1 King Abdullah Financial District Area 2 Project Daily Site Toilets Checklist P(4.01,4.03,4.04,4.06) Month Sr # Date From Description 1 Toilet area is clean 2 Septic tank is covered 3 Proper illumination 4 Sink clean 5 Water closet with cover 6 Proper Flush 7 Hand Wash Liquid available 8 Wall ceiling are clean 9 10 Proper portable cubicles Safety hygiene sign 11 Any water stagnation 12 Pest control needed 13 Proper PPE for cleaning 14 Proper door lock and handles 15 Water availability 16 All tap is in good condition 17 Floor damage or leakage 18 Cleaning material Saturday Due Date Location Sunday Monday Tuesday Wednesday Thursday Friday Remarks Inspected By: Prepared By Reviewed By Environmental Engineer