No.1525 FZ54-14U Ram BOP Rev.A0 Security Guide The manual covers matters needing attention for ensuring personal safety as well as protecting product and connected equipment from damage. All matters needing attention are given with symbols for clear warning and are also respectively described with the following characters upon on the severity: Notice Ignoring proper prevention measures may cause injuries, deaths, serious personal injury or large property loss. Notice Catch your attention on important information of the product or specific part during handling with the product or files. Competent person No one but the competent person is authorized to assemble and operate the equipment. The competent person shall be the person with certain experience on on-site well control and be able to assemble, perform test run and operate the equipment according to specified safety practices and standards. Correct way to use Pay attention to the following: Notice The equipment and assemblies thereof shall be applied only to description in product catalogue or technical manual, and shall be connected only with devices or assemblies that are approved by Shenkai or other recommended manufacturers. Safety first shall be complied for well control equipment. Any quick-wear metal and non-metal part, in particular the rubber core that influences the product safety and performance in test shall be replaced timely. The product can work correctly and safely on the premise of correct transportation, storage, assembling, installing, and being operated and maintained by the recommended mode. Trademarks R ○ R ○ 、 、 R ○ are the registered trademark of Shenkai. Any third party using other names related to the trademarks in this manual for its own purpose (s) shall be treated as infringing the rights and interests of the proprietor of the trademarks. Shanghai SK Petroleum & Chemical Equipment Corporation Ltd. holds the copyright○c 2014. All rights reserved. None of the manual or contents may be reproduced, transmitted or used without clear written authorization. Rights reserved. All rights reserved, including patent right, utility model or appearance design exclusive right. The BOP meets the requirements of standards API 16A and GB/ T20174 and gained logo usage license issued by API and production license issued by State Administration for Quality Supervision and Inspection and Quarantine: 16A-0111, , XK14-001-0002 and . Shanghai SK Petroleum & Chemical Equipment Corporation Ltd. hereby declares that by check the contents of the manual are consistent with the product and cannot in the nature of things be free from error, the consistency is maximized. The contents of the manual will be reviewed at fixed period and modified in the next version. Suggestions for improvements are highly welcomed. Shanghai SK Petroleum & Chemical Equipment Corporation Ltd. holds the copyright○c 2014. No inform will be made for any change. Shanghai SK Petroleum & Chemical Equipment Corporation Ltd. After-sale Service Department Customer Hotline: +86(21)64290467 Fax:+86(21)64290467 Website:www.shenkai.com Postal Code: 201114 Catalogue 1 Overview .............................................................................................................................................. 1 2 Model & Specification and Technical Parameters ............................................................................... 2 2.1 Model......................................................................................................................................... 2 2.1.1 Bore Code ....................................................................................................................... 2 2.1.2 Rated working pressure .................................................................................................. 2 2.1.3 Temperature grade ......................................................................................................... 2 2.2 Technical Parameters of ram BOP ........................................................................................... 4 3 Working Principles and Structure Characteristics ............................................................................... 6 3.1 Working principle....................................................................................................................... 6 3.1.1 Hydraulic control principle .............................................................................................. 6 3.1.2 Sealing principle ............................................................................................................. 7 3.2 Structural features of main parts ............................................................................................... 7 3.2.1 Pipe ram assembly ......................................................................................................... 8 3.2.2 Sealing part for front rod of main piston ......................................................................... 9 3.2.3 Secondary seal ............................................................................................................. 10 3.2.4 Sealing part for tail rod of main piston .......................................................................... 12 3.2.5 Manual locking mechanism of ram ............................................................................... 13 3.2.8 The sealing way of Intermediate Flange ...................................................................... 14 3.3 Parts list................................................................................................................................... 15 4 Installation and Use ........................................................................................................................... 20 4.1 Preparation for use.................................................................................................................. 20 4.2 Usage and matters needing attention ..................................................................................... 