
BCR 0.80
136.52 &
15.04.14
0.00
0.00
0.00
5.00
Additional 1X10MVA is
proposed.Hence, the work may
be dropped.
2
BA1107
Thovinakere:
Replacement of 1x12.5MVA,
66/11kV by 1x 20MVA,
66/11kV Transformer.
Tumakuru
BCR 1.028
177.07 &
08.04.14
0.00
0.00
0.00
5.00
Transformer to be allotted
3
BA1123
Kadaba:
Replacing 1x10
MVA,110/11kV by 1x 20
MVA, 110/11kV Transformer.
Tumakuru
BCR 1.14
204.20 &
11.05.17
0.00
0.00
5.00
Transformer to be allotted
4
BA1124
Kolala:
Replacing 2nd 1x8 MVA,
66/11kV by 1x 12.5 MVA,
66/11kV Transformer.
Tumakuru
BCR 0.73
139.07 &
17.05.17
0.00
0.00
5.00
Transformer to be allotted
5
BA1125
Sampige:
Replacing1x10MVA,110/11kV
by 1x 20MVA, 110/11kV
Transformer.
Tumakuru
BCR 1.14
204.20 &
17.05.17
0.00
0.00
5.00
Transformer to be allotted
6
BA1126
K.G Temple:
Replacing1x10MVA,110/11kV
by 1x 20MVA, 110/11kV
Transformer.
Tumakuru
BCR 1.14
204.53 &
11.05.17
0.00
0.00
5.00
.
BA1129
Bellavi:
Replacing 1x12.5MVA Power
Trnasformer-1 by 1x20MVA
Power Transformer at
66/11kV Bellavi Substation
Tumakuru
BCR 0.84
203.49 &
27.09.17
0.00
0.00
5.00
Transformer to be allotted
1
7
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
BA1132
Tavarekere:
Replacing 1x8MVA, 66/11kV
Power transformer-1 by
1x12.5MVA 66/11kV Power
transformer
Tumakuru
BCR 0.73
142.26 &
27.09.17
0.00
0.00
5.00
Transformer to be allotted
9
BA1133
Koratagere:
Replacement of 1x 12.5MVA
66/11kV Power Transformer
by 1x 20 MVA, 66/11kV
Transformer.
Tumakuru
BCR 0.83
206.30 &
10.10.17
0.00
0.00
5.00
Transformer to be allotted
10
BA1135
Thimmasandra:
Replacing1x8MVA, 66/11kV
by 1x 12.5MVA, 66/11kV
Transformer.
Tumakuru
BCR 0.75
136.44&
27.09.17
0.00
0.00
5.00
Transformer to be allotted
11
BA1136
Hebbur:
Replacing 1x12.5 MVA,
66/11kV by 1x 20 MVA,
66/11kV Transformer.
Tumakuru
BCR 0.81
212.01&
10.10.17
0.00
0.00
5.00
Transformer to be allotted
BA1137
Sira:
Replacing 12.5MVA,66/11kV
by 1x 20 MVA, 66/11kV
Transformer.
Tumakuru
BCR 0.8
214.02&
28.03.18
0.00
0.00
5.00
Transformer to be allotted
13
BA1138
Hirehalli:
For replacement of 1 x 12.5
MVA Tr.-1 by 1 X20 MVA Tr.
at 66/11 KV Sub-station with
1IC+4F+1BC
Tumakuru
BCR 0.84
204.16&
15.02.18
0.00
0.00
200.00
Transformer to be allotted
14
BA1139
Yadiyur: For replacement of
1 x 6.3 MVA by 1 X 20 MVA
Tr. at 66/11 KV Sub-station
Tumakuru
BCR 1.58
205.68&
28.03.18
0.00
0.00
5.00
Sl.
No.
8
12
Work Code
Name of the Work
Cost of
DWA
0.00
Budget
2019-20
Remarks
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Kunigal: For replacement of
1 x 12.5 MVA Tr-2 by 1 X 20
MVA Tr. 1Bank + 4Feeders at
66/11 KV Sub-station
Tumkur
BCR 0.84
204.52&
27.03.18
0.00
0.00
5.00
BA1141
Honnudike: Replacing 1x8
MVA-1 66/11kV by 1x 12.5
MVA, 66/11kV Transformer
(2nd Tr.)
Tumkur
BCR 0.7
145.00&
15.02.18
0.00
0.00
5.00
17
BB1061
Davanagere:
Providing Spare 1x20MVA,
66/11kV Transformer at
220/66kV Davanagere SRS.
Davanagere
ES NA
BCR 2.44
253.24 &
09.12.13
0.00
0.00
1.00
18
BB1072
Bidarekere:
Providing Additional 1x8MVA,
66/11kV Power Transformer.
Davanagere
BCR 0.877
179.01 &
27.08.14
0.00
0.00
150.00
19
BB1073
Obbajjihalli:
Providing Additional 1x8MVA,
66/11kV Power Transformer
Davanagere
BCR 0.87
179.01 &
02.09.14
0.00
0.00
150.00
20
BB1074
Avaregare:
Replacing 1x8MVA, 66/11kV
by 1x 12.5MVA, 66/11kV
Tranformer.
Davanagere
BCR 0.8
136.52 &
05.09.14
0.00
0.00
5.00
21
BB1076
Mayakonda:
Replacing 1x8MVA, 66/11kV
by 1x 12.5MVA, 66/11kV
Transformer.
Davanagere
BCR 0.792
137.84 &
02.09.14
0.00
0.00
10.00
Sl.
No.
Work Code
15
BA1140
16
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Davangere
BCR 0.62
201.47 &
11.05.17
0.00
0.00
1.00
Bharamasagara: Providing
Spare 1x12.5MVA, 66/11kV
Transformer
Chitradurga
ES NA
BCR 1.53
198.54 &
23.01.14
0.00
0.00
1.00
BC1075
Pandarahalli :
Replacing 2nd 12.5 MVA,
66/11kV by 20MVA, 66/11kV
Transformer.
Chitradurga
BCR 0.71
203.88&
30.05.17
0.00
0.00
1.00
25
BC1076
Mylanahalli :
Replacing 1x8 MVA, 66/11kV
by 1x 12.5 MVA, 66/11kV
Transformer.
Chitradurga
BCR 0.71
142.42&
08.02.18
0.00
0.00
0.00
1.00
26
BC1077
Thallak :
Replacing 1x6.3 MVA,
66/11kV by 1x 12.5 MVA,
66/11kV Transformer.
Chitradurga
BCR 1.03
139.75&
23.02.18
0.00
0.00
0.00
1.00
27
BC1078
Hanagal:
Replacing 1x8 MVA, 66/11kV
by 1x12.5 MVA, 66/11kV
Transformer.
Chitradurga
BCR 0.69
156.71&
23.02.18
0.00
0.00
1.00
BA1142
Chikkanayakanahalli:
Replacement of 1x10 MVA
power transformer-1 by 1x 20
MVA, 110/11kV Transformer
at 110/11kV
Chikkanayakanahalli
Tumakuru
BCR 1.11
212.26 &
03.04.18
0.00
5.00
Sl.
No.
Work Code
22
BB1081
Harapanahalli:
Replacing 1x12.5 MVA,
66/11kV by 1x 20 MVA,
66/11kV Transformer.
23
BC1060
24
28
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
Surrender of Rs. 5.00 lakhs
Estimate submitted for
Technical Sanction.
(Rs. In Lakhs)
Sl.
No.
29
30
31
32
33
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
BA1143
Bidare:
Providing Additional 1x10
MVA, 110/11kV Power
Transformer at 110/11kV S/s
at Bidare.
Tumakuru
BCR 0.90
254.05 &
08.05.18
0.00
120.00
BA1144
Guligenahalli:
Replacing 1x6.3MVA,
66/11kV power Transformer
by by 1x 12.5 MVA, 66/11kV
Transformer at 66/11kV
Guligenahalli.
Tumakuru
BCR 1.00
143.85 &
03.04.18
0.00
5.00
BA1146
Hosakere(Madhugiri):
Replacing 1x8MVA Power
Transformer by 1x12.5MVA,
66/11kV Power Transformer
at 66/11kV
Hosakere(Madhugiri),
Tumakuru
BCR 0.48
142.00 &
23.11.18
0.00
5.00
BA1147
Holavanahalli :Replacing
1X8 Power Transformer-2 by
1X12.5MVA 66/11KV Power
Transformer at 66/11kV
Holavanahalli
Tumakuru
BCR 0.47
144.00 &
23.11.18
0.00
5.00
BA1148
Pulamaghatta:
Replacing 1x8 MVA, Power
Transformer -2 by
1x12.5MVA, 66/11kV Power
Transformer at 66/11kV
Pulmaghatta S/s.
Tumakuru
BCR 0.45
143.00 &
23.11.18
0.00
5.00
Work Code
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
Estimate submitted for DPR
preparation.
(Rs. In Lakhs)
Sokke:
Providing Additional 1x8MVA,
66/11kV Power Transformer
at 66/11kV Sokke S/S
Davanagere
BCR 0.35
329.00 &
15.11.18
0.00
10.00
BC1079
Nagasamudra :
Providing addl. 1x8 MVA,
66/11 KV Power Transformer
at 66/11KV Nagasamudra
S/S
Chitradurga
BCR 0.07
230.07 &
16.08.18
0.00
10.00
Tendering under process
BC1080
Kalamaranahalli:
Providing addl. 1x8 MVA,
66/11 KV Power Transformer
at 66/11KV S/S
Chitradurga
BCR 0.74
229.32 &
06.09.18
0.00
10.00
Tendering under process
BC1082
Hariyabbe:
Replacement of
1x6.3+1x8MVA, 66/11kV
power transformer by 2x 12.5
MVA, 66/11kV Power
Transformer at 66/11 kV
hariyabbe S/s
Chitradurga
BCR 0.85
286.43 &
23.05.18
0.00
100.00
BC1084
P.D.Kote: Providing additional
1x8 MVA, 66/11 kV Power
transformer at 66/11kV
P.D.Kote Sub-Station in
Hiriyur Taluk, Chitradurga
District.
Chitradurga
BCR 0.73
150.00&
16.09.18
0.00
150.00
34
BB1091
35
36
38
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Work Code
37
Cost of
Original / Date of
Revised
LOI
DPR & Date
Energy
Savings &
BCR
Sl.
No.
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
DPR Approved on 06.09.2018.
Tendering under Process.
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
BC1085
Venkatapura: Replacement of
1x5 MVA Trasformer by
1x12.5 MVA, Transformer at
66/11kV Venkatapura SubStaion.
Chitradurga
BCR 0.73
144.00 &
30.11.18
0.00
5.00
70th TCCM approved on
20.12.2016.
BC1086
Thallak: Providing additional
3rd 1x100 MVA, 220/66kV
power transformer at
220/66/11kV Thallak SubStation in Challakere taluk
Chitradurga District.
Chitradurga
BCR 2.34
964.51 &
03.11.18
0.00
500.00
Tendering under Process..
BC1087
Rampura :
Replacing 1x6.3 MVA,
66/11kV Power transformer
by 1x12.5 MVA, 66/11kV
power Transformer at
66/11kV Rampura S/s .
Chitradurga
BCR 0.67
155.00 &
14.11.18
0.00
5.00
42
BC1088
Turuvanur:
Replacing 1x6.3MVA Power
Transformer by 1x 12.5MVA,
66/11kV Power Transformer
at 66/11kV Turuvanuru S/s.
Chitradurga
BCR 0.68
144.00 &
18.12.18
0.00
5.00
43
BA1151
Honnavalli:
Replacing 1x10
MVA,110/11kV by 1x 20
MVA, 110/11kV Transformer.
Tumakuru
BCR1.12
209.10 &
11.04.18
0.00
150.00
Estimate submitted for
Technical Sanction.
44
BA1152
Bevinahalli:
Replacing 1x8MVA, 66/11kV
by 1x 12.5MVA, 66/11kV
Transformer.
Tumakuru
BCR0.71
142.56 &
01.03.18
0.00
100.00
Estimate submitted for
Technical Sanction.
Sl.
No.
39
40
41
Work Code
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Balenahalli:
Replacing 1x8 MVA, 66/11kV
by 1x12.5MVA, 66/11kV
Transformer.
Chitradurga
BCR 0.48
141.00 &
26.12.18
0.00
5.00
BC1091
Sanikere:
Replacing 1x6.3 MVA,
66/11kV by 1x 12.5 MVA,
66/11kV Transformer.
Chitradurga
BCR 0.85
287.07 &
28.03.18
0.00
5.00
47
BC1092
Hiriyur:
Replacing 1x8 MVA, 66/11kV
by 1x12.5 MVA, 66/11kV
Transformer.
Chitradurga
BCR 0.69
145.48 &
11.06.18
0.00
5.00
48
BC1093
Bharamasagara:
Replacing 2x12.5 MVA,
66/11kV by 2x 20 MVA,
66/11kV Transformer.
Chitradurga
BCR 0.56
206.00 &
31.12.18
0.00
5.00
49
BB1094
Attigere:
Replacing 1x8MVA, 66/11kV
by 1x 12.5MVA, 66/11kV
Transformer.
Davangere
BCR 0.73
282.00 &
09.09.19
0.00
5.00
50
BB1095
Punabghatta:
Replacing 1x8MVA, 66/11kV
by 1x 20 MVA, 66/11kV
Transfformer.
Davangere
BCR 0.98
212.77 &
18.05.18
0.00
50.00
51
BB1096
Kurubarahalli:
Replacing 1x8MVA, 66/11kV
by 1x12.5MVA, 66/11kV
Transformer.
Davangere
BCR 0.48
142.63 &
17.09.18
0.00
50.00
52
BA1153
Badavanahalli:
Replacing 2nd 1x12.5MVA,
66/11kV by 1x 20MVA,
66/11kV Transformer.
Tumakuru
BCR 0.56
206 &
01.02.19
0.00
5.00
Sl.
No.
Work Code
45
BC1090
46
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Tumakuru
BCR 1.12
207.08 &
11.04.18
0.00
150.00
Cost of
DWA
Budget
2019-20
53
BA1154
Bandihalli:
Replacing
1x10MVA,110/11kV by 1x
20MVA, 110/11kV
Transformer.
54
BA1155
Chikkabanagere:
Replacing 1x12.5MVA,
66/11kV by 1x 20MVA,
66/11kV Transformer.
Tumakuru
BCR 0.83
205.99 &
11.04.18
0.00
100.00
55
BA1156
K.B.Cross:
Replacing 1x10 MVA,
110/11kV by 1x 20 MVA,
110/11kV Transformer @
220/110kV
Tumakuru
BCR 1.08
216.24 &
18.05.18
0.00
5.00
56
BA1157
Mayasandra:
Replacing 2nd 10
MVA,110/11kV by 1x 20
MVA, 110/11kV Transformer.
Tumakuru
BCR 1.08
215.88 &
02.05.18
0.00
100.00
57
BA1158
Nonavinakere:
Replacing 1x10
MVA,110/11kV by 1x 20
MVA, 110/11kV Transformer.
Tumakuru
BCR 1.10
211.07 &
11.04.18
0.00
150.00
58
BA1159
Turuvekere:
Replacing 1x10 MVA,
110/11kV by 1x 20 MVA,
110/11kV Transformer.
Tumakuru
BCR 1.08
214.87 &
02.05.18
0.00
5.00
BA1160
Pandrahalli :
Replacement of 2nd
1x12.5MVA, 66/11KV Power
Transformer by 1x20MVA at
66/11KV S/S in Chitradurga
district.
Tumakuru
BCR 0.84
203.88 &
30.05.17
0.00
150.00
59
Remarks
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Pavagada: For replacement
of 1 x 12.5 MVA Tr-1 by 1 X
20 MVA Tr. at 66/11 KV Substation .
Tumakuru
BCR 0.56
207.00 &
08.08.19
0.00
5.00
BC1094
Aimangala :Replacing 1x12.5
MVA, 66/11kV by 1x 20 MVA,
66/11kV Transformer.
Chitradurga
BCR 0.55
210.00 &
31.12.18
0.00
5.00
BB1097
Guttur:Providing 125 MVAR
Bus Reactor at 400/220 KV
Station Guttur
Davanagere
NA
1138.00 &
05.03.19
0.00
5.00
BA1162
Nagalamadike :
Replacment of 1x8MVA power
transformer at 66/11kV
nagalmadike substation in
pavagada taluk Tumkur
district
Tumakuru
0.45
145.00&
11.03.19
0.00
1.00
64
BB1098
Anagodu: Replacement of
Existing 1x8 MVA power
transformer-1 by 1x20 MVA
Power transformer and 1x8
MVA power transformer-2 by
1x12.5 MVA power
transformer at 66/11 kV
Anagodu Sub-station in
Davangere Taluk, Davangere
District.
Davangere
BCR 0.76
345.00 &
18.01.19
0.00
1.00
65
BC1095
Hireguntanur:
Replacing 1x8 MVA, 66/11kV
by 1x 12.5 MVA, 66/11kV
Transformer.
Chitradurga
BCR 0.48
285.00 &
14.01.19
0.00
1.00
Sl.
No.
Work Code
60
BA1161
61
62
63
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
DPR approved vide OM
No.B19/5747/96-97/11.2.2019
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Work Code
Name of the Work
District
Energy
Savings &
BCR
BC1096
Chitradurga:
Replacing 1x12.5 MVA,
66/11kV by 1x 20 MVA,
66/11kV Transformer at
66/11 KV station chitradurga.
Chitradurga
BCR 0.51
225.00 &
05.01.19
0.00
100.00
BC1097
Chitrahalli:Replacement of
1x8MVA power transformer-2
by 1x12.5 MVA Power
transformer at 66/11kV SubStation in Holalkere Taluk,
Chitradurga district.
Chitradurga
BCR 0.49
140.00 &
31.12.18
0.00
50.00
BA1163
Doddasarangi:
Providing additional 1 x 8
MVA 66/11kV Transormer at
66/11kV Doddasrangi Substation
Tumakuru
BCR 0.49
250.00 &
23.03.19
0.00
1.00
BC1098
Nayakanahatti:
Replacing 1x12.5 MVA,
66/11kV by 1x 20 MVA,
66/11kV Transformer.
Chitradurga
BCR 0.53
218.00 &
28.03.19
0.00
1.00
70
BA1164
Somalapura : Providing
additional 1x10MVA,
110/11kV Power Transformer
at 110/11KV S/S
Somapalapura
Tumkur
BCR 0.58
266.00 &
23.03.19
0.00
1.00
71
BC1099
Sirigere:
Replacing 2nd 8MVA,
66/11kV by 1x 12.5MVA,
66/11kV Transformer.
Chitradurga
BCR 0.48
143.00 &
09.01.19
0.00
1.00
BA1165
Kora:
Replacement of existing
1x8MVA power transformer-1
by 1x20MVA, power
transformer at 66/11kV
Kora substation in Tumakuru
Taluk.
Tumakuru
BCR 0.90
215.50 &
27.04.19
0.00
1.00
Sl.
No.
66
67
68
69
72
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Sl.
No.
Work Code
72
1
2
3
4
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
0.00
Total of Augmentation
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
Budget
2019-20
0.00
0.00
2750.00
0.00
0.00
10.00
BA1079
Chelur Sub-Station:
Construction of DC line for a
length of 16.22 kms using
Drake conductor from Chelur
tap point to Chelur SubStation and in the exisiting
corridor with modification of
66kV Bays
Tumakuru
116.47 &
23.04.14
BB1067
Chilur Station to Chilur Tap
point:
Conversion of SC line on SC
towers to DC line on DC
towers from Tap point to
Chilur 66kV Sub-Station for a
distance of 1 Km with TB at
Chilur station for LILO
arrangement.
Davanagere
54.14&
20.06.17
0.00
0.00
10.00
BB1088
Jagalur-Sokke 66KV line:
Recontruction of existing
66kV, age old coyote
conductor SC line from 66kV
Sub-Station Jagalur to 66kV
Sub-Station Sokke as SC line
on DC towers with coyote
conductor for a distance of
20.961 Kms.
Davanagere
401.10&
29.06.18
0.00
0.00
10.00
BB1089
Sasvehalli Station to
Sasvehalli Tap
point:Providing LILO
arrangement at 66kv station
Sasvehalli from tap point of
Lingadahalli-Channagiri line
for a distance of 0.5 kms with
TB.
Davanagere
53.3&
20.06.17
0.00
0.00
10.00
NA
0.00
Remarks
Rs. 10 Lakhs to be surrendered
(Rs. In Lakhs)
Sl.
No.
5
6
7
Work Code
Name of the Work
District
BB1092
Harihara Hospet line:
Providing LILO arrangement to
existing 66/11kv Harihara
Sub station from 66kV
Harihara-Hospete line at
LOC.78-79(79-80) to 66kV
Harihara Substation by
stinging 2nd circuit on
existing DC tower withcoyote
conductor for a distance of
50m in Harihara Taluk,
Davangere District.
Davanagere
BB1093
66kV Itagi-Bennehalli SC
line:Stringing of 66 kV second
circuit on existing 66kV ItagiBennehalli SC line on DC
towers from 220kV Itagi
station to 66/11kV bennehalli
for a distance of 19.06 Kms in
the existing corridor along
with construction of 1 no of
66kV terminal bay at both
stations
Davangere
BC1089
Hiriyur & J.G Halli :Stringing
of second circuit on existing
66kV Hiriyur-Bevinahalli (220
kV SRS Hiriyur to J.G Halli
sub-station) SC line on
existing DC towers using
Coyote conductor with
construction of new TB at
both 220kV SRS Hiriyur & J.G
Halli Sub-station for distance
of 21.352 kms in Hiriyur
taluk, Chitradurga district.
Chitradurga
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
43.50 &
17.11.18
547.00 &
15.02.19
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
0.00
1.00
0.00
100.00
0.00
200.00
Remarks
Hiriyur-Bevinahalli Line :
Proposal for conversion of 66kv
Hiriyur-Bevinahalli (Hiriyur
220kv SRS to JG Halli muss)
Single circuit line to double
circuit line on existing line on
existing double circuit towers by
drawing 2nd circuit using coyote
conductor in existing corridor
with extension of new terminal
bay in both 220kv SRS Hiriyur
and 66/11kv Javagondanahalli
(Rs. In Lakhs)
Sl.
No.
8
9
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
BA1043
Nagalamadike :
Construction of new 66kV SC
tap line on DC towers from
Pavagada tapping point to
Nagalamadike S/ S
(Replacement of Rabbit
conductor on RCC poles) for a
distance of 13.46Kms.
Tumakuru
NA
211.20 &
03.03.11
04.11.
11
197.11
0.00
197.11
41.30
10.00
Short closed already, proposed
for retendered
BA1044
Shylapura - Y. N. Hosakote:
Construction of new 66kV SC
line on DC towers
(Replacement of Rabbit
conductor on RCC poles by
Coyote conductor on 17.24
Kms.
Tumakuru
NA
235.24 &
11.05.11
30.11.
11
265.00
0.00
265.00
71.62
10.00
Short closed already, proposed
for retendered
Total of Lines
462.11
0.00
462.11
112.92
361.00
Total of Tumakuru Zone
462.11
0.00
462.11
112.92
3411.00
0.00
0.30
400.00
Work Code
9
84
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
HASSANA TRANSMISSION
ZONE
1
CA1064
Kundur Mata:
Establishing 1 X 8 MVA
,66/11 KV S/S at Kunduru
Mata in CR Patna Taluk,
Hassana District along with
associated line for a distance
of 6.2Kms
Hassana
ES 0.92
BCR 0.89
491.91 &
04.04.07
Tendered at CE/ T&P
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
District
Energy
Savings &
BCR
CC1018
Sulia:
Up-gradation of existing 2 x 5
MVA, 33/11kV to 1 x 10
MVA, 110/33kV sub-station
& 1 x 10MVA, 110/11kV at
110/33/11kV Sullia Substation in Sulliya Taluk, D.K.
District along associated line
for a distance of 20kMs.
Dakshina Kannada
ES5.56
BCR0.72
1492.02 &
01.09.10
CA1007
Gangur : Est 1x8 MVA, 66/11
kV sub-station Gangur in
Belur taluk, Hassan District
with associated line for a
distance of 13.14kMs.
Hassan
ES1.12
BCR1.023
4
CD1070
Mavali:Establishing 1 x
10MVA, 110/11KV substation at 110/11kV Mavali
sub-station in Soraba Taluk,
Shivamogga District with
associated line.
