Fire Protection System Checklist Doc. No. : QAD/IV/0557 Revision No: 00 Issue Date:: 18-10-2016 SOP Ref. No.: QAD/IV/0252 Inspection Date: 25 - 03 – 2017 Inspector: HSE Manager Type of fire suppression system changed: Fire extinguisher (DCP) Third Party Fire Alarm Verification Report Received? Yes No N/A Fire Alarm Monitored? Fire extinguisher monitoring? Yes Yes No No N/A N/A Visual Check the Following Devices and Displays If a No is indicated below note the problem to the right Fire Extinguishers Fire extinguisher relocated Yes No New Fire extinguisher installed Yes No Zones properly indicated and marked Yes No Commissioning is going on Devices properly indicated and marked Yes No Same as above Power indicator lamp operational Yes No Same as above Panel clear from trouble indicators Yes No Same as above Lamp test Yes No Same as above Panel in an acceptable location Yes No Commissioning is going on Panel lamp test ok Yes No Same as above Power on lamp on Yes No Same as above Main Fire Alarm Panel Annunciator Panel Page # 1 Fire Protection System Checklist Doc. No. : QAD/IV/0557 Revision No: 00 Issue Date:: 18-10-2016 SOP Ref. No.: QAD/IV/0252 Pull Station locations acceptable Yes No Same as above Heat Detectors and/or Smoke Detectors locations acceptable Yes No Same as above Fire Alarm System Demonstration If a No is indicated below note the problem to the right Fire location lamp on main panel operated correctly Yes No Commissioning is going on Bells and buzzers operated correctly Yes No Same as above Bells and Buzzers Audibility Yes No Same as above Monitoring company notified Fire Station Yes No Same as above Annunciator Panel Indicated Proper Zone or location. Yes No Same as above System back on line No problems indicated on panels Yes No Same as above Page # 2