Unit IG2: Risk assessment Declaration: By submitting this assessment (Parts 1 – 4) for marking I declare that it is entirely my own work. I understand that falsely claiming that the work is my own is malpractice and can lead to NEBOSH imposing severe penalties (see the NEBOSH Malpractice Policy for further information). Important note: You must refer to the document ‘Unit IG2: risk assessment – Guidance and information for learners and Learning Partners’ while completing all parts of this assessment. Your Learning Partner should provide you with a copy, but it can also be downloaded from the relevant resources section for this qualification on the NEBOSH website. Part 1: Background You should aim to complete this section in 150 - 200 words. Topic Comments General description of the organisation The company also implement it civil works expertisein to SEZ development,water treatment plant project ,irrigation and power projects .It has 4 branches in indiaThe sites operates 8.00 am to 5.00 pm on weekends and the site is closed at weekends. Name of organisation* Site location* Number of workers Rpp infra project ltd Thiruchendur, tamilnadu,india 240 workers Rpp infra project limited is a big contruction company.The company has been around 45 year.It is construction comapany primarily engaged in the business of infrastructure development such as highways,roads,and bridges. They are used lot machineries and vehicles like concrete mixer,trailer, ambulance,treasury ,crawler loaders,bulldozer,scraper, excavator,common dumpers, truck etc. Description of the area to be included in the The risk assesment cover theconcreting the high rised building,earth boring, deep risk assessment excavation and steel structure eruction both all the risk assesment area in the company 3 person working in the health and safety officer in the company . In sites any problem Any other relevant information this person report to the general manager or managing director Learner number: 733 Learner name: Green World Safety &Security Consultancies LLC Page 1 of 10 * If you’re worried about confidentiality, you can invent a false name and location for your organisation but, all other information provided must be factual. You should aim to complete this section in 100 - 200 words. Note: this section can be completed after you have competed your risk assessment. Outline how the risk assessment was carried out this should include: sources of information consulted; who you spoke to; and how you identified: - the hazards; - what is already being done; and - any additional controls/actions that may be required. Learner number: 733 I started the by looking to see a HSE WEBSITES releting to construction.lot of resource In hse website such as construcion phase plan ,managing health and safety in construction(L153),health and safety (HSG150) ,scabbling or grinding(CN1),THE CDM regulation 2015 ,safe use of vehicle in construction sites (hsg 144) etc. After l read the information I will go site and inform to all workers how to identify the hazards and how to avoid hazards and control measures of hazards. If the manager allowes me to sites I will see if the safety equipements and measures are adequate I also check the accident records each days .what type of accidents occured in this site . any of accident is recurring and how to reduce the accidents in site I will check reason for accidents and ill health This site safety measure are medium .I will improved some health and safety measure and avoid and accidents and injuries ,ill health etc. This information are referred by hse websites and this company sites Learner name: Green World Safety &Security Consultancies LLC Page 2 of 10 Part 2: Risk Assessment Organisation name:RPP infra project limited Date of assessment: 15.03.2021 Scope of risk assessment: Construction Sites Hazard category and hazard Who might be harmed and how? What are you already doing? Noise Labours ,engineers,operator, They fix the sign Helpers associatte with this board in this are sites area (heavy equipement working Noise reflected in It cause hearing loss ,some area) excavator,crusher, woker head ache,elecvated batching ,plantbreaker blodd pressure Boring machinery etc They provide ear the worker working in their mufs and ear plug crusher machinery area in all the workers It reflect lot of noisein the machinery .the woker was affected permanat hear In noises area lossing problem already provide awareness sign boards . Every day the safety person instructed the safety index Learner number: 733 What further controls/actions are required? Nescessary rectification required Some measures have been taken to prevent much noise during rock blasting To avoid unnecessary horn used in workplace After repairing the machinery produced lot of noise then replace the machinery Learner name: Green World Safety &Security Consultancies LLC Timescales for further actions to be completed (within …) Immediate action taken Responsible person’s job title Equipement & safety officer (both officers Required) Immediate action taken Equipement& safety officer (both officers required) Immediate action taken Equipement &safetyofficer(both officersrequired) Immediate action taken Equipement&safety Officers(both officers required) Page 3 of 10 Hazard category and hazard Who might be harmed and how? What are you already doing? What further controls/actions are required? Vibration Labours,operator,engineers are affect in this sites Baregating the workplace surrounding To reduce vibration during concrete blasting using dexpan chemical Vibration reflected in boring machinery,earth driling etc It causes temprory hear lossing. There is morethan cracks ina nearby construction building,loss of grip strength,bonecysts In finger and wrists.,loss of touch Brakers