Shivamoggga
5
CD1071
Ulavi:Establishing 1x10MVA,
110/11kV Ulavi Sub-Station
in Soraba Taluk, Shivamogga
District with associated line.
Shiamoga
Sl.
No.
2
3
Work Code
Name of the Work
5
Total of Sub-stations
1
MSEZ: Providing 1 x20 MVA,
110/33/11kV Transformer as
spare at 220kV Station MSEZ, Dakshina Kannada
Bajpe in Mangalore Taluk, DK
Dist
CB1055
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
Budget
2019-20
Remarks
0.00
5.00
386.77&
21.04.07
0.00
300.00
ES1.10
BCR0.869
646.07&
09.01.19
0.00
100.00
tendered
ES1.08
BCR0.9628
709.45&
06.02.19
0.00
100.00
tendered
0.00
0.30
905.00
0.00
0.00
1.00
0.00
285.41&
13.11.17
0.00
To be tendered.
(Rs. In Lakhs)
Sl.
No.
2
3
4
5
6
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
CD1061
Balligavi (Shiralkoppa):
Providing 1X20MVA,
110/11kV Spare Transformer
at 220kV Balligavi
(Shiralkoppa) sub-station in
Shikaripura Taluk,
Shivamogga District .
CD1065
Kumsi:Replacement of 2nd
1x 10MVA 110/11KV Power
transformer by 1 x 20 MVA,
110/11KV power transformer
at existing 110/11KV Kumsi
S/s in Shimogga Taluk
Shivamogga
BCR 0.5
312.09
0.00
CE1041
Mudigere:
Creating 33kV reference by
installing 1x8MVA, 66/33kV
Transformer at 66/33/11kV
Mudigere sub-station in
Chikkamagaluru Taluk &
District
Chikka-magalur
BCR 1.75
400.53&
20.03.18
0.00
CE1043
Singtagere:
Providing additional
1x10MVA, 110/11KV Power
Transformer at 110/11kV
Singatagere S/s Kadur Taluk
Chikkamagalur
BCR 0.68
CE1044
Tangli: Enhancement of 1 x
10MVA 110/11KV Power
transformer 2 by 1 x 20 MVA,
110/11KV power transpower
at 110/11kV Tangli S/s in
Kadur Taluk.
Chikkamagalur
BCR 2.24
376.64 &
07.02.17
Shivamogga
0.00
0.00
Budget
2019-20
Remarks
10.00
To be tendered
0.00
80.00
1X20MVA Transformer is
charged on 08.02.2019. other
related works are under
tendering stage.
0.00
150.00
289.44&
22.05.18
0.00
10.00
To be re-tendered
319.38&
18.05.18
0.00
100.00
Tendered
(Rs. In Lakhs)
Sl.
No.
7
8
9
10
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Work Code
Name of the Work
District
Energy
Savings &
BCR
CE1045
Panchanahalli :
Replacement of 1x6.3 MVA,
66/11 kV Power Transformer2 by 12.5MVA, 66/11 kV
power transformer at 66/11kV
Panchanahalli sub-station, in
Kadur Taluk, Chikkamagalur
District
Chikkamagalur
BCR 2.05
277.33&
11.04.18
0.00
50.00
CA1086
Bandishettyhally: Providing
additional 1x8MVA, 66/11kV
Power Transformer at
Bandishettyhally S/s in
Holenarasipura Taluk,
Hassan District
Hassan
BCR 0.68
216.95 &
24.09.18
0.00
100.00
Tender invited
CA1087
Mattanavile:
Replacement of 1x8MVA,
66/11kV Power Transformer
by 1x12.5MVA, 66/11kV
Power Transformer at
66/11kV Mattanavile S/s in
Channarayapattana Taluk,
Hassan District
Hassan
BCR 0.49
300.00 &
17.11.18
0.00
100.00
Tender invited
CA1089
Juttanahally: Providing Spare
1x12.5MVA, 66/11kV Power
Transformer at 66/11k
Juttanahally Sub-station in
Channarayapattana Taluk,
Hassan District
Hassan
BCR 1.13
213.14 &
17.11.18
0.00
1.00
Tender invited on 06.03.2019
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Sl.
No.
11
12
13
14
Work Code
Name of the Work
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Hassan
BCR 0.86
145.75 &
28.05.18
0.00
10.00
To be tendered.
BCR 1.31
251.85 &
17.11.18
0.00
50.00
DPR awaited.
Cost of
DWA
Budget
2019-20
Remarks
CA1090
Re-placement of
1x6.3MVA,66/11kV Power
transformer by 1x12.5MVA,
66/11kV power Transformer
at 66/11kV Magge Sub
station in Alur Taluk, Hassan
District
CB1058
Kulashekara: Providing
additional 1X20MVA, 110/11
KV Power Transformer at
Dakshina Kannada
110/33/11kV Kulashekar SubStation in Mangaluru Taluk,
Dakshina Kannada District.
CE1046
Muthinakoppa:Replacement
of 1X10MVA 110/11kV Power
Transformer by
1x20MVA,110/11kV
Muthinakoppa substation
Narasimharajanagara
(N.R.Pur)Taluk.
Chikkamagalur
BCR 0.7
266.30 &
06.09.18
0.00
50.00
Tendered
CD1068
Kammaradi:
Providing additional 1X10MVA
110/11kVPower Transformer
at 110/11kV kammaradi substation in thirthahalli Taluk
Shivamogga
BCR 0.58
269.16 &
20.09.18
0.00
10.00
Tender to be invited.
(Rs. In Lakhs)
Sl.
No.
15
16
17
18
19
District
Energy
Savings &
BCR
CD1069
Thirthahalli:
Replacement of 1X10MVA
Power Transformer by
1x20MVA,110/11kV power
transformer at 110/11kV
Thirthahalli substation
Shivamogga
BCR 0.58
CA1091
Kandli:
Replacement of 2 X 8 MVA,
66/11 KV power Transformer
by 2 X 12.5 MVA @ Kandli
S/S in Hassana Taluk
Hassana
BCR 0.59
CA1092
Chikkakondagola:
Replacement of 1x12.5MVA by
1x20MVA Power Transformer
at 66/11kV S/s
Chikkakondagola in Hassan
Taluk, Hassan District.
Hassan
BCR 0.69
CA1093
Rampura:
Augmentation of 1x6.3MVA,
66/11kV Power Transformer
by 1x12.5MVA, 66/11kV @
66/11 kV Rampura S/s in
Channarayapatna Taluk,
Hassan District
Hassan
CD1072
Sagara:
Replacement of 1 x 10MVA
,110/33kV Transformer by
1x20MVA, 110/33KV
transformer at 110/33/11kV
Sagara Sub-Station in Sagar
Taluk, Shivamogga District.
Shivamogga
Work Code
Name of the Work
Cost of
Original / Date of
Revised
LOI
DPR & Date
289.64 &
16.10.18
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
50.00
tendered
0.00
1.00
to be tendered
200.58 &
20.01.19
0.00
1.00
to be tendered
BCR 0.83
141.01&
01.02.2019
0.00
1.00
to be tendered
BCR 0.83
228.25
18.03.19
0.00
50.00
DPR to be approved
279.73 &
01.02.19
(Rs. In Lakhs)
Sl.
No.
20
21
22
23
24
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
10.00
Estimate submitted
CE1047
Mugulavalli: Providing
additional 1 x 8MVA
transformer at 220/66/11KV
Mugulavalli sub-station in
Chikkamagaluru Taluk &
District.
CD1073
MRS Shivamogga: Providing 1
x 100MVA, 220/66KV
Transformer and construction
of 66kV Terminal Bays at MRS
Shivamogga sub-station in
Shivamogga Taluk & District.
Shivamogga
BCR 1.00
1916.98 &
08.04.19
0.00
100.00
DPR to be approved
CE1048
Yagati:
Replacement of 1 x 10MVA,
110/11kV transformer by 1 x
20MVA, 110/11kV
Transformer at 110/11kV
Yagati sub-station in Kadur
Taluk, Chikkamagaluru
District.
Chikkamagalur
BCR 0.61
300.29&
25.01.19
0.00
10.00
To be tendered
CA1094
C.R. Patna: Replacement of
existing 1x12.5 MVA 66/11 kV
Transformer by 1 x20 MVA,
66/11 kV Transformer at
66/11 kV Channarayapatna
sub-station in
Channarayapatna Taluk,
Hassan District
Hassan
BCR 0.68
204.36 &
27.04.2019
0.00
50.00
CA1095
Singapura: Replacement of 1
x8MVA, 66/11kV Transformer
by 1 x 12.5 MVA, 66/11kV
Transformer at 66/11kV
Singapura Sub-station in
Holenarasipura Taluk, Hassan
District.
Hassan
BCR 0.63
140.49 &
09.04.2019
0.00
1.00
Chikkamagalur
(Rs. In Lakhs)
Sl.
No.
25
26
27
District
Cost of
Original / Date of
Revised
LOI
DPR & Date
CA1096
Hallymysuru: Replacement of
1 x 6.3 MVA, 66/11kV
Transformer by 1 x 12.5 MVA,
66/11kV Transformer at
66/11kV Hallymysuru Substation in Holenarasipura
Taluk, Hassan District.
Hassan
BCR 0.82
141.66 &
16.04.2019
0.00
20.00
CD1074
Jade:Providing additional
1X10 MVA, 110/11 kV
Transformer at existing
110/11 kV Jade Sub-station
in Sorabs Taluk , Shivamogga
District.
Shivamogga
BCR 0.64
288.28 &
08.04.2019
0.00
50.00
CD1075
Ripponpete: Providing
additional 1X10 MVA, 110/11
kV Transformer at existing
110/11 kV Ripponpete Substation in Hosanagara Taluk ,
Shivamogga District.
Shivamogga
BCR 0.64
286.15 &
08.04.2019
0.00
50.00
0.00
1116.00
0.00
50.00
Work Code
27
1
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Energy
Savings &
BCR
Name of the Work
Total of Augmentation
CA1088
Atthichowdenahally:
Providing 66kV LILO to 66kV
Channarayapatna-Malali line
Hassan
at66/11kVAttichowdanahally
Substation with 66kV
Terminal Bay, CR patna Taluk
Cost of
DWA
0.00
154.75 &
17.11.18
0.00
0.00
Budget
2019-20
Remarks
Tendered Published on
06.03.2019
(Rs. In Lakhs)
Sl.
No.
2
3
4
Work Code
CA1033
CA1048
CA1071
Name of the Work
Gendehally - Arehally:
Construction of 66kV DC line
from 66kV Arehalli Substation to LILO the existing
66kV SC line between BelurGendehally Sub-station along
with two Nos of 66kV TB's at
66kV Arehalli Sub-station
S K Pura to Arehall:
Stringing of 2nd Circuit with
Coyote ACSR Conductor on
existing 66KV SC line onDC
towers between 66/11KV S/s
at Sakaleshpura and 66/11
KV S/s at Arehally with TB at
both Sakaleshpura and
Arehalli S/s.
Reconstruction of 66kV SC
line in existing corridor of
66kV SC MBT(FTS MysuruBhadra) line on DC towers
from Hassan to H.N.Pura and
reconstruction of 66kV sC line
in the existing 110kV SC
SMT(Shimoga-Mysuru) line
corridor on DC towers from
HN Pura to Hootagalli
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Hassana
444.11 &
24.11.09
Hassana
Hassan
Cost of
DWA
0.00
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
0.00
200.00
NIT Issued
857.92 &
13.06.17
0.00
0.00
100.00
Re tendered
2108.42 &
02.04.08
0.00
0.00
100.00
To be tendered
(Rs. In Lakhs)
Sl.
No.
5
6
Work Code
Name of the Work
District
CB1030
Vitla Sub-Station :
Construction of 1 No. of
110KV Terminal Bay at
exiscting 110KV Vittla
substation for making LILO of
Dakshina Kannada
the proposed 110KV Line from
existing 110KV NetlamandurSalethur SC Line for a
Distance of 0.55 with 110KV
MC towers.
CE1028
Shimoga Station to 220kV
Kadur Station:
Construction of 110kV SBT2DC line on DC tower for a
distance of 60.281 kms in the
existing Corridor of 110 KV
SBT-2 SC line from
220/110/66/11 KV M.R.S
Shivamogga to 220/110/11KV
Kadur Station along with
Construction of 110KV TB at
220KV M.R.S Shivamogga and
220KV Kadur Sation
Chikkamagaluru
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
262.38&
28.03.18
2134.06 &
08.06.17
Budget
2019-20
0.00
80.00
0.00
10.00
Remarks
Tendered
To be tendered
0.00
(Rs. In Lakhs)
Sl.
No.
7
8
9
9
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Work Code
Name of the Work
District
CC1034
Re-conductoring of the
existing Lynx conductor by
drake conductor of 110kV
Kemar-Hiriyadka-Mudabidare
DC line between Khemar
220kV substation and
Kuntalpady village limits (from
Loc 01 to Loc 16) for a
distance of 1.727Kms in
Karakala Taluk.
Udupi
84.59&
28.05.18
0.00
70.00
Tendered
CD1067
Linganamakki to Iduvani:
Re-construction of two
numbers of 110kV Dc lines
from iduvani limits to
Linganamakki power House in
the existing corridor of 110kV
JLT-3&4 DC line(4.6 Kms) and
110kV LST-3 &4 DC line
(4.7Kms) using Lynx
conductor for a distance of
9.28kms in Shimoga District.
Shimoga
566.76&
01.06.18
0.00
10.00
To be tendered
CD1076
Balligavi limit to 110KV
anvatti MUSS :
Stringing of 110kV 2nd Circuit
using vacant cross arms of
existing 110kV DC towers
from balligavi limits to 110kV
Anavatti (Kotipura) substation
for a distance of about 27 Kms
along with construction of
110kV TB at 110kV
Anavatti(Koti Pura) S/S
Shivamogga
250&
05.02.19
0.00
10.00
To be tendered
0.00
630.00
Total of Lines
0.00
0.00
0.00
Remarks
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Dakshina Kannada
BCR 0.55
1
CB1022
Kulashekar:
1) Re-arranging of existing
110kV lines at 110/33/11kV
Kulashekara S/S inview of
R&M works of S/S.
2) R&M of 110/33/11kV
Kulashekara S/S and
providing additional
1X20MVA, 110/33kV Tr at
110/33/11kV Kulashekara
S/S
2
CB1023
Kavoor:
R & M Works at Kavoor 220kV Dakshina Kannada
Station.
3
CC1028
Formation of 220KV rigid bus
at 220KV RS, Kemar
4
CC1033
CE1031
5
Cost of
Original / Date of
Revised
LOI
DPR & Date
716.04 &
18.02.11
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
Budget
2019-20
Remarks
0.00
0.11
1.00
To be tendered.
1948.23 &
30.04.11
0.00
0.00
1.00
To be tendered.
Udupi
236.89 &
04.12.09
0.00
0.00
1.00
Revised DPR awaited.
Formation of 110KV rigid bus
at 220KV RS, Kemar
Udupi
236.89&
04.12.09
0.00
0.00
70.00
Tender invited
Chikkamagalur:
Providing of 2Nos. of 66kV
SF6 CB to Incoming lines from
220kV R/S Mugluvalli
(Chikkamagalur) & 2Nos of
66kV SF6 CB to Incoming
lines from Bhadra including
2Nos. bay at Chikkamagalur
Sub-Station
Chikka-magalur
211.33 &
15.06.17
0.00
0.00
10.00
To be tendered
5
Total of TB's & Others
0.00
0.00
0.00
0.11
83.00
46
Total of Hassana Zone
0.00
0.00
0.00
22.41
2734.00
MYSURU TRANSMISSION
ZONE
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
1
DA1044
Kampalapura: Establishing
1x8MVA, 66/11kV SubStation with associated line for
a distance of 1.837Kms
Mysuru
ES 1.067 &
BCR 1.29
562.89
13.06.17
DA1118
Chamalapura (B.Seehalli):
Establishing 1x8MVA,
66/11kV Sub-Station with
associated line for a distance
of 3.835Kms
Mysuru
ES 1.152 &
BCR 1.29
3
DD1047
Arkalavadi:
Establishing 1x8MVA,
66/11kV Sub-Station with
associated line for a distance
of 10.368Kms
Chamarajanagar
4
DD1053
Ajjipura: Establishing
1x8MVA, 66/11kV SubStation with associated line.
2
5
6
6
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Remarks
0.00
0.00
200.00
Approved in 70th TCCM
618.08 &
06.03.17
0.00
0.00
200.00
DPR Received, To be ReTendered.
ES 2.10 &
BCR 1.71
736.13&
1.9.18
0.00
0.00
200.00
Chamarajanagara
Es 0.850
BCR 0.98
645.20 &
20.09.18
0.00
200.00
DA1125
Yerahally Hand post :
Upgadation of 33/11KV SS to
1x8MVA,66/11kV Substation
at Yarahalli(handpost) with
associated line.
Mysuru
Es 1.130
BCR 1.22
699.18 &
11.12.18
0.00
200.00
CESC Land Handed over to
KPTCL
DB1110
Talagawadi /
Nelamakanahally limits :
Establishing 1x12.5MVA,
66/11kV Sub-Station at
Talagavadi (Nelamakanahalli)
with associated line.
Mandya
Es 1.946
BCR 1.84
781.35 &
18.12.18
0.00
100.00
DPR Approved
0.00
1100.00
Total of Sub-stations
0.00
Budget
2019-20
0.00
0.00
0.00
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
District
Energy
Savings &
BCR
Bhogadhi:
Providing Spare 1x20 MVA
66/11kV Transformer
Mysuru
BCR 2.15
225.70 &
12.09.14
DA1092
Jayapura:
Replacing 2nd 8MVA,
66/11kV by 12.5MVA,
66/11kV Transformer
Mysuru
BCR 0.74
134.19 &
27.09.14
3
DA1094
KHB Colony:
Replacing 1x6.3MVA,
66/11kV by 1x12.5MVA,
66/11kV Transformer
Mysuru
BCR 0.89
138.86 &
03.11.14
4
DA1099
Hebbal :
Replacement of 2 X 12.5 MVA,
66/11 KV Power Transformer
by 2 X 20 MVA .
Mysuru
BCR 0.98
371.90 &
27.02.15
5
DB1106
Mandya KIADB:
Replacing 1x12.5MVA,
66/11kV by 1x20MVA,
66/11kV Transformers with
SWGs
Mandya
BCR 0.53
6
DD1042
Hanur :
Replacement of 1 X 8 MVA by
1 X 12.5 MVA, 66/11kV
Transformer.
Chamarajanagar
DD1054
Madhuvanhalli :
Replacement of 1X6.3
MVA,66/11 KV Power
transformer by 1X12.5 MVA,
66/11kV Power transformer at
Madhuvanhalli
Chamarajanagar
Sl.
No.
Work Code
1
DA1091
2
7
Name of the Work
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
0.00
1.00
To be Tendered.
0.00
0.00
10.00
Tender Evaluation under
process
0.00
0.00
10.00
Tender Evaluation under
process
230.66
0.00
10.00
Estimate submitted for inviting
tender to SEE, T(W&M)Circle,
Mysueru on 07.07.2018.
272.30&
21.11.17
0.00
0.00
10.00
BCR 1.05
158.64 &
16.11.15
0.00
0.00
10.00
BCR 0.74
141.91 &
08.06.18
0.00
10.00
27.09.
14
02.07.
16
84.18
146.48
To be tendered
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Chamarajanagar
BCR 0.49
149.29 &
01.06.18
0.00
10.00
Cost of
DWA
Budget
2019-20
Remarks
8
DD1055
Yelandur :
Replacement of 1x 8
MVA,66/11 KV transformers2 by 1X12.5 MVA,66/11kV
Power transformers at
66/11kV Yelandur S/s.
9
DA1137
Antharasanthe: Providing
additional 1x8MVA, 66/11kV
Power Tr at Antharasanthe
S/s
Mysuru
BCR 0.74
228.85 &
27.09.18
0.00
10.00
NIT Issued
DA1138
Bilikere:
Replacement of 1x8 MVA
66/11kV Power Tr. By 1x12.5
MVA , 66/11kV Power Tr at
Bilikere S/s Hunsur Taluk
Mysuru
BCR 0.57
161.53 &
03.09.18
0.00
10.00
To be Tendered
DA1139
B.Matakere: Providing
additional 1x8MVA, 66/11kV
Power Tr at 66/11kV
B.Matakere S/s in H.D Kote
Taluk
Mysuru
BCR 0.74
228.85 &
29.09.18
0.00
10.00
NIT Issued
12
DA1140
Chidravalli :
Providing additional 1x8MVA
66/11KV Power Transformer
at Chidravalli 66/11KVSub
Station in TN Pura Taluk &
Mysuru Dist.
Mysuru
BCR 0.70
239.897
22.10.18
0.00
10.00
To be Tendered
13
DA1141
Mirle: Providing additional
1x8MVA, 66/11kV Power Trat
66/11kV Mirle S/s .
Mysuru
BCR 0.73
232.25 &
20.09.18
0.00
10.00
To be tenderd
10
11
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
District
Energy
Savings &
BCR
DA1142
Nanjanagud:
Replacing 1st 1x12.5 MVA,
66/11kV Tr. by 1x20 MVA
66/11kV power Tr. At
66/11kV Nanajanagud S/s
Mysuru
BCR 0.70
240.31 &
18.07.18
15
DA1143
Talakadu:
Replacement of 2x8 MVA
66/11kV Power Transformer
by 2x12.5 MVA 66/11kV
Talakadu S/s
Mysuru
BCR 0.59
16
DA1144
Chunchanakatte: Providing
additional 1x8MVA, 66/11kV
at Chunchankatte S/s Power
Tr.
Mysuru
17
DA1145
Bherya: Providing additional
1x8MVA, 66/11kV Power
Transformer at 66/11kV
Bherya substation .
18
DC1016
19
DC1017
Sl.
No.
14
Work Code
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
10.00
To be Tendered
315.63 &
27.10.18
0.00
10.00
DPR Approved;To be Tendered
BCR 0.59
225.66 &
03.02.18
0.00
10.00
To be Tendered
Mysuru
BCR 0.792
231.09 &
18.01.18
0.00
10.00
To be Tendered
Suntikoppa: Providing
additional 1x8MVA, 66/11kV
Power Tr at 66/11kV
Suntikoppa Sub station
Kodagu
BCR 0.62
235.19 &
11.10.18
0.00
10.00
NIT Issued
Alur-Siddapura: Providing
additional 1x8MVA, 66/11kV
Power Transformer at
66/11kV Alur Siddapura.
Kodagu
BCR 0.58
250.64 &
18.12.18
0.00
10.00
DPR approved; To be tendered
Name of the Work
Cost of
DWA
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
20
DA1128
DMG Halli :
Providing additional 1 X 8
MVA, 66/11 KV Power
Transformer at DMG Halli
66/11KV Sub Station in
Mysuru Taluk & Mysuru Dist.
21
DA1146
Gejjaianavaddaragudi :
Replacement of 1 X 8 MVA,
66/11 KV Power Transformer
by 1 X 12.5 MVA.
Mysuru
DA1147
Sinduvallipura:Replacement
of 2x8MVA,66/11kV Power
Transformer by 2x12.5MVA,
66/11kV Power Transformer
at 66/11kV Sinduvallipura
Substation in Nanjangud
Taluk, Mysuru District
Mysuru
DA1148
Thandya:Repl of 1x12.5MVA
by 1x20MVA Transformer at
66/11kV Thandya sub-station
in Nanjanagudu Taluk,
Mysuru District.
Mysuru
BCR 0.66
238.05 &
16.04.19
0.00
1.00
DD1056
Begur (66kV S/S):Repl of 2nd
8MVA, Transformer by
12.5MVA, Transformer at
66/11kV Begur sub-station in
Gundlupet Taluk,
Chamarajanagara District.
Chamarajanagara
BCR 0.48
142.10 &
26.04.19
0.00
1.00
0.00
204.00
22
24
25
24
Total of Augmentation
Mysuru
0.00
10.00
0.00
10.00
304.57
0.00
1.00
84.18
146.48
230.66
Remarks
To be Tendered
(Rs. In Lakhs)
Sl.
No.
