Uploaded by rowaters

202010210759280.FT54 LZ Teraju IRI Report Final 13082020

advertisement
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT
USING IKRAM ROAD SCANNER (IRS) FOR PROJEK
MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI
BULOH KE ASSAM JAWA, DAERAH KUALA SELANGOR,
SELANGOR DARUL EHSAN (PAKEJ 1, SEC 0+000 - SEC 14+000)
Prepared by:
IKRAM PAVES SDN BHD.
Block 8, Unipark Suria
Jalan Ikram - Uniten
43000 Kajang
Selangor Darul Ehsan.
Tel: (603) 8738 3302
Fax: (603) 8739 1904
Prepared for:
LZ TERAJU RESOURCES SDN BHD
Lot 20249, Batu 30, Kg Sg Buah Luar,
Jalan Bangi - Dengkil,
43800 Dengkil,
Selangor Darul Ehsan.
Tel: (603) 8920 2234
Fax: (603) 8925 4759
JULY 2020
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
TABLE OF CONTENTS
1.0 INTRODUCTION ................................................................................................. 2
2.0 OBJECTIVE .......................................................................................................... 2
3.0 SCOPE OF WORK ................................................................................................ 3
4.0 METHODOLOGY ................................................................................................ 3
5.0 SUMMARY OF FINDINGS ................................................................................. 5
6.0 DETAILED INTERNATIONAL ROUGHNESS INDEX (IRI) RESULTS......... 6
List of Tables: Table 1: Condition Criteria for Roughness based on JKR/SPJ-2008-S4-44 (4.5.3.3)
List of Figures: Figure 1: Route Map
Figure 2: IKRAM Road Scanner (IRS)
Figure 3: Typical configuration of non-contact sensors
Figure 4: Road Profile Measurement
Figure 5: Overall Roughness Distribution
IKRAM PAVES SDN BHD
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
1.0
INTRODUCTION
IKRAM PAVES Sdn Bhd was engaged by LZ Teraju Sdn Bhd to conduct
International Roughness Index (IRI) measurement using Ikram Road Scanner (IRS) for
Projek Menaiktaraf Jalan Persekutuan FT54 Dari Sungai Buloh Ke Assam Jawa,
Daerah Kuala Selangor, Selangor Darul Ehsan (Pakej 1, Sec 0+000 - Sec 14+000). The
route map is shown in the Figure 1.
Figure 1: Route Map
2.0
OBJECTIVE
The objective of this report is to present the International Roughness Index (IRI)
compliance result. This IRI result was compared against JKR Standard Specification
(JKR/SPJ-2008) for the new constructed road as shown in Table 1.
Table 1: Condition Criteria for Roughness based on JKR/SPJ-2008-S4-44 (4.5.3.3)
Condition Criteria
Roughness, IRI (m/km)
IKRAM PAVES SDN BHD
Compliance
Non Compliance
< 2.0
≥ 2.0
2
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
3.0
SCOPE OF WORK
This exercise involves International Roughness Index (IRI) measurement using Ikram
Road Scanner (IRS). The field work was carried out on 04/03/2020 & 29/07/2020 with
a total length of 62.800 ln-km.
4.0
METHODOLOGY
The pavement functional condition was collected using IKRAM Road Scanner (IRS).
The IRS is one of the latest network survey vehicles developed by ARRB Transport
Research utilizing progressive technologies. This vehicle was designed to capture
pavement functional condition data, survey mapping information and roadside asset
details whilst travelling at highway speed. This fully-featured vehicle contains a
compact workstation capable of capturing and storing individual data elements for
roughness, rutting, texture and surface condition, as well as providing high-detail video
images of road and roadside assets.
The IRS is made of seven (7) packages which are the Profiler Package, Gipsitrac
Geometry Package, GPS Package, Video Package, Distance Package, Transverse
Profile & Rutting Package and Laser Crack Measurement System Package.
Figure 2: Ikram Road Scanner (IRS)
The Profiler Package is a digital, road profiling package that uses laser sensors to
accurately record the profile of the road surface such as longitudinal surface profile,
IKRAM PAVES SDN BHD
3
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
road roughness and surface texture. This capability put the IRS survey into Class I
profile techniques - the same class as the rod-and-level survey, the TRL beam, the
dipstick and the walking profiler.
