ABSTRACT SHEET PROJECT NAME : CONSTRUCTION OF RESIDENCE FOR Mr. K.A.K.SENEVIRATHNE DATE : 2020-09-17 SECTION D Excavating EXCAVATION AND EARTH WORKS S/Excavation top soil for Site preperation preservation, average depth S/Site preperation for clearing 150mm and disposal on site. site vegitation 3.0m away from 106.73 outer column pit edge Say 107.0m D.2.1.1 2 faces < 2.0m, 104.43 2 Say 104.0m 267.49 Say 267.0m 2 Excavation column pit, hight not exceeding 1.0m Nr/Removing trees and strumps girth 500-1000mm, filling voids with selected meterial as instructed by the engineer 3 equal, total depth < 2.0m, distance between opposite faces < 2.0m, 59.2 -13.8 45.4 C/Excavation column pit, hight 1000-2000mm Say 45.0 m Say 03 nr Say 7.0 m D.1.2.1 118.37 -13.94 D.7.2.2 140.82 S/Earthwork support for column pits, using category type ii or D.1.1.1 Say 7.0 m D.2.4.1 Earthwork support S/Earthwork support for foundation, using category type ii or equal, total depth < 2.0m, distance between opposite 3 2 D.7.2.1 1.20 1.80 4.32 6.48 13.8 D.2.4.2 Nr/Removing trees and strumps girth 1120-2500mm, filling voids with selected meterial as instructed by the engineer D.1.2.2 C/Excavation trenches, width >300mm and depth not exceeding 1.0m 49.94 52.95 Say 50.0 m D.2.5.1 3 C/Excavation trenches, width >300mm and depth 1.0m - 2.0m -3.01 49.94 Disposal Disposal of ground water item Say item D.8.2 Filling C/Filling under floor up to make up level with selected material, maximum thickness 450mm, watered & compacted in 150mm thick layers 32.35 3 Say 32.0 m D.9.3.1 C/Back filling with imported soil, filling to make up level laying with 150mm hight layers and well rammed. 17.75 18.15 -0.4 3 SECTION F CONCRETE WORKS SECTION F2 Form work Say 18.0 m E2.3.1 SECTION G SECTION G2 17.75 SECTION F1 Insitu concrete S/75mm thick G15 screed in to concrete for column bed, pord sand bed. Say 8.0 m F1.2.1 S/Form work for column & pier using class iii or equal timber F2.1.2.2 STONE WORK S/600mm wide Random Ruble Masonary, vertical foundation, using by 150x225mm ruble, in 1:5 cement sand motar. 2 S/150mm thick G15 screed concrete , pord in to trench ground. 5.49 Say 5.00 F1.2.1 SECTION F3 Reinforcemnt in insitu concrete M/Tor steel 16mm reinforcement up to length, bend to shape and place in position, tied with GI binding wire. 0.15 Say 0.150 M.ton F3.2.2.1 C/300mm thick G25 column bed, reinforcement concrete for pord on to screed concrete. 60.94 Say 61.0 m G2.1.1.1 S/450mm wide Random Ruble Masonary, vertical foundation, using by 150x225mm ruble, in 1:5 cement sand motar. M/Tor steel 10mm dia up to length, bend to shape and place in position, tied with GI binding wire. 0.073 G2.1.1.1 Say 0.073 M.ton F3.2.1.6 M/Mild steel 6mm dia up to length, bend to shape and place in position, tied with GI binding wire. 0.022 F1.2.2.2 C/G25 reinforced concerte in foundation, column & pier on plan <0.5m 2 Say 0.49m F1.2.2.3 Say 0.022 M.Ton F3.1.1.6 3 SECTION H WATER PROOFING 2 S/450mm wide 25mm thick 1:3 cement sand motar horizontal Damp proof course on random ruble masonary, including appying two coats of hot tar and blinding with sand. 6.21 Say 6.00 m H.2.2.1 2