What is Team X? Keith Warfield June 27, 2012 Copyright 2012 California Institute of Technology. Government sponsorship acknowledged. What is Team X? Team X is a concurrent engineering team for rapid design and analysis of space mission concepts Developed in 1995 by JPL to reduce study time and cost More than 1100 studies completed Institutionally endorsed Emulated by many institutions Team X profiled in Time magazine, October 2005 -2- 2 Concurrent Engineering – What is it? Traditional Method – Serial Start Provide Staff Subsystem Design System Trades Cost End Delays Concurrent Engineering – Parallel Diverse specialists working in real time, in the same place, with shared data, to yield an integrated design Subsystem Design System Trades Start Cost -3- End How Does Team X Operate? People About 20 regular “chairs” – each with a lead and at least 2 backups Each represents major subsystems of the spacecraft design Represent the “doing” orgs Usually working on current flight projects too Additional experts are added as needed Tools Each chair has subsystem sizing tools in Excel and exchange data with a common database through custom VB code Tools are endorsed by the “doing” orgs and selected by the chair leads Some tools currently in use: STK, Institutional Costs Models, Zemax, @RISK, Mathcad, SolidWorks, Unigraphics, and JPL proprietary trajectory and EDL tools Process Structured process is the framework for the study Products – Team has a set of standard products, but will generate custom products when requested Pre-work – non-concurrent work is started in advance of the study Sessions – 3 hours each. Number and schedule vary depending on the study and products required Post Study – Work is completed after sessions. SEs and Study Lead responsible for report completion. -4- The Mission Team Systems Science Structures Instruments Power Thermal C & DH Flight Software Attitude Control Ground Systems Telecom Propulsion Cost Mission Design -5- The Instrument Team Based on the classic Team X paradigm Fully equipped, maintained and logistically managed PDC facilities Covers the full array of disciplines needed for full concept development SFC Studies typically take 1-3 half day concurrent design sessions UVS IR Coronagraph Vis Coronagraph IR Occulter IR IFU Ozone Camera Fine Guidance Sensors Aft Metering Structure •Concept of operation ⇒ •Detection ⇒ •Data volumes and rates ⇒ •Thermo-mechanical sizing ⇒ •Cost Shutters T1 / T2 Nuller Shutter Phase Plates DM1 Results can be seamlessly fed into full mission concept studies Phase Plates DM2 Bright Bright Dichroic mirror ACS Camera Pupil Remap Lens Pupil Geom. Camera DM3 Beam launcher Null Beam Combiner Assembly DM Control Fiber Bundle Array To Pupil Geom Mechanism DM Control T3-4 Dark Phase Plates T1-2 Dark ACS Camer a output with pupil camer a allows Phase diversi ty WFS as well! T3 / T4 Nuller Phase stepping dither Single fibers with matched properties as the fiber bundle Filters Lens compensator WFS Camera1 -6- WFS Camera2 slit Science Camera Typical Study Options Concept Design Institutional Cost Estimate Red Team Review • • • • Design and size a full space mission, platform or instrument Products: study report including mass, power and cost estimates Optional Products: configuration images; trajectory visualization; risk reports Schedule: 6-7 weeks • Estimate the cost of a full space mission design concept • Products: study report including cost estimate and its underlying assumptions • Schedule: 3-4 weeks • Identify the strengths/weaknesses in an existing space mission or instrument design • Products: report w/ technical and cost strengths, weaknesses, opportunities & threats • Schedule: 1-2 weeks -7- 7 What Does Team X Produce? Text or Powerpoint Design Descriptions Trajectory/Orbit Design Ground Track Maps Operations Scenarios and Timelines Mass/Power Estimates Block Diagrams Parts Lists Heritage Descriptions Ground System Architecture Data Volume/Rate Calculations Link Budgets Radiation Analysis Instrument Design Optics Ray Tracing Animation CAD Thermal FEA Schedule Estimates ICM Cost Estimates Cost Risk S-Curves Risk Lists/Matrix Limited Trades -8- High Visibility Products for NASA Team X supported 16 architecture and mission concepts for Planetary Science Decadal Survey Team X supported 14 instrument and mission concepts for ASTRO 2010 Decadal Survey -9-