To measure the longitudinal surface profile, the Profiler Package measured and
recorded the vertical distance between the Profiler Package and the pavement surface,
the vertical acceleration of the profiler beam, time and distance at which the parameters
were recorded. International Roughness Index (IRI) is calculated based on the
longitudinal surface shape using a computer-based model of a quarter car suspension.
Figure 3: Typical configuration of non-contact sensors
Figure 4: Road Profile Measurement
IKRAM PAVES SDN BHD
4
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
5.0
SUMMARY OF FINDINGS
Figure 5: Overall Roughness Distribution
Based on the result shown in Figure 5, 95% of the road was complied with JKR
requirement which roughness condition was below 2.0 m/km IRI. However, 5% of the
surveyed location was not complied with JKR requirement which the IRI is equal or
greater than 2.0 m/km.
Detailed IRI results as shown in Item 6.0 on the following page.
IKRAM PAVES SDN BHD
5
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
6.0
DETAILED INTERNATIONAL ROUGHNESS INDEX (IRI) RESULTS
State
Road
Location
Chainage
: Selangor Darul Ehsan
: FT054, Sungai Buloh - Assam Jawa
:1
: CH 0.000 - CH 1.700
Roughness (m/km)
Chainage
Start
Chainage
End
Towards Sabak Bernam
Towards Klang
Slow Lane
Fast lane
Fast lane
Slow Lane
1.600
1.700
1.93
1.89
1.92
1.87
1.500
1.600
1.99
1.56
1.64
1.92
1.400
1.500
1.79
1.44
1.59
2.00
1.300
1.400
1.43
1.31
1.52
1.93
1.200
1.300
1.95
1.31
1.52
1.55
1.100
1.200
1.86
1.66
1.35
1.67
1.000
1.100
2.00
1.52
1.08
1.92
0.900
1.000
1.87
1.98
1.18
1.59
0.800
0.900
1.80
1.89
1.12
1.99
0.700
0.800
1.91
1.93
1.21
1.88
0.600
0.700
1.99
1.99
1.32
1.99
0.500
0.600
1.97
1.69
1.38
1.92
0.400
0.500
1.98
1.75
1.18
1.98
0.300
0.400
1.72
1.73
1.39
1.46
0.200
0.300
1.95
1.60
1.03
1.44
0.100
0.200
1.92
1.44
1.23
1.59
0.000
0.100
1.88
1.99
1.47
1.76
IRI < 2.0
IKRAM PAVES SDN BHD
Remarks
IRI ≥ 2.0
6
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
State
Road
Location
Chainage
: Selangor Darul Ehsan
: FT054, Sungai Buloh - Assam Jawa
:2
: CH 0.000 - CH 14.000
Roughness (m/km)
Chainage
Start
Chainage
End
Towards Sungai Buloh
Towards Assam Jawa
Slow Lane
Fast lane
Fast lane
Slow Lane
13.900
14.000
1.95
1.24
3.72
1.01
13.800
13.900
1.68
1.09
1.01
1.53
13.700
13.800
1.50
0.94
0.95
1.79
13.600
13.700
1.06
1.10
1.58
1.84
13.500
13.600
1.25
1.73
1.71
3.42
13.400
13.500
1.93
1.53
1.62
1.80
13.300
13.400
1.55
0.89
1.58
1.99
13.200
13.300
1.67
1.03
1.78
1.44
13.100
13.200
1.43
1.45
1.79
1.92
13.000
13.100
1.39
1.42
1.32
1.73
12.900
13.000
1.84
1.43
1.22
1.57
12.800
12.900
1.59
1.26
1.34
1.96
12.700
12.800
1.65
1.24
1.21
1.34
12.600
12.700
