WEEKLY SPOC MEETING SLIDES Date: Dec 26, 2020 ER 5G :: ROLLOUT:: LTE-NR DL AGGREGATION DEACTIVATION ER 5G :: ROLLOUT :: LTE-NR DL AGGREGATION DEACTIVATION • DL LTE-NR Aggregation was deactivated on the whole NW • Improvement can be observed in User Throughput and DL Traffic while users have remained stable • DL Aggregated Traffic has been reduced to zero. • Other KPIs have remained stable ER 4G :: S0042 INSTANT SPECTRUM SHARING TRIAL ER 4G :: S0042 INSTANT SPECTRUM SHARING TRIAL ER 4G :: S0042 INSTANT SPECTRUM SHARING TRIAL ER 5G :: S0042 INSTANT SPECTRUM SHARING TRIAL ER 5G :: S0042 INSTANT SPECTRUM SHARING TRIAL ER 5G :: S0042 INSTANT SPECTRUM SHARING TRIAL S0042 was upgraded to 20Q4 and trial for Instant Spectrum Sharing was initiated on Dec 21. • LTE: • RRC and S1 failures and Call Drop Rate (PS & CS) have increased • Users were exchanged between L800 and L1800 F1 but have recovered now. L1800 F2 users have reduced • 5G NR: • User count has reduced • Call Drop rate had increased. At Last interval it seems to have improved • ENDC Setup SR has degraded with slight increase in UL Interference • UL MCS has degraded as reported previously with upgrade to 20Q2. ER 4G :: MISSING INTRA FREQ DEFINITIONS RECTIFICATION ER 4G :: MISSING INTRA FREQ DEFINITIONS RECTIFICATION ER 4G :: MISSING INTRA FREQ DEFINITIONS RECTIFICATION • Intra Freq Freq Definitions were found missing and defined for about 36 cells across 13 sites • Most of the KPIs have improved, more notably Throughputs • UL BLER, Packet Loss and DL Latency have all improved. • Detailed KPIs are attached in the sheet. • Overall KPIs are stable LTE Missing Intra Freq Contact us omantel.om facebook.com/omantel @omantel 13 | © Omantel 2017