22 5 Dismounting and Maintenance of BOP ............................................................................................. 23 5.1 Opening Intermediate Flange of BOP..................................................................................... 23 5.2 Replacement of ram and its sealing rubber core .................................................................... 24 5.3 Replacement of Seal Ring between Intermediate Flange and Body ..................................... 25 5.4 Repair and replacement of cylinder assembly........................................................................ 25 5.5 Disassembly of ram opening and closing piston rod .............................................................. 27 5.6 Matters needing attention for assembly .................................................................................. 29 5.7 Daily maintenance................................................................................................................... 29 5.8 Operating Period Maintenance ............................................................................................... 30 6 Preservation procedures ................................................................................................................... 32 6.1 Storing for periods greater than 30 days ................................................................................ 32 6.2 Storage of Rubber Parts ......................................................................................................... 32 7 Common Troubles and Troubleshooting ........................................................................................... 33 (The Manual applies to FZ54-14U Ram BOP P/N: C25 2C25 ) FZ54-14U Ram BOP User Manual Rev.A0 1 Overview Ram BOP is the key part of well control device and its main purpose is to control wellhead pressure to effectively prevent blowout accident and realize safe construction during drilling, well repair, well test and other processes. Its appearance sees Fig.1-1. The following operations can be finished with it: Sealing the annular space between the sleeve and the pipe column by corresponding pipe ram when there is a pipe column in the well; Sealing the whole wellhead by full ram when there is no pipe column; Sealing the whole wellhead in case of emergency by cutting off the pipe column with a shear ram; Realizing slurry circulation, choke and blowout controller, well control, well flushing and the like special operations via the well controller and choke manifold connected to the stone and the side outlet of body, when the well is sealed; Controlling the pressure at the bottom of well and realizing the near balance by cooperating with choke and well control manifold. Fig.1-1 Appearance of 2FZ54-14U Double-ram BOP 1 FZ54-14U Ram BOP User Manual Rev.A0 2 Model & Specification and Technical Parameters 2.1 Model U Model of BOP Rated working pressure code(Table 2-2) Bore code: (Table 2-1) Ram BOP code: FZ- single ram BOP; 2FZ-double ram BOP; 3FZ- triple ram BOP 2.1.1 Bore Code Table 2-1 Bore Coder Bore Code 18 Bore Specification (in) 7 1/16 〃 Bore Code 48 Bore Specification (in) 18 3/4〃 23 9〃 53 20 3/4〃 28 35 11〃 54 68 21 1/4〃 13 5/8〃 16 3/4〃 43 26 3/4〃 30〃 76 2.1.2 Rated working pressure The BOP has rated working pressure at six grades, as shown in Table 2-2. Table 2-2 Rated working pressure Pressure code Rated working pressure MPa psi 14 13.8 2,000 21 20.7 3,000 35 34.5 5,000 70 69.0 10,000 105 103.5 15,000 140 138.0 20,000 2.1.3 Temperature grade Minimum temperature is namely the minimum environmental temperature that might be suffered from, and maximum temperature is namely the maximum temperature of the liquid flowing through the equipment. 2 FZ54-14U Ram BOP User Manual Rev.A0 Metal parts of the equipment work within the temperature range as shown in Table 2-3. Synthetic rubber materials in the equipment, contacting with the liquid in the well, work at the temperature grade as shown in Table 2-4. Table 2-3 Temperature grade of metal material Temperature Rating Code API Code Working Temperature Scope T-75 75 -59℃~121℃(-75 ºF ~250 ºF) T-20 20 -29℃~121℃(-20 ºF ~250 ºF) T-0 00 -18℃~121℃(0 ºF ~250 ºF) Table 2-4 Temperature grade of nonmetal sealing material in contact with liquid in well Lower Limit (first letter) Upper Limit (second letter) Code Temperature Code Temperature A -26℃(-15℉) A 82℃(180℉) B -18℃(0℉) B 93℃(200℉) C -12℃(10℉) C 104℃(220℉) D -7℃(20℉) D 121℃(250℉) For example: AB presenting the temperature rating of -26℃~93℃ (-15℉~200℉). The specific temperature rating is indicated on the sealing parts. 3 FZ54-14U Ram BOP User Manual Rev.A0 2.2 Technical Parameters of ram BOP Table 2-5 Specification and main technical parameters of ram BOP Description Double-ram BOP Model 2FZ54-14U Drift diameter Rated working pressure Hydrostatic test pressure Hydraulic control rated working pressure Recommended hydraulic control operation pressure Starting capacity of hydraulic cylinder Closing capacity of hydraulic cylinder Closing Ratio Locking Screw turns (each end) Temperature grade c Weight Single-ram BOP FZ54-14U 1 539.8mm(21 /4 in) 14MPa(2000Psi) 21MPa (3000Psi) 21 MPa(3000Psi) 8.4-10 .5MPa(1200-1500Psi) 16.7L×4 16.7L×4 17.7L×4 17.7L×4 7.0:1 50圈 T-20 14500kg 14500kg Instructions: a. The BOP is designed and manufactured according to specifications API Spec 16A. b. The part in the BOP, in contact with liquid in well is resistant to hydrogen sulfide stress corrosion, and the requirements of NACE MR-0175 are met. c. The weight of BOP in the connection mode of flanged is showed in the table (see Fig.2-1, Fig.2-2, including ram assembly). The actual weight shall change with the change of the upper and the lower connection and the side port. 4 FZ54-14U Ram BOP User Manual Rev.A0 Fig.2-1 Size diagram of appearance of FZ54-14U single-ram BOP Fig.2-2 Size diagram of appearance of 