1.80
1.47
1.93
1.01
12.500
12.600
1.88
1.59
1.64
1.94
12.400
12.500
1.68
1.64
1.30
1.76
12.300
12.400
1.16
1.85
1.59
1.53
12.200
12.300
2.59
1.40
1.38
1.39
12.100
12.200
1.90
1.78
1.61
1.23
12.000
12.100
1.60
2.58
3.22
1.13
11.900
12.000
1.92
1.62
3.30
2.68
11.800
11.900
1.97
1.27
2.81
2.41
11.700
11.800
1.21
1.72
1.86
1.95
11.600
11.700
2.88
1.95
1.52
1.92
11.500
11.600
2.81
1.99
1.61
1.90
11.400
11.500
1.26
1.75
2.77
3.35
11.300
11.400
1.90
1.96
1.97
1.34
11.200
11.300
1.92
2.65
1.92
1.73
11.100
11.200
1.81
1.47
0.99
1.17
11.000
11.100
1.28
1.31
1.22
1.58
10.900
11.000
1.87
1.49
1.45
1.82
10.800
10.900
2.45
1.13
1.20
1.75
10.700
10.800
1.90
0.91
1.27
1.39
10.600
10.700
1.92
1.80
1.11
1.88
IRI < 2.0
IKRAM PAVES SDN BHD
Remarks
IRI ≥ 2.0
7
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
State
Road
Location
Chainage
: Selangor Darul Ehsan
: FT054, Sungai Buloh - Assam Jawa
:2
: CH 0.000 - CH 14.000
Roughness (m/km)
Chainage
Start
Chainage
End
Towards Sungai Buloh
Towards Assam Jawa
Slow Lane
Fast lane
Fast lane
Slow Lane
10.500
10.600
3.97
1.13
1.92
1.40
10.400
10.500
1.92
1.93
1.98
1.96
10.300
10.400
1.10
2.97
1.27
1.22
10.200
10.300
1.66
1.08
1.02
1.77
10.100
10.200
1.11
1.03
2.50
3.68
10.000
10.100
1.15
1.36
0.84
1.66
9.900
10.000
1.71
1.69
1.23
1.40
9.800
9.900
1.85
1.72
1.64
1.65
9.700
9.800
1.61
1.28
1.46
1.29
9.600
9.700
1.23
1.76
1.73
1.40
9.500
9.600
1.74
1.14
1.87
2.85
9.400
9.500
1.23
1.74
1.69
1.85
9.300
9.400
1.04
1.52
1.41
1.46
9.200
9.300
1.57
1.31
1.59
1.51
9.100
9.200
1.64
1.56
1.29
1.13
9.000
9.100
1.17
1.38
1.49
1.56
8.900
9.000
1.72
1.19
1.38
1.55
8.800
8.900
1.41
1.76
1.49
1.72
8.700
8.800
1.18
1.72
1.83
1.72
8.600
8.700
1.98
1.86
1.50
1.57
8.500
8.600
1.53
1.63
1.27
1.45
8.400
8.500
1.83
1.71
1.58
1.96
8.300
8.400
1.78
1.90
1.35
1.89
8.200
8.300
1.83
1.30
1.54
1.51
8.100
8.200
1.51
1.86
1.53
1.68
8.000
8.100
1.63
1.62
1.31
1.67
7.900
8.000
1.73
1.06
1.49
1.75
7.800
7.900
1.46
1.81
1.31
1.64
7.700
7.800
1.98
1.70
1.37
1.71
7.600
7.700
1.50
1.74
1.16
1.76
7.500
7.600
1.15
1.77
1.46
1.62
7.400
7.500
1.93
1.61
1.44
1.72
7.300
7.400
1.89
1.20
1.57
1.78
7.200
7.300
1.43
1.17
1.32
1.49
7.100
7.200
1.46
1.59
1.63
1.61
IRI < 2.0
IKRAM PAVES SDN BHD
Remarks
IRI ≥ 2.0
8
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
State
Road
Location
Chainage
: Selangor Darul Ehsan
: FT054, Sungai Buloh - Assam Jawa
:2
: CH 0.000 - CH 14.000
Roughness (m/km)
Chainage
Start
Chainage
End
Towards Sungai Buloh
Towards Assam Jawa
Slow Lane
Fast lane
Fast lane
Slow Lane
7.000
7.100
1.61
1.49
1.23
1.41
6.900
7.000
1.06
1.27
1.39
1.20
6.800
6.900
1.46
1.43
1.13
1.41
6.700
6.800
1.87
1.76
1.42
1.52
6.600
6.700
1.12
1.80
1.17
1.69
6.500
6.600