and road compactor Are produced lot of vibration Timescales for further actions to be completed Responsible person’s job title Immediate action taken Safety officer and engineer To instruct all the To install vibration workers about safety absorber in machinery measure Immediate action taken Provide sign board about vibration surrounding Safety officer and mechanical engineer 7 DAYS Safety officer The worker working in vibrational area after one or few hours Subsitute withother worker Immediate action taken Safety officer and zone engineer Use high quality,low vibration tools 2 to 3 days Equipement officer Limit the time spent by workers on a vibrating surface Machinry to Install vibration damping seats Learner number: 733 Every week the doctors check the workers for hearing problems Learner name: Green World Safety &Security Consultancies LLC (within …) Page 4 of 10 Hazard category and hazard Who might be harmed and how? What are you already doing? What further controls/actions are required? Voilence at work Management ,and engineers are affected this problem Mostly we are trying toavoid this type of workers problem in this sites To fulfill requirements of workers Worker are fighting each other in industry Upper limbs disorder This is the leading causes injuries in workers Learner number: 733 The worker are affect in such as pain likely shoulder ,arm,wrist,hands and fingers in this construction area Timescales for further actions to be completed Responsible person’s job title 3months Managing director Workers must engage in non violence legislation Immediatte action taken Site manager Management should issues a clear worplace violence policy 2 or 3days Managing director (within …) Workers are trained to raise awareness of ergonomic factors and to recognize and avoid unsafe working condition Pain tests are required while the work is finished Every day Safety officer Management is provide pain reliver for every worker We will buy some machinery for upper limb workers 5 to 6 months Site manager Maintained illness and injuries records for reducing this type of injuries We wil run some ergonomic programs and construction safety programs 2months Site manager Learner name: Green World Safety &Security Consultancies LLC Page 5 of 10 Hazard category and hazard Who might be harmed and how? Manual handling Worker are affect by this manual handling works for So many manual handling work in this construction site.Itcause hand injuries etc .worker shift the bricks load push or pull .it cause pain and injuries example: worker lifting the bricks suddenly slip the leg the bricks are fallen the worker legs. It causes injuries in worker leg What are you already doing? Daily safety equipement is provided and check the all workers wearing the safety Measures What further controls/actions are required? To reduce the needs for manual handling Should be used for lifting Machinery or robots Learner number: 733 Learner name: Green World Safety &Security Consultancies LLC Timescales for further actions to be completed Responsible person’s job title Immediate action taken Engineer&safety officer (within …) 6 to 7 months Managing director Page 6 of 10 Hazard category and hazard Who might be harmed and how? What are you already doing? What further controls/actions are required? Timescales for further actions to be completed Responsible person’s job title (within …) Learner number: 733 Learner name: Green World Safety &Security Consultancies LLC Page 7 of 10 Part 3: Prioritise 3 actions with justification for the selection Suggested word counts Moral and financial arguments for all actions: 300 to 350 words For EACH action: Specific legal arguments: 100 to 150 words Likelihood AND severity: 75 to 150 words How effective the action is likely to be in controlling the risk: 100 to 150 words Moral and financial arguments for ALL actions Moral, general legal and financial arguments Justification for action 1 Action Specific legal arguments Consideration of likelihood AND severity How effective the action is likely to be in controlling the risk. This should include: the intended impact of the action; justification for the timescale that you indicated in your risk assessment; and whether you think the action will fully control the risk. Learner number: 733 Learner name: Green World Safety &Security Consultancies LLC Page 8 of 10 Justification for action 2 Action Specific legal arguments Consideration of likelihood AND severity How effective the action is likely to be in controlling the risk. This should include: the intended impact of the action; justification for the timescale that you indicated in your risk assessment; and whether you think the action will fully control the risk. Justification for action 3 Action Specific legal arguments Consideration of likelihood AND severity How effective the action is likely to be in controlling the risk. This should include: the intended impact of the action; justification for the timescale that you indicated in your risk assessment; and whether you think the action will fully control the risk. Learner number: 733 Learner name: Green World Safety &Security Consultancies LLC Page 9 of 10 Part 4: Review, communicate and check Suggested word counts for each section: Planned review date or period and reasoning for this: 50 - 100 words How the risk assessment findings will be communicated and who needs to know the information: 100 - 150 words Follow up on the risk assessment: 100 - 150 words. Planned review date/period with reasoning How the risk assessment findings will be communicated AND who you need to tell How you will follow up on the risk assessment to check that the actions have been carried out Learner number: 733 Learner name: Green World Safety &Security Consultancies LLC Page 10 of 10