Uploaded by Muhammad Faizan

Toilets Checklists

advertisement
1
Daily Site Toilets Checklist
Month
Sr #
King Abdullah Financial District Area 2 Project
P(4.01,4.03,4.04,4.06)
Date From
Description
1
Toilet area is clean
2
Septic tank is covered
3
Proper illumination
4
Sink clean
5
Water closet with cover
6
Proper Flush
7
Hand Wash Liquid available
8
Wall ceiling are clean
9
10
Proper portable cubicles
Safety hygiene sign
11
Any water stagnation
12
Pest control needed
13
Proper PPE for cleaning
14
Proper door lock and handles
15
Water availability
16
All tap is in good condition
17
Floor damage or leakage
18
Cleaning material
Saturday
Due Date
Location
Sunday Monday Tuesday Wednesday Thursday Friday Remarks
Inspected By:
Prepared By
Reviewed By
Environmental Engineer
Download