Example of Variable Cost and Fixed Cost High-Low Method Steps and Example Step 1: Determine the highest and lowest activity and the costs associated thereunto. Step 3: Obtain the TOTAL FIXED COST by removing the variable cost component in the total costs. Step 2: Obtain the VARIABLE COST PER UNIT by dividing the change in cost over the change in activity. How much is the total maintenance cost at 8,200 machine hourse? Where: y = total cost a = total fixed cost b = variable cost per unit x = volume of activity Method of Least Square Steps and Example Step 1: Prepare a table calculating x (activity), y (total cost), xy, and x2. Step 2: Substitute the computed amounts in the following equation to get VC/unit. Step 3: Substitute b to any equation to get a (fixed cost).