DOCUMENT TRANSMITTAL FORM Power Grid Corporation of India Limited 800 KV HVDC Terminal, Gram-Taga Tahasil – Akaltara Distt. Janjgir,Champa, Chhattisgarh , INDIA PIN – 495668 For the attention of Mr. S.K Dhambhare (CGMAGM-ENGG (Engg.) Distributi Date: AS BUILT-E-CHP-DTF0001 RAKESH SINGH (Project Director-HVDC-CK2) GE/ENGG/5427PS080Issued by: Sheet 1 of 1 28-Jul-20 Your Ref: LOA : 1.CC-CS-418-WR1-HVDC-2318-1-G3-NOA-I-4999 Dtd 22.07.2014 LOA : 2. CC-CS-418-WR1-HVDC-2318-1-G3-NOA-II-5000 Dtd 22.07.2014 LOA : 3. CC-CS-418-WR1-HVDC-2318-1-G3-NOA-III-5001 Dtd 22.07.2014 Project :- Upgradation of 3000MW, ± 800kV HVDC Terminals at Champa Pooling Station & Kurukshetra to 6000MW under strengthening in WR-NR Transmission SUB:- Following Drawing/Documents of ±800kV,3000MW HVDC Terminal Package Upgrade (CK Bipole2) at CHAMPA & KURUKSHETRA No of Copies * P 4 - - - - RC Voltage Divider OMM & Installation - - - - - - A CONVERTER TRANSFORMER O&M MANUAL STAR/STAR COUPLING - - - - - - CK2-COM-DCL-TST-22006-OM A CONVERTER TRANSFORMER EXTENSION OF APPROVAL FOR O&M MANUAL Delta / Star coupling - - - - - - CK2-COM-DCL-PES-23110-OM D DC Through Wall Bushing Operation and Maintenance Manual & Installation - - - - - - CK2-COM-DCL-PES-23028-OM A Valve Access Platform Operation and Maintenance Manual - - - - - - CK2-COM-DCL-PES-23030-OM B OPTICAL FIBRE INSTALLATION GUIDE Installation Guide for Fibre Optic Cables between Multiple Valve Unit MVU and VBE Cubicle - - - - - - CK2-COM-DCL-PES-23031-OM A DOUBLE VALVE ASSEMBLY ANODE & CATHODE TOP - - - - - - CK2-COM-DCL-PES-23033-OM H Installation, Precommissioning and Commissioning Instructions (Valves) - - - - - - CK2-COM-DCL-PES-23045-OM B Operation and Maintenance manual H400 THYRISTOR CONVERTER VALVES - - - - - - CK2-COM-DCL-PES-23074-OM C Valve Installation guide - - - - - - Drawing/Document Issue CK2-COM-DCL-PES-20036-OM A CK2-COM-DCL-TST-21006-OM GE T&D India Limited T‐5 T‐6, Plot I‐14, Axis House (Jaypee Wishtown), Sector‐128 ,Noida‐201 304, U.P, INDIA T +91 120 5021500 F +91 120 5021501 www.gegridsolutions.com Description CK2-COM-DCL-PES-23080-OM A LEVEL TEST EQUIPMENT (LTE) Operation and Maintenance Manual H400 THYRISTOR CONVERTER VALVES Extension of Approval CK2-COM-DCL-PES-23086-OM A Valve Hall Insulator Installation and OMM - - - - - - CK2-COM-DCL-PES-23090-OM F Operating instructions for H400 valve divider compensation box. - - - - - - CK2-COM-DCL-PES-23091-OM E Operating Instructions for H400 Valve Test Equipment for use During Works Test only. - - - - - - CK2-COM-DCL-PES-24013-OM A DC yard HV Insulator Installation and OMM - - - - - - CK2-COM-DCL-PES-24023-OM A HVHSS O&M Manuals - - - - - - CK2-COM-DCL-PES-24133-OM A High Voltage High Speed DC Switch OMM & Installation - - - - - - CK2-COM-DCL-PES-24160-OM B DC Commutation Switch - Reactors OMM & Installation Extension of Approval - - - - - - CK2-COM-DCL-PES-24180-OM A DC Commutation Switch - Surge Arresters - OMM & Installation - - - - - - CK2-COM-DCL-PES-24200-OM A DC Commutation Switch OMM & Installation - - - - - - CK2-COM-DCL-PES-24220-OM A DC Smoothing Reactor OMM & Installation - - - - - - CK2-CHP-DCL-PES-25046-OM A Neutral Bus Capacitor O&M Manual - - - - - - CK2-COM-DCL-PES-25110-OM A Blocking