Uploaded by Alphard Darmawan

Component Overhaul Schedule A109S

advertisement
A109S/AW109SP IETP 27th Issue
Unmaintained Copy
Page 1 of 3
Component overhaul schedule – General
Table of contents
References
1
Component overhaul schedule
2
List of components
2.1
Number (No) column
2.2
Component column
2.3
Part number column
2.4
Overhaul interval column
List of tables
1
2
References
List of components
References
Table 1 References
Data module/Technical publication
Title
No references
Description
1
Component overhaul schedule
This sub-section gives you the overhaul intervals for the components of the helicopter.
2
List of components
Note
–
–
The overhaul intervals, specified for the any given part numbers written in Table 2,
apply also to all successive dash numbers for that item, unless differently specified.
No tolerance is permitted on component overhaul schedule.
Refer to Table 2. Each column of the table has a heading that gives the data that follows:
2.1
Number (No) column
This column gives the system plus a number to identify each listed component.
2.2
Component column
This column gives the item description which identifies the component.
2.3
Part number column
This column gives the part number which identifies the component.
2.4
Overhaul interval column
AMPI (EASA) - 0B-A-05-12-00-00A-000A-A Component overhaul schedule - General
Printed on 1/6/2021
A109S/AW109SP IETP 27th Issue
Unmaintained Copy
Page 2 of 3
This column gives the overhaul interval for the component. Unless specified differently, the
overhaul interval is in flight hours.
Table 2 List of components
No
Component
Part number
Overhaul interval
21-01
Cooling turbine
1538D000-002
5000 FH
24-01
Starter generator
160SG139Q2-1
1000
25-01
Rescue hoist
109-0900-61-801
2000 lifts or 5 years. Use limit that occurs
first (Note 1)
25-02
Cargo hook
200-216-00
1000 h of operation with a load attached
to cargo hook or 5 years from the date of
installation. Use limit that occurs first
(Note 2)
25-03
Cargo hook
109-0705V03-107
1000 h of operation with a load attached
to cargo hook or 5 years from the date of
installation. Use limit that occurs first
(Note 2)
25-04
Safety cargo hook
528-010-01
1000 h of operation with a load attached
to cargo hook or 5 years from the date of
installation. Use limit that occurs first
(Note 2)
25-05
Safety cargo hook
109-0705V03-105
1000 h of operation with a load attached
to cargo hook or 5 years from the date of
installation. Use limit that occurs first
(Note 2)
62-01
Main rotor
dampers
109-0112-39-103
or 109-0112-39105
1200
63-01
Main transmission
assembly
109-0400-03113/119
4800
63-02
Oil cooler fan
109-0455-01-103
4800
65-01
90-degree
gearbox assembly
109-0440-01-121
3000
67-01
Main rotor
servoactuator
assembly
109-0110-42-134
1800
67-02
Main rotor
servoactuator
assembly
109-0110-42-135
1800
67-03
Main rotor
servoactuator
assembly
109-0110-42-136
1800
67-04
Tail rotor
servoactuator
assembly
109-0040-51-103
1800
AMPI (EASA) - 0B-A-05-12-00-00A-000A-A Component overhaul schedule - General
Printed on 1/6/2021
A109S/AW109SP IETP 27th Issue
No
Component
Unmaintained Copy
Part number
Page 3 of 3
Overhaul interval
Note
1
2
Rescue hoist lift definition. A lift is defined as an unreeling and recovery of the
cable with a load attached to the hook, independently of the length of the cable that
is deployed / recovered. An unreeling / recovery of the cable with no load on the
hook is not considered to be a lift. Any operation where a load is attached for half the
operation (i.e. unreeling or recovery) must be considered as a lift.
When the helicopter operates in a sandy or dusty environment, multiply by two the
hours of operation with a load attached to the cargo hook. This applies also when the
helicopter is used for logging works.
AMPI (EASA) - 0B-A-05-12-00-00A-000A-A Component overhaul schedule - General
Printed on 1/6/2021
Download