2FZ54-14U double-ram BOP A-1 Length-intermediate flange is closed, and the end of clamp axis is unlocked A-2 Length-intermediate flange is opened, and the end of clamp axis is unlocked B-1 Height-flange connection B-2 Height-upper bolted and lower flanged connection C Width-not including side port Table 2-6 Size of appearance of ram BOP Overall dimension Model A-1 mm A-2 mm B-1 mm B-2 Mm C mm FZ54-14U Single Ram BOP 4120 5800 944 765 1000 2FZ54-14U Double Ram BOP 4120 5800 1638 1638 1000 5 FZ54-14U Ram BOP User Manual Rev.A0 3 Working Principles and Structure Characteristics 3.1 Working principle 3.1.1 Hydraulic control principle When the high pressure oil of hydraulic control system enters the closed chamber of left and right cylinder rams, it will push the main piston, and the left and right ram assembly will move toward the center of wellhead along the ram chambers of the body, enabling the sealing of the wellhead. When the high pressure oil enters the opened chamber of left and right cylinder rams, it will push the main piston and the left and right ram assembly will move far away from the center of well head, enabling the opening of wellhead. The ram switch is controlled by the selector valve of hydraulic control system. Generally the opening and the closing can be finished within 3~5 seconds. The hydraulic control system can be used to open and close the cylinder assembly, so as to replace the ram. Open the cylinder assembly -- after unscrewing cylinder bolts, close the ram by the hydraulic oil, and the pressure for closing the ram will push the ram toward the wellhead, while pushing the cylinder assembly far from the body, and the ram will move out of the body. And then lift the ram to replace it by hoist screws. Close the cylinder assembly -- Open the ram by hydraulic oil that will push the main piston, and pull back the ram assembly to the opening status, and then push the hydraulic cylinder assembly toward the body until being fitting with the body. One of important features of UM ram BOP is that: Before the cylinder assembly moves toward the body, the ram will firstly be pulled back to the opening status by the hydraulic oil. So when the cylinder assembly is closed, the ram will not be interfered with the drilling tool in the through-hole. Diagram of oil circuit is showed in Fig.3-1. CLOSE OPEN The ram is closed, and the cylinder assembly is opened The ram is opened, and the cylinder assembly is closed Fig.3-1 Diagram of hydraulic circuit of ram switch and cylinder assembly switch 6 FZ54-14U Ram BOP User Manual Rev.A0 3.1.2 Sealing principle The ram BOP shall ensure four available sealing places at least to maintain effective sealing of well head. They are respectively the sealing between the top ram sealing and the body; the sealing between the front ram sealing and the pipe column, and that between the body and the front sealing; the sealing between the body and the intermediate flange; the sealing between the front bar of main piston and the intermediate flange. The sealing of ram is finished by two steps: the first step is that under the effect of hydraulic oil the main piston pushes the rubber core of the front ram sealing to make the front part of seal squeezed and deformed, and also pushes the top of interference and compression seal between the rubber core and the body of sealing, which form the initial sealing; the second step is that when there is pressure in the well, the well pressure will push the front ram seal from the rear part of ram for further squeeze and deformation. Meanwhile the well pressure will push the ram from the bottom to lift it to fit on the sealing surface of body, namely, the effect of assisting sealing with the well pressure is realized. 3.2 Structural features of main parts The U-type ram BOP is comprised of body, intermediate flange, cylinder assembly, main piston, cylinder for replacing the ram, ram ON/OFF piston, lock screw, ram assembly and sealing parts and the like main parts. The body, the intermediate flange and the like pressure-bearing parts are made of high strength and high tenacity alloy steel, strictly controlling the harmful chemical components and non-metal substances of materials, making the secondary refining, forging and molding, so as to ensure safe and reliable usage of BOP after proper heat treatment. The ram chamber of body is in a shape of long runway so as to reduce stress concentration. Both the intermediate flange switch and the ram switch are driven hydraulically from the same oil circuit. The open-close ram for intermediate flange are from the same oil circuit under the same operation; it is the same with the close-open ram for Intermediate flange. 7 FZ54-14U Ram BOP User Manual Rev.A0 3.2.1 Pipe ram assembly Top rubber core Ram body Front rubber core Fig.3-2 Diagram of pipe ram assembly Table 3-1 Parts of pipe ram Description (quantity) of pipe ram assembly Ram Type Ram assembly Ram body (2) Front rubber core (2) Top rubber core (2) Blind 2C25.08A.00 2C25.08A.01 2C05.01A.03 2C05.08A.02 5″ 2C25.08B.00 2C25.08B.01 2C05.01B.02 2C05.08A.02 13 3/8" 2C25.08C.00 2C25.08C.01 2C05.01C.02 2C05.08A.02 Note: The number in the bracket means the quantity of rams in a pair of pipes The ram is an integrated long runway style. Its sealing rubber core adopts the assembly structure of front sealing and top sealing. The front seal and the top seal can be replaced independently according to the damage condition. The assembly and the disassembly are simple and labor saving. Note: The sign of “HO” (Hang-Off) on the ram body indicates that drilling tools could be hanged on. Drilling tools shall not be hanged on the ram assembly without the sign of "HO". 