3/21/2021 1. Assignment Print View Award: 1.00 point TB 15-72 A term that refers to the automatic detectio... A term that refers to the automatic detection of defects is: autonomation. poka-yoke. kanban. jidoka. andon. References 2. Multiple Choice Difficulty: Hard TB 15-72 A term that refers to the automatic detectio... Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 1.00 point TB 15-71 The term used in Japan that refers to qualit... The term used in Japan that refers to quality at the source, meaning stopping to fix problems to avoid passing defective products on to the next workstation is: autonomation. andon. poka-yoke. kanban. jidoka. References 3. Multiple Choice Difficulty: Hard TB 15-71 The term used in Japan that refers to qualit... Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 1.00 point https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 1/10 3/21/2021 Assignment Print View TB 15-51 Of the following, which is an obstacle to JI... Of the following, which is an obstacle to JIT/lean conversion? Resources are allocated to the project Management lacks commitment Managers shift some responsibility to workers Suppliers accept long-term commitments Workers are willing to be cooperative References 4. Multiple Choice Difficulty: Medium TB 15-51 Of the following, which is an obstacle to JI... Learning Objective: 15-07 Explain how lean production can be implemented and describe common obstacles to implementation. Award: 11.00 points Problem 15-3 (LO6) A cell uses 90 kg of a certain material each day. The material is transported in vats that hold 54 kg each. Cycle time for a kanban is about two and half hours. The manager has assigned a safety factor of 1.00. The plant operates on an eight-hour day. How many kanbans are needed? (Round the final answer to the nearest whole number.) Number of Kanbans References Worksheet 5. Problem 15-3 (LO6) Learning Objective: 15-06 Describe those aspects of planning and control that are important for lean production, and solve typical problems for level mixedmodel sequencing and determining the number of kanbans at a work centre. Award: 1.00 point TB 15-81 A kanban card is used to signal that: A kanban card is used to signal that: work is ready to be moved to the next station. work is needed from the preceding station. a machine has broken down. a worker has run out of parts. https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 2/10 3/21/2021 Assignment Print View a machine is ready for preventive maintenance. References 6. Multiple Choice Difficulty: Medium TB 15-81 A kanban card is used to signal that: Learning Objective: 15-06 Describe those aspects of planning and control that are important for lean production, and solve typical problems for level mixed-model sequencing and determining the number of kanbans at a work centre. Award: 1.00 point TB 15-74 JIT philosophy tries to eliminate work-in-pr... JIT philosophy tries to eliminate work-in-process inventory because: it initiates shorter production runs. dependency on suppliers should be increased. of the savings in capital requirements. inventory covers up recurring problems. it frees up space for kanban storage bins. References 7. Multiple Choice Difficulty: Hard TB 15-74 JIT philosophy tries to eliminate work-in-pr... Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 1.00 point TB 15-86 A visual tool consisting of process flow dia... A visual tool consisting of process flow diagrams that includes information flows and the activity times refers to: pull analysis. the 5S principles. push analysis. kanban control. value stream mapping. References Multiple Choice Difficulty: Medium https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 3/10 3/21/2021 Assignment Print View TB 15-86 A visual tool consisting of process flow dia... 8. Learning Objective: 15-07 Explain how lean production can be implemented and describe common obstacles to implementation. Award: 1.00 point TB 15-58 Which one of the following is not one of the... Which one of the following is not one of the foundational building blocks of JIT? Product design Planning and controls Process design ERP application software Personnel/organizational elements References 9. Multiple Choice Difficulty: Medium TB 15-58 Which one of the following is not one of the... Learning Objective: 15-01 Explain what is meant by the terms just-in-time (JIT) and lean production. Award: 1.00 point TB 15-65 Which of the following is a benefit of small... Which of the following is a benefit of small lot sizes in JIT systems? No safety stock is required. Quicker response to changing customer demands. Inventory planning models are not required. Long production runs increase efficiency Work-in-process inventory is eliminated. References 10. Multiple Choice Difficulty: Hard TB 15-65 Which of the following is a benefit of small... Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 1.00 point https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 4/10 3/21/2021 Assignment Print View TB 15-55 The progress of a plant toward perfection (z... The progress of a plant toward perfection (zero injuries, zero waste/loss/defects/breakdowns, and zero inventories) is measured by ___ technical criteria (called pillars) and ___ managerial criteria(foundations). 5, 7 10, 10 7, 9 5, 5 7, 10 References 11. Multiple Choice Difficulty: Medium TB 15-55 The progress of a plant toward perfection (z... Learning Objective: 15-09 Describe Aspects of World Class Manufacturing. Award: 1.00 point TB 15-73 The basic objective for operating with low i... The basic objective for operating with low inventories in JIT systems is: major problems must have been solved. inventory investment must be saved. to uncover recurring problems in production processes. inventories must be reduced rapidly. major problems must be uncovered. References 12. Multiple Choice Difficulty: Hard TB 15-73 The basic objective for operating with low i... Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 10.00 points Problem 15-4 (LO6) Determine a level mixed-model sequence, given the following demand data: Product A B C Daily Quantity 1 3 2 https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 5/10 3/21/2021 Assignment Print View D 3 B-D-C-A-B-D-C-B-D B-C-D-A-B-C-D-B-C B-D-D-A-C-D-C-B-C B-D-D-B-A-C-D-C-B-C References Worksheet 13. Problem 15-4 (LO6) Learning Objective: 15-06 Describe those aspects of planning and control that are important for lean production, and solve typical problems for level mixedmodel sequencing and determining the number of kanbans at a work centre. Award: 11.00 points Problem 15-11 (LO4) Calculate the takt time for a system where the total time per shift is 480 minutes, there is one shift, and workers are given two 12minute breaks and 45 minutes for lunch. Daily demand is 290 units. (Round the final answer to 2 decimal places.) Takt time minutes per unit References Worksheet 14. Problem 15-11 (LO4) Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 1.00 point TB 15-49 The maximum time The maximum time allowed at each workstation to complete its set of tasks on a unit is called: JIT time Andon time takt time unit time flow time References Multiple Choice Difficulty: Easy TB 15-49 The maximum time Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 6/10 3/21/2021 15. Assignment Print View Award: 1.00 point TB 15-85 A system of lights used at each workstation ... A system of lights used at each workstation to signal problems or slowdowns is a(n): automation. jidoka. pull system. andon. kanban. References 16. Multiple Choice Difficulty: Easy TB 15-85 A system of lights used at each workstation ... Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 11.00 points Problem 15-13 (LO4) Calculate the takt time for a service system that is intended to perform a standardized service. The system will have a total work time of 430 minutes per day, two 12-minute breaks, and an hour for lunch. The service system must process 100 jobs a day. (Round the final answer to 2 decimal places.) Takt time minutes per job References Worksheet 17. Problem 15-13 (LO4) Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 11.00 points Problem 9-7 (LO5) Prepare a scatter diagram for each of the following pairs of variables and then express in words the apparent relationship between the two variables. Put the first variable on the horizontal axis and the second variable on the vertical axis. a. Age Days absent b. Temperature (°C) Error rate 29 7 29 7 12 3 28 7 14 4 31 8 16 3 38 4 17 2 39 2 20 2 38 3 20 0 43 2 18 2 44 1 23 3 48 1 25 4 53 2 27 4 52 2 54 1 56 2 29 4 https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 7/10 3/21/2021 Assignment Print View a-1. Select the scatter diagram for Age and Days absent. Scatter Diagram A Scatter Diagram A Scatter Diagram B Scatter Diagram B Scatter Diagram C Scatter Diagram C a-2. Express the apparent relationship between two variables. Age and Days absent are inversely related. Age and Days absent are directly related. b-1. Select the scatter diagram for Temperature (°C) and Error rate. Scatter Diagram A Scatter Diagram A Scatter Diagram B Scatter Diagram B Scatter Diagram C Scatter Diagram C b-2. Express the apparent relationship between two variables. Error rate is linearly related to temperature. Error rate is non-linearly related to temperature. References Worksheet 18. Problem 9-7 (LO5) Learning Objective: 09-05 Describe methodology of problem solving and process improvement, including plan-do-study-act and seven basic quality tools. Award: 1.00 point TB 15-82 With regard to suppliers, JIT systems typica... With regard to suppliers, JIT systems typically require: buyer inspection of goods and materials. focusing on the lowest price possible. https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 8/10 3/21/2021 Assignment Print View delivery of large lots at regular intervals. multiple sources from which to purchase. long-term relationships and commitments. References 19. Multiple Choice Difficulty: Medium TB 15-82 With regard to suppliers, JIT systems typica... Learning Objective: 15-06 Describe those aspects of planning and control that are important for lean production, and solve typical problems for level mixed-model sequencing and determining the number of kanbans at a work centre. Award: 11.00 points Problem 15-1 (LO6) A manager wants to determine the number of kanbans to use in a new process for a part. The process will have a usage rate of 90 pieces of the part per hour. Because the process is new, the manager has assigned a safety factor of 1.0. Each container holds 48 pieces and a kanban will take an average of 72 minutes to complete a cycle. a. How many kanbans should be used? (Round up the final answer to the next whole number.) Number of Kanbans b. As the system improves, will more or fewer kanbans be required? More kanbans required Fewer kanbans required References Worksheet 20. Problem 15-1 (LO6) Learning Objective: 15-06 Describe those aspects of planning and control that are important for lean production, and solve typical problems for level mixedmodel sequencing and determining the number of kanbans at a work centre. Award: 11.00 points Problem 15-12 (LO4) What takt time would match capacity and demand if demand is 175 units a day, there are two shifts of 450 minutes each, and workers are given three half-hour breaks during each shift, one of which is for lunch or dinner? (Round the final answer to 2 decimal places.) Takt time minutes per unit References https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 9/10 3/21/2021 Assignment Print View Worksheet 21. Problem 15-12 (LO4) Learning Objective: 15-04 Describe those aspects of process design that are important for lean production. Award: 11.00 points Problem 15-2 (LO6) A JIT/lean system uses kanban cards to authorize production and movement of materials. In one portion of the system, a work centre uses an average of 95 pieces of a part per hour. The manager has assigned a safety factor of 0.50. Standard containers are designed to hold seven dozen pieces each. The cycle time for a kanban is 99 minutes. How many kanbans are needed? (Round the final answer to the nearest whole number.) Number of Kanbans References Worksheet Problem 15-2 (LO6) Learning Objective: 15-06 Describe those aspects of planning and control that are important for lean production, and solve typical problems for level mixedmodel sequencing and determining the number of kanbans at a work centre. https://ezto.mheducation.com/hm.tpx?todo=C15PrintView&wid=13252715521453139&role=student&pid=36136445_4610804096_1_126913802 10/10