1.53
1.93
1.52
1.97
6.400
6.500
1.74
1.27
1.49
1.73
6.300
6.400
1.87
1.93
1.15
1.52
6.200
6.300
1.95
1.98
1.09
1.76
6.100
6.200
1.95
1.33
1.18
1.40
6.000
6.100
1.73
1.63
1.34
1.68
5.900
6.000
1.89
1.68
1.46
1.39
5.800
5.900
1.89
1.97
1.61
1.16
5.700
5.800
1.41
1.44
1.64
1.61
5.600
5.700
1.84
1.80
1.10
1.61
5.500
5.600
1.55
1.33
1.45
1.23
5.400
5.500
1.53
1.36
1.01
1.06
5.300
5.400
1.59
1.55
1.90
1.87
5.200
5.300
1.98
1.13
1.78
2.42
5.100
5.200
1.61
1.76
1.63
1.84
5.000
5.100
1.77
1.55
1.27
1.34
4.900
5.000
1.87
1.27
1.72
1.97
4.800
4.900
1.66
1.32
1.55
1.26
4.700
4.800
1.73
1.59
1.74
1.91
4.600
4.700
1.80
1.54
1.98
1.83
4.500
4.600
1.79
1.48
3.17
1.39
4.400
4.500
1.93
1.31
3.17
2.52
4.300
4.400
1.18
1.79
2.47
3.42
4.200
4.300
1.95
1.34
1.53
1.87
4.100
4.200
1.47
1.08
1.97
1.95
4.000
4.100
1.46
1.03
1.92
1.77
3.900
4.000
1.69
1.07
2.52
1.21
3.800
3.900
1.42
1.13
1.33
1.99
3.700
3.800
1.52
1.09
1.29
1.93
3.600
3.700
1.36
1.74
1.69
1.22
3.500
3.600
1.02
1.31
1.75
1.97
IRI < 2.0
IKRAM PAVES SDN BHD
Remarks
IRI ≥ 2.0
9
INTERNATIONAL ROUGHNESS INDEX (IRI) MEASUREMENT USING IKRAM ROAD SCANNER (IRS) FOR
PROJEK MENAIKTARAF JALAN PERSEKUTUAN FT54 DARI SUNGAI BULOH KE ASSAM JAWA, DAERAH
KUALA SELANGOR, SELANGOR DARUL EHSAN, (PAKEJ 1, SEC 0+000 - SEC 14+000)
State
Road
Location
Chainage
: Selangor Darul Ehsan
: FT054, Sungai Buloh - Assam Jawa
:2
: CH 0.000 - CH 14.000
Roughness (m/km)
Chainage
Start
Chainage
End
Towards Sungai Buloh
Towards Assam Jawa
Slow Lane
Fast lane
Fast lane
Slow Lane
3.400
3.500
1.87
1.92
1.66
1.80
3.300
3.400
1.74
1.51
1.29
1.76
3.200
3.300
1.23
1.56
1.48
1.90
3.100
3.200
1.50
1.76
1.12
1.67
3.000
3.100
1.43
1.89
1.21
1.64
2.900
3.000
1.09
1.63
1.94
1.07
2.800
2.900
1.62
1.94
1.23
1.84
2.700
2.800
1.92
1.54
1.78
1.91
2.600
2.700
1.24
1.75
1.53
1.76
2.500
2.600
1.88
1.20
1.82
1.80
2.400
2.500
1.25
1.76
1.68
1.75
2.300
2.400
1.95
1.83
1.98
1.09
2.200
2.300
1.04
1.82
1.42
1.85
2.100
2.200
1.09
1.86
1.47
1.85
2.000
2.100
1.50
1.71
1.50
1.35
1.900
2.000
1.96
1.56
1.19
1.05
1.800
1.900
1.43
1.85
1.22
1.95
1.700
1.800
1.38
1.93
1.36
1.20
1.600
1.700
1.86
1.69
1.28
1.87
1.500
1.600
1.14
1.63
0.97
1.99
1.400
1.500
1.70
1.06
1.24
1.21
1.300
1.400
1.80
1.90
0.97
1.35
1.200
1.300
1.59
1.43
1.33
1.19
1.100
1.200
1.54
1.77
0.89
1.73
1.000
1.100
1.84
1.03
1.87
1.30
0.900
1.000
1.91
1.68
1.75
1.51
0.800
0.900
1.84
1.95
1.84
1.91
0.700
0.800
1.75
1.37
1.53
1.91
0.600
0.700
1.81
1.56
1.73
1.44
0.500
0.600
1.99
1.58
1.86
1.45
0.400
0.500
1.83
1.56
1.96
1.99
0.300
0.400
1.35
1.92
2.00
1.83
0.200
0.300
1.31
1.91
1.16
1.79
0.100
0.200
1.09
1.64
1.32
1.03
0.000
0.100
2.96
3.64
2.75
4.24
IRI < 2.0
Remarks
IRI ≥ 2.0
IKRAM PAVES SDN BHD
10
Download