1
2
3
4
Energy
Savings &
BCR
Work Code
Name of the Work
District
DA1051
Hootagalli - Bherya Limits:
Replacing of H - Frames by Reconstruction of 66kV SC line
between Hootagalli - Bherya
Limits to a distance of 54 km
Mysuru
DA1059
Bettadapura Sub-station:
Reconstruction of 66 kV SC
line on SC towers by LILO line
from existing 66 kV
Chunchanahatti-Kushalnagar
line to 66/11 kV Bettadapura
S/S for a distance of 2.457
km in Periyapatna
Taluk,Mysuru District for a
distance of 2.46 kms
Mysuru
NA
DA1060
Jayapura :
Providing additional 1 No. of
66 kV TB and LILO of
Kadakola - Sargur 66kV line
by constructing additional
Circuit on existing towers for a
distance of 6.0 kms along with
Terminal Bay at Jaipura for a
distance of 6 kms
Mysuru
NA
DA1080
Hootgalli-Kanayanbetta upto
Bavali limit:
Re-Construction of 220kV
Hootgalli-Kanayanbetta line
upto Bavali limit for a distance
of 81kms as per Southern
Grid instruction.
Mysuru
Cost of
Original / Date of
Revised
LOI
DPR & Date
1025.04
22.04.16
22.04.
16
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
0.00
10.00
To be re-tendered
94.25 &
18.08.12
0.00
0.00
1.00
To be Re- tendered
58.00 &
06.09.11
0.00
0.00
1.00
To be Re- tendered
415.2 &
26.03.15
0.00
0.00
10.00
To be Re- tendered
(Rs. In Lakhs)
Sl.
No.
5
6
7
8
Work Code
DA1081
DB1024
DB1053
DB1090
Name of the Work
K R Nagar to
Chunchanakatte:
Re-Construction of existing
66kV line between K R Nagar
Sub-Station to
Chunchanakatte Sub-Station
for a distance of 5.8kms
Shimsha - Mandya:
Construction of 66kV SC link
line in the existing corridor for
a distance of 44.57KMs.
Hampapura :
LILO of Kadakola Santhesaguru 66kV line by
constructing additional Circuit
on existing towers for a
distance of 6.5km along with
Terminal Bay at Hampapura
(HD Kote) for a distance of 6.5
kms
Anegola LILO:
Construction of 2nd circuit on
existing 66kV DC towers for a
distance of 2.965 Kms for
Making LILO arrangement to
Anegola Sub-Station
District
Energy
Savings &
BCR
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
155.96 &
23.11.15
Mysuru
Mandya
Cost of
Original / Date of
Revised
LOI
DPR & Date
NA
431.53 &
13.10.09
0.00
31.07.
10
346.87
0.00
0.00
Budget
2019-20
Remarks
9.00
To be retenderd
346.87
42.29
1.00
After commissioning of
220/66/11 KV Shivasamudra
(Hebbani) Station, the load of
malavalli muss and mandya
load will be bifurcated and feed
from proposed 220 kv station for
which fresh proposal for this
work will be submitted for
TCCM approval
To be tendered
Mandya
60.57 &
06.09.11
0.00
0.00
10.00
Mandya
74.09 &
12.06.15
0.00
0.00
10.00
(Rs. In Lakhs)
Sl.
No.
9
10
11
12
13
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
DD1029
Santhemaranahalli
Sub-station:
Providing 66kV LILO
arrangment to existing
66/11kV Santhemaranahally
S/s along with 1 No TB
Chamarajanagara
154.78 &
20.01.15
0.00
0.00
10.00
DD1036
Ramapura LILO:
Construction of 66kV 2nd
circuit line for a distance
1.5Kms. on existing D/C
towers for making LILO
arrangement to Ramapura
Sub-Station along with
Terminal Bay.
Chamarajanagara
56.27 &
20.11.14
0.00
0.00
10.00
DB1111
Kadaballi LILO: Running of
2nd Ckt on Existing 66kV DC
Tower from Tapping Point to
Kadaballi S/s for a distance of
about 1.5 Kms with TB at
Kadaballi S/s
Mandya
56.24&
05.02.19
0.00
1.00
DPR to be approved
DB1112
Seelanere LILO: Running of
2nd Ckt on Existing 66kV DC
Tower from Tapping Point to
Seelanere S/s for a distance of
about 1.75 Kms with TB at
Seelanere S/s
Mandya
62.74&
06.02.19
0.00
1.00
DPR to be approved
DB1113
Yattambadi LILO: Running of
2nd Ckt on Existing 66kV DC
Tower from Tapping Point to
Yattambadi S/s for a distance
of about 1.5 Kms with TB at
Yattambadi S/s
Mandya
56.68&
16.02.19
0.00
1.00
DPR to be approved
(Rs. In Lakhs)
Sl.
No.
14
15
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
DB1114
Kolakaranadoddi LILO:
Running of 2nd Ckt on
Existing 66kV DC Tower from
Tapping Point to
Kolakaranadoddi S/s for a
distance of about 0.75 Kms
with TB at Kolakaranadoddi
S/s
Mandya
54.64&
05.02.19
0.00
1.00
DPR to be approved
DB1115
Shivalli (V.C.Farm) LILO:
Running of 2nd Circuit on
existing 66KV DC tower from
Tapping Point to Shivalli
(V.C.Farm) S/s for a distance
of about 7.6Kms with TB at
Shivalli (V.C.Farm) S/s.
Mandya
94.61&
05.02.19
0.00
1.00
DPR to be approved
15
Total of Lines
346.87
0.00
346.87
42.29
77.00
45
Total of Mysuru Zone
BAGALKOTE
TRANSMISSION ZONE
431.05
146.48
577.53
42.29
1381.00
0.00
0.00
1.00
1
2
ED1008
Banavasi:
Establishing 1x10MVA,
110/11kV Sub-Station with
associated line & TB.
EE1059
Mughalkod:
Establishing 2x100MVA,
220/110kV & 1x10MVA,
110/11kV Sub Station at
Mughalkod(Kabbur) village in
Raibagh Taluk, Belagavi
District
Uttara Kannada
Belagum
4.04/
2.59
6.84/
0.46
938.90 &
21.09.17
13600.36&
10.12.18
0.00
0.00
1000.00
For the Year 18-19
Token Budget- Rs 1.00 Lacs
For the Year 19-20
budget of Rs. 5000lakh is
sought as the work pertains to
green energy corridar.
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
EE1127
Haliyal:
Upgradation of 2x5MVA,
33/11kV Haliyal Sub Station
to 2x10MVA, 110/11KV SubStation at Haliyal in Athani
Taluk, Belagavi district
Belagavi
4.28
3.06
961.02 &
16.11.18
0.00
100.00
4
EB1033
Alnavara:
Up-gradiation of 2x5 MVA,
33/11KV Alnvara sub-station
to 2X10MVA, 110/11KV &
1x20 MVA, 110/33 kV Substation at Alnvara in Dharwad
Taluk, Dharwad District. .
Dharwad
3.730
1.81
1757.08 &
01.10.18
0.00
100.00
5
EG1062
Aaheri: Establishing 2 x 100
MVA 220/110kV sub station
at Aaheri in sindagi Taluk
Vijayapura District.
Vijayapura
5.3
1.51
10437.35 &
31.12.18
0.00
500.00
6
EG1064
Kambagi : Establishing
2x10MVA,110/11kV SubStation at Kambagi in
Vijayapura Taluk, Vijayapura
District.
Vijayapura
7.9/
5.78
927.4 &
11.02.19
0.00
100.00
7
EE1136
Diggewadi:
Establishing 1x10MVA,
110/11kV Sub-Station at
Diggewadi in Raibagh Taluk .
Belagavi
6.93/3.57
1259.58&
29.04.19
0.00
1.00
3
Remarks
For theYear 18-19
Token Budget of Rs 1.00 Lac (
as DPR approved )
Say Rs 1.00 Lac
For theYear 19-20
Token Budget of Rs 1.00 Lac
Say Rs 10.00 Lac
Private Land identified in
Diggewadi - Jalalpur Area
Land Purchased on 14.08.2018
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
8
EE1137
AEQUS 220kV : Establishing
2x100 MVA, 220/110 kV substation at AEQUS SEZ
premises Hattaragi in
Hukkeri Taluk, Belagavi
District
9
EG1068
Jumnal: Establishing 2x10
MVA, 110/11kV sub-station
at Jumnal in Vijayapura
Taluk, Vijayapura District.
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Belagavi
1.15
8499.5&
26.03.19
0.00
1.00
Vijayapura
6.84
4.69
990.00&
11.03.19
0.00
1.00
0.00
0.00
1804.00
0.00
0.00
9
Total of Sub-stations
1
EC1019
Gadag:
Providing additional 4th
1x100MVA, 220/110kV
Transformer at 220kV Gadag
station in Gadag Taluk
Gadag
BCR 2.3
786.94 &
29.12.16
0.00
0.00
100.00
EC1022
Konnur:
Providing additional
1X10MVA, 110/11kV Power
Transformer at 110kV Konnur
S/s.
Gadag
BCR 0.59
281.4&
17.06.17
0.00
0.00
50.00
2
Remarks
Land lease deed executed on
25.09.2018
( For 15 acre 01 Gunta)
Additional For theYear 18-19
Token Budget of Rs 1.00 Lac ( if
DPR approved )
Say Rs 1.00 Lac
For theYear 19-20
Token Budget of Rs 1.00 Lac
Say Rs 1.00 Lac
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Name of the Work
District
Energy
Savings &
BCR
EE1123
Shiragaon :
Replacing 1x10MVA,
110/11kV by 1x20MVA,
110/11kV Transformer
Belgaum
BCR 0.45
286.82&
26.05.17
4
EE1124
Hirebagewadi:
Augmentation of 10 MVA
,110/11 KV by 20 MVA,
110/11 KV Power Transformer
at 110 KV S/S Hirebagewadi
Belgaum
BCR 0.44
295.05&
30.05.17
0.00
0.00
50.00
5
EF1068
Bagalkot:
3rd 1x100MVA Transformer at
220/110KV Bagalkote S/s
Bagalkot
BCR 1.99
728.87&
18.01.18
0.00
0.00
100.00
DPR cost requested for 2019-20.
6
EF1069
110 kV S/S Bisnal : Creating
33 kV reference by installing
1x20 MVA, 110/33 kV
transformer at 110 kV Bisnal
sub-station, in Bilagi Taluk,
Bagalkot District
Bagalkot
BCR 0.87
320.29&
31.10.17
0.00
0.00
320.00
DPR cost requested for 2019-20.
7
EG1035
Muddebihal:
Providing additional
1x10MVA, 110/33kV
Transformer
Bijapur
BCR 1.09
179.3 &
14.10.10
0.00
5.75
50.00
DPR cost requested for 2019-20.
8
EG1052
Zalaki:
Replacement of 10MVA,
110/11kV by 20MVA,
110/11kV Transformer
Bijapur
BCR 1.35
256.11 &
05.11.15
0.00
0.00
50.00
DPR cost requested for 2019-20.
9
EG1053
Chadachan:
Providing additional
1x10MVA, 110/11kV
Transformer
Bijapura
BCR 0.58
287.07 &
16.02.17
0.00
0.00
50.00
DPR cost requested for 2019-20.
Sl.
No.
Work Code
3
Cost of
DWA
0.00
0.00
0.00
Budget
2019-20
Remarks
50.00
For theYear 18-19
Token Budget - Rs 10.00 Lacs
For theYear 19-20
Token Budget - Rs 10.00 Lacs
For theYear 18-19
Token Budget - Rs 10.00 Lacs
For theYear 19-20
Budget of 150lakh sought
exculding cost of the
transformer.
(Rs. In Lakhs)
Sl.
No.
10
11
12
13
Work Code
Name of the Work
EE1128
Katkol: Replacement of
1x10MVA, 10/11 KV by 20
MVA, 110/11 KV Power
Transformer by 1x20MVA,
110/11KV Power transformer
at 110/33/11 KV S/S Katkol.
EE1129
110 KV S/S Yalapharatti
Creating 33 KV reference by
providing 1X20 MVA ,110/33
KV Transformer at
Yalapharatti Sub station in
Raibag Taluk, Belagavi Dist
EE1130
110 KV S/S Yalapharatti :
Replacement of 1x10 MVA,
110/11kV transormer by 1x20
MVA, 110/11 KV transformer
at 110 kV Yalaparahatti substation, in Raibag Taluk,
Belagavi District.
EE1131
110 KV Udyambagh
Creating 33 KV Reference by
providing additional 1X20
MVA 110/33 KV Transformer
at 110 KV Udyambagh Sub
Station in Belagavi Taluk,
Belagavi Dist
District
Belagavi
Belagavi
Belagavi
Belagavi
Energy
Savings &
BCR
BCR 0.4
0.76
Cost of
Original / Date of
Revised
LOI
DPR & Date
298.07 &
10.09.18
336.89 &
29.09.18
0.4
296.89 &
12.10.18
1.37
202.99
27.08.11
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
0.00
0.00
0.00
Budget
2019-20
Remarks
1.00
For theYear 18-19
Token Budget of Rs 1.00 Lac
Say Rs 1.00 Lac
For theYear 19-20
Token Budget of Rs 1.00 Lac
Say Rs 1.00 Lac
50.00
For theYear 18-19
Token Budget of Rs 1.00 Lac
For theYear 19-20
Token Budget of Rs 1.00 Lac
50.00
50.00
Additional For theYear 18-19
Token Budget of Rs 1.00 Lac
For theYear 19-20
Token Budget of Rs 1.00 Lac
For theYear 18-19
Token Budget of Rs 1.00 Lac
For theYear 19-20
Token Budget of Rs 1.00 Lac
(Rs. In Lakhs)
Sl.
No.
14
15
16
17
Work Code
Name of the Work
EE1132
110 KV S/S Sadalaga
Providing spare 1X10
MVA,110/11 KV Power
Transformer at existing
110/11 KV Sadalaga Sub Station in Chikkodi Taluk,
Belagavi Dist
EE1133
220 KV Chikkodi
Providing 3rd 100 MVA ,at
220/110 KV power
transformer at existing
220/110/11kV Chikkodi
Sub Station in Chikkodi
Taluk, Belagavi District
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
203.61
16.10.18
Belagavi
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
Budget
2019-20
10.00
Belagavi
1.52
886.14 &
15.10.18
0.00
400.00
EA1025
Hosa Honnatti: Providing
Addl 1X10MVA, 110/11KV
Trfr at existing 110/11KV
Hosa Honnatti Sub station in
Ranebennur Taluk, Haveri
District.
Haveri
0.58
286.45 &
10.08.18
0.00
50.00
EA1026
110 kV S/S Tumminakatti :
Creating 33 kV reference by
Providing 1x20 MVA, 110/33
kV Power transformer at
existing 110/11 kV
Tumminakatti sub-station, in
Ranebennur Taluk, Heveri
District
Haveri
0.96
336.04&
15.10.18
0.00
150.00
Remarks
For theYear 18-19
Token Budget of Rs 1.00 Lac
For theYear 19-20
Token Budget of Rs 1.00 Lac
For theYear 18-19
Token Budget of Rs 1.00 Lac
Say Rs 1.00 Lac
For theYear 19-20
Budget ( Tender Cost excluding
Trf Cost ) of Rs 400.00 Lac
Say Rs 400.00 Lac
Replaced Tr. Is already diverted.
(Rs. In Lakhs)
Sl.
No.
18
19
20
21
District
Energy
Savings &
BCR
EA1027
Tiluvalli: Augmentation of
1X10MVA, 110/11KV Power
Tr by 1X20MVA, 110/11KV
Power Tr at 110/33/11KV
Tiluvalli Sub station in
Hanagal Taluk, Haveri
District.
Haveri
0.63
EC1023
Hirehal :Interchanging of
1X20MVA,110/33kV Power Tr
at existing 110/33/11kV
RON Sub-station and
1X10MVA,110/33kV Power Tr
at 110/33/11kV Hirehal S/S
in Ron Taluk, Gadag District.
Gadag
EC1024
Mundargi:Replacement of
1X10MVA,110/11kV Trf by
1X20MVA,110/11kV Trf at
110/33/11kV Mundargi S/S
in Mundargi Taluk, Gadag
District.
Gadag
EC1025
Sambapur Road: Providing
spare 1X20MVA, 110/3311KV Power Tr at existing
110/11KV Sambapur Road
Sub station in Gadag Taluk,
Gadag District instead of
110kV Mundaragi station
Gadag
Work Code
Name of the Work
0.55
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
248.06 &
22.10.18
0.00
50.00
24.87 &
30.10.18
0.00
10.00
280.58 &
10.08.18
0.00
150.00
291.03 &
02.11.18
0.00
50.00
Remarks
(Rs. In Lakhs)
Sl.
No.
22
23
24
25
26
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Work Code
Name of the Work
District
Energy
Savings &
BCR
EG1058
Muddebihal:Replacement of
1x10MVA, 110/11kV
transformer by 1x20MVA
110/11kV transformer at
110kV Muddebihal substation
in Muddebihal taluk,
Vijayapura District.
Vijayapura
0.53
290.40 &
25.10.18
0.00
50.00
EG1059
Tikota: Replacement of 1x10
MVA, 110/11 kV transformer
by 1x20 MVA, 110/11 kV
Transformer at 110 kV Tikota
sub-station, in Vijayapura
Taluk, Vijaypura District.
Vijayapura
0.48
315.39
17.11.18
0.00
150.00
EG1060
Almel: Replacement of 1x10
MVA, 110/11 kV transformer1 by 1x20 MVA, 110/11 kV
transformer at 110 kV Almel
sub-station in Indi Taluk
Vijayapura District.
Vijayapura
0.79
202.18 &
03.11.18
0.00
60.00
EF1070
Jambagi K.D.: Providing
additional 1x10 MVA, 110/11
KV Transformer at 110 KV
Jambagi K.D. S/S in Mudhol
Tq. Bagalkot Dist.
Bagalkote
0.43
278.75 &
01.09.18
0.00
150.00
EG1063
Aski :Creating 33kV reference
by providing 1 x 20 MVA,
110/33 kV power
transforemer at 110kV substation Aski in Sindagi Taluk,
Vijayapura district
Vijayapura
0.56
274.56 &
31.1.19
0.00
50.00
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Sl.
No.
27
28
29
30
31
Work Code
Name of the Work
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
Belagavi
0.72
356.6&
18.1.19
0.00
250.00
Cost of
DWA
Budget
2019-20
EE1138
110 KV Taushi
Creating 33kV reference by
providing 1x20MVA,110/33
KV Power Transformer at
110kV Taushi(Balligeri) S/s in
Athni Taluk.
EC1026
Replacement of 1X10MVA,
110/33KV Tr by 1X20MVA,
110/33KV Tr at 110KV
Dambal Sub station in
Mundaragi Taluk, Gadag
District.
Gadag
0.85
203.11&
26.12.18
0.00
1.00
EA1028
110 kV S/S Aremallapura :
Providing additional 1x10
MVA, 110/11 kV transformer
at 110 kV Aremallapura substation, in Ranebennur Taluk,
Haveri District
Haveri
0.46
325.3&
26.12.18
0.00
1.00
EE1139
Uchagaon: Creating 33kV
reference by providing 1x20
MVA, 110/33kV transformer
along with 33kV bank &
feeders bay at 110 kV
Uchagaon Sub-station in
Belagavi Taluk & District
Belagavi
0.85
379.03&
09.01.19
0.00
1.00
EG1065
Vijayapur: Providing
additional 1x10MVA,
110/11kV Power Transformer
at 220/110/11 KV Vijayapur
Sub-statuib ub vijayapur
Taluk and District.
Vijayapura
0.55
278.03&
21.03.19
0.00
1.00
Remarks
(Rs. In Lakhs)
Sl.
No.
32
33
34
35
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
EG1066
Hiremasali: Providing 1x10
MVA, 110/11kV Power
transformer along with
1/C+5F+1AP3 switchgear at
110kV Hiremasali sub-station
in Indi Taluk & Vijayapur
District
Vijayapura
0.53
287.19&
24.01.19
0.00
1.00
EE1140
Belagavi: Providing additional
3rd 100MVA 220/110kv
transformer along with other
renovation & modernisation
works at existing
220/110/11kV Belagavi substation in Belagavi Taluk &
District
Belagavi
0.56
2227.42&
01.03.19
0.00
1.00
EF1071
BISNAL :Providing additional
1X10 MVA, 110/11 kV power
transformer along with 11kV
switchgears at existing 110/11
kV Bisnal Sub-station in Bilagi
Taluk , Bagalkot District
Bagalkote
0.41
289.17 &
09.04.18
0.00
1.00
EF1072
Augmentation of 1X10 MVA,
110/11kV power transformer
by 1X20 MVA, 110/11kV
power
transformer
at
110/11kV
Kaladagi
substation in Bagalkot Taluk and
District.
Bagalkot
0.4
289.27 &
16.4.19
0.00
1.00
Work Code
Name of the Work
Cost of
DWA
Budget
2019-20
Remarks
(Rs. In Lakhs)
Sl.
No.
36
37
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Work Code
Name of the Work
District
EF1073
Augmentation of 1X10 MVA,
110/11kV power transformer
by 1X20 MVA, 110/11kV
power
transformer
at
110/11kV Uttur sub-station
in
Mudhol
Taluk
and
Bagalkot District.
Bagalkot
0.4
306.9 &
27.4.19
0.00
1.00
EG1067
Babaleshwar : Augmentation
of 1X10 MVA, 110/11kV
power
transformer-II
by
1X20 MVA, 110/11kV power
transformer along with 1I/C +
6F + 1CB at 110 kV
Babaleshwar sub-station in
B.Bagewadi Taluk, Vijayapur
District.
Vijayapura
0.52
294.56
/30.4.19
0.00
1.00
0.00
5.75
2561.00
0.00
0.00
2000.00
37
1
Cost of
Original / Date of
Revised
LOI
DPR & Date
Energy
Savings &
BCR
Total of Augmentation
EB1032
220kV SRS Hubli -220kV
Haveri Station:
Conversion of existing S/C
line on /SC Towers to SC line Dharwad / Haveri /
on DC towers from
UK
220/110kV SRS Hubli R/S to
220/110kV Haveri Station for
a length of 78Kms
Cost of
DWA
0.00
2218.56&
28.03.18
0.00
Budget
2019-20
Remarks
(Rs. In Lakhs)
Sl.
No.
2
3
4
5
Work Code
Name of the Work
District
EB1029
110KV Kawalwad-Hubli Line:
Replacing of Exisisting
Dog/Wolf conductor by Lynx
Conductor of 110kV NK1 &
NK2 Line from 110kV
Kavalavad S/s 220kV SRS
Hubali S/s for a distance of
32kms along with
strenghthening of line by
replacing weakened Towers for
a distance of 32Kms
Dharwad
EC1017
Gadag-Naregal-Ron:
Conversion of 110kV SC line
to DC line from 220kV Gadag
S/s to 110kV Naregal S/s
and Stringing of 110kV 2nd
Circuit from 110kV Naregal
S/s to 110kV Ron S/s for a
distance of 28.57 &
16.795Kms
Gadag
ED1019
Jog-Sirsi:
Replacement of Existing
Towers Dog/Coyote Conductor
by new towers and Lynx
Conductor of 110kV NK1 &
NK-2 DC line form MGHE PH
Jog to 110kV Sirsi S/s for A
distance of 49.71 Kms
Shivamogga/Uttar
Kannada
ED1020
Sirsi and Kavalawada line
Replacement of 110kV
Dog/coyote ACSR conductor
by Lynx conductor of NK-1
and NK-2 lines between Sirsi
and Kavalawada for a distance
of 67.376Kms
North Canara
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
869.92 &
15.04.15
Cost of
DWA
Budget
2019-20
0.00
0.00
1.00
1194.72 &
19.03.15
0.00
0.00
250.00
1534.87 &
02.02.15
0.00
0.00
1.00
0.00
0.00
1.00
1560.53 &
15.05.14
0.00
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Remarks
(Rs. In Lakhs)
Sl.
No.
6
7
8
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
ED1025
Ambewadi - Kawalwad Line:
Replacement of Dog / Wolf
conductor 110kV NK-1 & 2
Line between Ambewdai and
Kawalwad by Lynx conductor
along with line strengthning
by replacing weakened towers
Uttar
Kannada
879.91 &
24.12.16
0.00
0.00
1.00
EF1049
Mudhol Tap line:
Conversion of existing 110kV
Mudhol tap line to D/C line
along with 1 TB for a distance
of 1.176kms.
Bagalkote
88.16 &
17.05.14
0.00
0.00
1.00
EG1061
B.Bagewadi - ShahabadMoratagi line :
Replacement of MS towers by
GI towers along with
conductor of 110KV and
B.Bagewadi - Shahabad DC
Line from 220kV S/S
B.Bagewadi upto 110KV
Moratagi Sub Station
(Loc.No194 to 415) in
Vijayapura Taluk, Vijayapura
District and Conversion of
110KV tap line of 110KV
Sindagi Sub Station to LILO
arrangement in Sindagi Taluk,
Vijapura District.
