INTERIOR ELEVATION TAG C 133401 1 EXTERIOR ELEVATION TAG A1.1 1 BUILDING SECTION FLAG A1.1 1 SHEET NOTE TAG 8 DEMOLITION NOTE TAG 1 REVISION TAG A WINDOW TYPE TAG 1'-0" BBL ARCHITECTS 200 NORTH STATE STREET LAKE OSWEGO, OREGON 97034 PHONE: (503) 635-4425 FAX: (503) 635-3581 CONTACT: LANG BATES / LISA MURPHY LEWIS & VAN VLEET, INC., CONSULTING ENGINEERS 18660 SW BOONES FERRY ROAD TUALATIN, OREGON 97062 PHONE: (503) 885-8605 FAX: (503) 885-1206 CONTACT: LANCE CERNY WALL TYPE TAG CEILING HEIGHT TAG ROOM NAME SIM DETAIL CALLOUT NORTH ARROW 0 ARCHITECTS SIM DETAIL FLAG 101 0'-0" A.F.F. MECHANICAL ENGINEERS FLOOR PLAN ROOM LABEL & NUMBER SYSTEM DESIGN CONSULTANTS 333 SOUTHWEST SECOND AVENUE, SUITE 100 PORTLAND, OREGON 97219 PHONE: (503) 248-0227 CONTACT: (MECHANICAL) GARY BARNES CONTACT: (PLUMBING) ROBERT LEWIS CONTACT: (ELECTRICAL) JOHN ROGERS ELEVATION TAG VERIFY AND COMPLY WITH THE CITY OF MILWAUKIE POLICIES REGARDING DESIGN/BUILD PORTIONS OR COMPONENTS OF THIS PROJECT. 1. STEEL STAIR SYSTEM 2. GLASS AND STEEL RAILING SYSTEM 3. TRANSLUCENT ROOF SKYLIGHT SYSTEM 4. FIRE ALARM AND DETECTION SYSTEM G1.0 G2.1 G2.2 A1.0 A1.1 A1.2 A1.3 A1.4 A1.5 A1.6 A1.7 A1.8 A1.9 A1.10 A1.11 A2.1 A2.2 A3.1 A3.2 A3.3 A3.4 A4.1 A4.2 A4.3 A5.1 A5.2 A6.1 A6.2 ALTERNATES 1. ENTRANCE CANOPY 2. REROOFING 3. SPARE REFRIGERANT LINES 4. ADDITIONAL HVAC CONTROLS 5. CONDUIT ABOVE CEILING 6. NOT USED 7. PARKING LOT LIGHTING RETROFIT 8. INTERIOR ALUMINUM ENTRANCE/STOREFRONT SYSTEM COORDINATE ALL WORK WITH ARCHITECTURAL DRAWINGS AND SPECIFICATIONS. 2. DO NOT SCALE DRAWINGS. 3. CONTRACTOR AND SUB-CONTRACTORS SHALL FAMILIARIZE THEMSELVES WITH EXISTING CONDITIONS, LOCATIONS, AND PROJECT REQUIREMENTS PRIOR TO SUBMITTING A BID. 4/20/2015 4:33:38 PM 4. CONTRACTOR AND SUB-CONTRACTORS SHALL FIELD VERIFY DIMENSIONS, AND FAMILIARIZE THEMSELVES WITH PROJECT REQUIREMENTS PRIOR TO COMMENCING WITH THE WORK. CONTRACTOR SHALL REPORT ANY DISCREPANCIES TO ARCHITECT. 5. WORK SHALL INCLUDE ALL REQUIRED PERMITS, LABOR, MATERIALS, AND EQUIPMENT TO COMPLETE ALL WORK INDICATED ON DRAWINGS AND AS NECESSARY FOR A COMPLETE PROJECT. 6. PROVIDE TEMPORARY DUST-PROOF PARTITIONS AS REQUIRED TO PROTECT ALL EXIST. AREAS AND EQUIPMENT FROM DAMAGE DUE TO DEMOLITION OR NEW CONSTRUCTION ACTIVITIES. COORDINATE LOCATIONS AND REQUIREMENTS WITH OWNER. 