NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with E - 02 A B C D E F G H I 3 3 SCIENCE LAB LADIES GENTS TYPICAL CLASSROOM TYPICAL CLASSROOM TYPICAL CLASSROOM TYPICAL CLASSROOM 42 pax 42 pax 42 pax 42 pax PREP. RM NURSE'S STATION WAITING AREA INFIRMARY CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. HOME SCIENCE LAB lockers covered walkway covered walkway lockers lockers covered walkway covered walkway covered walkway lockers lockers covered walkway covered walkway 2 1 1 A B C D E F G H I GIRLS' RECEPTION STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. J MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and WASHROOMS junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. E - 04 COURTYARD ADMIN BLOCK CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. STORE 2 ACCOUNTS (BURSAR) each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. J 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. E - 03 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. BOYS' A B C D E F G WASHROOMS H ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical I J STAFF LOUNGE 1 1 covered walkway covered walkway lockers 2 covered walkway covered walkway lockers lockers covered walkway covered walkway covered walkway lockers lockers DEPUTY HEAD TEACHER'S STATION 2 READING AREA COMPUTER LAB LIBRARIAN OFFICE LIBRARY SUPPLIES STORE 42 pax 42 pax 42 pax 42 pax TYPICAL CLASSROOM TYPICAL CLASSROOM TYPICAL CLASSROOM TYPICAL CLASSROOM REVISIONS, ADDITIONS & ALTERATIONS BOOK SHELVES NO. HEAD TEACHER'S STATION 3 DATE DESCRIPTION BY 3 A B C D E F G H I J E - 01 TYPICAL PRIMARY SCHOOL SITE PLAN TOTAL FLOOR AREA = 1,213 SQM ARCHITECT (FOOT PRINT FITS ON 1 ACRE) - ADMINISTRATION BLOCK - BURSAR/ ACCOUNTS OFFICE - STAFF ROOM / LOUNGE - RECEPTION - HEAD TEACHER + DEPUTY HEAD TEACHER'S OFFICES - STAFF ABLUTION - INFIRMARY (SCHOOL NURSE) - 8 TYPICAL CLASS ROOMS - HOME SCIENCE LABORATORY - SCIENCE LABORATORY - COMPUTER LABORATORY - LIBRARY - ABLUTION BLOCK *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured G dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with H each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. ACCOUNTS (BURSAR) RECEPTION ADMIN BLOCK STAFF LOUNGE CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. HOME SCIENCE LAB lockers 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. covered walkway ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical G TYPICAL ADMINISTRATION BLOCK Total Area = 124 SQM H TYPICAL HOME SCIENCE LAB Total Area = 60 SQM REVISIONS, ADDITIONS & ALTERATIONS NO. C D H I DATE DESCRIPTION BY J 3 SCIENCE LAB INFIRMARY TYPICAL CLASSROOM ARCHITECT PREP. RM 42 pax NURSE'S STATION *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers STORE innovation@projectbuild3d.com 2 lockers covered walkway P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT covered walkway 1 C TYPICAL CLASSROOM Total Area = 60 SQM D H I TYPICAL SCIENCE LAB Total Area = 90 SQM J DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. 3 2 1 1 2 3 STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. A A A A MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and LADIES GENTS HEAD TEACHER'S STATION junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. DEPUTY HEAD TEACHER'S STATION ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical B B B B INFIRMARY SUPPLIES STORE WAITING AREA REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY NURSE'S STATION C C C C ARCHITECT TYPICAL HEAD TEACHERS' OFFICES & SUPPLIES STORE HEAD TEACHERS' OFFICES = 30 SQM SUPPLIES STORE = 30 SQM Total Area = 60 SQM TYPICAL INFIRMARY & STAFF ABLUTION BLOCK INFIRMARY = 30 SQM STAFF ABLUTION BLOCK = 30 SQM Total Area = 60 SQM *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 H I NOTES: J GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on READING AREA H I LIBRARIAN OFFICE hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. LIBRARY GIRLS' 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. WASHROOMS MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. BOOK SHELVES 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. H I ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical J TYPICAL LIBRARY Total Area = 90 SQM BOYS' G WASHROOMS REVISIONS, ADDITIONS & ALTERATIONS NO. H H DATE DESCRIPTION BY I covered walkway lockers ARCHITECT COMPUTER LAB TYPICAL ABLUTION BLOCK Total Area = 110 SQM *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT G TYPICAL COMPUTER LAB Total Area = 60 SQM H DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. A B C D E F G H I J CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. PRIMARY SCHOOL ELEVATION 01 MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. J I H G F E D C B A 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical J I H G F E D PRIMARY SCHOOL ELEVATION 02 C B A REVISIONS, ADDITIONS & ALTERATIONS NO. 3 2 1 1 2 DATE DESCRIPTION BY 3 ARCHITECT 3 2 1 1 2 3 *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 PRIMARY SCHOOL ELEVATION 03 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 3 2 1 1 2 3 PROJECT 3 PRIMARY SCHOOL ELEVATION 04 2 1 1 2 3 DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY ARCHITECT *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT TYPICAL PRIMARY SCHOOL SITE PLAN DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY ARCHITECT *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT TYPICAL PRIMARY SCHOOL ADMINISTRATION BLOCK DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY ARCHITECT *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT TYPICAL PRIMARY SCHOOL ADMINISTRATION BLOCK DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY ARCHITECT *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT TYPICAL PRIMARY SCHOOL LIBRARY AND SCIENCE LAB REAR VIEW DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY ARCHITECT *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT TYPICAL PRIMARY SCHOOL VIEW FROM COURTYARD DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY ARCHITECT *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT TYPICAL PRIMARY SCHOOL VIEW FROM COURTYARD DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202 NOTES: GENERAL 1. All measurements are shown in millimeters. Drawings not to be scaled. Only figured dimensions to be used. 2. The contractor must check and verify all dimensions on site before commencement of work. Any discrepancies must be notified immediately to the architect. 3. All sections are to be read as per floor plan and all drawings must be read in concert with each other. Any discrepancies must be notified immediately to the architect and clarified consulting the architectural or consultants drawing. CONSTRUCTION 4. Damp proof course must be provided under all external walls at grade. DPC to be minimum 150 mm above ground level. 5. All slab at grade to be poured at 1000 Gauge polythene on 50 mm stone dust blinding on hardcore. 6. All soil under slab and around external foundations to be poisoned for termite control. 7. Window sills must be finished before internal plastering. CIVIL 8. All soils on cut embankment to be stabilized. The slope is not to exceed the natural angle repose of the soil. STRUCTURAL 9. All RC work to structural engineer's details. 10. Depth of foundation to be determined on site to S.E's approval. 11. All walls less than 200 mm thick to be reinforced with hoop iron at every alternate course. MECHANICAL 12. All plumbing and drainage to comply with city councils specifications. 13. All service ducts to be accessible from all floors. 14. Deep seal or anti-vac to all fittings connected to the SVP or waste pipes. All bends and junctions to have inspection plates. 15. SVP (soil vent pipes) to be provided at the head of the drainage. 16. Drain pipes passing beneath buildings and driveways to be encased in 150 mm concrete surround. 17. All under ground foul and waste drainpipes shall be UPVC to comply to BSS 4514 & 5255. 18. The storm water drain to comply to BSS 556. 19. All inspection chamber covers and frames shall be cast iron to comply to BSS 497 table 6 grade C. 20. Minimum slopes in drainpipes shall be 1%. 21. No chases will be allowed in the slabs for pipes. Sleeves will be allowed with the written approval of the S.E. 22. All testing of pipes must be completed before plastering. 23. All mechanical work must be coordinated with electrical work. Any conflicts must be clarified before work begins. ELECTRICAL 24. All conduits must be laid before plastering. 25. All electrical work must be coordinated with mechanical REVISIONS, ADDITIONS & ALTERATIONS NO. DATE DESCRIPTION BY ARCHITECT *All Drawings are exclusively copyrighted by the architect CONSULTANTS Innovation 360 architects & project managers innovation@projectbuild3d.com P. O. Box 1659 - 00502 KAREN, NAIROBI, KENYA, EA tel: 020-2063507 mobile: 0722-720907 PROJECT TYPICAL PRIMARY SCHOOL MAIN ENTRANCE VISTA DRAWING TITLE Job No. Presentation Drawings SCALE DRAWN AKT CHECKED MM DATE JUNE 2015 Dwg. No. 150202