Filter Reactor OMM & Installation - - - - - - CK2-COM-DCL-PES-25130-OM A Blocking Filter Resistor OMM & Installation - - - - - - GE T&D India Limited T‐5 T‐6, Plot I‐14, Axis House (Jaypee Wishtown), Sector‐128 ,Noida‐201 304, U.P, INDIA T +91 120 5021500 F +91 120 5021501 www.gegridsolutions.com - - - - - - CK2-COM-DCL-PES-25170-OM A DC Filter HV Capacitors OMM & Installation - - - - - - CK2-COM-DCL-PES-25190-OM A DC Filter Reactors OMM & Installation - - - - - - CK2-COM-DCL-PES-26115-OM A AC Harmonic Filter HV & LV Capacitor OMM & Installation - - - - - - CK2-COM-DCL-PES-26350-OM A AC Filter Reactor OMM & Installation - - - - - - CK2-COM-400-PTI-28025-OM A O&M 80 MVAR SHUNT REACTOR OF CHAMPA & KURUKSHETRA STATION - - - - - - CK2-COM-DCL-PES-31088-OM A TFR Panel Operation and Maintenance Manual Extension of approval - - - - - - A CHAMPA & KURUKSHETRA HVDC TERMINAL STATION - CRP+SAS System – INTALLATION INSTRUCTIONS, OPERATION & MAINTENANCE MANUAL for AUXILIARY RELAYS - - - - - - A CHAMPA & KURUKSHETRA HVDC TERMINAL STATION - CRP+SAS System – INTALLATION INSTRUCTIONS, OPERATION & MAINTENANCE MANUAL for NUMERICAL RELAYS [P141, P442, P64X, M871] - - - - - - A CHAMPA & KURUKSHETRA HVDC TERMINAL STATION - CRP+SAS System – INTALLATION INSTRUCTIONS, OPERATION & MAINTENANCE MANUAL for TRENCH CPR04 RELAY - - - - - - CK2-COM-000-PCP-34018-OM A CHAMPA & KURUKSHETRA HVDC TERMINAL STATION - CRP+SAS System – INTALLATION INSTRUCTIONS, OPERATION & MAINTENANCE MANUAL for BAY CONTROLLER UNIT(C264) - - - - - - CK2-COM-000-NMS-37023-OM A CHAMPA & KURUKSHETRA HVDC TERMINAL STATION SCADA SYSTEM - STANDARD SCADA MANUAL - - - - - - CK2-COM-DCL-PES-38313-OM A Online DC Line Fault Locator OMM & Installation - - - - - - CK2-COM-000-RMK-42001-OM A O&M OF Instrument Transformer & Wave Trap-of Champa & Kurukshetra Station - - - - - - CK2-COM-000-PCP-34015-OM CK2-COM-000-PCP-34016-OM CK2-COM-000-PCP-34017-OM GE T&D India Limited T‐5 T‐6, Plot I‐14, Axis House (Jaypee Wishtown), Sector‐128 ,Noida‐201 304, U.P, INDIA T +91 120 5021500 F +91 120 5021501 www.gegridsolutions.com A CHAMPA & KURUKSHETRA HVDC TERMINAL STATION - FOTE SYSTEM (SDH & PDH)– INSTALLATION INSTRUCTIONS, OPERATION & MAINTENANCE MANUAL - - - - - - CK2-COM-000-NMS-44002-OM A CHAMPA & KURUKSHETRA HVDC TERMINAL STATION EPABX (Building Telephone System) INSTALLATION INSTRUCTIONS, OPERATION & MAINTENANCE MANUAL - - - - - - CK2-COM-DCL-PES-45030-OM A PLC Filter Capacitor OMM & Installation and Data Sheet - - - - - - CK2-COM-DCL-PES-45050-OM A PLC Filter Reactor (Line Trap) O&M Manual Extension of Approval - - - - - - CK2-COM-400-SCI-53004-OM A CHAMPA KURUKSHETRA TERMINAL STATIONS - O & M MANUAL FOR 390KV SURGE ARRESTER - - - - - - CK2-COM-DCL-PES-53410-OM B AC Surge Arresters OMM & Installation - - - - - - CK2-COM-DCL-PES-53430-OM A AC Filter Surge Arresters OMM & Installation - - - - - - CK2-COM-DCL-PES-53510-OM A DC Surge Arresters OMM & Installation - - - - - - CK2-COM-DCL-PES-53530-OM A DC Filter Surge Arresters OMM & Installation - - - - - - CK2-COM-DCL-PES-53538-OM A Valve Hall Surge Arresters OMM & Installation - - - - - - CK2-COM-DCL-PES-53552-OM B Surge Monitor O&M Manual Extension of Approval - - - - - - CK2-COM-DCL-PES-54506-OM A LVDC post