Risk Managment Exercise 5

advertisement
RM exercise 5
1. Plan Your Trip - (Plan Risk Management)
This phase is about deciding and defining how to conduct risk management.
The name of the exercise “Plan your trip” speaks to the goal of determining the appropriate
level of risk .
Suppose you are to take nature tripping in Masasa Beach , Tingloy this summer . You are to
take a boat ride going to the island . Huts are not available since the beach is just newly opened and
resorts are not yet set up. Toilets are not available and only a few houses may be seen a top the hilly
area of the island. It is a 3 days and 2 nights nature tripping including travel to the island . You will
spend 2 nights in the island . You are in a group of four only because the boat ride can only
accommodate 5 people per ride including the boatman . Identify the 4 people you will be with and give
a brief description of their personality , their weakness (e.g. sickly but adventurous ) and their strength .
Identified below are 20 important items which is important for the trip, Using the concept of the
four C’s explain the following items and from the choice column identify 7 important items you will
bring with you
Cost
(Value of The item
or importance of
bringing )
Can
goods/noodles
Water
Money
Toilet paper
Match
stick/lighter
Charcoal
Swim suit
Sunblock
Camping tent
for 2
Fruits
Consequence
(what happens
if the item is
not brought)
Context
(who is most
vulnerable to
the item that
should be given
importance or
given
consideration )
Choice
(making a choice
of bringing or
leaving behind)
Reason for the
choice
Jacket
Clothes
Umbrella
Soap
/shampoo
Slippers
Chocolate
bars/Candies
Flashlight
Cellular Phone
Trash Bag
Rice
Cooking
utensils