A Report On Six Sigma (In Bangla) Prepared By: Md. Asaduzzaman Apu Trainee Engineer HIP-RFL-RPL-SPARK Staff ID: Supervised By: Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Prohlad Sarkar Trainee Engineer HIP-RFL-RPL-PVC Staff ID: Md. Atiqur Rahman (Atiq) Manager (RPL Production) RFL Plastic Limited (RPL) Habiganj Industrial Park. Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar σ Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar σ σ σ σ σ σ Md. Asaduzzaman Apu, Mr. Prohlad Sarkar × × × Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar 2 1000000 24 9 Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar PRAN-RFL Group Lean Six Sigma Team Project Form Team Name Team Leader Team Member RPL MR. X MR. Y, MR. Z Department Project Duration RPL-PVC PRODUCTION From Improvement Area (please tick as appropriate) ⃝ Cost Reduction ⃝ Defect/Waste Reduction ⃝ Safety Improvement ⃝ Service Improvement 10/4/17 To ⃝ Energy Conservation ⃝ Process Improvement 17/4/17 ⃝ Quality Improvement ⃝ Others Problem Statement / Objective: Rejection reduction Scope: Parameter setting, Raw materials quality, Mold preventive Support or Resources Required: Parameter expert, Skilled mold technician etc. _ __________ _______________ Team Leader Department Head Actual Outcome or Achievement: _______________ Human Resources ______________ Director/ED/COO Actual Financial Impact: ___________ Team Leader _______________ Department Head Md. Asaduzzaman Apu, Mr. Prohlad Sarkar _______________ Human Resources ______________ Director/ED/COO Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar × Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar 4.video.Cause Effect Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar FMEA Calculation: Occurrence Rank ( 10 - 100 Per 1,000 9 - 50 Per 1,000 8 - 20 Per 1,000 7 - 10 Per 1,000 6 - 5 Per 1,000 5 - 2 Per 1,000 4 - 1 Per 1,000 3 - 0.5 Per 1,000 2 - 0.1 Per 1,000 1 0.01 Per 1,000 Md. Asaduzzaman Apu, Mr. Prohlad Sarkar X X Severity Rank ( 10 Hazardous, without warning 9 Hazardous, with warning 8 Very High 7 High 6 Moderate 5 Low 4 Very Low 3 Minor 2 Very Minor 1 None = RPN ( ) Detection Rank ( 10 Absolutely Impossible 9 Very Remote 8 Remote 7 Very Low 6 Low 5 Moderate 4 Moderately High 3 High 2 Almost Certain 7.video.FMEA 1 Certain Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar 2. Document. Control Chart Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Project Charter Why-Why, Fish-bone FMEA Brain-Storming Md. Asaduzzaman Apu, Mr. Prohlad Sarkar Define Project Charter Measure VSM Bench-marking Analyze Why-Why Fish-bone Improve Brain-Storming FMEA Poka-Yoke Control Control Chart