Uploaded by fconway

learner-log

advertisement
Level 1/2 Technical Award in
Unit 02: Internal Synoptic Project- Learner Log
This learner log should be completed to record your approach to tasks 1–4 of the synoptic project.
It will be used as part of the overall evaluation in Task 5 of the full synoptic project.
All of the work you submit must be your own. Please complete the details below clearly and in BLOCK CAPITALS.
Learner name
Centre name
Centre number
Learner number
Learner signature
All the material in this publication is copyright © NCFE.
L1/2 Technical Awards- Synoptic Project Learner Log v0.1
Task
Number
Preparation carried out:
Project Management
Resources required:
Time needed:
All the material in this publication is copyright © NCFE.
Progress Log:
L1/2 Technical Awards- Synoptic Project Learner Log v0.1
Task
Number
Preparation carried out:
Project Management
Resources required:
Time needed:
All the material in this publication is copyright © NCFE.
Progress Log:
L1/2 Technical Awards- Synoptic Project Learner Log v0.1
Project Review
What went well and why?
What didn’t go well and why?
What changes would you
make and how would these
changes improve the outcome
of the tasks if you were to do
the project again?
All the material in this publication is copyright © NCFE.
L1/2 Technical Awards- Synoptic Project Learner Log v0.1
Download
Study collections