8 FZ54-14U Ram BOP User Manual Rev.A0 3.2.2 Sealing part for front rod of main piston Two-way seal is adopted between the Intermediate flange and the front rod of main piston. The wellhead can be sealed by Y-seal and gaskets. The hydraulic control pressure can be sealed by O-ring. 11 10 9 8 7 6 5 Direction of hydraulic Direction of well control pressure pressure Fig.3-3 Structure of sealing part for front rod of main piston Table 3-2 List of sealing parts for front rod of main piston Qty Qty (Single) (Double) 2C25.18 2 4 Fastened sealing ring 2C02.25 2 4 Reinforced sealing ring 2C02.26 2 4 2C02.27 2 4 No. Description P/N 11 O-ring 10 9 8 Sealing ring of front rod of main piston 7 gasket 2C02.28 2 4 6 gasket 2C02.18 2 4 5 Retainer ring 140 2C02.17 2 4 9 FZ54-14U Ram BOP User Manual Rev.A0 3.2.3 Secondary seal The sealing part between the Intermediate flange and the front rod of main piston is comprised of two parts. The first one is the sealing wellhead. And the other one is the oil pressure for sealing the hydraulic control. The secondary seal is at the middle of the two parts. Generally, the sealing is highly reliable by the sealing ring of several structures. But the sealing ring may be damaged due to not being maintained for a long term or other reasons, leakage may happen during well sealing. The secondary seal will be needed for emergency handling. At the condition of well sealing, if any fluid flows from the access hole (at the bottom of the Intermediate flange), the sealing ring shall have been damaged. Whether the sealing ring for well sealing pressure or that for the oil sealing pressure is damaged can be damaged according to the property of fluid. Now remove the Z1″ external hex blocking for greasing hole at the top immediately. Rotate the hole screws clockwise by a socket head wrench. Eject the secondary sealing grease in bar shape to the annular space via a one-way valve, so as to reinforce the sealing ring and make sealing compensation. Precautions during usage of secondary sealing device: To prevent the secondary sealing grease from being solidified and invalid when the BOP is not used for a long term, the secondary sealing grease bar shall not be mounted when the BOP leaves out of factory, and our company also doesn't recommend to install the secondary sealing grease bar when the BOP is not used. It shall not be mounted before being inserted to the well, and removed after well completion and maintenance. It shall be washed to keep clean. Special tools shall be prepared in advance for urgent need. Observe frequently from the access hole (internal hexagonal plug screws with hole) at the bottom whether drilling fluid or oil fluid flows during usage of BOP. After the sealing ring becomes invalid, the secondary sealing grease shall not be ejected excessively, which shall be subject to the standard that the observation hole would not be leaked. Because the friction resistance of secondary sealing grease is high and particles are adhered, a major damage may happen to the main piston. 10 FZ54-14U Ram BOP User Manual Rev.A0 18 19 17 16 Direction of hydraulic control Direction of well pressure pressure 44 Fig.3-4 Structure of secondary seal Table 3-3 Parts list of secondary sealing device Qty Qty (Single) (Double) 2C01.21 2 4 Cock 1-8UNC 2C01.20 2 4 17 Secondary sealing grease EM-09-1/L25mm 2 4 16 Check valve 2C01.07 2 4 2C01.32 2 4 No. Description P/N 18 Z1″ External hexagonal blocking 19 44 Z1/2″ hexagon socket screw plug 11 FZ54-14U Ram BOP User Manual Rev.A0 3.2.4 Sealing part for tail rod of main piston Main cylinder Direction of hydraulic control pressure Main piston 24 25 Fig.3-5 Sealing part for tail rod of main piston Table 3-4 List of sealing parts for tail rod of main piston Qty Qty (Single) (Double) 2C01.49 2 4 77.5×5.3 2 4 No. Description P/N 1 Sealing ring of tail rod of main piston 2 O-ring 12 FZ54-14U Ram BOP User Manual Rev.A0 3.2.5 Manual locking mechanism of ram The manual locking mechanism of ram is comprised of locking screw, locking axle seat, main piston and manual control assembly. (The length is generally 3.8m and 3.38m, or customized). The effect of manual locking mechanism is when it takes a long time to have well sealing, and after the ram is closed hydraulically, rotate the hand wheel by manual force, and lock the ram at the closed position. At this time, the hydraulic pressure may be released. Locking -- When it is locked manually, rotate the hand wheel clockwise, and drive the lock screw for rotation by a joystick. Because the locking screw locates at the clamp seat, rotate the locking screw to push it at the rear of main piston, forcing the main piston moving toward the center of wellhead and locking the ram assembly (Generally rotating 50 turns clockwise). Unlocking -- The manual locking device can just close the ram instead of opening the ram. If to open the ram that has been locked manually, firstly reset and unlock the locking device manually, and open the ram by hydraulic pressure. This is the only way. The detailed operation method is: Firstly rotate the hand wheel to the terminal point counter-clockwise (Generally rotating 50 turns counter-clockwise); And then rotate back for 1/8~1/4 turns, to prevent the clamp axle from jamming during change of temperature; And then the ram is opened by hydraulic pressure. Fig.3-6 Manual control assembly Fig.3-7 Locking status 13 FZ54-14U Ram BOP User Manual Rev.A0 3.2.8 The sealing way of Intermediate Flange The sealing between the intermediate flange and the body for ram BOP adopts the O-ring, showed in the following figure; O-ring Fig.3-8 Seal (side door sealing ring) of Intermediate Flange and installation Table 3-7 Parts list of seal (side door sealing ring) assembly of middle flang No. Description P/N 2 O-ring 2C25.16 14 Qty Qty (Single) (Double) 2 4 FZ54-14U Ram BOP User Manual 3.3 Parts list Figure 3-9 Breakdown Drawing of BOP Parts 15 Rev.A0 FZ54-14U Ram BOP User Manual Rev.A0 Table 3-6 BOP Parts List No. Description Part No/Model 1 Body 2 Qty (Single) (Double) -- 1 1 O-ring 2C25.16 2 4 3 Ram assembly 2C25.08 ( ) .00 1 2 4 Guide pin 2C05.16 4 8 5 Retainer ring 140 2C02.17 2 4 6 gasket 2C02.18 2 4 7 Sealing ring of front rod of main piston 2C02.27 2 4 8 gasket 2C02.28 2 4 9 Reinforced sealing ring 2C02.26 2 4 10 