Sheet 2 Switching 1-construct a 200*50 2-stage crossbar selector using 20*10 modules find number of cross points, saving ratio & number of links. 2-Repeat (1) for 10*5 modules. 3-In 3-stage cross system N=256 sub calculate n & k for min NX and then calculate NX & saving ratio. 4-Implement the switching using (T-S) for the following switching plan: a) (T1)7 ---------- (T6)13 b) (T5)9 ---------- (T5)20 c) (T9)16 ---------- (T4)16 Repeat when we use (S-T) switching.