Vijayapura
3187.58 &
18.12.18
0.00
300.00
Remarks
(Rs. In Lakhs)
Sl.
No.
9
10
11
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Work Code
Name of the Work
District
EE1134
110kV Mahalingpur –
Athani: Conversion of 110 KV
SC Line on SC Towers
(Partially MS and Partially GI)
to new SC line on DC towers of
110kV Mahalingpur - Athani
SC line from Loc No-1 to 117
for a distance of 33.184 Km in
Bagalkot and Belagavi Dist
Bagalkote &
Belagum
1273.1 &
09.01.19
0.00
100.00
EB1034
Tarihal Akshaya Colony:
Construction of 110 kV link
line between 110 kV Tarihal
and 110 lV Akshaya Colony
sub-stations using 110 kV
EHV 630 sq.mm UG cable for
a distance of 7.922 kms along
with TBs at Hubli Taluk.
Dharwad
4236.16 &
23.02.19
0.00
100.00
EE1141
Construction of 110 KV SC
Link Line on DC Towers
between proposed 110 KV
Shiraguppi and existing 110
Kagwad Sub Station in Athani
taluk
Belagavi
463.88
09.01.19
0.00
1.00
--
Remarks
>Proposed to be completed
subject to award
(Rs. In Lakhs)
Sl.
No.
12
Work Code
EE1142
12
1
2
Name of the Work
Mahalingapura-Kudchi:
Conversion of 110kV SC line
on SC towers to new SC line
on DC towers in the existing
corridor from Loc 07 to Loc 90
of 110 KV MahalingapuraKudchi line for a distance
27.205 Kms in Jamakhandi &
Athani Taluks of Bagalkot &
Belagam Districts.
District
Belagum
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
EC1013
EE1093
Chikkodi 220kV R/S:
Construction of 2 Nos of
220kV TBs at 220kV Chikkodi
S/s for Terminating 220kV
Ghataprabh-Chikkodi DC line.
Gadag
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
986.64 &
22.02.19
Total of Lines
Mundaragi Sub-station:
Providing 1No of 110kV TB at
Mundaragi station for
providing independent control
to 110kV Betagera Line.
Cost of
DWA
37.73 &
26.10.11
Budget
2019-20
0.00
1.00
0.00
0.00
0.00
0.00
2757.00
0.00
6.03
6.03
11.56
38.00
For theYear 18-19
Token Budget of Rs 1.00 Lacs
Say Rs 1.00 Lacs
Belagum
362.32 &
01.01.14
0.00
0.00
0.00
300.00
2
Total of TB's & Others
0.00
6.03
6.03
11.56
338.00
60
Total of Bagalkote Zone
0.00
6.03
6.03
17.31
7460.00
KALABURAGI
TRANSMISSION ZONE
Remarks
For theYear 19-20
Budget DPR Cost- Rs 362.00
Lacs
Say Rs 362.00 Lacs
(Rs. In Lakhs)
Sl.
No.
1
2
3
4
5
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Work Code
Name of the Work
District
Energy
Savings &
BCR
FA1054
Bayappur: Upgradation of 2x5
MVA, 33/11kV sub-station to
2x10 MVA, 110/11kV substation at Bayapur by
constructing 110 kV SC line
on DC towers for a distance of
14.450 Kms and by
constructing 110KV terminal
bay at 110/33/11 KV substation at Mudgal in
Lingasugur Taluk, Raichur
District.
Raichur
ES 2.50
BCR 1.44
1286.94&
17.12.18
0.00
0.00
50.00
FC1050
Ghanagapura:
Establishing 2x100MVA,
220/110/11kV Station with
associated 220kV and 110kV
lines.
Kalaburagi
BCR2.83
6911.68 &
25.05.17
0.00
0.00
5.00
FC1052
Kalaburagi switching station
- 400kV:
Establishment of 400/220 kV
Sub Station at Kalaburagi
Kalaburagi
ES 55.120
BCR 1.10
47401.63&
09.03.18
0.00
0.00
5.00
FE1022
Manhalli:(Yakatpur)
Up-gradation of 3x5MVA,
33/11kV Manhalli sub-station
to 2x10MVA, 110/11KV SubStation at Manhalli(Yakatpur)
in Bidar Taluk, Bidar District.
Bidar
ES 3.386
BCR 1.82
1286.65 &
06.12.18
0.00
100.00
FA1058
Gandhinagar : Establishing
1x10MVA, 110/11kV SubStation at Gandhi nagar in
Sindhanur Taluk, Raichur
District.
Raichur
ES 1.390
BCR 1.14
870.66 &
14.01.19
0.00
50.00
Cost of
DWA
Budget
2019-20
Remarks
DPR approved ,tender under
process
Approved in 75th TCCM dated
4.11.2017
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
Energy
Savings &
BCR
FD1038
Chilkmukhi:Up-gradation of
2x5 MVA, 33/11KV S/s to
2x10 MVA, 110/11kV S/s
with construction of 110kV
line from existing 110kV
Bevoor S/s for a distance of
12.709kms in Koppal Taluk &
District.
Koppal
ES 2.160
BCR 1.25
1302.04 &
16.02.19
0.00
10.00
7
FA1059
Jawalgera:Establishing
1x10MVA, 110/11kV SubStation at Jawalagera in
Sindhanur Taluk, Raichur
district.
Raichur
ES 1.204
BCR 1.48
606.96 &
22.02.19
0.00
25.00
8
FD1039
Hiresindhogi:
Upgradation of 2x5 MVA
33/11kv S/S to 2x10MVA
110/11kV S/S
Koppal
ES 2.610
BCR 1.66
1164.46 &
18.03.19
0.00
10.00
FA1060
Valaballari
Upgradation of existing
2X5MVA 33/11KV to
2X10MVA 110/11KV Subststion at Valaballari by
Constructing 110KV
Sindhnoor- Raichur Line -2
and constructing 110KV DC
line on DC Towers for a
distance of 15.142 Kms in
Sindhnoor Tq, Raichur Dist
Raichur
ES 2.720
BCR 1.24
1586.07&
23.02.19
0.00
25.00
0.00
280.00
Sl.
No.
6
9
9
Work Code
Name of the Work
Total of Sub-stations
Cost of
DWA
0.00
0.00
0.00
Budget
2019-20
Remarks
Approved in 74th TCCM, Dated:
20.06.2017.
Approved in 74th TCCM, Dated:
20.06.2017.
(Rs. In Lakhs)
Sl.
No.
1
2
3
Cost of
Original / Date of
Revised
LOI
DPR & Date
District
Energy
Savings &
BCR
FA1051
Manvi:
Enhancement of 1x10MVA by
1x20MVA 110/11KV Power
Transformer at 110KV S/S
Manvi and providing 3 Nos of
1x1000Sqmm XLPE cable to
11kV bank II at 110/11kV
manvi station
Raichur
BCR 0.80
213.52&
16.4.18
FB1092
66/11KV S/S Ujjini:
Construction of new control
room building along with
shifting of equipments from
existing control to the
proposed control with
providing protection for the
existing equipment .
Providing LILO arrangement
for 66KV incoming Line (66KV
Kottur-Kudigi-Ujjini) along
with Constuction of TB at
Ujjini.
Bellary
NA
131.46 &
28.03.18
FB1094
Venkatapura: Repl of
1X8MVA by 1X12.5MVA,
66/11KV Trf at 66/11KV S/S
Venkatapura
Work Code
Name of the Work
Bellary
BCR 0.56
155.46 &
03.04.18
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
0.00
Budget
2019-20
Remarks
0.00
10.00
Budget for FY-2019-20
Tfr cost : 160.73 Lakhs
Erection cost: 17.79 Lakhs
Total :178.52 Lakhs
0.00
10.00
4 Lakhs to be Surrendered
5.00
Budget for FY-2019-20
Tfr cost: 117.13 Lakhs
Switchgear: 5.3 Lakhs
Erection cost:13.15 Lakhs
Total : 135.63 Lakhs Rs. 10.00
Lakhs to be surrendered.
0.00
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
FB1098
Hampasagara: Enhancement
of 1X6.3MVA, 66/11KV Power
Transformer by 1X12.5MVA,
66/11KV Power Transformer
at 66/11KV Hampasagara
Sub-station in H.B.Halli
Taluk, Bellary District.
Bellary
BCR 0.82
151.78 &
01.06.18
FC1059
Yedrami:
Replacement of 1 x 10 MVA
110/33 KV Transformer by 1
x 20 MVA 110/33 KV
Transformer at 110 kv
Yedrami Sub-Station
Kalaburagi
BCR 1.190
196.66 &
20.03.17
6
FC1061
Creating 33 KV reference by
providing additional 1 x 20
MVA 110/33kV Transformer
along with construction of
33kV Terminal Bay at 110/11
kv Kalaburagi (South) SubStation
Kalaburagi
BCR 1.187
379.12 &
03.07.17
7
FC1063
Providing additional 1x10MVA,
110/33kV Power Transformer
at 110/11kV Mandewal Sub
Station.
Kalaburagi
BCR 0.76
287.72 &
18.01.18
FD1033
Koppal:
Providing spare 20 MVA,
110/33/11 kV Power
Transformer at 110 kV S/S
Koppal
4
5
8
Koppal
287.27 &
01.04.19
Cost of
DWA
0.00
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
0.00
5.00
0.00
0.00
5.00
0.00
0.00
100.00
0.00
5.00
0.00
5.00
0.00
Remarks
Budget for FY-2019-20
Tfr cost : 117.13 Lakhs
Switchgear: 4.30 Lahs
Erection cost:10.97 Lakhs
Total : 132.43 Lakhs
Approved in 75th TCCM,Dtd:
04.11.2017.
(Rs. In Lakhs)
Sl.
No.
9
10
11
12
District
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Work Code
Name of the Work
FD1035
Venkatagiri : Enhancement of
1X10 MVA, 110/11kV Power
Transformer by 1X20 MVA
110/11kV Power Transformer
at 110/11kV S/s Venkatagiri.
Koppal
BCR 0.62
267.46&
16.04.18
0.00
0.00
5.00
FD1036
Enhanncement of 10MVA,
110/11kV power Transformer
NGEF Make by 20MVA,
110/11KV POWER
Transformer at
110/33/11kVkV MUSS
Koppal in Koppal Tq, District.
Koppal
BCR 0.55
279.13 &
09.01.19
0.00
0.00
5.00
FD1037
110KV Sriramnagar:
Replacement of 1X10 MVA,
110/11kV
by
1x20MVA
110/11KV Power Transformer
at 110/11kV Sriram Nagar
S/s.
Koppal
BCR 0.60
265.75 &
03.06.17
0.00
0.00
5.00
FF1005
Enhancement of 1x10MVA,
110/11kV Power Transformer
No. 1 by 1x20 MVA 110/11kV
Power Transformer at
110/11kV Shorapur.
Yadgir
BCR 0.76
294.34&
21.02.18
0.00
0.00
5.00
Remarks
Budget for FY-2019-20
Tfr cost : 160.73Lakhs
switchgear : 32.0 Lakh
Erection cost:37.28 Lakhs
Total : 230. Lakhs
Budget for FY-2019-20
Tfr cost :
160.73Lakhs
switchgear : 32.34 Lakh
Erection cost:37.28 Lakhs Total
: 230.35 Lakhs
(Rs. In Lakhs)
Cost of
Original / Date of
Revised
LOI
DPR & Date
District
Energy
Savings &
BCR
FF1006
Enhancement of
1x10MVA,110/33kV power
transformer No.III by
1X20MVA 110/33kV Power
Transformer at 110/33/11
kV Shahapur S/S
Yadgir
BCR 1.1
207.60&
12.02.18
FB1099
66KV S/S Huvina Hadagali:
Enhancement of 1x6.3MVA
66/11kV Power TransformerIII by 1x12.5MVA 66/11kV
Power Transformer at
66/11kV Huvinahadagali
S/s.
Bellary
BCR 0.81
15
FE1021
110/11kv Chidri :Replacement of 1x10MVA,
110/11kV Power Transformer1 by 1x20 MVA, 110/11kV
Power Transformer at
110/11kV Chidri S/s .
Bidar
16
FB1101
Sanklapura-Providing Spare
1x10MVA ,110/33-11kV
Transformer at 110/11kV
Sanklapura.
FB1100
Bellary( North) :Providing
Spare 1x10MVA, 110/33-11
Power Transformer at existing
110/11kV Bellary(North) SubStation in Hospet taluk,
bellary District.
Sl.
No.
13
14
17
Work Code
Name of the Work
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
Budget
2019-20
0.00
5.00
153.68&
28.06.18
0.00
1.00
BCR 0.45
287.81&
30.07.18
0.00
50.00
Bellary
BCR 0.845
238.81 &
21.06.18
0.00
1.00
Bellary
BCR 0.857
235.71 &
27.06.18
0.00
1.00
Remarks
(Rs. In Lakhs)
Sl.
No.
18
19
20
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
District
FA1061
Mukunda:
Replacement of 1x10MVA by
1x20MVA 110/11KV Power
Transformer at 110KV S/S
Mukunda
Raichur
BCR 0.69
228.00 &
19.01.19
0.00
10.00
FA1062
Turvihal:
Providing additional 1x10MVA
,110/11KV Power
Transformer at 110KV S/S
Turvihal.
Raichur
BCR 0.57
271.38 &
24.01.19
0.00
10.00
FD1040
Kanakagiri:
Augumentation of 1x10 MVA
110/11kV Power Transformer 2 by 1x 20MVA 110/11KV
power Transformer at
110/33/11kV Sub-station,
Kanakagiri
Koppal
BCR 0.69
227.52 &
26.03.19
0.00
5.00
0.00
0.00
248.00
0.00
0.00
1.00
Work Code
20
1
Cost of
Original / Date of
Revised
LOI
DPR & Date
Energy
Savings &
BCR
Name of the Work
Total of Augmentation
FB1057
Alipur to Bellary(South):
Stringing of 110kV 2nd Circuit
on exisitng DC towers from
Alipur Station to Bellary
(South) Sub-Station for a
distance of 8.00 Km.
Cost of
DWA
0.00
Bellary
ES 0.3
BCR 1.62
51.95 &
13.08.12
0.00
0.00
Budget
2019-20
Remarks
DPR Approved
DPR approved
(Rs. In Lakhs)
Sl.
No.
2
3
4
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Work Code
Name of the Work
District
FB1096
a) Construction of 110KV LILO
line to 110/11KV Kamalapura
sub-station on the existing DC
towers from the tapping point
for a distance of 5.8Kms along
with Construction of 110KV
terminal bay at existing
110/11KV Kamalapura substation in Bellary Taluk and
District.
Bellary
86.33 &
18.05.18
0.00
1.00
FB1097
a) Construction of 110KV LILO
line to 110/11KV Bisilahalli
sub-station on the existing DC
towers from the tapping point
for a distance of 1.906Kms
along with Construction of
110KV Terminal Bay for the
proposed line to 110KV/11KV
Bisilahalli Substation in
Bellary Taluk & District.
Bellary
57.37&
21.04.18
0.00
1.00
FC1051
Jewargi Sub-station:
Construction of 110kV LILO
line from existing ShahabadShahapur line to 110/3311kV Jewargi sub-station in
the existing corridor for a
distance of 0.86Kms
Kalaburagi
128.83 &
16.06.17
0.00
10.00
0.00
Remarks
(Rs. In Lakhs)
Sl.
No.
5
6
7
8
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Work Code
Name of the Work
District
FD1030
Betagera to proposed 220kV
Station at Koppal:
Construction of 110kV SC line
on DC towers from proposed
220/110/11kV
Halavarthy(Koppal) S/s to the
existing 110/33/11kV
Betagera S/s for a distance of
23.836Kms along with
construction of TB's at both
end
Koppal
1029.46 &
07.06.17
FB1102
Construction of 110KV LILO
line to 110KV Somasamudra
S/s on the existing D/c tower
from the tapping point 110KV
Allipura-Ballari(North) Line
for a distance of 4.1KM
pertaining to TLM SubDivision Munirabad in TL&SS
Division Munirabad.
Bellary
FF1007
Construction of 2nd circuit
line from 220/110/11kV
Shahapur S/s to
110/33/11kV Khanapur S/s
on existing DC tower for a
distance of 19.261 Kms along
with Construction of TB at
both ends.
FB1103
Conversion of existing 400kV
SC line to 400KV DC Quad
Moose line between BTPS (
Excluding Jindal LILO line)
to Guttur around for a route
length of 137 Kms.
Cost of
DWA
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
Budget
2019-20
Remarks
0.00
10.00
Budget to be surrendered for FY
18-19 Rs. 9.0 Lakhs
112.58 &
09.04.19
0.00
5.00
Estimates ( Cost Rs. 101.60 )
submitted for techincal sanction
.
Shahapur
446.20 &
15.03.19
0.00
5.00
Approved in 74th TCCM,Dtd:
20.06.2017.
Ballari
62964.14 &
12.10.12
0.00
10.00
As per DPR Report included in
APW 12-13 with work code
FA1035(b)
0.00
(Rs. In Lakhs)
Sl.
No.
Work Code
Name of the Work
District
8
Total of Lines
1
FD1021
Munirabad Power House
Station:
Shifting of exisiting Control
Room at 220kV Munirabad
Power House to existing work
shop building at 220kV
Munirabad Power House yard
Koppal
FD1031
Guddadahalli:
Providing Bus Bar protection
to 220kV KPTCL Bays at
400/220kV, Guddadahalli,
PGCIL Sub-station in Koppal
Taluk and District
Koppal
2
2
39
364
Energy
Savings &
BCR
Cost of
Original / Date of
Revised
LOI
DPR & Date
Cost of
DWA
0.00
315.78 &
06.07.13
Cost of
Cum Exp
Deptly.
Total
up to
Supplied
Work Cost 31/03/19
Materials &
others
0.00
0.00
160.37 &
26.09.17
Budget
2019-20
0.00
0.00
43.00
0.00
1.00
10.00
0.00
0.00
10.00
Total of TB's & Others
0.00
0.00
0.00
1.00
20.00
Total of Kalaburagi Zone
0.00
0.00
0.00
1.00
591.00
8410.33
292.26
8702.59
603.01
21325.00
Total of List-III for All Zones
Remarks
List-IV : Projects which have been cleared
either by Technical Advisory
Committee/Technical
co-ordination committee but administrative
sanctions are still to be obtained.
Sl.
No.
Name of the Work
District
BENGALURU TRANSMISSION ZONE
1
Establishing 2x100 MVA, 220/66 kV sub-station at
Srinivasapura in Kolar District.
2
Establishing 2x8 MVA, 66/11 kV sub-station at
Kodambally in Channapatna Taluk, Ramanagar
District.
3
Establishing 2 X 500 MVA, 400/220kV Dommasandra
GIS station, at Dommasandra, Bengaluru with revised
400 kV scheme and associated 220kV evacuation lines
along with additional 400 kV incoming line to proposed
3 X 500 MVA, 400/220kV Mylasandra sub-station
(Revised scheme for 75th TCCM appoval held on
04.11.2017).
4
5
Ratification to 69th TCCM proposal held on
17.08.2016): Establishing 220/66 kV sub-station in
the premises of existing 66/11 kV sub-station at
Nelamangala, Bengaluru Rural District
AND
Modification to the proposal approved in 70th TCCM
held on 20.12.2016:- Conversion of existing 66KV SC
Coyote line to DC Drake line between 66/11KV
Nelamangala sub-station to 66/11KV MEI sub-station –
Modification in scheme.
Establishing 2x 31.5 MVA, 66/11 kV sub-station at
Sorahunse in Bengaluru East Taluk, Bengaluru Urban
District
Kolar
Ramnagar
Bengaluru
Urban
6
Establishing 2x8MVA, 66/11kV Sub-Station at
Rayalapadu in Srinivasapura Taluk, Kolar District
7
Establishing 1x12.5MVA, 66/11kV Sub-Station at
Guluru in Bagepalli Taluk, Chikkaballapura District
8
Establishing 1x12.5MVA, 66/11kV Sub-Station at
Chikkaballapu
Buradagunte in Chintamani Taluk, Chikkaballapura
ra
District
9
Establishing 2x150 MVA, 220/66/11 kV sub-station
at Nagarabhavi, Bengaluru North Taluk, Bengaluru
Urban District - Revision of 66 kV line connectivity for
the proposal approved in 76th TCCM held on
05.03.2018.
Establishing of 2x12.5 MVA, 66/11kV station at
10 Dodderi in Bengaluru South Taluk, Bengaluru Urban
District.
Kolar
Chikkaballapu
ra
Bengaluru
Urban
10 Total of Sub-stations
1
Replacement of 1x20 MVA, 66/11 kV transformer by
1x31.5 MVA transformer at 66/11 kV Pottery Road
sub-station.
2
Replacement of 1x20 MVA, 66/11 kV transformer by
1x31.5 MVA transformer at 66/11 kV Yellar Bande
(L.R. bunde)sub-station.
3
Augmentation of existing 1x8 MVA, 66/11 kV
transformers by 1x20 MVA transformers at 66/11 kV
Vidurashwatha sub-station in Gowribidanur Taluk,
Chikkaballapura District.
4
Proposal for errection of 1X20MVA , 66/11KV Spare
Power Transformer by extending existing 66KV bay at
66/11 kV Bommasandra I/A sub-station in TL&SS
Division, Yerandanahalli.
5
Proposal for errection of 1X12.5MVA,66/11KV Spare
Power Transformer at 66/11 kV 'D' Cross sub-station
in TL&SS Division Doddaballapura.
6
Providing spare 1X100MVA, 220/66kV Power
transformer at 220/66kV Malur sub-station.
7
Providing additional 1X500 MVA, 400/220 kV power
transformer at proposed 400/220 kV Devanahalli
Hardware Park sub-station.
8
Providing 3rd 100 MVA, 220/66 kV power transformer
at 220/66 kV TK Halli sub-station at Malavalli taluk,
Mandya District.
9
Augmentation of 2x20MVA Power Transformers by
2x31.5MVA Power Transformer at 66/11KV Brigade
Metropolies Sub-station in Bengaluru.
10
Augmentation of 1x12.5MVA Power Transformer by
1x20MVA Power Transformer at 66/11KV Vijayapura
Sub-station in Devanahalli Taluk , Bengaluru Rural
district.
Chikkaballapu
ra
Mandya
Bengaluru
Rural
Augmentation of 1x12.5MVA Power Transformers-2 by
11 1x20MVA Power Transformer at 66/11KV Shidalgatta
Sub-station in Chintamani.
172
List-IV
Sl.
No.
12
Name of the Work
Augmentation of 1x8MVA Power Transformer-2 by
1x20MVA Power Transformer at 66/11KV
Gundamanagere Sub-station at D.B.Pura Tq in
Bengaluru Rural Dist.
District
Bengaluru
Rural
Augmentation of 2x20MVA Power Transformers by
13 2x31.5MVA Power Transformer at 66/11KV
Dommasandra Sub-station in Bengaluru.
Augmentation of 2x8MVA Power Transformers by
14 2x12.5MVA Power Transformer at 66/11KV N. G.
Hulkur Sub-station at Bangarupete Tq in Kolar.
Kolar
Providing additional 1x31.5MVAPower Transformer at
15 66/11KV Prestige Shanthinikethan Sub-station in
Bengaluru
Providing additional 1x12.5MVA Power Transformer at
16 66/11KV Mallanayakanahalli Sub-station at
Mulabagilu in Kolar
Kolar
Providing additional 1x31.5MVA Power Transformer at
17 66/11KV Provident Housing Ltd Sub-station in TL &
SS Division of Subramanyapura.
Providing additional 1x20MVA Power Transformer along
18 with associated Tr. bay at 220/66/11KV Gowribidanur
Sub-station in TL & SS Division of Gowribidanur .
19
Augmentation of 1x12.5MVA 66/11kV Power
Transformer-2 by 1x20MVA Power Transformer at
66/11kV Jadigenahalli Sub-station in Hosakote taluk,
Bengaluru Rural District.
Bengaluru
Rural
20
Augmentation of 1x12.5MVA 66/11kV Power
Transformer-1 by 1x20MVA Power Transformer at
66/11kV Hejjala Sub-station in Ramanagara taluk
and, Ramanagara District.
Ramnagar
20 Total of Augmentations
1
Conversion of existing 220 kV SC line to DC line from
Peenya to proposed 400 kV Mylasandra Station.