Fastened sealing ring 2C02.25 2 4 11 O-ring 2C25.18 2 4 12 O-ring 41.2X3.55 2 4 13 Nozzle Flange 2C25.09 2 4 14 Stud M12X35 GB70-85 8 16 15 Intermediate Flange Screw 2C25.10 24 48 16 Check value 2C01.07 2 4 17 Secondary sealing grease EM-09-L/25mm 2 4 18 NPT1” External hexagonal blocking 2C01.21 4 8 19 Cock 1-8UNC 2C01.20 2 4 20 O-ring 345X7 2 4 21 Operating Piston Assembly 2C25.06.00 2 4 22 Lip ring of piston 2C01.08 4 8 24 Seal ring of Tail Rod 2C01.49 2 4 25 O-ring 77.5X5.3 2 4 26 Bonnet Screw 2C25.11 8 16 27 Bonnet 2C25.03.00 2 4 28 Seal Gland 2C05.05 2 4 29 Seal Plug 2C05.04 2 4 30 NPT1” Plug 2C01.34 4 8 31 Locking screw 2C25.02 2 4 32 Locking Screw Housing 2C25.01.00 2 4 33 Bolt M36(L=110) GB70-85 12 24 34 NPT1/2”Hexagon Socket Plug Head 2C01.36 8 16 35 Ram closing piston 2C25.15 2 4 16 FZ54-14U Ram BOP User Manual Rev.A0 Continued Table 3-6 Parts list No. Description Part No/Model 36 O-ring 37 Qty (Single) (Single) 112X7 4 8 Ram opening piston 2C25.14 2 4 38 Ram change cylinder 2C25.13 4 8 39 O-ring 165X7 4 8 40 O-ring 73X5.3 4 8 41 Guide ring 2C05.18 4 8 42 O-ring 150X7 4 8 43 O-ring 90X5.3 4 8 44 NPT1/2” Hexagon Socket Plug Socket Head 2C01.32 2 4 45 Intermediate Flange 2C25.12 2 4 2C25.06.00 Operating Piston Assembly contain Following Parts 21-1 Hook(一) 2C05.06.02 2 4 21-2 Stop block 2C02.11A-04 4 8 21-3 Piston Rod 2C25.06.01 2 4 21-4 O-ring 100.97x5.33 2 4 21-5 Backup ring C664-22 102.31x111.61x1.52 4 8 21-6 Piston 2C25.06.02 2 4 21-7 Stop block C17.08.03 6 12 21-8 Screw M12X20 GB/T 77-2000 6 12 17 FZ54-14U Ram BOP User Manual Rev.A0 Figure 3-10 Breakdown Drawing of Spare Parts 18 FZ54-14U Ram BOP User Manual Rev.A0 Table 3-7 Spare parts list for one year Qty Qty (Single) (Double) 2C25.16 2 4 Sealing ring of front rod of main piston 2C02.28 4 8 8 gasket 2C02.27 2 4 9 Reinforced sealing ring 2C02.26 2 4 10 Fastened sealing ring 2C02.25 2 4 11 O-ring 2C25.18 2 4 12 O-ring 41.2×3.55 2 4 17 Secondary sealing grease EM-09-L/25 2 4 20 O-ring 345×7 2 4 21-2 Stop 2C02.11A-04 1 2 21-7 Stop C17.08.03 6 12 22 Lip ring of piston 2C01.08 4 8 24 Seal ring of Tail Rod 2C01.49 2 4 25 O-ring 77.5×5.3 2 4 36 O-ring 112×7 4 8 39 O-ring 165×7 4 8 40 O-ring 73×5.3 4 8 41 导向环 2C05.18 4 8 42 O-ring 150X7 4 8 43 O-ring 90X5.3 4 8 No. Description Part No/Model 2 O-ring 7 19 FZ54-14U Ram BOP User Manual Rev.A0 4 Installation and Use 4.1 Preparation for use After the ram BOP is installed at the wellhead, check the following operations before use, and it shall be used when it is thought no problem by the test running. Check if BOP is correctly installed: the hoisting bolt of the body is on the top; the manual lock device is well installed and fixed with the hanger in the hand wheel indicating the opening and closing cycles; the opposite angles of the attachment bolts at all position are even and tightening. Check whether the size of mounted ram rubber cores and the size of drilling tools under the well; Check whether the blowout control, the well control, and the choke manifold are well connected; Use the control device to open and close all rams respectively twice by 2-3MPa(300psi~500psi) control pressure for test run. Remove air in the oil line. Check if the connection pipeline of the oil road is consistent with opening and closing as indicated by BOP. In the case that the ram’s opening and closing action is not consistent with that as indicated by the console handle, adjust the connection pipeline. Check whether the manual locking device is well connected, and whether it is flexible to open and close the ram by manual lever, and record the rotating turns of hand wheel during the well shut-in, and hang a sign on the hand wheel. After the trial run, rotate the hand wheel leftward to return and unlock. Open the ram by the hydraulic pressure; Have complete pressure test to the wellhead device, and the pressure test standard shall be executed according to the well control regulations. After the pressure test, tighten again the connection bolt, to prevent the loosening or uneven. The tightening torque of flange bolt is showed at Table 4-1 or Table 4-2; When the BOP is performed with ground inspection and test, the BOP shall be filled with water, and then open and close the ram for once to release the air in the rear of ram chamber. 20 FZ54-14U Ram BOP User Manual Rev.A0 Table 4-1 Recommended value (Metric system) of connecting and tightening torque of stud and screw Tightening torque Tightening torque Tightening torque N· m ft· lb Specifications of stud and screw M33×3 1292 952 M52×3 5505 4060 113 M36×3 1737 1280 M58×3 7892 5821 266 196 M39×3 2272 1674 M64×3 10885 8028 M22 424 313 M42×3 2910 2145 M70×3 14549 10731 M27 643 474 M45×3 3654 2693 M76×3 18957 13982 M30×3 930 686 M48×3 4516 3328 M80×3 21565 15906 Specifications of stud and screw N· m ft· lb M12 80 59 M16 153 M20 Specifications of stud and screw N· m ft· lb Table 4-2 Recommended value (British system) of connecting and tightening torque of stud and screw Specifications of stud and screw 1 /2-13UNC 5 /8-11UNC 3 /4-10UNC 7 /8-9UNC 1-8UN 1 1 /8-8UN Tightening torque N· m 80 153 266 424 643 930 ft· lb 59 113 196 313 474 686 Specifications of stud and screw 1 1 /4-8UN 3 1 /8-8UN Tightening torque N· m ft· lb 1292 953 2-8UN 5505 4060 1 7892 5821 1 10885 8028 3 1737 1 1 /2-8UN Tightening torque Specifications of stud and screw 2272 1281 1676 2 /4-8UN 2 /2-8UN N· m ft· lb 5 2910 2146 2 /4-8UN 14549 10731 3 3654 2695 3-8UN 18957 13982 3331 1 24174 17830 1 /8-8UN 1 /4-8UN 7 1 /8-8UN 4516 21 3 /4-8UN FZ54-14U Ram BOP User Manual Rev.A0 4.2 Usage and matters needing attention The usage of BOP shall be responsible by specially-assigned person. Relevant responsibilities are carried out. User shall know the working principles, the performance and the technological process; and be able to operate, maintain, care and have troubleshooting; When there is no pipe column in the well, if to make a test on closing the pipe ram, the maximum hydraulic control pressure shall not exceed 3MPa