Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
27:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
Nigerians
Sub Total
CONCEPTUAL DESIGN, FEED, DED
Discipline
Code
SUMMARY SHEET
PIPELINE ENGINEERING
Lead Engr.
4500
300.00
234.00
534.00
CONCEPTUAL DESIGN
4500
63.00
12.00
75.00
FRONT END ENGINEERING DESIGN
4500
99.00
89.00
188.00
DETAILED ENGINEERING DESIGN
4500
138.00
133.00
271.00
300.00
234.00
534.00
SCOPE OF WORK
CTR
Discipline Grand Total
Discipline
Engr.
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
27:03:2020
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE ENGINEERING
CONCEPTUAL DESIGN
General
Nigerians
Lead Engr.
Discipline
Engr.
0.00
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
2.00
10.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Scope Clarifications
1.00
5.00
5
3.00
33.00
Site Visit
0.00
10.00
33.00
Site Visit Checklist
1.00
5.00
5
Site Visit
1.00
20.00
20
Site Visit Report
1.00
8.00
8
General Layouts & Drawings
1.00
5.00
12.00
17.00
1.00
5.00
12.00
17
0.00
15.00
General Layouts Route Map
Meetings - Project
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
Discipline Grand Total
63.00
12.00
75.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.:
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
27:03:2020
R1
DEPARTMENT
ENGINEERING
DURATION:
8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE ENGINEERING
FEED
General
Nigerians
Lead Engr.
Discipline
Engr.
0.00
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
3.00
15.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query, RFIs
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
1.00
4.00
1.00
4.00
6.00
10
1.00
2.00
10.00
12.00
1.00
2.00
10.00
12
9.00
32.00
36.00
66.00
Datasheets
Valve Datasheets
Design Philosophies
Pipeline Design Philosophy
Studies & Report
15.00
5
6.00
10.00
Pipeline Wall Thickness Calculation Report
1.00
4.00
4.00
8
Pipeline Alignment Sheet
1.00
2.00
4.00
4
Pipeline Route Verification Report
1.00
4.00
4.00
8
Pipeline Expansion Analysis Report
1.00
4.00
4.00
8
Cathodic Protection Design Report
1.00
4.00
4.00
8
Pipeline Corrosion Inhibitor Selection Report
1.00
4.00
4.00
8
Corrosion Control Study/Report
1.00
4.00
4.00
8
Pipeline Corrosion Assessment & Management Report
1.00
2.00
4.00
6
Pipeline On-bottom Stability Analysis
1.00
4.00
4.00
8
1.00
6.00
10.00
16.00
1.00
6.00
10.00
16
1.00
3.00
7.00
10.00
Lists
Valve List
Schedules
Tie-In Schedules
1.00
3.00
7.00
10
2.00
10.00
20.00
30.00
Pipeline Route Map
1.00
5.00
10.00
15
General Layouts Route Map
1.00
5.00
10.00
15
1.00
12.00
0.00
12.00
1.00
12.00
3.00
15.00
0.00
15.00
General Layouts & Detailed Drawings
Reviews
HAZOP Study
Meetings - Project
12
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
Discipline Grand Total
5.00
99.00
5
89.00
186.00
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.: R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
DEPARTMENT
ENGINEERING
27:03:2020
DURATION: 8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE
ENGINEERING
DED
General
Nigerians
Lead Engr.
Discipline
Engr.
0.00
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
3.00
15.00
Input to MDR / Schedule Preparation and Weekly updates
1.00
5.00
5
Technical Query, RFIs
1.00
5.00
5
Input to Final Design Dossiers & Close-out Report
1.00
5.00
5
1.00
10.00
1.00
10.00
2.00
6.00
Pipeline Design Philosophy
1.00
3.00
3
Welding & NDT Philosophy
1.00
3.00
3
Datasheets
Valve Datasheets
Design Philosophies
Studies & Report
0.00
15.00
10.00
10
0.00
6.00
10.00
38.00
49.00
87.00
3D Plant Model Review
1.00
4.00
5.00
9
Pipeline Design Basis
1.00
4.00
5.00
9
Pipeline Wall Thickness Calculation Report
1.00
4.00
5.00
9
Pipeline On-bottom Stability Analysis
1.00
2.00
4.00
6
Pipeline Route Verification Report
1.00
4.00
5.00
9
Pipeline Expansion Analysis Report
1.00
4.00
5.00
9
Cathodic Protection Design Report
1.00
4.00
5.00
9
Pipeline Corrosion Inhibitor Selection Report
1.00
4.00
5.00
9
Corrosion Control Study/Report
1.00
4.00
5.00
9
Pipeline Corrosion Assessment & Management Report
1.00
4.00
5.00
9
11.00
20.00
40.00
58.00
Pipeline material specification
1.00
2.00
4.00
6
Flanges and fittings specifications
1.00
2.00
4.00
6
Conrete Weight Coating for Pipelines Specification
1.00
2.00
4.00
6
Welding Specification
1.00
2.00
4.00
4
Field Joint Coating Specification
1.00
2.00
4.00
6
Isolating Joint Specification
1.00
2.00
4.00
6
Pipeline Coating Specification
1.00
2.00
4.00
6
Cathodic Protection Design Report
1.00
2.00
4.00
6
Pipeline Corrosion Inhibitor Selection Report
1.00
2.00
4.00
6
Specifications
Cost, Time and Resource Analysis
CLIENT
NECONDE ENERGY LIMITED
REVISION No.: R1
PROJECT
JONES CREEK GAS EXPORT PROJECT
DATE:
DEPARTMENT
ENGINEERING
27:03:2020
DURATION: 8 WEEKS
DEPARTMENT CODE 08
DISCIPLINE CODE
DISCIPLINE UNIT
4500
ACTIVITY SCOPE:
PIPELINE
ENGINEERING
DED
Corrosion Control Study/Report
Lists
Valve List
Schedules
Tie-In Schedules
Nigerians
Sub Total
Deliverable
Type
Activity / Deliverables
Estimated
No. of
Deliverables
DELIVERABLES:
Lead Engr.
Discipline
Engr.
1.00
2.00
4.00
6
1.00
2.00
8.00
10.00
1.00
2.00
8.00
10
1.00
2.00
8.00
10.00
1.00
2.00
8.00
10
General Layouts & Detailed Drawings
7.00
14.00
28.00
42.00
Pipeline Alignment Sheet
1.00
2.00
4.00
6
Pipeline Field Joint Coating Drawing
1.00
2.00
4.00
6
Tie-in Spools General Arrangement
1.00
2.00
4.00
6
Tie-in Spools Details Drawing
1.00
2.00
4.00
6
Tie-in Spools Isometric/Spools Isometric
1.00
2.00
4.00
6
Pipeline Route Map
1.00
2.00
4.00
6
General Layouts Route Map
1.00
2.00
4.00
6
0.00
15.00
Meetings - Project
3.00
15.00
Project Review Meeting - Internal - Design Team
1.00
5.00
5
Project Review Meeting - Internal - PM Team
1.00
5.00
5
Project Review Meeting - External - Customer
1.00
5.00
5
1.00
16.00
1.00
16.00
Meetings - Project
3D Model and Constructability Review
Discipline Grand Total
138.00
0.00
16.00
16
133.00
269.00