lOMoARcPSD|5483753 Executive-Shirt-Company-Inc case study Business Management (Institute of Business Management) StuDocu is not sponsored or endorsed by any college or university Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Case Analysis: Executive Shirt Company, Inc. Summary: Mr. Dwight Collier, Gen. Manager of Executive Shirt Company (ESC) is planning to introduce customized shirts in his current production facility since they can fetch 75% more price as compared to regular shirts. Currently, ESC is manufacturing 16,000 shirts per month and they plan to manufacture 2,000 customized shirts per month without hampering the current production. The company has 5 departments, namely, Cutting: 1 Machine, 4 Workers Sewing: 48 Machines, 48 Workers Inspection: 4 workers Ironing: 4 Machines, 4 Workers Packaging: 4 workers Indirect Workers (material handlers) : 4 Workers Mr. Collier introduced a change in the manufacturing process by introducing a Laser Cutting Machine for customized shirt. He requested two of his managers, Mike and Ike to devise a production plan to maximize the profit from both the products. The highlights of their plans are Mike’s Plan: To go with one production line manufacturing both the products simultaneously (other than the cutting process) o Eight Batches of regular shirts with 5 shirts each o One batch of 5 custom shirts Ike’s Plan: To go for a separate production line for regular and customized shirt o Eight Batches of regular shirts with 6o shirts each o One batch of 5 custom shirts Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Fig 1. Process Flow Diagram- Current Production Process Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Current Production Process Time required for producing one unit from laying and cutting operation=120/60*8=0.25 min Table 1.1. Current Production Plan Operation Regular Shirt Labour Content Number of workers Time required for producing one unit (in min.) Make Collar 3.90 8 .4875 Make Cuffs 2.00 4 .5 Make Sleeves 0.65 2 .325 Make Front 2.50 6 .41 Make Back 1.70 4 .42 Join Shoulder 0.66 2 .33 Attach collar 1.65 4 .41 Attach sleeves 1.55 4 .39 Stitch Down sleeves Sew Side seam 0.65 2 .32 1.80 4 .45 Attach cuffs 1.55 4 .39 Hem Button 1.70 4 .42 Inspect 1.50 4 .38 Iron 1.95 4 .49 Fold Package 1.75 4 .42 From the table it is clear that cuff making is the slowest process and hence the cycle time of Regular Shirt making is equal to the time of cuff making=0.5 min. Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Table 1.2. Current Production Plan Quantity Actual Cycle Time Obtained Value Bottle neck time Bottle Neck = 30 min per batch 0.5 per shirt Bottle neck time Bottle Neck = 30 min per batch 480/0.5 =960 units WIP Inventory Total Inventory Cutting + Other operations 10800+960 =11760 Manufacturing Lead Time(days) Input to Output WIP/production Capacity 11760/960 =12.25 Capacity Utilisation Actual Production : Production Capacity 800/960 83.33% Direct Labour Utilisation(min/shirt) Direct Labour per unit Cutting + Other operations 25.51+4(0.25)= 26.51 Direct Labour Cost Total labour cost per unit of production Labour cost =64 * 8 * 6 3072/800=$ 3.84/shirt Labour utilized/ Labour Available (800 * 26.51)/(8*60*64) 69.03% (min/shirt) Production Capacity (shirts/day) ($/shirt) Direct Labour Utilisation Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Fig 2: Process Flow Diagram- Mike’s Plan Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Mike’s Production Plan Time required for producing one unit from laying and cutting operation=120/60*8=0.25 min whereas the cycle time of laser cutting machine is 2.5/5=0.5 Table 2.1. Mike’s Production Plan Operation Regular Shirt Labour Content Number of workers Time required for producing one unit (in min.) Make Collar 3.90 8 .4875 Make Cuffs 2.00 4 .5 Make Sleeves 0.65 2 .325 Make Front 2.50 6 .41 Make Back 1.70 4 .42 Join Shoulder 0.66 2 .33 Attach collar 1.65 4 .41 Attach sleeves 1.55 4 .39 Stitch Down sleeves 0.65 2 .32 Sew Side seam 1.80 4 .45 Attach cuffs 1.55 4 .39 Hem Button 1.70 4 .42 Inspect 1.50 4 .38 Iron 1.95 4 .49 Fold Package 1.75 4 .42 From the table it is clear that cuff making is the slowest process and hence the cycle time of Mike’s Shirt making process is equal to the time of cuff making=0.5 min. Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Table 2.2. Mike’s Production Plan Quantity Actual Cycle Time Obtained Value(Regular and Custom Shirts) Bottle neck time Bottle Neck = 30 min per batch 0.5 per shirt Bottle neck time Bottle Neck =40 min per batch 480/0.5=960 units WIP Inventory Total Inventory Cutting + Other operations 1800+180 =1980 Manufacturing Lead Time(days) Input to Output WIP/production Capacity 1980/960=12.58 Capacity Utilisation Actual Production : Production Capacity 900/960 93.75% Direct Labour Utilisation(min/shirt) Direct Labour per unit Cutting + Other operations 25.51+0.5=26.01 Direct Labour Cost Total labour cost per unit of production Labour cost =65* 8 * 6 3120/900=3.47 Labour utilised : Labour Available Labour Utilised = 900 * 26.01 75.02% (min/shirt) Production Capacity (shirts/day) ($/shirt) Direct Labour Utilisation Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Fig 3: Process Flow Diagram- Ike’s Plan Regular Shirt Custom Shirt Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Ike’s Production Plan Table 3.1. Ike’s Production Plan A. Regular Shirt Production Operation Regular Shirt Labour Content Number of workers Time required/lbr/shrt (in min) Make Collar 3.90 7 .56 Make Cuffs 2.00 3 .67 Make Sleeves 0.65 1 .65 Make Front 2.50 5 .5 Make Back 1.70 3 .57 Join Shoulder 0.66 1 .66 Attach collar 1.65 3 .55 Attach sleeves 1.55 3 .52 Stitch Down sleeves 0.65 1 .65 Sew Side seam 1.80 3 .6 Attach cuffs 1.55 3 .52 Hem Button 1.70 3 .57 Inspect 1.50 3 .5 Iron 1.95 3 .65 Fold Package 1.75 3 .59 Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Table 3.2. Ike’s Production Plan B. Customized Shirt Operation CUSTOM Shirt Labour Content Number of workers Time required/lbr/shrt (in min) Make Collar 3.90 1 3.90 Make Cuffs 2.00 1 2.00 Make Sleeves 0.65 1 0.65 Make Front 2.50 1 2.50 Make Back 1.70 1 1.70 Join Shoulder 0.66 1 0.66 Attach collar 1.65 1 1.65 Attach sleeves 1.55 1 1.55 Stitch Down sleeves 0.65 1 0.65 Sew Side seam 1.80 1 1.80 Attach cuffs 1.55 1 1.55 Hem Button 1.70 1 1.70 Inspect 1.50 1 1.50 Iron 1.95 1 1.95 Fold Package 1.75 1 1.75 Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Table 3.3. Ike’s Production Plan Quantity Actual Cycle Time Obtained Value(Custom Shirts) Bottle neck time Bottle Neck = 3.9 min per shirt 3.9 per shirt Bottle neck time Bottle Neck =3.9 min per shirt 480/3.9 =123 units WIP Inventory Total Inventory Cutting + Other operations 45+5 =50 Manufacturing Lead Time(days) Input to Output WIP/production Capacity 50/123 =0.41 Capacity Utilisation Actual Production : Production Capacity 100/123 81.3% Direct Labour Utilisation(min/shirt) Direct Labour per unit Cutting + Other operations 25.51+0.5 =26.01 Direct Labour Cost Total labour cost per unit of production Labour cost =16* 8 * 6 768/100=7.68 Labour utilised : Labour Available Labour Utilised = 100 * 26.01 33.86% (min/shirt) Production Capacity (shirts/day) ($/shirt) Direct Labour Utilisation Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Table 4: Comparison of Mike’s and Ike’s Production Plan Current Process Mike’s plan Ike’s plan Ike’s plan Regular Shirts Regular & Custom shirts Regular Shirts Custom Shirts Actual Cycle Time(min./ shirt) 0.5 0.5 0.67 3.9 Manufacturing Lead Time ( days) 12.25 2.06 12.58 0.41 WIP Inventory (shirts) 11760 1980 9060 50 Production capacity 960 960 720 123 Capacity Utilization 83.33% 93.75% 111.11% 81.3% Direct Labour content (min/shirt) 26.51 26.01 26.51 26.01 Direct Labour utilization 69.03% 75.02% 90.17% 33.8% Direct labour Cost 3.84 3.47 3.43 7.68 Quantity ( shirts/ day) ( $/ shirt ) Downloaded by Fuad Hasan (fuad4765ma@gmail.com) lOMoARcPSD|5483753 Table 5: Cost Comparison of Mike’s and Ike’s Plan A. For Normal Shirts Mikes plan Ikes plan Raw materials $7.00 $7 Direct labor $3.46 $3.32 Indirect labor $.66 $.66 Other Indirect Cost $4.50 $4.50 Total manufacturing Cost $15.62 $15.48 Retail price $50 $50 Profit/shirt $34.38 $34.52 Mikes plan Ikes plan Raw materials $7.7 $7.7 Direct labor $3.46 $7.68 Indirect labor $.66 $.66 Other Indirect Cost $4.50 $4.50 Total manufacturing Cost $16.32 $20.54 Retail price $87.5 $87.5 Profit/shirt $71.18 $66.96 B. For Customized Shirt Conclusion: From Table 5: Cost Comparison of Mike’s and Ike’s Plan, we can see that the total profit per shirt from Mike’s plan is greater $4.08. Thus, Mike’s plan is better. Downloaded by Fuad Hasan (fuad4765ma@gmail.com)