EQ. EXISTING SLAB 8" NEW SLAB APPLY COAT OF BONDING AGENT PRIOR TO PLACEMENT OF NEW SLAB NEW SLAB OVER EXISTING DEPRESSED SLAB MATCH TOP OF SLAB WITH ADJACENT FLOOR #3 x 1'-8" DRILL AND EPOXY GROUT INTO EDGE OF EXISTING SLAB @ 1'-6" O.C. EXISTING SLAB - DEPRESSED 6x6-W2.1xW2.1 W.W.F. 1 TYPICAL DETAIL FOR FILLING EXISTING SLAB DEPRESSION 1" = 1'-0"