so as to avoid of damage to rubber core. When there is a pipe column in the well, it is forbidden to close the full ram; When it takes a long time to have well sealing, lock the ram by a manual lock device, and hang an instruction on the control console, so as to avoid of faulty operation; After entering the destination layer, the ram shall be opened and closed once everyday. Check if the closing and opening are flexible and if the manual clamp device is under good condition. Every time after pulling out of the hole, the test on opening and closing of full ram shall be done, and it is forbidden to close the full ram when there is a pipe column in the well; It is forbidden to release the pressure by opening the ram, which may damage the rubber core. Before open the rams shall wait 10 minutes after gauges indicate pressure has been bled to 0 psi or open the choke/kill valves above and below the rams to ensure the chambers are equalized. Every time before opening the ram, check whether the manual locking device has been unlocked. After opening, check if the ram is at the fully-opened position (completely returning into the body), to protect the ram from being damaged by the drilling tool; The hydraulic oil shall be kept clean; After using the BOP, keep the ram at the fully-opened position for the purpose of maintenance. Lugs on the BOP body is used only for lifting the BOP body, rather than lifting the BOP set Recommended Hydraulic Oil for the Hydraulic System for BOP Stacks ISO Brand: HM32 (used for plunger pump system with low or no Zn) Mobil Brand: D.T.E24 (used for plunger pump system with low or no Zn) Shell Brand: Tellus32 (used for plunger pump system with low or no Zn) Note: The kinematic viscosity of hydraulic oil is 17-33 mm2/s when the temperature is at 50℃. 22 FZ54-14U Ram BOP User Manual Rev.A0 5 Dismounting and Maintenance of BOP The BOP shall be subjected to appearance examination and seal test before starting drilling each time or entering high-pressure hydrocarbon reservoir. BOP shall be comprehensively disassembled for examination and cleaning after serving a well each time, and any damaged parts shall be replaced timely. Oil shall be coated on the ram chamber of the body to avoid rusting, and the screw thread oil shall be coated on the connecting thread part. 5.1 Opening Intermediate Flange of BOP 5.1.1 Open the ram by hydraulic oil to keep the ram at the opening position; (▲! Caution: The manual lock device shall be under unlocking status. ) Fig.5-1 Opening the ram 5.1.2 Loosening the cylinder bolt (▲! Caution: If the BOP is mounted on the well, the cylinder bolt shall not be uninstalled if any pressure in the well); Fig.5-2 Loosening the cylinder bolt 5.1.3 The hydraulic oil less than 10.5MPa shall be used to open the intermediate flange, namely making the action of closing the ram, to open the intermediate flange to the limit position. To prevent the intermediate flange from closing, in case necessary two wooden beams at the same size shall be put between the intermediate flange and the 23 FZ54-14U Ram BOP User Manual Rev.A0 shell, or the control pipe line shall be disassembled; Fig.5-3 Opening the intermediate flange 5.2 Replacement of ram and its sealing rubber core The ram rubber core is the key part deciding whether the BOP has the effect of well sealing. Once being damaged, the BOP will lose its effect. So it must be ensured complete and not damaged. Once any damage at the sealing surface is found, it must be replaced timely. 5.2.1 Ram assembly is lift to the top from the rear part of ram axle. When the ram assembly is taken out, protect the opening and closing piston rod, to prevent hit and scratch; Fig.5-4 Removal of ram assembly 5.2.2 To replace the ram rubber part, firstly pry out the top sealing and the remove 24 FZ54-14U Ram BOP User Manual Rev.A0 the front seal and replace with new rubber core. Fig.5-5 Disassembly of ram rubber core 5.3 Replacement of Seal Ring between Intermediate Flange and Body When the sealing ring for the intermediate flange is damaged, it has to remove the sealing ring of the intermediate flange: 5.3.1 Pry the sealing ring by tools; Fig.5-6 Pry out the sealing ring of Intermediate Flange 5.3.2 When replacing a seal, pay attention on the position of sealing ring that shall be applied with lubricating oil during installation of sealing part. 5.4 Repair and replacement of cylinder assembly If any damage or oil leakage is found at the front rod seal of main piston, seal of main piston, tail rod seal of main piston, or the closing and opening piston seal of ram, they shall be disassembled for maintenance immediately 5.4.1 Release the pressure in the cylinder. Put a clean vessel under the cylinder to prevent the pollution by the hydraulic oil. 25 FZ54-14U Ram BOP User Manual Rev.A0 5.4.2 Remove bolts of the Locking Screw Housing, nuts, Locking Screw Housing and Locking Screw. Fig.5-7 Remove bolts of the Locking Screw Housing, nuts, Locking Screw Housing and Locking Screw 5.4.3 Remove screws of cylinder head and screws of intermediate flange; Fig.5-8 Remove screws of cylinder head and screws of Intermediate Flange 5.4.4 Remove cylinder and ram replacement cylinder; Fig.5-9 Remove cylinder and ram replacement cylinder 5.4.5 Remove the tail sealing ring of main piston and O-ring; 26 FZ54-14U Ram BOP User Manual Rev.A0 Fig.5-10 Remove the tail sealing ring of main piston and O-ring 5.4.6 Take out the main piston; Fig.5-11 Take out the main piston 5.5 Disassembly of ram opening and closing piston rod 5.5.1 Push the intermediate flange to the position near to the body, so as not to affect the operation by a wrench; Fig.5-12 Push the Intermediate Flange 27 FZ54-14U Ram BOP User Manual Rev.A0 5.5.2 Hang up the intermediate flange by a crane gently, so as to minimize the lower pressure that the intermediate flange may apply to the opening and closing piston rod of ram; 5.5.3 The opening and closing piston of ram is threaded with the body. Its position near to the