Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 27:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 Nigerians Sub Total CONCEPTUAL DESIGN, FEED, DED Discipline Code SUMMARY SHEET PIPELINE ENGINEERING Lead Engr. 4500 300.00 234.00 534.00 CONCEPTUAL DESIGN 4500 63.00 12.00 75.00 FRONT END ENGINEERING DESIGN 4500 99.00 89.00 188.00 DETAILED ENGINEERING DESIGN 4500 138.00 133.00 271.00 300.00 234.00 534.00 SCOPE OF WORK CTR Discipline Grand Total Discipline Engr. Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 27:03:2020 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING CONCEPTUAL DESIGN General Nigerians Lead Engr. Discipline Engr. 0.00 Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: 2.00 10.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Scope Clarifications 1.00 5.00 5 3.00 33.00 Site Visit 0.00 10.00 33.00 Site Visit Checklist 1.00 5.00 5 Site Visit 1.00 20.00 20 Site Visit Report 1.00 8.00 8 General Layouts & Drawings 1.00 5.00 12.00 17.00 1.00 5.00 12.00 17 0.00 15.00 General Layouts Route Map Meetings - Project 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 Discipline Grand Total 63.00 12.00 75.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: PROJECT JONES CREEK GAS EXPORT PROJECT DATE: 27:03:2020 R1 DEPARTMENT ENGINEERING DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING FEED General Nigerians Lead Engr. Discipline Engr. 0.00 Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: 3.00 15.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query, RFIs 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 1.00 4.00 1.00 4.00 6.00 10 1.00 2.00 10.00 12.00 1.00 2.00 10.00 12 9.00 32.00 36.00 66.00 Datasheets Valve Datasheets Design Philosophies Pipeline Design Philosophy Studies & Report 15.00 5 6.00 10.00 Pipeline Wall Thickness Calculation Report 1.00 4.00 4.00 8 Pipeline Alignment Sheet 1.00 2.00 4.00 4 Pipeline Route Verification Report 1.00 4.00 4.00 8 Pipeline Expansion Analysis Report 1.00 4.00 4.00 8 Cathodic Protection Design Report 1.00 4.00 4.00 8 Pipeline Corrosion Inhibitor Selection Report 1.00 4.00 4.00 8 Corrosion Control Study/Report 1.00 4.00 4.00 8 Pipeline Corrosion Assessment & Management Report 1.00 2.00 4.00 6 Pipeline On-bottom Stability Analysis 1.00 4.00 4.00 8 1.00 6.00 10.00 16.00 1.00 6.00 10.00 16 1.00 3.00 7.00 10.00 Lists Valve List Schedules Tie-In Schedules 1.00 3.00 7.00 10 2.00 10.00 20.00 30.00 Pipeline Route Map 1.00 5.00 10.00 15 General Layouts Route Map 1.00 5.00 10.00 15 1.00 12.00 0.00 12.00 1.00 12.00 3.00 15.00 0.00 15.00 General Layouts & Detailed Drawings Reviews HAZOP Study Meetings - Project 12 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 Discipline Grand Total 5.00 99.00 5 89.00 186.00 Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: DEPARTMENT ENGINEERING 27:03:2020 DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING DED General Nigerians Lead Engr. Discipline Engr. 0.00 Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: 3.00 15.00 Input to MDR / Schedule Preparation and Weekly updates 1.00 5.00 5 Technical Query, RFIs 1.00 5.00 5 Input to Final Design Dossiers & Close-out Report 1.00 5.00 5 1.00 10.00 1.00 10.00 2.00 6.00 Pipeline Design Philosophy 1.00 3.00 3 Welding & NDT Philosophy 1.00 3.00 3 Datasheets Valve Datasheets Design Philosophies Studies & Report 0.00 15.00 10.00 10 0.00 6.00 10.00 38.00 49.00 87.00 3D Plant Model Review 1.00 4.00 5.00 9 Pipeline Design Basis 1.00 4.00 5.00 9 Pipeline Wall Thickness Calculation Report 1.00 4.00 5.00 9 Pipeline On-bottom Stability Analysis 1.00 2.00 4.00 6 Pipeline Route Verification Report 1.00 4.00 5.00 9 Pipeline Expansion Analysis Report 1.00 4.00 5.00 9 Cathodic Protection Design Report 1.00 4.00 5.00 9 Pipeline Corrosion Inhibitor Selection Report 1.00 4.00 5.00 9 Corrosion Control Study/Report 1.00 4.00 5.00 9 Pipeline Corrosion Assessment & Management Report 1.00 4.00 5.00 9 11.00 20.00 40.00 58.00 Pipeline material specification 1.00 2.00 4.00 6 Flanges and fittings specifications 1.00 2.00 4.00 6 Conrete Weight Coating for Pipelines Specification 1.00 2.00 4.00 6 Welding Specification 1.00 2.00 4.00 4 Field Joint Coating Specification 1.00 2.00 4.00 6 Isolating Joint Specification 1.00 2.00 4.00 6 Pipeline Coating Specification 1.00 2.00 4.00 6 Cathodic Protection Design Report 1.00 2.00 4.00 6 Pipeline Corrosion Inhibitor Selection Report 1.00 2.00 4.00 6 Specifications Cost, Time and Resource Analysis CLIENT NECONDE ENERGY LIMITED REVISION No.: R1 PROJECT JONES CREEK GAS EXPORT PROJECT DATE: DEPARTMENT ENGINEERING 27:03:2020 DURATION: 8 WEEKS DEPARTMENT CODE 08 DISCIPLINE CODE DISCIPLINE UNIT 4500 ACTIVITY SCOPE: PIPELINE ENGINEERING DED Corrosion Control Study/Report Lists Valve List Schedules Tie-In Schedules Nigerians Sub Total Deliverable Type Activity / Deliverables Estimated No. of Deliverables DELIVERABLES: Lead Engr. Discipline Engr. 1.00 2.00 4.00 6 1.00 2.00 8.00 10.00 1.00 2.00 8.00 10 1.00 2.00 8.00 10.00 1.00 2.00 8.00 10 General Layouts & Detailed Drawings 7.00 14.00 28.00 42.00 Pipeline Alignment Sheet 1.00 2.00 4.00 6 Pipeline Field Joint Coating Drawing 1.00 2.00 4.00 6 Tie-in Spools General Arrangement 1.00 2.00 4.00 6 Tie-in Spools Details Drawing 1.00 2.00 4.00 6 Tie-in Spools Isometric/Spools Isometric 1.00 2.00 4.00 6 Pipeline Route Map 1.00 2.00 4.00 6 General Layouts Route Map 1.00 2.00 4.00 6 0.00 15.00 Meetings - Project 3.00 15.00 Project Review Meeting - Internal - Design Team 1.00 5.00 5 Project Review Meeting - Internal - PM Team 1.00 5.00 5 Project Review Meeting - External - Customer 1.00 5.00 5 1.00 16.00 1.00 16.00 Meetings - Project 3D Model and Constructability Review Discipline Grand Total 138.00 0.00 16.00 16 133.00 269.00