CONTRACTOR
DATE STARTED
CONTRACT COMPLETION DATE
CONTRACT COST
CONSTRUCTION CONSULTANT
IMPLEMENTING OFFICE
SOURCE OF FUND
50
30
50
30
50
30
50
30
50
30
1310
50
30
50
:
:
:
:
:
:
:
240
60
70
30
30
Text 2920 or call (02) 165-02 for any concern on this project
www.dpwh.gov.ph
20
20
100
360
2624
NOTE :
Layout of Project Billboard is based on DO 141, Series of 2016.
For Source of Fund, state if DPWH Regular Budget, Priority Development
Assistance Fund, DepEd/DA//DAR Budget, Calamity Fund, MVUC Fund, etc.
DPWH STANDARD PROJECT BILLBOARD
DISPLAY AREA
(1200 x 2400 x 12
MARINE PLYWOOD)
1 200
1 200
COCO LUMBER
DISPLAY AREA
50 x 75 VERTICAL
COCO LUMBER
(TARPAULIN 1200 x 2400 x 5
MARINE PLYWOOD)
1 200
DISPLAY AREA
50 x 75 VERTICAL
BILLBOARD
50 x 75 VERTICAL
GROUND LEVEL
TRAFFIC DIRECTION
GROUND LEVEL
500
50 x 50 WOODEN
STAKE
500
GROUND LEVEL
50 x 50 WOODEN
STAKE
500
STAKE
1 000
COCO LUMBER
1 000
50 x 50 WOODEN
1 000
EDGE OF ROAD
50 x 75 VERTICAL
COCO LUMBER
ROAD
1 000
TYPICAL FRAME ELEVATION
ORIENTATION
PROJECT & LOCATION:
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS & HIGHWAYS
OFFICE OF THE REGIONAL DIRECTOR
REGION IV-A, EDSA, QUEZON CITY
2 400
WIDENING OF BUCAL BY-PASS BRIDGE
LAGUNA 2ND LD
BRIDGE LENGTH = 30.88 L.M.
K001+599.31 - K001+630.19
SUBMITTED :
FRONT ELEVATION
( OPTION 2 )
RECOMMENDING APPROVAL:
APPROVED:
SET NO.
SHEET NO.
ENGINEER III
PLAN FOR THE
MFO-1 NATIONAL ROAD NETWORK SERVICES
CONSTRUCTION OF BY-PASSES / DIVERSION ROADS, INCLUDING
ROW BUCAL BY-PASS ROAD INCL. BRIDGE WIDENING
FRONT ELEVATION
( OPTION 1 )
DESIGNED BY :
SHEET CONTENTS :
2 400
CADD BY :
PROJECT BILLBOARD
JOHN MYRON A. CONSUELA
ENGINEER I
JULIETA A. DESEO
YOLANDA L. TANGCO
SAMSON L. HEBRA, CESO IV
MELQUIADES H. STO. DOMINGO
CHIEF, PLANNING & DESIGN DIVISION
ASSISTANT REGIONAL DIRECTOR
DIRECTOR IV
REGIONAL DIRECTOR
CHECKED BY:
ENGINEER IV
B
1515
Download