Ref. No:21-0316A ISOLATION REQUEST &PERMIT TO WORK 1. ISOLATION REQUEST-TO CE(O)/ CE(Col. (North,East,West,South)COLOMBO CITY I hereby declare that the High Tension Maintenance unit requests the release of plant/apparatus from service for the below mentioned purpose. (i) LOCATION: Sub 655, No. 30, Galpotta Street Colombo 13 (ii) PLANT/APARATUS TO BE RELEASED: RMU, TF & LTP (iii) PURPOSE OF RELEASE:For Seasonal Maintenance (Cancelled previous week) (iv) DATE & TIME OF RELASE: DAY:Friday DATE:2021.03.19 TIME:08.30am SIGNED to 0430pm (Engineer Requesting Release) Contact No. 0710 183 816 (EE- HTM) Date: 2021.03.16 Mr. Rasanjana (HTM-S)Mr. Gomas(HTM-W) Mr. Ukas (HTM-E)Mr. L.M.D Lakmal (HTM-N) Tel. 0718506990 Tel. 0714908910 Tel. 0714291080 Tel. 0714150766 2. ISOLATION - AUTHORIZATION / ACCEPTANCE 1.1 AUTHORIZATION – TO CE (O)/Area Engineer:Please release the above plant/apparatus with suitable alternative supply arrangements to other plant/ apparatus. SINGED ………………………...............CE (O)/Area EngineerDate: …………………… 1.2 ACCEPTANCE – TO ES (HT Operation / LT Breakdown) I hereby declare that the above mentioned apparatus can be released from service on the date and at the time as stated above. Please isolate plant/apparatus indicated above& make earth connections. Contact Engineer (Operations) in CCCC to get the Work Permit Reference No. and activate the work permit. SINGED ………………………................ …….. Electrical Engineer Date: ……………… ___________________________________________________________________________________________ 3. PERMIT TO WORK ISSUE PTW Ref: No. ………….. ……….Date ……….…. (i) To ……………………………………. (Person in charge of work). I hereby certify that the following Plant/Apparatus is safe to work on being dead, isolated and where practicable locked off from live conductors and earthed in accordance with C.E.B. Safety Rules. (ii) PLANT/APPARATUSIDENTIFICATION …………………………………………………………. ………………………………………………………………………………………………. (iii) POINTS OF ISOLATION ………………………………………………………………………. …………………………………………………………………………………………………………. (iv) CIRCUIT MAIN EARTHS APPLIED AT …………………………………………………………. ………………………………………………………………………………………………………………..….. Additional earths may be applied at point of work ALL OTHER PLANT/APPARATUS IS DANGEROUS (v) (vi) WORK TO BE DONE …………………………………………………………………………………………… REMARKS/KEY SAFE KEYS ISSUED (WHERE APPLICABLE) …………………………………………………………………………………………………………………… (vii) Issued with Consent of …………………………………………… Operations Eng/Control Person (viii) PERMIT ISSUED BY ………………………SIGNED Time ………………… Date …………… (Being an authorized person with authority to issue permits) V1 Page 1/2