PC-1 Gestation Period _______________________ Cost of Project _______________________ LIVESTOCK AND DAIRY DEVELOPMENT DEPARTMENT GOVERNMENT OF THE PUNJAB GOVERNMENT OF PAKISTAN PLANNING COMMISSION PC-1 FORM (_____________ SECTORS) 1 Name of the Project 2 Location 3 Authority responsible for: i. ii. iii. Sponsoring Execution Operation and maintenance iv. Concerned federal ministry 4 1. (a) Plan Provision i- If the project is included in the medium term/five year plan, specify actual allocation. ii- If not included in the current plan, what warrants its inclusion and how is it now proposed to be accommodated. iii- If the project is proposed to be financed out of block provision, indicate: (b)- Provision in the current year PSDP/ADP 5 Project objectives and its relationship with Sect-oral objectives 6 Description, justification and technical parameters 7 Capital cost estimates 8 Annual operating and maintenance cost after completion of the Project 9 Demand and supply analysis 10 Financial Plan and mode of financing 11 Project benefits and analysis Rs. 184.967 million 1 i. Financial & economic Analysis ii. Social benefits with indicators iii. Employment generation (direct and indirect) Environmental impact Risk Mitigation Plan Implementation schedule iv. v 12 13 Starting date: 01-07-2016 Ending date: 30-06-2017 (Annexure -III) Human Resource Plan Management structure and manpower requirements including Specialized skills during execution and operational phases No fresh recruitment will be made and the staff required for all the training Centres will be adjusted from existing strength of the department. The staff will be posted by the authority and trained according to the needs of institutes. N.A. 14 Additional projects/decisions required to maximize socio-economic benefits from the proposed project 15 Monitoring and Evaluation Plan 16 Certified that the project proposal has been prepared on the basis of instructions provided by the Planning Commission for the preparation of PC-I for Production Sector projects. Progress reports will be collected from the all the institutes regarding achievement of objectives on monthly basis. The execution authority will visit the institutes on regular basis to monitor the progress of project and consolidated report will be submitted to the concerned quarter. Prepared by Checked by Approved by 2