Schedule for WiFi system and cabling system renovation for The Landmark ID Task name Assignee Dur. Description W 1 W 2 W 3 W 4 W 5 W 6 W 7 W 8 W 9 W 10 W 11W 12 MT WT F MT WT F MT WT F MT WT F MT WT F MT WT F MT WT F MT WT F MT WT F MT WT F MT WT F MT WT F 1 2 3 3 3.1 3.2 3.2 4 4.1 4.2 4.3 4.4 4.5 4.6 4.7 5 7 8 9 9.1 9.2 9.3 9.4 9.5 9.6 10 11 12 Hardware Order Materials Order Materials Delivery Cabling Fiber Optic SR to F.10 F.11 & F.12 F.13 & F.14 Cabling Data Cable SR to G's AP Location F.10 F.11 F.12 F.13 F.14 G, RT, & Gym AP, Sw, & Ctr Config Staging Deployment Hardware Delivery AP Installation F.10 F.11 F.12 F.13 F.14 G, RT, & Gym Labeling Handover & Training UAT Signing Admin: 1 per Admin: 1 per Infra: 2 pers Infra Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Wansi: 3 pers Wansi: 1 per Wansi: 2 pers Infra Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers Infra: 5 pers PM PM 40 days Ordering hardware from Aruba Vietnam. 8 days Ordering cable and materials for cabling. 1 day Deliver cable and materials to The Landmark. 1 day 1 day 1 day Cabling fiber optic cable from SR to F.10 Cabling fiber optic cable from F.10 to F.11&F.12 Cabling fiber optic cable from F.10 to F.13&F.14 1 day 5 days 5 days 5 days 5 days 5 days 3 days 1 day 2 day 1 day Cabling data cable from SR to G's Aps Cabling data cable from F.10's Sw to Aps Cabling data cable from F.11's Sw to Aps Cabling data cable from F.12's Sw to Aps Cabling data cable from F.13's Sw to Aps Cabling data cable from F.14's Sw to Aps Cabling data cable from nearest Sw to Aps Configure Aps, Sws, and Ctr at NetNam's office Deploy a staging system at NetNam's office Deliver the hardware to the Landmark 2 day 2 day 2 day 2 day 2 day 1 day 1 day 1 day 1 day Install Aps at F.10 Install Aps at F.11 Install Aps at F.12 Install Aps at F.13 Install Aps at F.14 Install Aps at G, RT and gym Labeling all devices and cable. Handover the system, documents, and training. Sign the UAT and finish the project. Legend: SR = Server room G = Ground Floor F = Floor RT = Rooftop AP = Access Point Sw = Switch Ctr = Controller Admin = Administration team of NetNam. Inf = Infrastructure team of NetNam. PM = Project manager from NetNam. Per = Person Note: The working time is from 9:00 a.m to 5:00 p.m. Sunday and Saturday are not working day.