body has a flat face for usage of wrench. Rotate the ram opening and closing piston rod counter-clockwise, and rotate it outward. Caution: If the rotation is not smooth, the disassembly shall not be done forcefully, so as to protect the fitting surface between the ram opening and closing piston rod and the body. At this time, the hanging degree of intermediate flange shall be adjusted and the trial disassembly can be done; Fig.5-13 Removal of ram opening and closing piston 5.5.4 Remove the retainer ring. Take out the sealing ring of front rod of main piston and washer, and then take out the reinforced sealing ring, the fastened sealing ring and O-ring; Fig.5-14 Removal of sealing part Part examination after disassembling is as follows: Inner wall of cylinder assembly, and inner wall of ram replacement cylinder: Examine the longitudinal damage of the cylinder assembly and the internal surface of ram replacement cylinder. If the damage is caused by shallow linear friction or dotted mark, fine abrasive paper or oilstone can be used for repairing. In case of serious pulling scar, when the oil leakage can't be stopped by replacing new sealing ring, the mechanical processing method shall be taken for repairing the inner surface of cylinder. Meanwhile check relevant parts of piston 28 FZ54-14U Ram BOP User Manual Rev.A0 to find out causes and give solution. Ram opening and closing piston rod and its surface: When there is a pulling scar at the sealing surface, the judgment and treatment method are the same with that of cylinder. If the clad layer is peeled off, serious leakage may happen. In this case, new parts must be replaced or the damaged parts must be repaired. Sealing ring: Whether the lip side of the sealing part is damaged, or whether the O-ring is squeezed out or cut. Any damaged sealing part shall be replaced. Piston: If the uneven wear depth on the movable sealing surface of piston exceeds 0.2mm, it shall be replaced, and other surfaces shall not have obvious scar that affects the sealing. If the clad layer is peeled off, serious leakage may happen. In this case, new parts must be replaced or the damaged parts must be repaired. 5.6 Matters needing attention for assembly The assembly is in sequence opposite to disassembly and needs attention on the following points: Examine whether there is burr or sharp corner in the part, if any, remove them, so as to prevent the sealing ring from being scratched. Please keep clean; Coat lubricating oil on surface of sealing ring when the sealing ring is assembled, coat oil on the corresponding surface of the matched sealing ring, in order to assemble conveniently; Pay attention to the direction of the lip-type sealing ring, and make sure that the opening of the lip side faces the pressure direction. Make sure that the sealing ring can pass through the guide part of axle head smoothly without scratching. 5.7 Daily maintenance When the ram assembly operated by hydraulic pressure higher than 3.5MPa (500psi) is needed, check the jamming condition of body chamber and solve abnormal conditions. It is required to operate and test the BOP for one time every week according to requirements of API STD 53. ▲! Caution: When there is no drill stem in the well, to protect the rubber core from damage, do not close the pipe ram or the variable diameter ram 29 FZ54-14U Ram BOP User Manual Rev.A0 5.8 Operating Period Maintenance For the existing BOP, besides the onsite daily maintenance, it is recommended to have periodical examination according to requirements of SY/T 6160 Examination and Maintenance of BOP, for the purpose of confirming the repair items. The period of examination is divided into three-month examination, one-year examination and three-year examination. The examination shall be done on time and may be performed in advance according to usage condition. If one well is continuously operated over the specified examination period, the examination shall be done according to requirements of the next examination period after going back to the warehouse. ▲! Caution: The maintenance of BOP shall be subject to relevant local regulations about usage of BOP, and the BOP shall be certified periodically by the bop original manufacturer or a qualified third party, so as to make sure the stability and the reliability of usage of BOP. The three-month examination content 1、 Disassemble the BOP, carry out a visual examination of the parts; 2、 Equipment shall be tested in accordance with API 16A. One-year examination content: 1、 Check the both side of the body, the top sealing surface inside of body, seal ring groove, the sealing surface of bonnet and seal ring groove of bonnet. All of them are not allowed to have any defect that affect the sealing performance; 2、 Check the abrasion of bore of body; 3、 Check the ram packers and seals. The sealing surface shall be avoided serious deformation, wear, cracking, ageing of rubber core and phenomena the like; 4、 Check the connecting channel of the ram and hook. There cannot have crack, bending deformation; The width and height of ram are not allowed to have serious avulsion and deformation; 5、 Check the lock shaft, cannot have cracking, bending, grooved and switch lock shaft should be flexible; 6、 Check the thread hole, cannot have disorderly buckle, the phenomenon such as lack of buckle; 7、 Visual check ram cavity and flange of the body, cannot have cracking. 8、 All rubber sealing parts, backing ring and O-ring that have been used over one year or that have been damaged shall be replaced(see Table 3-7). Three-year examination content: 30 FZ54-14U Ram BOP User Manual Rev.A0 1、Disassemble all of the parts and clean up. In addition to examinations according to the requirements of the one-year check, also should deal with important size measurement of main parts. a) If the wear extent of inner diameter of the cylinder is more than 0.4 mm or there is obvious scars and the solder peels off, the cylinder should be remanufacture or replacement; b) If the wear extent of piston rod is more than 0.25 mm ,it should be remanufacture or replacement; c) If the wear ring diameter is lower than the metal body, the wear ring should be replace; d)If cladding material of the lock shaft is corroded and appear pits that would affect sealing, the lock shaft is overall bending or thread damaged that would affect the lock or unlock, or the quartet at end is damaged that will affect the connection with manual assembly, etc., the lock shaft should be replaced. 