1 King Abdullah Financial District Area 2 Project Daily Site Mess Hall Checklist P(4.01,4.03,4.04,4.06) Month Sr # Date From Description 1 Dining table neat & clean 2 Benches neat & clean 3 Proper walls & corners 4 Mess hall floor area clean 5 Adequate waste bins availability 6 Food waste removal on time 7 Proper garbage bag in bins 8 Cleaning material availability 9 10 Proper space for workers in hall Food Safety hygiene sign 11 Any pest issue 12 Adequate lighting & ventilation 13 Fans & light are cleaned 14 Proper hand wash facility 15 Water availability 16 Cold storage room Saturday Due Date Location Sunday Monday Tuesday Wednesday Thursday Friday Remarks Inspected By: Prepared By: Environmental Engineer Reviewed By: 2 King Abdullah Financial District Area 2 Project Daily Site Mess Hall Checklist P(4.01,4.03,4.04,4.06) Reviewed By Month Sr # Date From Description 1 Dining table neat & clean 2 Beaches neat & clean 3 Proper walls & corners 4 Mess hall floor area clean 5 Adequate waste bins availability 6 Food waste removal on time 7 Proper garbage bag in bins 8 Cleaning material availability 9 10 Proper space for workers in hall Food Safety hygiene sign 11 Any pest issue 12 Adequate lighting & ventilation 13 Fans & light are cleaned 14 Proper hand wash facility 15 Water availability 16 Cold storage room Saturday Due Date Location Sunday Monday Tuesday Wednesday Thursday Friday Remarks Inspected By: Prepared By: Environmental Engineer Reviewed By: