Uploaded by golam kibria

six sigma Presentation

advertisement
A Report
On
Six Sigma (In Bangla)
Prepared By:
Md. Asaduzzaman Apu
Trainee Engineer
HIP-RFL-RPL-SPARK
Staff ID:
Supervised By:
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Prohlad Sarkar
Trainee Engineer
HIP-RFL-RPL-PVC
Staff ID:
Md. Atiqur Rahman (Atiq)
Manager (RPL Production)
RFL Plastic Limited (RPL)
Habiganj Industrial Park.
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar




Md. Asaduzzaman Apu, Mr. Prohlad Sarkar

σ




Md. Asaduzzaman Apu, Mr. Prohlad Sarkar





Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
σ
σ
σ
σ
σ
σ
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
×
×
×
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar



2
1000000
24  9
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar







Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
PRAN-RFL Group
Lean Six Sigma Team
Project Form
Team Name
Team Leader
Team Member
RPL
MR. X
MR. Y, MR. Z
Department
Project Duration
RPL-PVC PRODUCTION
From
Improvement Area (please tick as appropriate)
⃝ Cost Reduction
⃝ Defect/Waste Reduction
⃝ Safety Improvement
⃝ Service Improvement
10/4/17
To
⃝ Energy Conservation
⃝ Process Improvement
17/4/17
⃝ Quality Improvement
⃝ Others
Problem Statement / Objective:
Rejection reduction
Scope:
Parameter setting, Raw materials quality, Mold preventive
Support or Resources Required:
Parameter expert, Skilled mold technician etc.
_
__________
_______________
Team Leader
Department Head
Actual Outcome or Achievement:
_______________
Human Resources
______________
Director/ED/COO
Actual Financial Impact:
___________
Team Leader
_______________
Department Head
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
_______________
Human Resources
______________
Director/ED/COO
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar








Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar



Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
×
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar





Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
4.video.Cause Effect
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar











Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar



Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar






Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
FMEA Calculation:
Occurrence Rank
(
10 - 100 Per 1,000
9 - 50 Per 1,000
8 - 20 Per 1,000
7 - 10 Per 1,000
6 - 5 Per 1,000
5 - 2 Per 1,000
4 - 1 Per 1,000
3 - 0.5 Per 1,000
2 - 0.1 Per 1,000
1 0.01 Per 1,000
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
X
X
Severity Rank (
10 Hazardous, without warning
9 Hazardous, with warning
8 Very High
7 High
6 Moderate
5 Low
4 Very Low
3 Minor
2 Very Minor
1 None
= RPN (
)
Detection Rank (
10 Absolutely Impossible
9 Very Remote
8 Remote
7 Very Low
6 Low
5 Moderate
4 Moderately High
3 High
2 Almost Certain
7.video.FMEA
1 Certain
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar










Md. Asaduzzaman Apu, Mr. Prohlad Sarkar





Md. Asaduzzaman Apu, Mr. Prohlad Sarkar


2. Document. Control Chart
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar










Md. Asaduzzaman Apu, Mr. Prohlad Sarkar



Md. Asaduzzaman Apu, Mr. Prohlad Sarkar



Md. Asaduzzaman Apu, Mr. Prohlad Sarkar



Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Project Charter
Why-Why, Fish-bone
FMEA
Brain-Storming
Md. Asaduzzaman Apu, Mr. Prohlad Sarkar
Define
Project Charter
Measure
VSM
Bench-marking
Analyze
Why-Why
Fish-bone
Improve
Brain-Storming
FMEA
Poka-Yoke
Control
Control Chart