Three power systems A, B and C are in synchronous operation through the tie lines. o RA = 650 MW/Hz, RB = 500 MW/Hz, RC = 450 MW/Hz o PMax AB = 400 MW, P AC BC Max = 150 MW, PMax = 120 MW. Lines disconnected by protection system if power flow exceeds o An outage of line AC takes place. Find the final frequencies and tieline flows