Lean manufacturing - Case History 2018- 01 Planning production area CH 2018-01 RA Version 1.0 VIT.INSTITUTE BOLOGNA ITALY OEM (Operational Excellence Mode) R VIT.INSTITUTE BOLOGNA ITALY 1 Context Introduction The company wanted to start the lean project in planning area and then go on in other areas Operating area ➢ We start with training and share basic competence like: ▪ ▪ ▪ ▪ OEE Level of Service Different type of planning ….. ➢ We measure OEE , Maintenance and Inventory KPI ➢ We activate a team to create the condition to be able to plan production ➢ Finally we organize planning team VIT.INSTITUTE BOLOGNA ITALY 2 Results achieved Visual Management Medium Term Production Planning AGENDA WK 07/18 PDCA KAIZEN KAIZEN WK 06/18 WK 05/18 KAIZEN KAIZEN WK 04/18 WK 03/18 KAIZEN TEMPO VIT.INSTITUTE BOLOGNA ITALY Results achieved Visual Management Medium Term Week Production Planning TIME (WK) LATE LEAD TIME VIT.INSTITUTE BOLOGNA ITALY OVERLOAD Results achieved 11 Weeks Goals -63% -73% Reduced Overload Reduced Lates ! TIME LATE LEAD TIME OVERLOAD VIT.INSTITUTE BOLOGNA ITALY Some technical tool Item Tec Group PRODOTTO N P G H T I O S L D B R C A E Q Z F M U V TAGLIO LASER PIEGA SALDATURA 1 1 1 1 1 TAGLIO TUBO 1 1 1 1 1 LAVORAZIONE PIEGA TUBO STAMPAGGIO FORATURA 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 TORNITURA TURNITURA TUBOASSEMBLAGGIO 1 1 1 1 1 1 1 VSM 1 1 1 1 1 1 1 1 1 VA analisys Lines Balancing VIT.INSTITUTE BOLOGNA ITALY 6 The real successful factor VIT.INSTITUTE BOLOGNA ITALY 7