2
Re-submission of subjects:- Strengthening of 66 kV
Doddaballapura–DG Yalahanka- Line II by
replacement of 1/0 Copper Conductor by HTLS
Conductor with double circuit towers from 66 kV
‘D’Cross sub-station to DG plant for a distance of 29
kMs using the existing corridor as per the list-3 of
Annual Program of Works 14-15.
3
Construction of 220 kV DC line between Chintamani &
Mittemari with a new corridor from the proposed
220 kV Mittemari R/s to Dibburahalli limits and upgradation of existing corridor having 66 kV SC to
MCMV towers for extending 220 kV and 66 kV circuits
upto 220 kV Chintamani R/s from Dibburahalli limits
via Ganjigunte.
4
Conversion of existing 220 kV Gowribidanur - D.B.Pura
SC to DC line to an extent of 40km for taking supply
directly from 400 kV Devanahalli s/s
5
Conversion of existing 220 kV Gowribidanur Madhugiri SC to DC line
6
Replacement of Coyote ACSR Conductor of 66kV
Doddaballapura-Chikkaballapura I & II DC line by
Drake ACSR conductor with intermediate tower from
220/66 kV NRS Doddaballapura to 66 kV
Chikkaballapura Industrial Area sub-station for a
circuit length of approximately 23.6 kMs.
7
LILO arrangement from 66/11 kV Somenahalli
substation by stringing second circuit on existing 66 kV
Somenahalli DC towers upto tap point of the 66 kV
Gowribidanur - Peresandra line (7.87 kMs).
8
Construction of new 66kV SC line on DC towers from
existing 66/11KV Solur (Gudemaranahalli) substation to 66/11KV Kudur with additional TB at
66/11KV Solur (Gudemaranahalli) and Kudur substations
9
Providing Alternate Source to 66/11 kV Harobele substation by tapping existing 66 kV KanakapuraT.K.Halli Line -2 in TL&SS Division, Kanakapura,
Kanakapura Taluk, Ramanagara dist.
Ramnagar
10
Proposal for strenghthening of 66 KV Jigani-2A & 2B
circuit lines from ACSR coyote to ACSR drake in the
existing corridor from RBI tapping point to Jigani
substation in Anekal Taluk, Bengaluru Rural District.
Bengaluru
Rural
173
List-IV
Sl.
No.
Name of the Work
11
Contruction of 220 kV multi-circuit, multi-voltage line
between 400/220 kV Somanahalli and 220/66 kV
Subramanyapura s/s in the existing 66 kV line
corridor.
12
Providing alternate 66 kV source to 66 kV Vidyanagar
sub-station by running 1000sqmm UG Cable from 220
kV Devanahalli Hardware Park sub-station for a
distance of 9.1 km
District
Providing 66KV Alternate Source to 66/11 kV
Anjanapura sub-station by tapping existing 66 kV
13 Somanahalli-J2 Line by laying 66KV SC line with
630/1000Sqmm XLPE UG cable in TL&SS Division,
Subramanyapura.
14
Revision of approved Scheme :Providing 66KV
Alternate Source to 66/11 kV Muddenahalli (Nandi)
sub-station by construction of 66KV LILO line from
66KV DC Doddaballapura- Chikkaballapura line for a
distance of 3.46Kms in Chikkaballapura Taluk &
District.
15
66 kV connectivity from proposed 2 X 100 MVA,
220/66 kV and 2 X20 MVA, 66/11 kV sub-station at
Harohalli TL&SS Division, Kanakapura, Kanakapura
Taluk, Ramanagara District.
Work of running of 66kV 1000sq mm UG cable from
220kV HBR Layout station to 66/11kV Pottery Road
sub-station for a distance of 3.75kms and replacement
of existing 66kV line circuit breaker by Hybrid
16
Switchgear and replacement of existing station bus of
coyote/lynx conductor by drake conductor at 66/11kV
Pottery Road substation in Bengaluru North Taluk,
Bengaluru District –Reg
Proposal for the work of providing 66kV alternate
source to 66/11kV Brigade Metropolis by tapping
existing 66kV HAL-1 or 2 line (Bagmane 1 or 2
17
feeding from 220/66kV Hoody) by laying 66kV,
1000sq mm single circuit XLPE insulated copper UG
cable -Reg
18
66 kV connectivity from proposed 2 X 100 MVA,
220/66 kV and 2 X20 MVA, 66/11 kV sub-station at
Harohalli TL&SS Division, Kanakapura, Kanakapura
Taluk, Ramanagara District- Ratification
19
Providing 66KV alternative source line by UG cable
from 66KV Bommasandra Industrail Area substation
to 66/11KV Jigani Industries Area Sub-station Submission of TCCM Proposal Regarding.
Reconductoring of existing DC line from Coyote ACSR to
20 HTLS Conductor for a length of about 3 kMs from 66KV
Austin Town to Koramangala LILO Point.
Reconductoring of existing SC line on SC towers with
Coyote ACSR to DC line on DC towers with HTLS
21 Conductor between Tapping point upto K&C Velley
substation for a length of about 1.5 kMs for LILO
arrangement.
22
Conversion of existing 66KV DC line with Coyote ACSR
to HTLS Conductor between 220KV Hebbal substation
to 66KV Gokul substation for a length of about 3.546
kMs
Conversion of 220 kV Gowribidanur-DB Pura SC line
with Drake ACSR conductor to 220 kV DC line with
AAAC Moose conductor by terminating one of the
23
circuits at D.B.Pura and other circuit at proposed 400
kV Devanahalli Hardware Park by using 1000sqmm
single circuit 220 kV UG Cable for a distance of 2.4km
Construction of 66 kV SC line partly by laying
1000/630Smm UG cable over a length of about 580
Mtrs towards 220/66/11KV Dobbaspete sub-station
out of approved 21KMs overhead line (using DRAKE
24 conductor) between 220/66/11KV Dobbaspete substation and 66/11KV Doddbelavangala sub-station;
partly in the existing 66 kV Dabespet-Kolala Corridor
–Modification /Revised proposal for the proposal
approved in 71st TCCM held on 17.01.2017.
24 Total of Lines
1
Providing additional switchgars at various sub-station
coming under Somanahalli & T.K.Halli Division.
2
Proposal for replacement of old regid bus with new
Aluminium BUS at 220/66KV NRS sub-station,
Rajajinagar, Bengaluru North Taluk
3
Providing 2 Nos. of 66KV Terminal bays with
protection control system including the Breaker control
for the I/C lines and equipment of GowribidanurBagepalli line-1 & Somanathapura tap line in 66KV
Yenegadele- Chakavelu line at 66/11 kV
Somanatthapura sub-station
174
List-IV
Sl.
No.
Name of the Work
4
Construction of 66KV TB at 220/66KV Sarjapura
substation for connecting 2nd circuit with Coyote ACSR
line on DC towers of Sarjapura- Attibele line from
220/66KV Sarjapura substation
5
TCCM Proposal Strengthening of 220KV Bus and
connected Renovation & Modernization works at
220/66/11KV Kolar substation in TL&SS Divison,
KPTCL, Kolar -Regarding.
6
Replacement of 3X167 MVA, 1 phase auto transformer
of ICT-1 bank by 500MVA, 3 phase power transformer
at 400 kV R/S Hoody
6
Total of TB's & Others
District
60 Total for Bengaluru Zone
TUMAKURU
TRANSMISSION ZONE
1
Establishing 400/200kv Sub station at Huliyurdurga in
Tumakuru District
Tumakuru
2
Establishing 1x8 MVA, 66/11 kV Sub-station at
Madikehalli with constructing 66 kV SC tap line from
proposed 66 kV Jiddigere SC line to the proposed
substation for a distance of 8 km in Kunigal Taluk,
Tumakuru District.
Tumakuru
3
Establishing 2x8 MVA, 66/11 kV sub-station at
Nandigavi in Harihara Taluk, Davanagere District with
66 kV LILO line from existing 66 kV Harihara-HospetBanuvalli line for a distance of 6.0 km.
Tumakuru
4
Establishing 1x10 MVA, 110/11kV sub-station at
Haridasanahally Turuvekere Taluk, Tumakuru
District.
Tumakuru
5
Establishing 2x8 MVA, 66/11kV sub-station at
Arsikere, Harapanahalli Taluk, Davangere District.
Tumakuru
6
Establishing 2x8 MVA, 66/11 kV sub-station at
Konanatale (Gonigere) in Honnali Taluk, Tumakuru
District
Tumakuru
7
Establishing 1x8 MVA, 66/11 kV sub-station at
Alappanagudde in Kunigal Taluk, Tumakuru District
Tumakuru
8
Establishing 1x8 MVA, 66/11 kV sub-station at
Senabaghatta in Kunigal Taluk, Tumakuru District.
Tumakuru
9
Establishing 1x8 MVA, 66/11 kV sub-station at J N
Kote (Jampanna Nayakana Kote) in Chitradurga
Taluk, Chitradurga District by constructing 66 kV Tap
line from existing 66 kV Chitradurga-Hiriyur line for a
distance of 7.0 km.
Tumakuru
10
Establishing 1x12.5 MVA, 66/11 kV sub-station at
N.G.Halli in Holalkere Taluk, Chitradurga District.
Tumakuru
11
For Establishing 1x12.5 MVA, 66/11kV Sub-station,
Konasagara in Molkalmuru Taluk, Chitradurga District
Tumakuru
Establishing 1x10 MVA, 110/11 kV sub-station at
Bidaregudi in Tiptur Taluk, Tumakuru District by
12 constructing 110 kV LILO line from existing 110kV
Gandasi-DM Kurke SC line for a distance of 2 km with
Lynx Conductor.
Establishing 1x10 MVA, 110/11 kV sub-station at
Belavaththa (Gangakshetra) in Gubbi Taluk,
13 Tumakuru District by constructing 110 kV LILO line
from existing 110kV Nittur-Kadaba SC line for a
distance of 4 km with Lynx Conductor.
Tumakuru
Tumakuru
Establishing 1x12.5 MVA, 66/11 kV sub-station at
Doddabeeranahalli in Challakere Taluk, Chitradurga
14 District by constructing 66 kV single LILO line from
existing 66kV Parashurampura-Hiriyur DC line for a
distance of 2 km with Coyote Conductor.
Tumakuru
Establishing 1x8 MVA, 66/11 kV sub-station at
Baragur (Pujar Muddanahalli) in Sira Taluk,
15 Tumakuru District by constructing 66 kV SC line on
DC towers from existing 66kV HiriyurPattanayakanahalli line for a distance of 11Kms
Tumakuru
Ratification:
Establishing 1x8 MVA, 66/11 kV sub-station at
Daginakatte in Channagiri Taluk, Davanagere District
16
by constructing 66 kV LILO line from existing 66kV
Honnali-Lingadahalli line-1 for a distance of 7 km with
Coyote Conductor.
Tumakuru
17
Establishing 2x100MVA 220/66kV Sub-station at
P.D.Kote in Hiriyur taluk, Davanagere district
Tumakuru
18
Establishing 2x100MVA 220/66kV Sub-station near
66/11 kV Hangal sub-station, Davanagere district
Tumakuru
175
List-IV
Sl.
No.
Name of the Work
District
Establishing 2x8 MVA, 66/11 kV Sub-station at
Kanchikere in Harapanahalli Taluk, Davanagere
Districtby constructing 66 kV LILO line from existing
19 66kV Neelagunga-Punabaghatta SC line for a distance
of 1 km with Coyote Conductor.Approved subject to
completion of the work of stringing of 66kV 2nd
circuit from 220/66kV Neelagunda to
Punabhaghatta LILO point
Tumakuru
Establishing 1x8 MVA, 66/11 kV Sub-station at
Talagunda in Sira Taluk, Tumakuru Districtby
20 constructing 66kV SC line (tap line) on DC towers from
existing 66kV Madhugiri-Sira Line-1 for a distance of
8kms using Coyote conductor
Tumakuru
Establishing 2x8 MVA, 66/11 kV Sub-station at
Kyasinkere (Chennenahalli) in Honnali Taluk,
21 Davanagere District by constructing 66kV LILO line on
DC towers from existing 66kV Honnali-Sasuvehalli line
for a distance of 2kms using coyote conductor
Tumakuru
Establishing 1x8MVA 66/11kV Sub-station at
Sirivara in Tumakuru Taluk, Tumakuru District by
22 constructing 66 kV LILO line from existing 66kV
Anchepalya Line-1 for a distance of 7 km with Coyote
Conductor.
Tumakuru
Establishing 1x10MVA 110/11kV Sub-station at
Karadalu in Tiptur Taluk, Tumakuru District by
23 constructing 110 kV LILO line from existing 110kV KB
Cross-Tiptur Line for a distance of 6 km with Lynx
Conductor.
Tumakuru
24
Establishing 2X100 MVA, 220/66 kV sub-station at
Bharamasagara in Chitradurga district
Tumakuru
Establishing 1x10 MVA, 110/11 kV sub-station at
Torehalli in Gubbi Taluk, Tumakuru District by
25 constructing 110 kV LILO line on DC towers from
existing 110kV Nittur-Gubbi SC line for a distance
of 4 kms with Lynx Conductor.
Tumakuru
Establishing 1x10 MVA, 110/11 kV sub-station at
MMA Kaval in Gubbi Taluk, Tumakuru District by
26 constructing 110 kV LILO line on DC towers from
existing 110kV Nittur-Gubbi SC line for a distance
of 4 kms with Lynx Conductor.
Tumakuru
Establishing 2x 8MVA, 66/11KV Sub-Station at
(Irakasandra Colony) I. K. Colony
(Mannurathimmanahalli) in Koratagere Taluk, Tumkur
27
District by constructing 66 KV LILO line on DC towers
to a distance of 10 Kms from existng 66kV KoratagereBeladara SC line with Coyote conductor.
Tumakuru
Establishing 2 X 100 MVA , 220/66/11 kV sub-station
28 at Sirivara (Kodithimmanahalli) in Tumkur taluk,
Tumkur District.
Tumakuru
29
Establishing 2x8 MVA, 66/11 kV sub-station at
Hosahalli Gummanuru in Davanagere Taluk & district.
Establishing 1x8 MVA, 66/11 kV sub-station at
30 Bramhadevarahalli Madhugiri Taluk, Tumakuru
district.-Ratification
31
Establishing 1X8 MVA, 66/11 kV sub-station at Garani
Gate in Madhugiri taluk, Tumkur dist.-Ratification
Establishing 1X8 MVA, 66/11 kV sub-station at
32 Kavanadala (Girigowdanahalli) sub-station in
Madhugiri taluk, Tumkur dist.-Ratification
Tumakuru
Tumakuru
Tumakuru
Tumakuru
32 Total of Sub-stations
1
Providing additional 1x12.5 MVA, 66/11 kV
Transformer at 66/11 kV Challakere Sub-station in
ChallakereTaluk, Chitradurga District.
Tumakuru
2
Replacement of 1x12.5 MVA, 66/11 kV Power
Transformer by 1x20 MVA,66/11 kV Power
Transformer at 66 kV Hosadurga sub-station in
Chitradurga District.
Tumakuru
3
Replacement of 1x10 MVA Power Transformer by 1x20
MVA 110/11kV Power Transformer at 110/11kV
Tiptur substation in TipturTaluk, Tumakuru District.
Tumakuru
4
Replacement of 1x8 MVA Power Transformer by 1x12.5
MVA 66/11kV Power Transformer at 66/11kV Honnali
substation in Honnali Taluk, Davanagere District.
Tumakuru
5
For Providing additional 1x8 MVA, 66/11kV Substation Hindasaghatta.
Tumakuru
6
For Replacement of 1x6.3 MVA Power transformer by
1x20 MVA Power transformer at 66/11kV sub-station
Chikkajajuru.
Tumakuru
176
List-IV
Sl.
No.
Name of the Work
District
7
For Augmentation of existing 2x8 MVA power
tranformer by 2x12.5 MVA power transformer at
66/11kV Sub-station, SASALAHALLA
Tumakuru
8
Replacement of 1x12.5 MVA power transformer 1 by
1x20 MVA power transformer at 66/11 kV
Basavapatna sub-station in Channagiri Taluk,
Davanagere District.
Tumakuru
9
Replacement of 1x12.5 MVA power transformer 1 by
1x20 MVA power transformer at 66/11 kV
Lingadahalli sub-station in Chennagiri Taluk,
Davanagere District.
Tumakuru
Replacement of 1x8 MVA power transformer-2 by
10 1x12.5 MVA power transformer at 66/11 kV Bagur substation in Hosdurga Taluk, Chitradurga District.
Tumakuru
Replacement of 1x12.5 MVA power transformer-2 by
11 1x20 MVA power transformer at 66/11 kV H.D.Pura
sub-station in Holalkere Taluk, Chitradurga District.
Tumakuru
Providing additional 1x12.5 MVA, 66/11 kV Power
12 Transformer at 220/66/11 kV Station Neelagunda in
Harapanahalli Taluk, Davanagere District
Tumakuru
13
Replacement of existing 1x8 MVA power transformer 2
by 1x12.5 MVA power transformer with 2 No.s of
additional 11 kV Switchgears at 66/11 kV Garaga substation in Hosadurga Taluk, Chitradurga
District.Approved subject to commissioning of 3rd
100 MVA at 220kV Hiriyur Station
Tumakuru
Replacement of existing 1x8 MVA power transformer by
14 1x12.5 MVA power transformer at 66/11 kV Nyamathi
Sub-station in Honnali Taluk, Davanagere District.
Tumakuru
Replacement of existing 1x8 MVA power transformer-1
by 1x12.5 MVA power transformer at 66/11 kV substation Mavinakatte in Davanagere Taluk, Davanagere
District.
Tumakuru
15
For replacement of existing 1x6.3 MVA power
transformer-1 by 1x12.5 MVA power transformer at
66/11 kV Benkikere sub-station in Channagiri Taluk,
Davanagere District.Approved subject to
commissioning of the 220kV Benkikere sub station
along with associated 66kV lines
Providing additional 1X10 MVA, 110/11 kV Power
17 transformer at 110/11 kV Tandaga sub-station in
Turuvekere taluk, Tumakuru district
16
Providing additional 1X10 MVA, 110/11 kV Power
18 transformer at 110/11 kV Talkere sub-station in
Turuvekere taluk, Tumakuru district
Tumakuru
Tumakuru
Tumakuru
19
Augmentation of 1x2.5 MVA, 66/11 kV Power
transformers-1 by 1x20 MVA Power Transformer at
66/11 kV Sub-station Bukkapatna in Tumakuru
Division.
Tumakuru
20
Augmentation of 1x8 MVA, 66/11 kV Power
Transformer-2 by 1x12.5 MVA Power Transformer at
66/11 kV Sub-station Pattanayakanahalli in
Tumakuru Division.
Tumakuru
Augmentation of 1x10 MVA, 110/11 kV Power
Transformer by 1x20 MVA Power Transformer at
110/11 kV Sub-station Handanakere in K.B. Cross
Division.
Augmentation of 1x10 MVA, 110/11 kV Power
Transformer by 1x20 MVA Power Transformer at
22
110/11 kV Sub-station Shettigere in K.B. Cross
Division.
Augmentation of 1x10 MVA, 110/11 kV Power
Transformer by 1x20 MVA Power Transformer at
23
110/11 kV Sub-station Thimmanahalli in K.B. Cross
Division.
Replacement of 12.5 MVA, 66/11 kV Power
24 Transformer -1 by 20 MVA, 66/11 kV Power
Transformer at 66/11 kV Parashuramapura
21
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Replacement of 8 MVA, 66/11 kV Power Transformer 25 1 by 12.5 MVA, 66/11 kV Power Transformer at 66/11
kV Ranganathapura.
Tumakuru
Replacement of 6.3 MVA, 66/11 kV Power Transformer 26 1 by 12.5 MVA, 66/11 kV Power Transformer at 66/11
kV Rangenahalli.
Tumakuru
Augmentation of 1x12.5 MVA, 66/11 kV Power
Transformer -1 by 1x20 MVA Power Transformer at
66/11 kV Sub-station Brahmasandra in Tumakuru
Division.
Tumakuru
Providing additional 1x8MVA power transformer and
28 associated 11kV switchgears at 66/11kV Shyagale substation in Davanagere taluk, Davanagere District.
Tumakuru
Providing additional 1x8MVA Power Transformer and
29 associated 11kV switchgears at 66/11kV Jiddigere
sub-station in Kunigal taluk, Tumakuru District.
Tumakuru
27
177
List-IV
Sl.
No.
30
Name of the Work
Providing additional 1x12.5MVA Power Transformer
and associated 11KV switch gears at 66/11kV
Nidasale sub-station in Kunigal taluk, Tumakuru
District.
District
Tumakuru
Providing additional 1x8MVA Power Transformer and
31 associated 11kV switch gears at 66/11kV Puravara
sub-station in Kunigal taluk, Tumakuru District.
Tumakuru
Augmentation of 1x8MVA by 1x12.5MVA, 66/11kV
32 Power Transformer at 66/11kV Devarahalli substation,
Channagiri taluk, Davanagere district.
Tumakuru
Augmentation of 1X6.3 MVA by 1X 20 MVA, 66/11 KV
33 power transformer at 66/11kV Sowlanga (Savalanga)
Sub-station, Honnali Taluk Davanagere district.
Tumakuru
Augmentation of 2x12.5MVA by 2x20MVA, 66/11kV
34 Power Transformers at 66/11kV Malebennur
substation, Harihara Taluk, Davanagere district.
Tumakuru
Augmentation of existing 1X8MVA by 1X12.5MVA
35 Power Transformer at 66/11kV Hiremallanahole
substation, Jagalur Taluk, Davanagere District.
Tumakuru
35 Total of Augmentations
1
2
3
Providing LILO arrangement to 66 kV Malebennur substation by constructing new 66 kV DC line in the
existing corridor for a distance of 0.4 kMs along with a
terminal bay.
Replacement of existing 66 kV line with Rabbit
conductor on fabricated tower by 66 kV DC line with
coyote Conductor from tapping point of multi-circuit
line of 66/11 kV Pavagada sub-station to 66/11 kV
Venkatapura sub-station for distance of 20 km in the
existing corridor.
Ratification: Construction of 2nd circuit LILO of 220kV
Davanagere-Shimoga DC line to 220kV Honnali
Station
Tumakuru
Tumakuru
Tumakuru
4
Construction of new 66 kV SC line on DC towers from
66 kV Kurubarahalli sub-station to 66 kV Guttur substation in the new corridor for a distance of 8 km along
with terminal bay at both stations
Tumakuru
5
Replacement of existing 66kV SC line with Rabbit
conductor on RCC poles by 66kV DC line on DC towers
with Coyote Conductor from 66/11KV Nagalamadike
Sub station to tapping point at 66 KV PavagadaShylapura line with Terminal bay at 66KV
Nagalamadike Sub station in existing corridor for a
distance of 16 Kms.
Tumakuru
6
Replacement of existing 66kV SC line with Rabbit
conductor on fabricated lattice towers by 66kV SC line
on DC towers with Coyote Conductor from tapping
point of 66/11 kV Venkatapura Sub station to
tapping point of proposed 220 kV Mittemari Substation in existing corridor for a distance of 49.44 Kms.
Tumakuru
7
Conversion of 66kV SC line on SC towers to DC line on
DC towers from 220kV Chitradurga Station to 66kV
Turuvanur Station in the existing corridor for a
distance of 22Kms along with construction of 1 No. of
66kV Terminal Bay at both stations.
Tumakuru
8
Providing LILO arrangement to existing 66/11kV
Bharamasagara Substation by conversion of SC line on
SC towers to DC line on DC towers from tap point on
66kV Davanagere-Chitradurga Line-1 to
Bharamasagara Sub-station for a distance of 3Kms
along with Terminal Bay Bharamasagara Sub-station.
Tumakuru
9
Providing LILO arrangement to existing 66/11kV
Nyamathi Substation by conversion of SC line on SC
towers to DC line on DC towers from tap point on 66kV
Honnali-Savalanga line to Nyamathi Sub-station for a
distance of 1.5 Kms along with construction of 66kV
Terminal Bay Nyamathi Sub-station.
Tumakuru
Replacement of existing 66kV Davanagere- Harihara
Hospete SC line on SC towers by new 66kV SC line
10 with coyote conductor on DC towers from Shamanur
limits (Loc. No. 19) to Harihara Limits (Loc. No: 93) in
the existing corridor for a distance of 15Kms.
Tumakuru
a) Stringing of 66kV Second circuit on existing 66KV
Davanagere-Kukkawada line on DC towers from 220KV
SRS Davanagere to 66KV Kukkawada Sub-station for
a distance of 13.523 Kms in the existing corridor along
with formation of 1 TB at Kukkawada Sub-station &
11 1TB at 220KV Davangere Station.
b) Stringing of 2nd Circuit on exisiting DC tower from
66kV Kukkuwada station to 66kV Santhebennur
TAP point (LOC:133) for a distance of 18.170 Kms in
the exisiting corridor along with formation of 1-TB at
66kV Kukkuwada station
Tumakuru
178
List-IV
Sl.
No.
Name of the Work
1) Stringing of 66KV 2nd circuit from 220 KV
Neelagunda to 66KV Punabgatta LILO point on existing
DC tower.
2) Conversion of existing S/C line on SC tower to D/C
line on DC tower from 66KV Punabgatta LILO point to
66KV Uchangiduga Tap point Loc No: 81. i.e 66KV
Davanagere- Sokke line.
3) Conversion of SC line on DC tower from Loc No: 81
12
to 66KV Bilichodu LILO point Loc No: 117 & total
distance of 46.5 Kms in the existing corridor ie.,
stringing of 2nd circuit on existing DC towers.
4) Providing LILO arrangements to 66KV Mellekatte
Sub-Station by constructing New 66KV DC line for a
distance of 0.25 Km.(loc no 69-70)
5) Formation of terminal bays at 220kV Neelagunda
R/S & 66KV Mellekatte Sub-station.
a) Stringing of 2nd Coyote circuit between 66kV
P.D.Kote and 66kV Hariyabbe S/s on existing D/C
towers for a distance of 12.25 Kms along with two nos
of new terminal bays, one at P.D.Kote and one at
Hariyabbe S/s.
b) Replacement of existing "66kV S/C coyote line on
S/C towers" between 66kV Hariyabbe S/s and
13 Hariyabbe tap point by "66kV D/C Drake line on D/C
towers" for a distance of 10.25 Kms and creation of one
termial bay at Hariyabbe S/s for providing LILO
arrangement.
c) Replacement of existing "66kV D/C coyote line on
D/C towers" between 220/66kV Hiriyur S/s and
Hariyabbe tap point by "66kV D/C Drake line on D/C
towers" for a distance of 18.0 Kms.
Ratification subjects:- A: Reconstruction of 66kV SC
idle line on SC towers having Coyote conductor from
66kV Chitradurga old S/s to 66kV Pandrahalli
substation for a distance of 17.5kms by 66kV SC line
on DC towers using Drake conductor in the existing
14 corridor.
B: Providing additional 66
kV circuit between H.D.Pura tap point and H.D.Pura
Substation for a distance of 10kms with Coyote
conductor to provide LILO arrangements at 66/11kV
H.D.Pura substation along with construction of 1 No of
66kV terminal bay at H.D.Pura substation.
Ratification subjects:- a) Construction of additional
66kV SC line having Coyote conductor from 66/11kV
HangalS/s to 66/11kV RampuraS/s with LILO at
66/11 kV Nagasamudra S/s for a distance of 28kms
15 approxalong with one number of 66kV terminal bay at
66/11kV Hangal & RampuraS/s and two numbers of
66kV terminal bay at 66/11kV Nagasamudra S/s.
b) Replacement of bus bar arrangement at 66/11 kV
Rampura S/s from Coyote to Drake.
Providing alternate source to existing 110/11kV
Handanakere Sub-station (feeding from 220kV K.B.
Cross Station) by constructing new 110kV SC line on
DC towers from existing 110/11kV D.M. Kurke Sub16
station (feeding from 220kV Arasikere Station) for a
distance of 18kms using Lynx Conductor along with
construction of 110kV Terminal bays at 110kV
Handanakere and D.M.Kurke Sub-stations
Providing alternate source to existing 66/11kV
Kunigal Sub-station by constructing new 66kV LILO
17 line from existing 66kV Yadiyur line for a distance of
2.5 kms in new corridor with new terminal bay at 66kV
Kunigal Sub-station.
Stringing of 66kV 2nd Circuit on existing 66kV DC
towers from Loc. No: 33 on 66kV Honnali-Kundur
18 line to 66kV Kundur Sub-station for a distance of
6kms along with construction of 66kV Terminal Bay at
66kV Kundur Sub-station.
Providing LILO arrangement to 66kV Banuvalli Substation by stringing 66kV new line on existing DC
towers from Loc. No.2 on 66kV Honnali-Banuvalli19 Nandigudi line to 66kV Banuvalli Sub-station for a
distance of 100 Mtrs using coyote conductor along
with formation of new 66kV Terminal Bay at 66/11kV
Banuvalli Sub-station
Stringing 66kV DC line on MC towers for connecting
66kV Kattige and 66kV Malebennur Sub-stations to
20 66kV Honnali Sub-station along with construction of
2 Nos. of 66kV terminal bays at 66kV Honnali Substation.
a) Re-Construction of 66kV Hiriyur-Sira SC line on
SC towers by new 66kV SC line on DC towers/MC
towers in the existing corridor upto 66kV Tavarakere
Sub-station LILO point for a distance of 40Kms
21 b) Partial Re-Construction of 66kV HiriyurChitradurga SC line on SC towers by new 66kV SC
line on DC towers/MC towers in the existing corridor
up to Loc No: 18 at Sugar Factory Layout area near NH4 (Hiriyur) for a distance of 6Kms
Replacement of existing 66kV SC line with rabbit
conductor on fabricated lattice structures by 66kV SC
line on DC towers with coyote conductor from 66/11kV
22
Sira Sub-station to 66/11kV Badavanahalli Substation in the existing corridor for a distance of 20kms
in Sira Taluk, Tumakuru District.
179
District
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Tumakuru
Tumakuru
List-IV
Sl.
No.
Name of the Work
District
Providing Alternate source to existing 66/11 kV
Nagalamadike substation and to evacuate solar power
at Nagalamadike sub-station by constructing new 66
kV DC line with Drake conductor from 220 kV
23
Pavagada substation (work under progress) to 66/11
kV Nagalamadike sub-station for a distance of 19 Km
in the new corridor with new terminal bays at
Nagalamadike & Pavagada 220 kV substation.
Tumakuru
Proposal for conversion of existing 220kV HiriyurMadhugiri SC line having Drake conductor on SC
tower to 220kV DC line on DC towers with Drake
conductor between 220kV Hiriyur receiving station
24 and tapping point of Antharasanahalli-Madhugiri
220kV line near Thonachagondanahalli (Madhigiri
taluq) for a distance of 61kms in the existing corridor
with new terminal bays at 220kV Hiriyur & Madhugiri
receiving stations in Tumkuru TLM subdivision
Tumakuru
25
Replacement of existing 66 kV SC line Rabbit conductor
on fabricated Lattice structure tower by SC line on DC
towers with Coyote conductor from 66/11 kV
Badavanahalli sub-station to 66/11 kV Madhugiri substation in the existing corridor for a distance of 16 Kms
in TLM sub-division Tumakuru.
Tumakuru
26
Stringing of 66 kV second circuit line on DC towers
from 220/66/11 kV Neelagunda receiving station to
66 kV Yaragunta station in the existing corridor for a
distance of 32 Kms in Davanagere circle.
Tumakuru
Construction of new 66 kV SC line on DC tower from
66/11 kV Bukkapatna sub-station to 66/11 kV
Hagalavadi sub-station for a distance of 18 Kms in the
new corridor using coyote conductor with new terminal
27 bays at Bukkapatna and Hagalavadi sub-station in
Tumakuru to Providing alternate source to existing
66/11 kV Sub-station at Bukkapatna (feeding from 220
kV receiving station Madhugiri) and 66/11 kV
Hagalavadi.
Tumakuru
Replacement of old 66 kV SC line Owl conductor on old
SC tower by SC line on DC towers (NBT) with Coyote
ACSR conductor from 220/66 kV Antharasanahalli
28
receiving station to 66/11 kV Tumakuru sub-station in
the existing corridor for a distance of 6 Kms in
Tumakuru District.
Tumakuru
Construction of 66KV DC BG Kere line on DC towers
with coyote conductor in the existing corridor of SC line
29 on SC towers with 66 kV extension of bay in 66/11 kV
BG Kere sub-station for LILO arrangement for a
distance of 1.2kms.
Tumakuru
Stringing of 2nd circuit of 66 kV DavanagereChitradurga-2 line from 220 kV SRS Davanagere to 66
30 kV Anagodu sub-station LILO point for a distance of 18
Kms in the existing corridor along with formation of
terminal bay.
Tumakuru
Conversion of 66kV Thallak- Nayakanahatty SC line on
SC towers by DC line on DC towers in the existing
31 corridor with 66KV bay formation at both 220kV
Thallak and 66kV Nayakanahatty substation for a
distance of 15.4kMs.
Tumakuru
32
Stringing of 2nd circuit on existing 66kV Thallak Parashurampura SC line on DC towers with terminal
bay formation at 66/11kV Parashurampura and at
220kV Thallak substation for a distance of 40kms
Connecting existing 66kV Chitradurga –Thallak express
line (line connecting directly from 220/66kV
Chitradurga SRS to 220/66kV Thallak SRS) to
Challakere 66/11kV substation with LILO arrangement
33
to Challakere line with constructing MC line on MC
towers in the existing corridor for a distance of 1.5km
with 66kV terminal bays in 66/11kV Challakere
substation.
Tumakuru
Tumakuru
33 Total of Lines
100 Total of Tumakuru Zone
HASSANA TRANSMISSION ZONE
1
Establishing 1x10 MVA, 110/11 KV sub-station at
Antaragatta village in kadur Taluk, Chickmagaluru
District
2
Establishing 2x10 MVA, 110/11 kV Udyavara substation in Udupi Taluk and District.
3
Up-gradation of 2x5 MVA, 33/11 kV sub-station to
2x10 MVA, 110/11 kV sub-station at Hosanagara by
constructing 110 kV SC line on DC towers from 110 kV
proposed Ripponpete sub-station for a distance of 30
kms.
4
Establishing 1x10 MVA, sub-station and construction
of 0.3 KMS of 110 kV Single circuit line on DC Towers
in Bejjavalli Thirthahalli Taluk, Shivamogga District.
5
Establishing 2x8 MVA, 66/11kV Sub-station at
Nuggehalli village in Channarayapatna Taluk, Hassan
District
180
List-IV
Sl.
No.
Name of the Work
6
Subject A20: Re-Submission of establishing 1x10 MVA,
110/11 kV sub-station at Thyagarthi Village in Sagar
Taluk, Shivamogga District by constructing 10kMs of
110kV SC line on DC towers from the existing 110 kV
SS-2 line.
7
Establishing 1x20 MVA, 110/33kV and 1x10 MVA, at
110/11kV Alankar Sub-station in Puttur Taluk, D.K.
District by constructing Appx. 12km 110kV SC line on
DC Towers from proposed 110kV Madavu substation(Under Construction).
8
Establishing 1x10 MVA,110/11 KV Sub-Station at
Kepu in Bantwal taluk, D.K.District, by constructing
appx. 15 Km SC line on DC Towers from existing
110/11 KV sub-station at Vittla.
9
Establishing 1x10 MVA, 110/11kV Substation at
Kunkanadu in Kadur Taluk, Chikkamagaluru District.
10
District
Upgradation of 1X5 MVA, 33/11KV substation to 1 x
10MVA, 110/11KV substation at Sringeri, in sringeri
taluk, Chikkmagaluru District, by Constructing 25KMs
OF 110 kV SC Line on DC towers from existing 110/11
kV sub-station Kammaradi to 110/11kV sub-station at
Sringeri, in Sringeri Taluk, Chikkamagaluru District.
Establishing 1x10 MVA, 110/11KV Sub-station at
Kuppagadde village in Soraba Taluk, Shivamogga
11 District by constructing 110KV SC tap line from the
existing 110KV line near Togarsi Sub-station for a
distance of 8 Kms
Upgradation of 2x5 MVA, 33/11 kV substation at
Neharu Maidan to 1x20 MVA, 110/33kV & 2x10 MVA,
110/11 kV Gas Insulated switchgear (GIS) substation
at Nehru Maidan in Mangaluru Taluk by laying of
110kV, 630 sqmm XLPE Copper U.G.Cable SC line
12
(with one spare run) from existing 220/110/33/11kV
Kavoor substation to the proposed 110/33/11 kV
substation at Nehru Maidan for a distance of
12.0Km(approx) in Mangalore Taluk, Dakshina
Kannada District.
Revised TAC agenda for chnge of route of Proposed
110kV line from Nandikur to 1x10 MVA , 110/11 kV
13
Substation at Belapu in Udupi Taluk, Udupi District for
a distance of 10kms
Establishing 2X100MVA and 1 x 8 MVA, 220/66/11kV
14 Sub-Station near kaniyaru village in Arakalgud taluk,
Hassan District.
Establishing 2 x 20 MVA, 110/33kV and 1 x 10 MVA,
110/11kV substation at Panja in Sulya Taluk D.K.
15 District by constructing 21Kms 110kV SC line on DC
Towers from the proposed 110kV Madavu substation (
Under construction)
Establishing 2 X 10MVA, 110/11KV Sub-station at
Kadalakere in Marpadi Village (near Moodabidri)in
Mangaluru Taluk, and construction of 110KV LILO line
on 110KV D/C Monopole towers with single sided cross
16 arms from existing 110KV D/C Moodabidri-Mannapitlu
line of M/s.Soham Power Projects to the proposed
110/11 KV Sub-station at Kadalakere for a distance of
1.50Kms. (approx.) in Mangalore Taluk, Dakshina
Kannada District.
Establishing 2x10MVA, 110/11 kV sub-station at
Ayanur in Shivamogga Taluk, Shivamogga District by
17 constructing 110 kV LILO line from existing 110 kV
Sagara-Shivamogga No.1 line for a distance of
0.20Kms.
Establishing 1x10MVA, 110/11KV Sub-station at
Byndoor in Byndoor Taluk Udupi District by
18 constructing 13 Kms 110KV SC line from
110/33/11KV Sub –Station at Navunda and formation
of 1 No 110kV TB at Navunda
19
Establishing 1x10 MVA, 110/11 kV sub-station at
Kagodu in Sagar Taluk, Shivamogga District by
constructing 09 kms 110kV SC line from existing
110kV Sagar-Talguppa LST-4 MC line at Tattekoppa.
20
Transmission scheme for proposed 1x 500 MVA,
400/220kV Arasapadavu sub-station
21
Establishing 2x8 MVA, 66/11kV sub-station at Heragu
village, Hassan Taluk and District
Establishing 1x8 MVA, 66/11 kV sub-station at
22 Santhemaruru Village in Arakalgud Taluk, Hassan
District.
Establishing 1x8 MVA, 66/11 kV sub-station at
23 Doddabemmathi Village in Arakalgud Taluk, Hassan
District.
24
Establishing 1x8 MVA, 66/11 kV sub-station at
Belavadi Village in Arakalgud Taluk, Hassan District.
Establishing 1x8 MVA, 66/11 kV sub-station at
25 Mudibetta Kaval Village in Channarayapatna Taluk,
Hassan District.
26
Establishing 1x8 MVA, 66/11 kV sub-station at
Biccodu Village in Belur Taluk, Hassan District.
27
Establishing 1x8 MVA, 66/11 kV sub-station at
Byrapura Village in Alur Taluk, Hassan District.
181
List-IV
Sl.
No.
Name of the Work
28
Establishing 2x10MVA, 110/11kV Sub-station at
Belapu in Kaup Taluk & Udupi District.
29
Establishing 1x8 MVA, 66/11 kV Sub-station at
Somanahally Village in Hassan Taluk, Hassan District
District
Establishing 1x8 MVA, 66/11 kV sub-station at
30 Hanike(channapura) village in Belur Taluk, Hassan
District
31
Establishing 1x10 MVA, 110/11 kV sub-station at
Kolagunda Gate in Arasikere Taluk, Hassan District
32
Establishing 1x8 MVA, 66/11 kV Sub-station at
Guddenahally village in Alur Taluk, Hassan District
Establishing 1x10MVA, 110/11kV and 1x10MVA
33 110/33kV sub-station at Karje in Brahmavara Taluk &
Udupi District
Establishing 1x10MVA, 110/11 kV & 1X10MVA,
34 110/33 kV sub-station at Koteshwara in Kundapura
Taluk, Udupi district
35
Establishing 2x10 MVA, 110/11 kV sub-station at
Adyar in Mangaluru Taluk, D.K District
Establishing 1x20 MVA, 110/33 kV and 2x10 MVA,
36 110/11 kV sub-station at Kaikara in Puttur Taluk,
D.K.District
Establishing 1x12.5 MVA, 66/11 kV sub-station at
37 Ganadalu in Chikkamagaluru Taluk, Chikkamagaluru
District
Establishing 2x8 MVA, 66/11 kV sub-station at
38 Jenugadde Village in Chikkamagaluru Taluk,
Chikkamgaluru District
a) Change in 110 kV line connectivity to the proposal
of establishing 1x10MVA, 110/11 kV sub-station at
Bejjuvalli Village in Thirthahalli Taluk,Shivamogga
District by LILO of 110 kV V3 line instead of tapping.
39
b) Providing radial connectivity to proposed 1x10MVA,
110/11 kV sub-station at Konandur Village in
Thirthahalli Taluk, Shivamogga District from proposed
110 kV Bejjuvalli sub-station
40
Change in 110 kV connectivity for the proposal for
establishing 1x10MVA, 110/11 kV sub-station at
Kuppagudde Village in Soraba Taluk, Shivamogga
District
Establishing 1x100 MVA, 220/66 kV & 1x100 MVA,
41 220/110 kV Sub-station at Dudda village in Hassan
Taluk, Hassan District
41 Total of Sub-stations
1
Providing additional 1x20 MVA, 110/33 kV transformer
with additional 1No. of 33 kV Bay at 110/33/11 kV
Konaje sub-station, in Bantwal Taluk, DK District
2
Providing additional 1x20 MVA, 110/33kV Power
Transformer along with one outgoing 33kV line Bay at
the existing 110/33/11 kV Guruvayanakere
substation in Belthangady Taluk, D.K.Dist.
3
Augmentation of 1x8MVA 66/11kV to 1x20 MVA
66/11kV Power Transformer at Hassan substation
4
Providing additional 1 x 8MVA Power Transformerat
66/11kV Mosalehosahally Substation in Hassan Taluk
& District.
5
Augmentation of existing 2 X 100 MVA, 220/110 kV
transformers by 2 X 150 MVA at 220/110kV Kemar
sub-station in Mangalore district
6
Providing additional 1x8 MVA, 66/11 kV transformer at
220/66/11KV Receiving Station, Mugalavalli in
Chikkamagalure Taluk, Chikkamagalure District.
7
Providing spare 1x12.5 MVA, 66/11 kV transformer at
220/66/11KV Receiving Station, Mugalavalli in
Chikkamagalure Taluk, Chikkamagalure District.
8
Enhancement of 1x5MVA, 66/11kV Power Transformer1 by 1x8MVA, 66/11kV Power Transformer along with
additional two numbers SWGs (one number in each
11kV Bank) with strengthening of 11kV ODS and
Providing Metering & Protection to 66kV Incoming line
and strengthening of 66kV ODS (replacement of
existing coyote conductor by drake) with necessary civil
works (viz replacement of un even and un-sized jelly as
per standards and formation of Cable duct) at 66/11kV
Hallymysore sub-station in Holenarasipura Taluk,
Hassan District.
182
List-IV
Sl.
No.
9
Name of the Work
District
Providing additional 1 x 100MVA, 220/110kV Power
Transformer at 220/110/11kV Netlamudnur Substation in Dakshina Kannada District
Providing spare 1 x 20MVA, 66/11kV Transformer at
10 66/11kV Hassan Sub-Station in Hassan Taluk and
District
11
Replacement of 1 x 10 MVA, 110/11kV Power
Transformer by 1 x 20 MVA, 110/11kV Power
Transformer at 110kV Moodabidri Sub-station, in
Mangaluru Taluk, Dakshina Kannada District
12
Replacement of existing 1x10 MVA 110/11 kV Power
Transformer-1 by 1 x20 MVA, 110/11kV power
transformer at 110/33/11kV Sagar Sub-station in
Sagar Taluk, Shivamogga District.
Replacement of 1 x 8 MVA, 66/11 kV Transformer by 1
13 x 12.5MVA, 66/11 kV at 66 kV Panchanahalli substation, in Kadur Taluk, Chikkamagaluru District
14
Creating 33 kV reference by installing 1x20 MVA,
110/33 kV Transformer instead of 1x10 MVA, 110/33
kV Transformer at 110 kV Kammaradi sub-station in
Thirthahalli Taluk, Shivamogga District
Providing additional 1x8MVA, 66/11 kV transformer at
15 66/11 kV Attichowdenahally sub-station in
Holenarasipura Taluk, Hassan District
Providing additional 1x8 MVA, 66/11kV Transformer at
16 66/11kV Doddahally sub-station, in Holenarasipura
Taluk, Hassan District
Providing additional 1x8 MVA, 66/11kV Transformer at
17 66/11kV Doddakadanuru sub-station, in
Holenarasipura Taluk, Hassan District
Providing additional 1 x 8 MVA, 66/11kV Transformer
18 at 66/11kV Hariharapura sub-station, in
Holenarasipura Taluk, Hassan District
Providing additional 1x8 MVA, 66/11kV Transformer at
19 66/11kV Somanahally sub-station, in Holenarasipura
Taluk, Hassan District
Providing additional 1x100 MVA, 220/110 kV power
20 transformer at 220/110 kV Balligavi sub-station in
Shivamogga District
20 Total of Augmentations
1
Resubmission of proposal : Running 110 kV, 400
Sq.mm. XLPE copper U.G cable double circuit line for
the portion between 220 kV SRS Kavoor to location No.
5 of the proposed (under construction) 110 kV
Kavoor–Kulashekara double circuit lines in 33 kV line
corridor in Mangalore Taluk, D.K. District.
2
Providing LILO arrangements to 66kV DVG-1 line at
66/11kV Holaluru Sub-station Holalur in TL&SS
Division Shivamogga.
3
Providing LILO arrangements to 110kV SS-2 line at
110/11kV Kumsi Sub-station in TL&SS Division
Shivamogga.
4
Providing LILO arrangements and M&P equipment’s at
110/11kV Substation at Machenahalli in Bhadravathi
Taluk, Shivamogga District.
5
Conversion of existing 110kV Bhadravathi-3 (BDVT-3)
SC line to DC line from 220kV receiving station MRS to
110/11kV Sub-station Machenahalli for a distance of
8kms & construction of new 110kV SC line on DC
tower from 110/11kV Sub-station Machenahalli to NRS
VISL Bhadravathi for a distance 8 kms in existing
corridor of TL&SS Division KPTCL, Shivamogga
Jurisdiction.
6
Providing LILO arrangements to 110kV Bhadravathi-3
(BDVT-3) line at 110/33/11kV Bhadravathi Substation in TL&SS Division Shivamogga.
7
Construction of 110KV DC Line from the existing
110/11KV Karaya sub-station to the existing
110/33/11KV Guruvayanakere sub-station for a
distance of 15 Kms in Belthangady Taluk, D K District.
183
List-IV
Sl.
No.
Name of the Work
8
Construction of new 66kV SC line on DC towers in the
existing corridor of 66kV Mild steel H-frame ShimogaMysore(SMT) from 220kV Receiving station Hassan to
66/11 kV Belur substation for a distance of about 35
kms with Terminal bay at Hassan and with LILO
arrangement at Hagare substation
9
Conversion of 66kV single circuit line on mild steel
single circui towers into 66kV double circuit line from
220kV sub-station Kadavinakote to 220kV substation Yachenhally duly providing 66kV TB’s at both
sub Stations in Hassan district.
District
Construction of new 66kV SC line on DC towers in the
existing corridor of the 66kV H-Frame ShivamoggaMysore-1(SMT from 66kV HNpura substation to tap
point of Saligrama(Munjanahalli limits) line for a
10
distance of about 21Kms in HN Pura Taluk Hassan
District by using conventional Dc towers and Coyote
conductor with terminal bay at 66kV Holenarasipura
substation.
11
Conversion of 66kV Single Circuit line on Mild steel
single circuit towers to Double circuit line from 66kV
Channarayapatna to Hirisave sub-station with
Terminal bay each at both substation.
