List of deliverables is given below: # 1 2 3 Deliverable Discovery finding document Test Strategy and Plan Document Align, revise and confirm proposal Remarks 4 Requirement Traceability Matrix (RTM) RTM will be developed in case of availability of controlled requirements document at project beginning. 5 6 Test Scenario & Test Case Document Test status report (Weekly) 7 Integration Testing Defects 8 9 10 11 12 13 14 15 16 17 Integration Testing Summary Report SIT Defects SIT Summary Report Performance Testing Defects Performance Testing Summary Report Test Automation Scripts BAT Testing Defects BAT 1.0 Summary Report BAT 2.0 Summary Report Project Closure Report Defects will be entered directly into JIRA and status will be reported periodically