Insulator Installation and OMM Extension of approval - - - - - - CK2-CHP-400-SCI-55003-OM A CHAMPA TERMINAL STATION - OMM FOR 400kV, DSCONNECTOR WITH E/S - - - - - - CK2-COM-DCL-CME-55710-OM A HVDC Disconnectors and Earthing Switches Installation Instruction and O&M Manuals - - - - - - CK2-COM-DCL-CME-55750-OM C MV - DC Disconnectors Centre Break Installation Instruction and O&M Manuals - - - - - - CK2-COM-000-NMS-42036-OM GE T&D India Limited T‐5 T‐6, Plot I‐14, Axis House (Jaypee Wishtown), Sector‐128 ,Noida‐201 304, U.P, INDIA T +91 120 5021500 F +91 120 5021501 www.gegridsolutions.com CK2-COM-M33-SCI-57004-OM A CHAMPA KURUKSHETRA TERMINAL STATIONS OMM FOR 72.5kV CIRCUIT BREAKER - - - - - - CK2-COM-400-HVM-57007-OM A ERECTION & COMMISSIONING, OPERATION AND MAINTANANCE MANUAL FOR SF6 BREAKER - - - - - - CK2-COM-M33-SCI-61003-OM A CHAMPA KURUKSHETRA TERMINAL STATIONS OMM FOR 72.5kV CT TERTIARY YARD - - - - - - CK2-COM-DCL-PES-61810-OM A AC filter CTs OMM & Installation - - - - - - CK2-COM-DCL-PES-61821-OM A DC yard AC CTs OMM & Installation - - - - - - CK2-COM-DCL-PES-63010-OM A DC Current Transducer OMM & Installation - - - - - - CK2-COM-DCL-PES-64027-OM A DC SF6 Gas insulated Voltage Divider Type RC 800-CG Maintenance Manual - - - - - - CK2-COM-000-SCI-71018-OM A O&M of LV System of Champa & Kurukshetra Stration - - - - - - CK2-COM-M33-SCI-71203-OM A CHAMPA KURUKSHETRA TERMINAL STATIONS OMM FOR STATION SERVICE TRANSFORMER - - - - - - CK2-COM-000-SCI-71403-OM A CHAMPA-KURUKSHETRA TERMINAL STATION - DG SET OMM - - - - - - CK2-COM-000-SCI-71502-OM A O&M MANUAL OF UPS- VALVE COOLING SYSTEM - - - - - - CK2-COM-000-SCI-73025-OM A CHAMPA & KURUKSHETRA TERMINAL STATION OPERATION & MAINTENANCE MANUAL FOR ILLUMINATION SYSTEM - - - - - - CK2-COM-000-SCI-74011-OM A Operation & Maintenance Manual of Fire Fighting System - - - - - - CK2-COM-000-SCI-74209-OM A Operation & Maintenance Manual of VESDA System - - - - - - CK2-COM-000-SCI-75011-OM A Operation & Maintenance Manual of Water Treatment, Supply & Distribution System - - - - - - CK2-COM-000-SCI-77011-OM A OPERATIONAL MANUAL OF ON-LINE DRYING SYSTEM (CHAMPA & KURUKSHETRA TERMINAL STATION) - - - - - - CK2-COM-000-SCI-77012-OM B OIL FILTRATION MACHINE-O&M MANUAL - - - - - - GE T&D India Limited T‐5 T‐6, Plot I‐14, Axis House (Jaypee Wishtown), Sector‐128 ,Noida‐201 304, U.P, INDIA T +91 120 5021500 F +91 120 5021501 www.gegridsolutions.com CK2-COM-000-SCI-77013-OM B O&M Manual-Stationary Oil Storage Tank-80kL - - - - - - CK2-COM-000-SCI-77014-OM B O&M Manual-Mobile Oil Storage Tank-10kL - - - - - - CK2-COM-DCL-PES-75460-OM A Valve cooling plant Installation - O& M manuals - - - - - - CK2-COM-DCL-PES-75461-OM A Valve Cooling Plant Transport Storage and Installation Manual - - - - - - CK2-COM-DCL-PES-75467-OM A Valve Cooling Plant FAULT TRACING - - - - - - PURPOSE: Please approve and return signed copy Returned and Approved Returned with Comments Documents sent in separate package PC – Photocopy P – Full size paper print RP – Reduced sized paper unit Signature. ………………………… GE T&D India Limited T‐5 T‐6, Plot I‐14, Axis House (Jaypee Wishtown), Sector‐128 ,Noida‐201 304, U.P, INDIA T +91 120 5021500 F +91 120 5021501 www.gegridsolutions.com √ x x x