Bifurcation of 66kV Hiremagalur-Chikkmagaluru line
by constructing a new DC line from Mugulavalli
220/66kV Receiving Station to Hiremagaluru
Substation for a distance of 1.5km by utilizing the
12
existing the existing spare line terminal bay (Bhadra
bay at Mugalavalli 220/66kVreceiving station) and
existing idle SMT line corridor in TL&SS division,
KPTCL, Shivamogga Jurisdiction.
Construction of 66kV SC line between 66/11kV
13 Substation at Rampura and Didiga duly providing
66kV TBs at both substation in Hassan Disrtict.
14
Providing LILO arrangement to 66 kV Hallimysore substation by stringing 66 kV 2nd circuit for a distance of
about 4.55 kms along with one number of 66kV
Terminal Bay in H.N.Pura Taluk, Hassan District
15
LILOing of 66 kV Hassan-C.R. Patna 2nd circuit line to
66 kV Udayapura sub-station for a distance of 75mtrs
along with 2 Nos. of 66kV Terminal Bays in C.R. Patna
Taluk, Hassan District
Stringing of 66 kV 2nd circuit with coyote conductor on
existing 66 kV DC towers from 220 kV MRS
Shivamogga sub-station to Holalur tapping
16
point(tower no 230A) for a distance of about 18.20kms
along with 66kV terminal bay at 220kV MRS
Shivamogga sub-station
17
Construction of 66kV SC link line between 66 kV
Attichowdanahally and 66 kV Hariharapura substations along with 66kV TBs at both sub-stations in
C.R. Patna Taluk, Hassan District.
18
Providing LILO arrangement to 66 kV Singapura substation by stringing 66 kV 2nd circuit for a distance of
about 6.128 Kms along with one number of 66kV TB in
H.N. Pura Taluk, Hassan District
Providing LILO arrangement to 66 kV Magge substation from one circuit of 66kV HassanSakaleshapura DC line duly converting 66kV SC tap
19 line having KEB make mild steel SC towers to DC
towers for a distance of about 9.50Kms along with one
no. of 66kV TB at 66kV Magge sub-station in Alur
Taluk, Hassan District
Conversion of existing 220 kV SC line from Kilara limits
to Balligavi limits for a distance of 52.817 kms to 220
20 kV DC line and construction of one no. of 220 kV
terminal bay at Sharavathi Generating station and one
at 220 kV Balligavi station in Shimoga district
21
Realignment of 220kV Shantigrama(PGCIL)-Gopalpura
M2 and Gopalpura-Kadavinkote-1 near 33/220kV
Suzlon wind pooling station at Gopalpura in
Holenarasipura Taluk
21 Total of Lines
1
Providing additional Terminal Bays at 66/11kV Belur
sub-station in Hassan District.
2
Providing 125 MVAr bus reactor at 400/220kV
Talaguppa Sub-station
3
Modification of the existing 220 kV Strung bus by Rigid
bus at 220 kV Khemar sub-station in Udupi District
3
Total of TB's & Others
85 Total of Hassana Zone
MYSURU TRANSMISSION ZONE
184
List-IV
Sl.
No.
Name of the Work
1
Nagamangala: Establishment 2x100MVA, 220/66kV
Station along with associated Transmission lines
2
Establishing 2x100 MVA, 220/66 kV sub-station at
Maddur in Maddur Taluk, Mandya District
3
Establishing 1x8 MVA, 66/11 KV Sub station at
Somarapete in Chamarajanagara Taluk & District
4
Establishing 1x12.5 MVA (66/11 kV) & 1x8 MVA
(66/33 kV) 66/33/11kV sub-station at Hanagal
Shettyhalli (Somawarapete) in Somawarapete Taluk,
Kodagu District with construction of 66KV SC Line on
DC Towers for a distance of about 27Kms.
5
Upgradation of 33/11kV sub-station to 66/11kV substation by providing 1X8 MVA, at Murnadu in Madikeri
Taluk, Kodagu District
6
Establishing 2x8 MVA 66/11kV sub-station at
Srimangala in Somvarpet Taluk, Kodagu District.
7
Establishing 1x8 MVA 66/11kV sub-station at Kudige
in Somvarpet Taluk, Kodagu District.
8
Establishing 1x8 MVA 66/11kV sub-station at
Lokkanahalli(Chennalinganahalli(C.N Halli)),
Kollegala Taluk, Chamarajanagar District.
9
Up-gradation of 33/11kV Sub-station to 66/11kV Substation by providing 1X12.5MVA, at
Siddapura(Beeticadu) in Virajpet Taluk, Kodagu
District.
10
District
Establishing 2 x 100 MVA, 220/66 kV Sub-Station at
Adakanahalli, Nanjangud Taluk, Mysuru District
Establishing 1x8 MVA, 66/11kV Sub-station at
11 Pandithanahalli(Bachanahalli) in Malavalli Taluk,
Mandya District
12
Establishing 1x8 MVA, 66/11kV Sub-station at
Sunkathonnur in Pandavapura Taluk, Mandya District
Establishing 1x8 MVA, 66/11kV Sub-station at
13 Eechalagudda kaval(ganadahalli gate) at K.R.Pet
Taluk, Mandya District
14
Establishing 1x8 MVA, 66/11kV Sub-station at Varuna
in Mysuru Taluk, Mysuru District
15
Establishing 1x8 MVA, 66/11kV Sub-station at
Honganuru in Chamarajanagara Taluk and District
16
Establishing 2x100MVA 220/66/11kV sub-station at
Hunsur in Hunsur Taluk and Mysuru District.
17
Establishing 1x8 MVA, 66/11kV Sub-station at
Hadinaru in Nanjangudu Taluk, Mysuru District
18
Establishing 1x8 MVA, 66/11kV Sub-station at Goluru
in Nanjangudu Taluk, Mysuru District
19
Establishing 1x8 MVA, 66/11kV Sub-station at
Volagere in Nanjangudu Taluk, Mysuru District
Establishing 1x8 MVA, 66/11kV sub-station at
20 Bhagamandala(Kopatti) in Madikeri Taluk, Kodagu
District.
21
Establishing 2x500 MVA, 400/220 kV sub-station at
Kadakola in Mysore District
Establishing 1x8 MVA, 66/11 kV sub-station at
22 Kodlipet(Handpost) in Somawarapete Taluk, Kodagu
District
23
Establishing 1x8 MVA, 66/11 kV sub-station at Katte
Malalavadi Gate in Hunsur Taluk, Mysuru District
Establishing 1x8 MVA, 66/11 kV sub-station at
24 Maragowdanahally(Mavathur)in K.R.Nagar Taluk,
Mysuru District
185
List-IV
Sl.
No.
Name of the Work
25
Establishing 1x8 MVA, 66/11 kV sub-station at Meluru
in K.R.Nagar Taluk, Mysuru District
26
Establishing 1x8 MVA, 66/11 kV sub-station at
Kyatanahalli in Pandavapura Taluk, Mandya District
27
Establishing 1x8 MVA, 66/11 kV sub-station at
Santhekasalagere in Mandya Taluk, Mandya District
28
Establishing 1x8 MVA, 66/11 kV sub-station at
Beeruvalli in K.R.Pete Taluk, Mandya District
29
Establishing 1x12.5 MVA, 66/11 kV sub-station at
Padukote in HD Kote Taluk, Mysuru District
30
Establishing 1x8 MVA, 66/11 kV sub-station at
Seeguru Gate in Periyapatna Taluk, Mysuru District
31
Establishing 1x8MVA, 66/11kV sub-station at
Hunasawadi in Periyapatna Taluk, Mysuru District
32
Establishing 1 x 8 MVA, 66/11 kV sub-station at
Mullur in Saragur Taluk, Mysuru District
33
Establishing 1x8 MVA, 66/11 kV sub-station at
Challahally in Hunsur Taluk, Mysuru District
34
Establishing 1x8 MVA, 66/11 kV sub-station at
Rathnapuri in Hunsur Taluk, Mysuru District
35
Establishing 1x8 MVA, 66/11 kV sub-station at Dodde
Koppalu Gate in Hunsur Taluk, Mysuru District
District
35 Total of Sub-stations
1
Providing 1x100 MVA, 220/66 kV spare transformer at
220 kV Kadakola sub-station.
2
Re-submission: Replacing 1x 6.3 MVA, 66/11 kV
transformer by 1x12.5 MVA transformer at 66 kV
Devanur(Nanjangud) Sub-station in Mysore District.
3
Replacing 1x8 MVA, 66/11 kV Transformer by 1x12.5
MVA, 66/11 kV Transformer-2 at 66 kV Megalapura
sub-station in Mysuru taluk and district
4
Replacing 2x8 MVA, 66/11 kV Transformer by 2x12.5
MVA, 66/11 kV Transformer at 66/11 kV
K.Honnalagere sub-station in Maddur Taluk and
5
Providing additional 1x8 MVA, 66/11 kV Power
Transformer at 66/11 kV Transformer Doora substation in Mysuru Taluk and Mysuru district
6
Providing additinal1x8 MVA, 66/11kV Power
Transformer at 66/11KV Hura Sub-station in
Nanjanagud Taluk, Mysuru District.
7
a. Providing additional 1x8 MVA, 66/11kV Power
Transformer at 66/11kV Mugur Sub-station in
T.N.Pura Taluk, Mysuru District.
b. Shifting of 66kV Tapping point of 66/11kV S/s
Mugur from existing 66kV Doddarayapet-KunthurMadhuvanahally Line to 66kV ChamarajanagarKollegala-Madhuvanahally Line by constructing SC line
on DC Towers for 3Kms
8
Providing additional 1x8 MVA, 66/11kV Power
Transformer at 66/11kV Martally Sub-station in
Kollegala Taluk, Mysuru District.
9
a. Replacement of 2x8 MVA, Power Transformer by
2x12.5 MVA Power Transformer at 66/11 KV
Ramapura sub- station in Kollegal Taluk,
Chamarajnagara District.
b.Construction of 66kV DC Line on DC Tower by
replacement of existing SC Line on SC tower of 66kV
Hanur-Cowdally line of 17.4Kms along with Radial SC
line on DC towers from 66/11kV S/s Ramapura to
Proposed 66/11kV s/s Ajjipura for about 13Kms for
Ring main arrangement by replacing existing Radial
arrangement at Kollegala taluk,Chamarajanagar district
10
Replacement of 2x8 MVA, Power Transformer by 2x12.5
MVA Power Transformer at 66/11 KV Doddinduvadi
sub- station in Kollegal Taluk, Chamarajnagara
District.
186
List-IV
Sl.
No.
Name of the Work
District
Providing additional 1x12.5MVA, 66/11kV at
11 Ganjigere sub-station, K.R.Pete Taluk, Mandya
District.
Providing additional 1x8 MVA, 66/11 kV transformer
12 at 66 kV Ayarahalli sub-station, in Mysuru Taluk and
District.
Providing additional 1x8 MVA, 66/11 kV transformer
13 at 66 kV Kabballi sub-station, in Gundlupet Taluk and
Chamarajanagara District
Providing additional 1x20 MVA, 66/11 kV transformer
14 at 66 kV Doddarayapete sub-station, in
Chamarajanagara Taluk and District
Replacing 1x12.5MVA, Power Transformer by 1x20MVA
15 Power Transformer at 66/11kV Koppa sub-station in
Maddur Taluk, Mandya District
16
Replacing 2x8MVA, 66/11 kV Transformers by
2x12.5MVA 66/11 kV Transformers at 66/11 kV
Mahadeshwarapura sub-station in Pandavapura Taluk
and Mandya District
17
Replacing 1x8 MVA, 66/11 kV Transformer by
1x20MVA 66/11 kV Transformer at 66/11 kV
Guddenahalli sub-station in Nagamangala Taluk and
Mandya District.
18
Replacing 1x8 MVA, 66/11 kV Transformer by
1x20MVA 66/11 kV Transformer at 66/11 kV
Chikkamandya sub-station in Mandya Taluk and
District.
19
Replacing 1x20 MVA, 66/11 kV Transformer by
1x31.5MVA 66/11 kV Transformer at 66/11 kV
Maddur sub-station in Maddur Taluk and Mandya
District
20
Replacing 2x12.5 MVA, 66/11 kV Transformers by
2x20MVA 66/11 kV Transformers at 66/11 kV
Nagamangala sub-station in Nagamangala Taluk and
Mandya District.
21
Replacing 1x12.5 MVA, 66/11 kV Transformer by
1x20MVA 66/11 kV Transformer at 66/11 kV
Gundlupete sub-station in Gundlupete Taluk and
Chamarajanagara District
22
Replacing 1x8 MVA, 66/11 kV Transformer-1 by
1x12.5MVA 66/11 kV Transformer at 66/11 kV
Hangala sub-station in Gundlupete Taluk and
Chamarajanagara District
23
Replacing 2x100 MVA, 220/66 kV Transformers by
2x150 MVA 220/66 kV Transformers at 220/66 kV
Tubinakare sub-station in Mandya Taluk and Mandya
District.
23 Total of Augmentations
1
Re-construction of 66 kV Vajamangala-SFC single
circuit idle line in Mysore & Mandya Districts
2
(Resubmission)Strengthening of 66 KV coyote SC line
on SC tower from Kadakola 220 KV sub-station to 66kV
Devanur (Nanjangud) sub-station by Drake conductor
on 110/66kv DC tower to a distance of 23 km.
3
Conversion of existing 220 kV SC HootagallyVajmangala-TK Halli to DC line with Drake ACSR
conductor
4
a)Providing 66kV SC link line between 66kV Bhogadi
sub-station and 66kV Santhebachahally Sub-station
K.R.Pet Taluk, Mandya District.
b) Providing radial connectivity for 66 kV Bhogadi substation from 66 kV Guddenahalli sub-station in K.R.Pet
Taluk, Mandya District.
5
Providing 66kV DC link line with coyote conductor
between 220kV Huygonahalli sub-station and 66kV
Chinakurali sub-station for a distance of about 20 kms
in K.R.Pet Taluk, Mandya District
6
Stringing of 66 kV 2nd circuit with coyote conductor on
existing 66kV DC towers of 66 kV ChamarajanagaraHonnali SC line for a distance of about 17kms along
with 66 kV TBs at both ends in Chamarajanagara Taluk
and District
6
Total of TB's & Others
187
List-IV
Sl.
No.
Name of the Work
District
64 Total of Mysuru Zone
BAGALKOTE TRANSMISSION ZONE
1
Establishing 2x100 MVA, 220/110 kV sub-station at
Savalagi (Near Chikkalaki Cross), Bagalkot District
Bagalkot
2
Establishing 1x10 MVA, 110/11 kV sub-station at
Thabakadahonnalli in Kalaghatagi Taluk, Dharwad
District
Dharwad
3
Upgradation of 33/11 kV sub-station to 2x10 MVA,
110/11 kV sub-station at Haunsbhavi in Haveri Taluk,
Haveri District
4
Establishing 1x10 MVA, 110/11 kV sub-station at
Hiremural(Nalathawad) in Muddebihal Taluk,
Vijayapura District
5
Establishing 1x10 MVA, 110/11 kV sub-station at
Bagewadi in Mundaragi Taluk, Gadag District.
Modification in 110 kV line scheme proposed for
establishing 1x10 MVA, 110/11 kV Sub-station at
Bagewadi in Mundaragi Taluk, Gadag District approved
in 73 rd TCCM on 20.3.17 .
6
Establishing 2x10 MVA, 110/11 kV sub-station at
Gosabal in Gokak Taluk, Belagavi District
Belagavi
7
Establishing 1x10 MVA, 110/11 kV sub-station at Itnal
in Soundatti Taluk, Belagavi District
Belagavi
8
Establishing 1x10 MVA, 110/11 kV sub-station at
Telagi in B.Bagewadi Taluk, Vijayapura District
Vijayapura
9
Establishing 1x10 MVA, 110/11 kV sub-station at
Hebballi in Dharwad Taluk, Dharwad District
Dharwad
10
Establishing 1x10 MVA, 110/11 kV sub-station at
Morab in Navalagund Taluk, Dharwad District
Dharwad
11
Establishing 2x10 MVA, 110/11 kV sub-station at
Nandagaon in Gokak Taluk, Belagavi District
Belagavi
12
Establishing 2x100 MVA, 220/110 kV sub-station at
Bilagi in Bilagi Taluk, Bagalkot District
Bagalkot
13
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Kainakatti in Badami Taluk, Bagalkot District
Bagalkot
14
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Suthagundar in Bagalkot Taluk, Bagalkot District
Bagalkot
15
Establishing 2 x 10 MVA, 110/11 kV sub-station at
Hebbal in Mudhol Taluk, Bagalkot District
Bagalkot
16
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Hireharkuni in Kundagol Taluk, Dharwad District
Dharwad
Upgradation of 3x5 MVA,33/11 kV sub-station to 2 x
17 10 MVA, 110/11 kV sub-station at Kaginele in Byadagi
Taluk, Haveri District
Haveri
18
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Belur in Ranebennur Taluk, Haveri District
Haveri
19
Establishing 2 x 10 MVA, 110/11 kV sub-station at
Bellada Bagewadi in Hukkeri Taluk, Belagavi District
Upgradation of 2x5 MVA, 33/11 kV sub-station to 2 x
20 10 MVA, 110/11 kV sub-station at Dhulkhed in Indi
Taluk, Vijayapura District
Haveri
Vijayapura
Gadag
Belagavi
Vijayapura
21
Establishing 2 x 10 MVA, 110/11 kV sub-station at
Kodachawad in Khanapur Taluk, Belagavi District
Belagavi
22
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Gubbewad in Sindagi Taluk, Vijayapura District
Vijayapura
23
Establishing 2x100 MVA, 220/110 kV sub-station at
Salahally in Ramadurga Taluk, Belagavi District
Belagavi
24
Establihing 2x100 MVA, 220/110 kV Sub-station at
Ramdurga Ramdurga Taluk, Belgavi District.
Belgavi
188
List-IV
Sl.
No.
Name of the Work
Establishing 1x10 MVA, 110/11 kV sub-station at
25 Khanderayanahalli in Ranebennur Taluk, Haveri
District
Establishing 1x10 MVA, 110/11 kV sub-station at
26
Kulenur in Haveri Taluk, Haveri District
District
Haveri
Haveri
27
Establishing 1x10 MVA, 110/11 kV sub-station at
Kanasur in Siddapura Taluk, Uttara kannada District
28
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Honwad in Vijayapura Taluk, Vijayapura District
Vijayapura
29
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Kannur in Vijayapura Taluk, Vijayapura District
Vijayapura
30
Establishing 2 x 10 MVA, 110/11 kV sub-station at
Jambagi in Vijayapura Taluk, Vijayapura District
Vijayapura
Upgradation of 2x5 MVA, 33/11 kV sub-station to
31 1X10 MVA, 110/11 kV & 1x20 MVA, 110/33 kV Sub
Station at Akkialur in Hangal Taluk, Haveri District
Uttara
Kannada
Haveri
32
Re-submission :- Establishing 2x100 MVA, 220/110 kV
Sub-station at Byadagi, Byadagi Taluk, Haveri District.
33
Establishing 2 x 10 MVA, 110/11 kV sub-station at
Bellubbi in Vijayapura Taluk, Vijayapura District
Vijayapura
34
Establishing 2 x 10 MVA, 110/11 kV sub-station at
Arjunagi in Vijayapura Taluk, Vijayapura District
Vijayapura
35
Establishing 1 x 10 MVA, 110/11 kV sub-station at
Hattaragi in Sirsi Taluk, Uttara Kannada District
Uttara
Kannada
Establishg 2x500 MVA, 400/220 kV sub-station at
36 Yalwar (Tentative Loacation) in Basavana Bagewadi
Taluk, Bijapur District.
Haveri
Vijayapura
37
Establishg 2x500 MVA, 400/220 kV sub-station at
Lokapur in Mudhol Taluk, Bagalkot District.
38
Establishg 2x100 MVA, 220/110 kV sub-station at Ron
in Ron Taluk, Gadag District.
Gadag
39
220kV GIS station to replace existing 220kV Ambewadi
SS , Haliyal Tq, North canara Dist
north canara
Establishing 1X10 MVA,110/11 kV Sub-station at
40 Navage Industrial Area in Belgavi Taluk and District.
Bagalkot
Belagavi
41
Establishing 2X10 MVA, 110/11kV sub station at
Hullur, Muddebihal Taluk, Vijaypura district.
Vijayapura
42
Establishing 1x10 MVA, 110/11 kV sub-station at
Kerur in Indi Taluk, Vijayapura District.
Vijayapura
43
Establishing 2x10 MVA, 110/11 kV Sub-station at
Harugeri in Raibag Taluk, Belgaum District.
Belagavi
Establishing 2X10 MVA, 110/11 KV sub-station at
44 Chimmada in Jamakhandi Taluka, Bagalkot District.
Establishing 2x100 MVA, 220/110 kV, 1x10 MVA,
45 110/11 kV Sub-station at Divagi in Kumta taluk,
Uttara Kannada District.
46
Establishing 2x100 MVA, 220/110 kV Sub-station at
Desur, Belagavi District.
Establishing 2X10 MVA, 110/11 KV sub-station at
Dindawar
by making LILO arrangement from 110kV BagewadiSindagi line
47 for a distance of 1.5Kms in Basavan Bagewadi Taluk,
Vijayapura
District.
Establishing 2X10 MVA, 110/11 KV sub-station at
Yankanchi by making LILO arrangement from 110kV
48 Sindagi-Bagewadi line for a distance of 10Kms in
Sindagi Taluk, Vijaypur District.
Establishing 1X10 MVA, 110/11 KV sub-station at
Machakanur by making LILO arrangement from
110kV Bagalkot-Lokapur line for a distance of 2.0 kms
in Mudhol Taluk, Bagalkot District.
Establishing 1X10 MVA, 110/11 KV sub-station at
Kendur by making LILO arrangement from 110kV
50
Kerur-Badami line for a distance of 8 Kms in Badami
Taluk, Bagalkot District.
49
189
Bagalkot
Uttara
Kannada
Belagavi
Vijayapura
Vijayapura
Bagalkot
Bagalkot
List-IV
Sl.
No.
Name of the Work
Establishing 2X10 MVA, 110/11 KV sub-station at
Alagur
by construction of 110kV SC line on DC towers from
approved 220/110kV Chikkalaki cross (Savalagi) for a
51
distance of 15Kms in Jamakhandi Taluk, Bagalkot
District.
Establishing 1X10 MVA, 110/11 KV sub-station at
Jigajevanagi by constructing S/C line on D/C towers
for a distance of 10 Kms from existing 110 KV substation Inchageri in Indi Taluk, Vijayapur District.
Upgradation of existing 2x5MVA, 33/11KV sub-station
to 2x10MVA,110/11KV sub-station at Naad in Indi
53 Taluka, Vijayapur District with construction of 110kV
SC line on DC towers from 110kV Hiremasali for a
distance of 9 kms.
Establishing 2X10 MVA, 110/11 KV sub-station at
Umaraj village by constructing S/C line on D/C tower
54
with Lynx conductor for a distance of 18 km in Indi
Taluk, Vijayapur District.
52
Establishing 2X500 MVA, 400/220kV SS at Bijapur 55 Bagewadi area at yalawar/ Shivanagi, Vijaypur Taluk &
dist
District
Bagalkot
Vijayapura
Vijayapura
Vijayapura
Upgradation of 33 kV sub-station to 2x10 MVA,
56 110/11 kV sub-station at Aralimatti in Gokak Taluk,
Belagavi District.
Upgradation of 33 kV sub-station to 2x10 MVA,
57 110/11 kV sub-station at Hallur in Gokak Taluk,
Belagavi District.
Establishing 2X10 MVA, 110/33/11 KV sub-station at
Madangeri near Gokarna by LILO arrangement from
58 110 Kumta – Karwar line for a distance of 0.03Kms in
Kumta Taluk, Uttara Kannada District.
59
Establishing 2x100 MVA, 220/110 kV Sub-Station at
Hungund, Hungund Taluk, Bagalkot district.
59 Total of Sub-stations
1
2
3
Replacement of MS and Deteriorated Towers and
Lines of 110 kV Supa-Goa DC line by new 110 kV DC
line with Lynx conductor using 110 kV GI towers in the
existing corridor in Uttara Kannada District
Providing additional 1x50 MVA, 220/11 kV Tr at 220
kV Sirsi (Esle) sub-station, in Sirsi Taluk, Uttara
Kannada District
Providing additional 1x100 MVA 220/110 kV Power
transformer at 220/110/11 kV Ghataprabha substation in Belagavi District.
