Inspection Report Visual Inspection of Lifting Equipment Inspection Number SKL/20/L/OIPTHAI/2058 Rev.0 Inspection Date: 18.06.2020 Next Inspection: 17.12.2020 (Mubadala, Cpoc) 17.06.2021 (PTTEP, Chevron) Project Reference No. PP228413/0E Customer : Intended for : Global NDT Inspection Co., Ltd. (For United Supply and Multitrade Co., Ltd) United Supply and Multitrade Co., Ltd Place of test : Date of test : United yard, Singhanakorn, Songkhla, Thailand. 18 June 2020 Item: Description as follows Equipment I.D No. Dimensions (L x W x H) Tare Weight Nett Weight MGW. : : : : : Rack Gas / RG-USM-008 126 x 126 x 195 cm. 0.50 MT. 2.50 MT. 3.00 MT. Complete with Sling & Master Link : : : : Wire Rope Sling Four Legs S/N.: USM-08 (AD 3003) Dia. 14.00 mm. x 220 cm. SWL: 5.00 MT. Complete with Shackles : : : Bolt Type Anchor Shackle ID. No.: 08 A to 08 D Dia. 5/8 In. SWL.: 3.25 MT . Note: - Require of MPI on pad eye at welds of Rack Gas / RG-USM-008 and MPI on wire rope sling 4 legs for master quad assemblies at welds report attached with certificate. - Recommend to user’s daily check for general corrosion at underneath structure before departure to offshore. Reference Specification: GLND: Guideline for Marine Lifting Operations 0027/ND Rev.10 (22/06/2013) PTTEP: General Instruction for PTTEP Lifting Equipment Integrity Inspection Procedure Docs No. CMS-12089-PDR-401, Container Guideline Docs No. CMS-12089-GDL-402, (Rev. No. 0-0, dated Dec.,2016) CPOC: General Instructions for Lifting Equipment CPOC-DPO-B17-1GEN-OP-INSP-018 Rev. 0 (April 2011) Chevron Offshore Thailand: Portable Lifting Equipment Operation Practices Version 1.3 (1 July,2016), Appendix 1-Version 1.4 (1 July 2016), Appendix 2- Version 1.3 (1 July., 2016) Mubadala Petroleum: Inspection of Lifting Equipment Procedure (TH-POT-AI-QA-PRC-0132-R6), (Dec., 2018) Result(s) of Inspection The above items are inspected and revealed no defects that would otherwise impair its continued use . DNV-GL Oil & Gas (Thailand) _______________________ Name Wiwat Techocha Inspector This Report Certificate intended for the sole use of the person or company to whom it is address and no liability of any nature whatsoever shall be assumed to any other party in respect of its contents DNV GL (Thailand) Co., Ltd 349 SJ Infinite I Business Complex ,15th Floor, Room no. 1501-1502 Vibhawadee Rangsit Road, Chomphon, Chatuchak Bangkok 10900 Tel 66(0) 2115 9868 Fax 66(0) 2115 9867 E-mail : www.dnvgl.com Page 1 of 1 Report no : 2020-MT-0808 GLOBAL NDT INSPECTION CO., LTD. Rev :0 Page : 1 of 1 MAGNETIC PARITCLE EXAMINATION REPORT Client : United Supply and Multitrade Co., Ltd. Location of Work : Utai Seya Yard, Songkhla Thailand Project Name : Lifting equipment inspection. Examination Date: June 18, 2020 OrderedBy : Ref. Code/Standard : AWS D1.1 Table 6.1/ASTM E-709 United Supply and Multitrade Co., Ltd. TEST METHOD Stat of Examination : As Weld Before Load Test After Load Test Before Hydro Test Serface Preparation : Brushing Grinding Machining Other Media and Applied Method : Visible Fluorescent Wet Dry Continous Residual Circular Longitudinal Permanent Yoke S/N: Magnatization Technique : AC Yoke S/N: 11949 Calibration Block : 40 lb S/N :G-001 Light Indensity : Daylight (> 1000 Lux) After Hydro Test 4279 EQUIPMENT OF INSPECTION Rack Gas Description : Serial Number : RG-USM-008 Sling+Master link (1 set) AD-3003 Shackle (4Ea) 08 A TO 08 D EXAMINATION PICTURE MPI on Weldment area of Padeyes and Master link around Weld joint and 4 Shackles Full Boby . Accepted Was found to be free of surface Defect at the time of inspection Repair Found Defect (Please see picture) kind of Rejected Other No visible imperfection were found at the time of inspection Inspection Results : Comment : Remark : Next of Inspection : 6 Month 12 Month N/A 6 Month 12 Month N/A 6 Month 12 Month N/A INSPECTOR - ASNT LEVEL-II Signature : PTTEP / CHEVRON : June 17, 2021 MUBADALA / CPOC : December 17, 2020 CUSTOMER REQUIREMENT : REVIEW BY Signature : CUSTOMER Signature : Name : Sakka Wanpuy Name : Vitasrut Apipuntananun Name : Date : June 18, 2020 Date : June 18, 2020 Date : The present Inspection has been carried out to the best of our knowledge and ability and our personability is Limited to the exercise of due care this Certificate / Report is issued on the understanding That it does not relieve sellers from their contractual obligations FM-OP-004