ETE 311 Assignment2 Due Date: 18 May 2021 Time: 11h59 Instructions: This is a five page assignment excluding cover page, table of content and reference list Use Times New Romans Line spacing 1.5 Run turnitin and submit the last page of turnitin report On 03 December 2003 Department of Environmental Affairs and Tourism (DEAT) issued a positive Record of Decision for what was by then referred to as the N2 Wild Coast Toll Highway Project between East London and Durban. However, on 09 December 2004, following numerous appeals from the public and various Non-Governmental Organisations (NGOs), the Minister of Environmental Affairs and Tourism set aside his Department’s earlier decision authorising the development of the N2 Wild Coast Toll Highway. The construction of the N2 Wild Coast Toll road is underway. Briefly discuss the steps that SANRAL took in N2 Wild Coast Toll Highway planning project.