Uttara
Kannada
Uttara
Kannada
Belagavi
4
Providing additional 1x10 MVA, 110/11 kV transformer
along with 1I/C+5F switchgear at 110 kV Nidagundi
sub-station in B.Bagewadi Taluk & Vijaypura District.
Vijayapura
5
Creating 33kV reference by installing 1X20 MVA,
110/33 kV power transformer at 110kV Chadachan
sub station in Indi Taluk, Vijaypura District.
Vijayapura
6
7
8
9
10
Providing 1x100 MVA, 220/110 kV Power transformer
at 220/110 /11 kV Kuduchi Sub-station in Raibhag
taluk.
Augmentation of existing 1x5 MVA, 110/11 kV Power
Transformer by 1x10 MVA, 110/11 kV power
transformer at 110kV Sub-station Siddapur in Sirsi
Taluk, Uttar Kannada District
Augmentation of 1X10 MVA, 110/11kV Power
Transformer by 1X20 MVA, 110/11kV Power
Transformer at 110/11kV Mamadapura Sub-station in
Gokak Taluk and Belgaum District.
Providing additional 1x10 MVA, 110/11 kV transformer
along with (1+5) 11kV switchgear at 110 kV
Ramankoppa sub-station in Kundagal Taluk ,
Dharwad District.
Dharwad
Providing additional 1x10 MVA, 110/33 kV transformer
along with one No. 33kV feeder bay at 110 kV Akshay
colony sub station in Hubli Taluk & District.
Providing additional 1x10MVA, 110/11kV Power
11 Transformer at 110/11kV Kawalawad sub-station in
Haliyal Taluk, Uttara Kannada District
12
Augmentation of 10MVA by 20MVA, 110/11KV power
transformer No-02 with additional (1+7) PCVCB switch
gears at 110/11KV Yallammanawadi sub station in
Athani Taluk, Belgaum District.
13
Augmentation of 10MVA by 20MVA, 110/11KV Power
transformer No-01 with additional (1+7) PCVCB
switchgears at 110/11KV Balligeri sub station in
Athani Taluk, Belgaum District
14
Augmentation of 10MVA, 110/11kV power transformer
No-02 by 20MVA, 110/11KV power transformer with
additional (1+7) MCVCB switch gears at 110/11KV
Ainapur sub station in Athani Taluk, Belgaum District
Augmentation of 10MVA, 110/11kV power transformer
by 20MVA, 110/11KV power transformer with
15 additional 1I/C+2F+1AP3 MCVCB switch gears at
220/110KV Basavan Bagewadi sub station in
B.Bagewadi Taluk, Vijaypura District.
190
Vijayapura
List-IV
Sl.
No.
Name of the Work
Augmentation of 10MVA, 110/11kV power transformer16 2 by 20 MVA, 110/11kV power transformer at 110kV
Yadwad sub station, in Gokak Taluk, Belagavi District
District
belagavi
Providing additional 1x10 MVA, 110/11 kV
transformer along with PCVCB switchgear at 110 kV
17
Shiraguppi sub-station in Bilagi Taluk , Bagalkot
District.
Augmentation of 1X10 MVA, 110/11kV Power
Transformer –I by 1X20 MVA, 110/11kV Power
18 Transformer along with 11kV PCVCB switchgears at
110 kV Malaghan (Sindagi) sub-station in Vijayapur District.
Augmentation of 10MVA, 110/11kv power transformer
19 1 by 20MVA, 110/11kV power transformer at 110kV
station Mudalagi in Mudalagi Taluk & district.
20
Augmentation of 1X10MVA, 110/11KV Power
Transformer –I by 1X20MVA, 110/11KV Power
Transformer along with switchgears at 110/11KV SubStation, Mukarthihal in Vijayapur Dist.
Augmentation of 1X10 MVA, 110/11kV Power
Transformer-I by 1X20 MVA, 110/11kV Power
21 Transformer along with 11kV PCVCB switchgears at
110/11kV Devarhipparagi Sub-station in sindagi
Taluk ,Vijayapur District.
22
Augmentation of 1X10 MVA, 110/11kV Power
Transformer-I by 1X20 MVA, 110/11kV Power
Transformer at 110/11kV Byadagi Sub-station in
Haveri District.
Providing additional 1x10 MVA, 110/11 kV transformer
23 along with switchgear at 110 kV Basavanakatti substation in Haveri Taluk & District
24
Augmentation of 1X10 MVA, 110/11kV Power
Transformer-I by 1X20 MVA, 110/11kV Power
Transformer at 110/11kV Rattihalli Sub-station in
Haveri District.
Providing additional 1x100 MVA, 220/110 kV power
25 transformer at 220/110 kV Vijayapura sub-station in
Vijayapura district.
Providing additional 1x100 MVA, 220/110 kV power
26 transformer at 220/110 kV Indi sub-station in
Vijayapura district.
26 Total of Augmentations
1
220 kV Evacuation lines from the proposed 2400+1600
=4000 WM NTPC Super Critical TPS at Kudgi in Bijapur
District - Modification reg.
2
Stringing of 110 kV 2nd circuit on existing 110 kV DC
GI towers from 110 kV KIADB sub-station to Tikota
S/S(from Loc 1 to 115) in Bijapur District
3
Conversion of 110 kV SC line to DC line from 220 kV
Athani sub-station to 110 kV Athani sub-station for a
distance of 3.7 kms with replacement of existing 110
kV SC line constructed on SC MS towers from location
125 to location 133 in Athani Taluk, Belagavi District
Construction of 110 kV SC line on DC towers with Lynx
conductor from 110 kV Shirabur to 110 kV Bisnal
sub-stations for a distance of about 10 kms in
Vijayapura/Bagalkot District
Replacement of H frame towers by GI towers along with
conductor and ground wire of 110 kV SRS Hubli5 Bidnal-Annigeri-Gadag SC line from Loc no 1 to 21,
27 to 182 and 182 to 304 for a distance of 54 kms in
Dharwad/Gadag District
Construction of 110 kV SC line on DC towers with Lynx
conductor from 110 kV Mamadapur sub-station to
6
110 kV Yaragatti sub-station with Terminal bays at
both ends in Belagavi District
Construction of 110 kV SC line on DC towers with Lynx
conductor from 110 kV Babaleshwara sub-station to
7
110 kV Tikota sub-station with Terminal bays at
both ends in Vijayapura District
Construction of 110 kV SC line on DC towers from 110
kV Nippani sub-station to proposed 110 kV
Kugonalli sub-station for a distance of about 15 kms
8
and 110 kV Bhoj sub-station to 110 kV Boregaon substation for a distance of about 14 kms in Belagavi
District
Stringing of 110 kV 2nd circuit on existing 110 kV DC
towers between 220 kV Belagavi sub-station to 110
9
kV Mache substation for a distance of about 29.54 kms
in Belagavi District
Replacement of MS Fabricated tower by GI lattice
tower along with conductor from 66 kV Multi circuit
10 to 66 kV Harihar-Hospet sub-station & Poly Fiber
station Harihar-Hospet in Haveri TLM section, Haveri
District
4
Providing alternate source to 220 kV Ranebennur sub11 station by LILOing 220 kV Haveri-Guttur line-1 at
Loc 94-95 in Ranebennur Taluk, Haveri District
191
Bijapur
Vijayapura
Belagavi
Vijayapura
Dharwad
Belagavi
Vijayapura
Belagavi
Belagavi
Haveri
Haveri
List-IV
Sl.
No.
Name of the Work
Replacement of rusted GI lattice towers along with
conductor and ground wire of 110 kV SRS Hubli12 Bidnal-Bagalkot DC line from loc no 01 to 15 & 18
to 250 in TLM sub-Division jurisdiction Dharwad and
Gadag District
Construction of 2nd circuit LILO of 220kV
13 Mahalingpura-Kudachi DC line to 220kV Athani substation
Strengthening of 220 kV DC line between 220/110 kV
Gadag and Lingapur switching station via proposed
14
400/220 kV Dhoni sub-station with Drake equivalent
HTLS conductor.
Replacement of partially MS towers by new DC GI
towers along with conductor & ground wire from Loc 01
to Loc 127 and replacing SC MS towers by DC
15
Monopole towers from Loc 128 to Loc 147 of 110 kV
B.Bagewadi-Bijapur city SC line for a distance of
about 47.5 kms in Vijayapura District
Stringing of 110 kV 2nd circuit from tapping point to
110 kV Mattihal sub-station for a distance of about
16
12.38 kms along with a TB at Mattihal sub-station in
Vijayapura District
Construction of 110 kV link line from 110 kV Hosa
Honnatti sub-station to Aremallapura tap line for a
distance of about 2.48 kms along with 110 TB at 110
17
kV Hosa Honnatti sub-station to have independent
souce to 110 kV Aremallapura sub-station in
Ranebennur Taluk, Haveri District
Replacement of partially MS towers by new DC GI
towers along with conductor & ground wire from Loc
170 to Loc 162, Loc 171 to Loc 237 and Loc 238 to Loc
18
244 of 110 kV Chikkodi-Sankeshwara-Hukkeri SC
line for a distance of about 22.7 kms in Belagavi
District
Replacement of existing SC towers by DC towers with
Drake conductor from 220kV Bidanal to 220kV
19 Soundatti to 220kV Mahalingpura in existing corridor
from Location 13 to 431 from 220kV Bidnal-Soundatti
line in Belgaum District.
Construction of 110kV SC line on DC towers from
110/11kV Toravi sub station to location No 140 of
Basavana Bagewadi- Vijayapura SC line and MC
narrow based tower from location No 140 : 147 for
20
creating ring main circuit in Muncipal Corporation area
in Vijayapura District.
21
Construction of 110kv SC line on DC towers with Lynx
conductor from 110kv Kudal Sangam S/S in Bagalkot
District to 110 kV Muddebihal S/S in Vijayapura
Dist.
Construction of 110 kV SC line on DC towers with Lynx
22 conductor from 110 kV Kaladagi to 110 kV Kataraki
sub-stations in Bagalkot District.
23
District
Gadag
Belagavi
Gadag
Vijayapura
Vijayapura
Haveri
Belagavi
Belgaum
Vijayapura
Vijayapura
Bagalkot
Stringing of second circuit on existing DC tower from
220/110 kV Athani receiving station to 110/11kV
MUSS Aigali for a distance of 21.08 kms in Athani
Taluk , Chikkodi District.
Replacement of existing 110kV MS SC line on SC
towers by DC line on GI DC Towers, conductors and
ground wires from 220KV Mahalingapur sub station
24 to 110kV Ghataprabha line from Loc No: 149 to 112
for a distance of 13 kms (up to 110kV Dawaleshwar
sub station) with one number terminal bay at 220KV
R/S Mahalingapur in Bagalkot District.
Bagalkot
Reconsidering the proposal of construction of 110kV
SC link line on DC towers from 110kV Hanagal Sub25 station to 110 kV Tiluvalli Sub-station, along with
110kV Terminal Bays at both ends in Haveri District
which was dropped in the 74th TCCM
Replacement of drake / porcelin insulators by HTLS
26 drake of outgoing 220kV lines from Kali generating
complex in uttara kannada Dist
Construction of 110 kV SC line on DC GI towers from
27 110 kV Bailhongal station to 110 kV Hosur substation in Saundatti taluk, Belagavi district.
Stringing of 2nd circuit on existing SC line on DC tower
with Lynx conductor from 220 kV Ghataprabha to
28 110 kV Ankalagi and 110 kV Nehrunagar sub-station
for a distance of 49 kms and new line for a distance of
7.5 kms in Belgaum district.
29
Stringing of 2nd circuit on existing SC line on DC tower
with Lynx conductor from tower No. 53 near LILO
point of Munavalli station to 110 kV Yargatti substation for a distance of 34 kms in Belgaum district.
30
Replacement of rusted GI Lattice SC towers along with
conductor and ground wire from 110kV Narendra sub
station to Kittur line with MC towers from tower No.
90 to 138 in Dharwad district.
192
List-IV
Sl.
No.
Name of the Work
District
Modification for the already approved proposal :
Replacement of 110 Lattice type SC towers along with
Lynx conductor & ground wire by 110kV UG cable from
31
220 kV SRS Hubli sub-station to Anandanagar &
upto 110kV UG cable terminating structure near
Anandnagar from Loc : 01 to 11 in Dharwad District.
31 Total of Lines
1
2
3
3
Providing dedicated metering arrangement to 220 kV
Mudashinge and 220 kV Talandage line TBs at 220
kV Chikkodi in Belagavi District
Providing metering & protection to 5 MVA, 110/11 kV
Transformer at 110/11 kV Anmod sub-station in
Joida Taluk, Uttara Kannada District
Replacement of age old MS towers by new GI towers
along with conductor and ground wire of 220kV Bidnal
sub station to 110kV Bagalkot sub station (old)
from loc No:-251 to 388 for a distance of 44 kms in
Bagalkot district.
Total of TB's & Others
Belagavi
Uttara
Kannada
Bagalkot
119 Total of Bagalkote Zone
KALABURAGI TRANSMISSION ZONE
1
Yadgir north:
Establishing of 2X10 MVA,110/11kV Substation at
Yadgir North in Yadgir Taluk & District.
2
Rudrawadi :
Establishing of 1X10 MVA,110/11kV Substation at
Rudrawadi village in Alanda taluk,Kalaburagi district.
3
Devapur Cross:
Establishing of 2X10 MVA,110/11kV Substationat
Devapur cross in Shorapur Taluk,Yadgir District.
4
Madana:
Establishing of 1X10 MVA,110/11kV Substation at
Madana village in Sedam taluk,Kalaburagi district.
5
Establishing 2 x 100 MVA, 220/110 kV Sub-Station at
Gangavathi in Gangavathi Taluk, Koppal District.
6
Jawahar Nagar:
Upgradation of 2X5MVA,33/11kV S/s to 2X10
MVA,110/11kV S/s at Jawahar Nagar in Raichur
Taluk & District.
7
Aurad:
Upgradation of
2X5MVA,33/11kV S/s to 1X10 MVA,110/33-11kV S/s
at Aurad in Aurad Taluk,Bidar District.
8
Bhagyanagar:
Establishing 2x10MVA, 110/11kV Sub-Station with
construction of 110kV line from proposed 220kV R/S
Koppal (Halavarthy) sub-station for a distance of about
10 kms in Koppal Taluk & District.
9
Kalbelgundi:
Establishing 2x10MVA, 110/11kV Sub-Station near
Banadeshwar temple ,Kalbelgundi village in Yadgir
Taluk and District
Azadpur:
10 Establishing 1x10MVA, 110/11kV Sub-Station at
Azadpur in Kalaburagi Taluk & District.
11
Kadlur:
Establishing 1x20MVA 110/33 kV & 1x10MVA
110/11 kV S/S along with construction of 110kV line
at Kadlur village in Raichur Taluk & District.
Udnoor cross:
12 Establishing 1x10MVA, 110/11kV Sub-Station at
Udnoor cross in Kalaburagi Taluk & District.
13
Establishing 1x10 MVA, 110/11kV Sub-Station at
Kollur village in Chincholli Taluk,Kalaburagi District.
14
Establishing 1x10 MVA,110/11kV Sub-Station at
Tavaragera village in Kalaburagi Taluk and District.
Establishing 1x20 MVA,110/33 kV and 1X10
15 MVA,110/11kV Sub-Station at Sagnoor in Afzalpur
Taluk,Kalaburagi District.
193
List-IV
Sl.
No.
Name of the Work
16
Establishing 2x10 MVA,110/11kV Sub-Station at
Bankalga village in Afzalpur Taluk,Kalaburagi District.
17
Establishing 2x10 MVA, 110/11kV Sub-Station at
Sirwal Village in Shahapur Taluk,Yadgir District.
18
Establishing 1x10 MVA, 110/11kV Sub-Station at MKollur in Shahapur Taluk,Yadgir District.
19
Establishing 2x10 MVA, 110/11kV Sub-Station at
Honagera in Yadgir Taluk and District.
20
Establishing 1x10 MVA, 110/11kV Sub-Station at
Ashapur Road in Raichur Taluk and District.
District
Chilkanahatti :
21 Establishing 1x8 MVA, 66/11kV Sub-Station at
Chilkanahatti in Hospet Taluk,Ballari District.
22
Upgradation of 2X5MVA, 33/11kV Sub-station to 2X10
MVA,110/11kV and 1X10 MVA,110/33 kV SubStation at H.V.Kunta in Yelburga Taluk,Koppal
District.
Upgradation of 2X5MVA, 33/11kV Sub-station to 2X10
23 MVA,110/11 kV Sub-Station at Vajrabandi village in
Yelburga Taluk,Koppal District.
24
Talakal :
Up gradation of 2X5 MVA,33/11 kV Sub-station to
1X10 MVA,110/11 kV Sub-station at Talakal Village in
Yelburga Taluk,Koppal District.
Sridhara Gadda :
Establishing 110/33/11 kV Substation by providing
25 2X10 MVA,110/11 kV and 1X20 MVA,110/33 kV at
Sridhara Gadda Village in Siruguppa Taluk,Bellary
District.
Kawloor Village:
26 Establishing 1X10 MVA,110/11 kV Sub-station at
Kawloor Village in Yadgir Taluk and District.
Naganoor Village :
27 Establishing 1X10 MVA,110/11 kV Sub-station at
Naganoor Village in Shorapur Taluk ,Yadgir District.
28
Establishing 2X100 MVA, 220/110 kV Sub-station at
Yelburga in Yelburga Taluk, Koppal District
29
Establishing 2 X 100 MVA , 220/110 kV sub-station at
Santhpur in Aurad taluk, Bidar District.
Gaddesugur:
30 Establishing 1X10 MVA,110/11 kV Sub-station at
Gaddesugur in Wadagera Taluk , Yadgir District
31
32
B Gudi:
Establishing 1X10 MVA,110/11 kV Sub-station at B
Gudi in Shahapur Taluk ,Yadgir District
Hanwal:
Establishing 1X10 MVA, 110/11 kV Sub-station at
Hanwal in Gangavathi Taluk, Koppal District
Nadavi Village :
Establishing 1X20 MVA, 110/33 kV and 2X10 MVA,
33 110/11 kV Substation at Nadavi Village in Siraguppa Taluk, Ballari
District
Gunhadgi Village :
Establishing 1X10 MVA, 110/11 kV Sub-station at
34
Gundhagi Village in Yadgir Taluk, and District
35
Kandakoor Village :
Establishing 1X10 MVA, 110/11 kV Sub-station at
Kandakoor Village in Gurmitkal Taluk,Yadgir District
Yagapur :
36 Establishing 1X10 MVA,110/11 kV Sub-station at
Yagapur in Chittapura Taluk , Kalaburagi District
37
Itagi :
Up-gradation of existing 33/11 kV Sub-station to 2X10
MVA, 110/11 kV Sub-station at Itagi in Kampli Taluk,
Ballari District
194
List-IV
Sl.
No.
Name of the Work
District
37 Total of Sub-Stations
1
110 kV Kolhar,20 MVA, 110 / 33-11 kV
2
110 kV Ladha,20 MVA, 110/ 33-11 kV
3
220kV Sedam, 20 MVA, 110/ 33-11 kV
4
110 kV Shahapur,20 MVA, 110/ 33-11 kV
5
110 kV Kalaburagi (South ),20 MVA,110/ 33-11 kV
6
110 kV Kavithal,20 MVA,110/ 33-11 kV
7
220 kV Raichur,20 MVA,110/ 33-11 kV
8
110 kV Rajeshwar,10 MVA,110/ 33-11 kV
9
220 kV Lingasugur,10 MVA,110/ 33-11 kV
10 110 kV Hiregonnagar,10 MVA,110/ 33-11 kV
11 220 kV Ittagi,12.5 MVA,66/ 11 kV
12 66 kV Chornur,12.5 MVA,66/ 11 kV
12 Total of Augmentations
1
Construction of new 66kV SC (Coyote) link line on DC
towers from 66kV Sub-station Banavikallu to 66kV substation C.J.halli for a distance of 4 kms(Munirabad Div)
2
Reconstruction of 110kV SC line on SC towers having
wolf/patridge conductor from 220kV Shahabad R/S to
110kV University SS for a distance of 27kMs by 110kV
SC line on DC towers using LYNX conductor in the
existing corridor
3
Re -Construction of 110kV Sedam -Chittapur H type
tower SC line for a distance of 25 km in the existing
corridor.
4
Re -Construction of 110kV Shahabad -Chittapur H type
tower SC line for a distance of 33.7 km in the existing
corridor.
5
Re -Construction of 110kV Shahapur-Shahabad DC
line for a distance of 57km in the existing corridor.
6
Construction of 110kV SC link line on DC towers
existing Kapnoor 220kV R/s to the existing
110/33/11kV Gulbarga (university) S/s via 110/3311kV Gulbarga (west),110/11kV Gulbarga(south) over
a distance of 51 Kms circuit length with 01 number of
Terminal Bay at 220kV R/S Kapnoor,02 number of
Terminal Bay at 110/33-11kV Gulbarga (west) S/s,02
number of Terminal Bay at 110/11kV Gulbarga (south)
and 01 number of terminal bay at 110/11kV
Gulbarga(University) S/s in Gulbarga Taluk & District
7
Reconstruction of existing 110kV Gulbarga line-I SC
line on SC tower by constructing 110kV DC new line
on DC towers from 220/110kV R/s Kapnoor to 220kV
substation Humnabad,LILO at 110/33-11kV Mahagaon
substation and 110/11kV Margutti substation using
the existing corridor over a distance of 56 kms circuit
length with 04 no's of TB at 110kV Mahagaon
substation in Kalaburagi Taluk & District.
195
List-IV
Sl.
No.
Name of the Work
8
Reconstruction of existing SC lines on SC towers by
new DC line on DC & MC towers from 220kV
substation Kapnoor to 110kV Gularga North
substation (08kms) and DC line on DC tower with
connectivity to MC tower for LILOing 110kV University
substation in the existing Corridor for a distance of
25Kms from center tap of MC towers from 220kV
Kapnoor to 110kV University S/s with 01 no of TB at
220kV substation Kapnoor in Kalaburagi Taluk &
District.
9
Re-conductoring of 110kV Munirabad-SindhanoorRaichur I & II lines by providing intermediate towers in
Raichur District.
196
District
List-IV
Sl.
No.
Name of the Work
10
Re-conductoring of 110kV Raichur-Shahapur DC line
by providing intermediate towers in Yadgir district.
11
Strengthening of 220 kV DC line between 220/110 kV
Kushtagi and proposed switching station at the LILO
point of Kushtagi-Lingapur-Lingasugur by replacing
existing Drake by higher ampacity conductor
District
Ratification : Reconstruction of 110 kV SC line on SC
towers having Lynx conductor from 220 kV Kushtagi
Substation to 110 kV Yelburga Sub station for a
12 distance of 28 kms by 110 kV DC line on DC towers
using Lynx conductor in the existing corridor along
with two terminal bays one at 220 kV Kushtagi Sub
station and one at 110 kV Yelburga Sub station
Construction of 110kV SC link line on DC towers from
existing 110/33-11kV Ladha sub-station to existing
13 110/33-11kV Kamalanagar sub-station for a distance
of 30 kms length with construction of Terminal Bays at
both stations
Construction of 110kV SC link line on DC towers from
existing 110/11kV Nirna sub-station to existing
14 110/33-11kV Mannaekheli sub-station for a distance
of 20 kms length with construction of Terminal Bays at
both stations
Strengthening of 220 kV Lingapura-Ittagi-Neelagunda15 Guttur SC line by replacing SC line with Drake
conductor by 220 kV DC line using Drake conductor
Stringing of 2nd circuit between 110 kV Janwad and
110 kV Bidar (Kolhar) sub-station on existing DC
16 towers for a distance of about 17.5 kms with Lynx
conductor along with two no's of new terminal bays,one
at Janawad and one at Bidar (Kolhar) Sub-station
Stringing of 2nd circuit between 110 kV P D Halli and
110 kV Bellary North sub-station on existing DC towers
17 for a distance of about 14.45 kms with Lynx conductor
along with two no's of new terminal bays,one at P D
Halli and one at Bellary North Sub-station
Modification in scheme for catering 66 kV Hangal Substation load from 66/11 kV Kudligi sub station to
220/66 kV Badeladaku (Kudligi) sub-station Station
18 by dismantaling existing 66kV towers in Kudligi
Taluk,Ballari
District
18 Total of Lines
67 Total of Kalaburagi Zone
495 Total of List-IV for All Zones
197
List-IV
Download