© 2008 High Voltage Maintenance Services
NERS process for ICP
1. Introduction
2. QMS
3. Gate Process
 Pre Contract
 Design
 Installation
 Commissioning & Adoption(Hand Over)
© 2008 High Voltage Maintenance Services
2. QMS
 Management System
 QMS Objectives
 Where are our QMS saved
© 2008 High Voltage Maintenance Services
2. QMS
 QMS Objectives Brainstorm
Report Turnaround time
Score of Customer Services
Score Cards / Call Response
Enquiry /Quote Response time
Design Approval (Route to Gold)
Lessons learnt
Improvement Scheme (So Do It)
Billing to customers
Delivery on programme
Emergency Response time
Bench mark rates schedule
© 2008 High Voltage Maintenance Services
Needs to achieve
Structured Document Management System
Agreed/consistence of rates to customers
Subcontractor consistent with HVMS QMS
Budgetary Control
3. Gate Process
Assurance Management System
• Sales
• Operations
• Engineering
Design
• Engineering
• Operations
Pre Contract
© 2008 High Voltage Maintenance Services
• Operations
• Engineering
Installation
Commissioning
• Engineering
• Operations
• Sales
• Operations
• Engineering
Performance
Review
4. Pre Contract – HVMS/SP/01
© 2008 High Voltage Maintenance Services
4. Pre Contract - NERS
No.
Action
1.
1.1
1.2
1.3
1.4
1.5
1.6
2.
2.1
2.2
Inquiry
Client Details
DNO area
Usage Profile
Did the client receive a quote from a DNO or ICP
Generation or Import
New site or existing, requirements for a site visit.
Collection of information for Application
Site Visit
Site Address
2.3
Site boundary plan showing proposed location of any switchgear and generation equipment
2.4
2.5
2.6
2.7
2.8
2.9
3.
Load requirement (any motors, welders, other disruptive loads)
Land owners agreement
Preliminary discussion with DNO
Assessment of DNO LTDS
Single line diagram
Fault study if it's a generation scheme
DNO Application
Prepare and send in application
Correspondence with DNO with regards to any queries
Preparation of information to put quote together
Inquiry to Switchgear suppliers
Inquiry to SSE, GTC, ESP for a quote for asset adoption
Inquiry to Civils company for civil works
Preparation of quote
Preparation of cost sheet
Preparation of quote form
Quote revision and sign off by manager
Submit quotation
Follow up
4.
5.
6.
7.
© 2008 High Voltage Maintenance Services
Owner
Sales (S) Estimator (E)
Contractor (C)
S
Time required
1 day
S/E/C
S/E
2 weeks
E
E
1 day
E
1 week
E
2 days
S
S
5. Design – HVMS/SP/15
© 2008 High Voltage Maintenance Services
5. Design – NERS
Processes
2-Responsibilities Process Flow-issue 1A
3.1-Scopes - Design Process Overview-part2-issue 1A
6.3-Assessment of Risk Process Overview-part2-issue1A
9-Contract Document & Record Control Process Overview-issue 1A
10 -Legislation Standards & Guidance Process Overview-issue 1A
Procedures
NERS Management Procedure No QA-NR-200 - Risk Management
NERS Management Procedure No QA-NR-201 - Roles & Responsibilities
QA-PR-219 NERS Management Procedure - Design Variations - Issue 1B
QA-PR-225 NERS Management Procedure - Audit - Issue 1B
Register
NERS Risk Register-issue 1A-option2-A4 (3)
QA-RG-202 NERS Design Skills Matrix - Issue 6A-review
© 2008 High Voltage Maintenance Services
6. Installation
Processes
3.2-Scopes - Project Management Process Overview-part3-issue 1A
3.3.1-Scopes - UMC Process Overview-part5-issue1A
3.3-Scopes - Construction Process Overview-part4-issue 1A
3-Scopes Process Overview-part1-issue 1A
5.2-Sub-contract Work - Labour Only Contractors Process Overview-part2-issue1A
5.3-Sub-contract Work - Ground Workers Process Overview-part3-issue1A
5-5.2-Sub-contract Work Process Overview-part1-issue1A
6.3-Assessment of Risk Process Overview-part2-issue1A
6-6.2-Methods of Working Process Overview-part1-issue1A
7.2-Approved Suppliers & Procurement Process Overview-part2-issue1A
9-Contract Document & Record Control Process Overview-issue 1A
10 -Legislation Standards & Guidance Process Overview-issue 1A
11-11.2-Quality & Safety Systems Process Overview-part1-issue1A
Procedures
NERS Management Procedure No QA-NR-200 - Risk Management
NERS Management Procedure No QA-NR-201 - Roles & Responsibilities
QA-PR-215 NERS Management Procedure - Project Start-up - Issue 1B
QA-PR-216 NERS Management Procedure - Project Files - Issue 1B
QA-PR-217 NERS Management Procedure - Project Management -Control fo Works - Issue 1B
Register
NERS Risk Register-issue 1A-option2-A4 (3)
© 2008 High Voltage Maintenance Services
6. Installation
© 2008 High Voltage Maintenance Services
7. Commissioning & Adoption
Processes
2-Responsibilities Process Flow-issue 1A
3.3-Scopes - Construction Process Overview-part4-issue 1A
6.3-Assessment of Risk Process Overview-part2-issue1A
9-Contract Document & Record Control Process Overview-issue 1A
10 -Legislation Standards & Guidance Process Overview-issue 1A
Procedures
NERS Management Procedure No QA-NR-200 - Risk Management
NERS Management Procedure No QA-NR-201 - Roles & Responsibilities
QA-PR-217 NERS Management Procedure - Project Management Control fo Works - Issue 1B
QA-PR-218 NERS Management Procedure - Commissioning - Issue 1B
QA-PR-225 NERS Management Procedure - Audit - Issue 1B
Register
NERS Risk Register-issue 1A-option2-A4 (3)