MECHA

advertisement
Concreting
6.30 cum
a)
b)
Materials
Cement
Sand
Gravel
Labor
56.70
3.15
6.30
69.30
-
bags
cum
cum
mhrs
250.00
800.00
600.00
90.00
Sub-Total:
Rebars
14,175.00
2,520.00
3,780.00
20,475.00
6,237.00
6,237.00
26,712.00
21,490.56
21,490.56
63,362.66
1,193.92 kilos
a)
b)
Materials
12mm bar x6.0meters length
224.00
23.88
238.78
GI wire #16
Labor
-
pcs
kilos
mhrs
180.00
65.00
90.00
Sub-Total:
Formworks
40,320.00
1,552.10
41,872.10
42.00 sqm
a)
b)
Materials
2x4 Form Lumber
3/4 Plywood
4" Nails
2" Nails
Labor
Fab/Install Forms
Strip Forms
336.00
10.08
6.30
6.30
-
bdft
shts
kilos
kilos
14.00
600.00
65.00
65.00
147.00
35.70
-
mhrs
mhrs
90.00
90.00
Sub-Total:
GRAND TOTAL
4,704.00
6,048.00
409.50
409.50
11,571.00
13,230.00
3,213.00
16,443.00
28,014.00
118,088.66