Uploaded by Muhammad Hadi Raza

Slides

advertisement
WEEKLY SPOC MEETING SLIDES
Date: Dec 26, 2020
ER 5G :: ROLLOUT:: LTE-NR DL AGGREGATION DEACTIVATION
ER 5G :: ROLLOUT :: LTE-NR DL AGGREGATION DEACTIVATION
• DL LTE-NR Aggregation was deactivated on the whole NW
• Improvement can be observed in User Throughput and DL Traffic while users have remained stable
• DL Aggregated Traffic has been reduced to zero.
• Other KPIs have remained stable
ER 4G :: S0042 INSTANT SPECTRUM SHARING TRIAL
ER 4G :: S0042 INSTANT SPECTRUM SHARING TRIAL
ER 4G :: S0042 INSTANT SPECTRUM SHARING TRIAL
ER 5G :: S0042 INSTANT SPECTRUM SHARING TRIAL
ER 5G :: S0042 INSTANT SPECTRUM SHARING TRIAL
ER 5G :: S0042 INSTANT SPECTRUM SHARING TRIAL
S0042 was upgraded to 20Q4 and trial for Instant Spectrum Sharing was initiated on Dec 21.
•
LTE:
• RRC and S1 failures and Call Drop Rate (PS & CS) have increased
• Users were exchanged between L800 and L1800 F1 but have recovered now. L1800 F2 users have reduced
•
5G NR:
• User count has reduced
• Call Drop rate had increased. At Last interval it seems to have improved
• ENDC Setup SR has degraded with slight increase in UL Interference
• UL MCS has degraded as reported previously with upgrade to 20Q2.
ER 4G :: MISSING INTRA FREQ DEFINITIONS RECTIFICATION
ER 4G :: MISSING INTRA FREQ DEFINITIONS RECTIFICATION
ER 4G :: MISSING INTRA FREQ DEFINITIONS RECTIFICATION
• Intra Freq Freq Definitions were found missing and defined for about 36 cells across 13 sites
• Most of the KPIs have improved, more notably Throughputs
• UL BLER, Packet Loss and DL Latency have all improved.
• Detailed KPIs are attached in the sheet.
• Overall KPIs are stable
LTE Missing Intra
Freq
Contact us
omantel.om
facebook.com/omantel
@omantel
13 | © Omantel 2017
Download