2、Hardness testing shall be carried out on the pressure-containing parts and the pressure-controlling parts such as body and bonnet. If the hardness is abnormal(> HRC22), contacting manufacturer is necessary. Repair and remanufacture parts shall be carried out according to API Spec 16A appendix B. Replacement of parts shall be design and manufacturing by the OEM. After checking the Bop, if the pressure-containing parts need to be welded to restore the performance, the bop is not suitable for easy maintenance in the field, must be remanufactured by the API Spec 16A qualified remanufacturer or authorized remanufacturer. 31 FZ54-14U Ram BOP User Manual Rev.A0 6 Preservation procedures Prior to shipping and storage, all equipment should avoid direct sunlight, rain and snow shower, keep them away from acid and alkali, organic solution etc, which would affect the quality of rubber material. 6.1 Storing for periods greater than 30 days All equipment shall be drained after testing and prior to storage; Prior to storage, parts and equipment shall have exposed metallic surfaces protected with a rust preventative that does not become fluid and run at a temperature of less than 50 °C (125 ℉) (Recommendation: Lithium base grease 3#) ; All connection faces and ring gasket grooves shall be protected with durable covers during storage; The hydraulic operating system shall be flushed with a non-freezing, corrosion-inhibiting fluid. Ports shall be plugged prior to storing (Recommendation: Antiwear hydraulic oil 32#) . 6.2 Storage of Rubber Parts All rubber parts shall be properly stored according to the following regulations: It is a must to store rubber parts in the indoor, low light and dry place with temperature of 0-25ºC and relative humidity 50% ~ 85% and to keep them away from the heating equipment and direct sunlight. It’s better to preserve them in the original packaging or the packaging similar to the original packaging materials, which has the function of shading. Keep rubber parts clean while in storage. Prevent them from being contaminated by solvents, oil, grease or other semi-solid or liquid matters and from being directly contacted with sulphur, manganese, copper, copper alloy (including bronze), polyvinyl chloride (PVC), timber containing wood preservative oil and other rubber products including different rubber constituents. Keep rubber parts away from ozone-generating equipment( e.g.: mercury vapor lamp, high-voltage electrical equipment, electric motor or any electrical devices which can generate electric arc; avoid being directly exposed under the sunlight or the light (e.g.: the fluorescent lamp) containing plenty of ultraviolet. Store the rubber parts which are under the slack state and have no bending, extrusion and hanging. It is not allowed to tie the tag on the rubber parts by the string, metal wire or adhesive tape in order to prevent causing deformation to the sealing surface. Check the rubber parts frequently. In the case that they have clamminess, softening, hardening, aging, embrittlement, cracking, bending, flaw etc, it is not Generally, the storage period of rubber parts is 2 years. 32 FZ54-14U Ram BOP User Manual Rev.A0 7 Common Troubles and Troubleshooting No. 1 Failure Causes The medium in the well flows out of the connection part of the body and the intermediate flange. a. The sealing ring for intermediate flange of BOP is damaged; b. The sealing face of the BOP body and the intermediate flange have bribes or have been damaged. 2 The moving direction of ram is inconsistent with the nameplate for control device of BOP The connecting pipes of control device and the connection pipe of BOP are wrongly connected. 3 The hydraulic system works normally, but the ram is not closed properly. The contact port of ram has other substances or deposit of sands and slurry. If the medium in the well goes into the cylinder, the oil may contain moisture. If the sealing ring of front rod of main piston is damaged, the front rod axis may be deformed of main piston or the surface may be pulled. 4 5 6 The hydraulic portion of BOP can not maintain the pressure, and the opening and closing of intermediate flange are inflexible. If any damage is found at the cylinder assembly of BOP, main piston and the sealing ring for opening and closing of ram. After the ram is closed, the pressure can't be sealed. The rubber core of ram seal may be damaged, or the top sealing surface for ram chamber on the shell is damaged. a. Replace damaged assembly of flange sealing; b. Clean out the foreign matters on the sealing face and restore the damaged parts. Replace the pipe position at the oil circuit port of BOP. Replace the ram and the intermediate flange. Replace the damaged sealing ring for the front rod of main piston, and repair the front rod portion of main piston. Replace each sealing ring, and repair the sealing surface or replace with new parts. Replace the rubber core of ram sealing, and repair the sealing surface of ram chamber of body. a. 7 Though the control oil circuit is normal, the ram or the side door can't be opened by hydraulic force. The ram is jammed by muddy sands; b. The oil circuit of BOP is jammed; c. The connecting pipes of control device and the connection pipe of BOP are blocked. Troubleshooting 33 a. Clean up the muddy sand; b. Clean up the oil circuit; c. Clean or replace connection pipes. the Design by: (Technical engineer) Audited by: (Chief engineer) FZ54-14U Ram BOP User Manual Rev.A0 Rev. A0 35