1) Scope of Work:
Under this contract M.ANAS is solely responsible for the Supply & Fabrication of material to site and Erection
of material at site until it’s completion and handed over to client. Any Civil work is not included in this
quotation, hence can be provided separately if requested. Please see below mentioned building and design
Parameters of the Pre-Fabricated building.
2) Building Parameters For Shed:
1
Building Type
Clear Span
2
Slop
1:10 Ridge
3
Width
80ft
4
Length
100 ft
5
Height(ft)
30ft clear height(15ft concrele+15steel
column)
6
Number of Bays
5 @ 20ft approx
7
Total Area of Pre-Fabricated
Building
8000 sqft
8
Solar Panels provision
Roof only (as and If required)
3) Design Parameters for shed:
1
Wind Pressure
135 km/hr
2
Roof Live Load(KN/m2)
0.57
3
Design Dead Load(KN/m2)
0.10
4
Live Load on Frame(KN/m2)
0.57
5
Co-lateral Load(KN/m2)
0.05
4) Material specification
Nos.
Material Type
Grade/Thickness
Specification
1
MS-sheets
A-36
36_ksi
2
Galvanized iron
36 / 2mm
80 microns
OFFICE # 4, 1ST FLOOR NADIR PLAZA, OPP DHA PHASE 2,
ISLAMABAD.
WORKSHOP, LCM STREET DAR-UL-EHSAN TOWN,
SAMUNDARI ROAD, FAISALABAD
CELL: +92-334-7922038, +92-308-7508022
E-MAIL: manaseng138@gmail.com
•
•
•
•
•
•
Building & industrial MEP system
HVAC System
Fire Protection System
Plant Erection & Installation
Plant Operation & Maintenance (O&M)
High Pressure Vessels & Storage Tanks
NTN: 7548646-4
3
Pre-painted Galvanized iron
4
Pint
36 / 0.5mm
-
120g/m sq.
Red Oxide + Enamel (Final
paint)
(Kansal Paints or App Eq)
5
Insulation (optional)
50mm
Density 12kg/m3 . WMSK
(KIMMCO, Pak Insulation or App
Eq )
5) Fabrication and Profile Standards:
M.ANAS will be using MS grade 36 material of thicknesses (4mm – 25mm) s per drawing for the fabrication of
columns, rafters and angle Bracings. All welding jobs will be carried out as per AWS D1. 1 standard. All rafters
and columns will be single side long weld and opposite side will be spot weld of 100mm after every
300mm.All stiffeners will be spot welded. M.ANAS will be cleaning the MS material with wire brush,
grinding/flap disc and manually removing any spatter with chizzle and hammer. Once these pieces are
cleaned, they will be painted with red oxide single coat to ensure material dose not catch rust and final paint
will be applied at site. M ANAS will be using purlins of z-shap of 200 x 60 x 15 of 2mm thickness. M ANAS will
fabricate the steel structure at its facility located at main service Road, Ring Road, Near combined Fabrics,
Ashiana Road, Lahore.
Site Address: _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
6) Cladding System:
M ANAS will use PPGI sheets of 0.5mm thickness of RAL no of client’s choice. All Four sides of shed will be
covered with 15ft corrugated sheets. We will be installing PPGI sheet gutter and 4’’ PVC downspout pipes for
rainwater drainage. All corners and gaps will be closed with same 0.5mm PPGI sheet trims.
7) Erection
M ANAS will be providing client with Anchor bolts and anchor bolts plan casting. Once client starts the Anchor
bolts casting then M ANAS will send a site Engineer to inspect that they are as per Anchor bolts plan. Once they
are approved then M ANAS mobilize its erection team to site to initiate the erection work. Client will need to
supply an electrical connection at site for using screw guns. It will altogether take 4 – 6 weeks for the erection
of structure to complete and site will be handed over to client.
OFFICE # 4, 1ST FLOOR NADIR PLAZA, OPP DHA PHASE 2,
ISLAMABAD.
WORKSHOP, LCM STREET DAR-UL-EHSAN TOWN,
SAMUNDARI ROAD, FAISALABAD
CELL: +92-334-7922038, +92-308-7508022
E-MAIL: manaseng138@gmail.com
•
•
•
•
•
•
Building & industrial MEP system
HVAC System
Fire Protection System
Plant Erection & Installation
Plant Operation & Maintenance (O&M)
High Pressure Vessels & Storage Tanks
NTN: 7548646-4
8) Cost
Sr
Description
Cost (Rs) / sqft
Total Cost (PKR)
7,360,000/-
1
Fabrication, Supply,
Transportation, loading and
unloading for 8000 sqft
Rs 920 / sqft
2
Installation for 8000 sqft
Rs 50/sqft
3
Total Cost without taxes (PKR)
400,000/7,760,000/-
These prices are based on current rate of M/S and GI Sheets.
For any Further increase in the price will be charged to client with Mutual consent.
All amounts are exclusive of income tax and sales tax
9) Cost for Extra Area:
Cost of extra area will be decided upon the decision of execution (either to be done the extra area or not)
10)
Payment Terms:
- 50 % Advance
- 30 % upon Delivery of Material
- 10 % after 50 % completion
- 10 % after completion of Works
OFFICE # 4, 1ST FLOOR NADIR PLAZA, OPP DHA PHASE 2,
ISLAMABAD.
WORKSHOP, LCM STREET DAR-UL-EHSAN TOWN,
SAMUNDARI ROAD, FAISALABAD
CELL: +92-334-7922038, +92-308-7508022
E-MAIL: manaseng138@gmail.com
Download