7. GENERAL CONTRACTOR TO PATCH, REPAIR AND PAINT (REFINISH) SURFACES AND BUILDING ELEMENTS DAMAGED BY MECHANICAL, ELECTRICAL, AND PLUMBING WORK AND WHERE ITEMS ARE REMOVED, RELOCATED OR ADDED. 8. REPAIR FLOORS WHERE DAMAGED BY THE WORK OF THIS PROJECT. 9. PATCH AND REPAIR ALL SURFACES TO MATCH EXISTING WHERE ITEMS ARE REMOVED OR ALTERED - FIELD VERIFY EXTENT REQUIRED. 10. ALL PAINTING SHALL BE DONE IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. CONTRACTOR IS RESPONSIBLE FOR PROTECTING ADJACENT FINISHES AND CLEANUP. 11. CONTRACTOR IS RESPONSIBLE FOR FINAL CLEANUP OF WORK AREA AND ALL EXPOSED BUILDING SURFACES AT SUBSTANTIAL COMPLETION. 12. ALL TRASH AND TOOLS SHALL BE REMOVED FROM PREMISES EACH DAY AND THE AREA LEFT CLEAN WHENEVER UNATTENDED. EACH CONTRACTOR SHALL BE RESPONSIBLE FOR CLEANUP. COORDINATE WITH OWNER IF SECURE STORAGE IS NEEDED ONSITE. 13. CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO FINISHED SURFACES, EQUIPMENT, FURNITURE, EXISTING MATERIALS OR FINISHES, CAUSED AS A RESULT OF HIS WORK. REPAIR OR REPLACE DAMAGED ITEMS AS DIRECTED BY ARCHITECT. 14. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPLICABLE CODES AND STANDARDS. E O OR E G F AT LAKE OSWEGO SITE PLAN FIRST FLOOR - DEMOLITION FLOOR PLAN SECOND FLOOR - DEMOLITION FLOOR PLAN FIRST FLOOR - DEMOLITION REFLECTED CEILING PLAN SECOND FLOOR - DEMOLITION REFLECTED CEILING PLAN FIRST FLOOR PLAN SECOND FLOOR PLAN FIRST FLOOR - REFLECTED CEILING PLAN SECOND FLOOR - REFLECTED CEILING PLAN ROOF PLAN ROOF REPLACEMENT PLAN ROOF REPLACEMENT DEMOLITION AND NEW DETAILS EXTERIOR ELEVATIONS ENTRANCE CANOPY BUILDING SECTIONS WALL SECTIONS WALL SECTIONS WALL SECTIONS ENLARGED FLOOR PLANS AND INTERIOR ELEVATIONS ENLARGED STAIR PLAN, SECTION, AND DETAILS INTERIOR ELEVATIONS DETAILS DETAILS DOOR SCHEDULES SCHEDULES STRUCTURAL NOTES FOUNDATION PLAN FOUNDATION DETAILS SECOND FLOOR AND MEZZANINE FRAMING PLANS FLOOR FRAMING DETAILS ROOF FRAMING PLAN ROOF FRAMING DETAILS MECHANICAL M0.1 M0.2 M1.1 M1.2 M1.3 M2.1 M2.2 M2.3 M3.0 MECHANICAL SCHEDULES AND DETAILS MECHANICAL SCHEDULES AND DETAILS FIRST FLOOR HVAC DEMOLITION PLAN SECOND FLOOR HVAC DEMOLITION PLAN ROOF HVAC DEMOLITION PLAN FIRST FLOOR MECHANICAL PLAN SECOND FLOOR MECHANICAL PLAN ROOF HVAC PLAN HVAC DETAILS ALL "BUILDER DESIGNED" SYSTEMS ARE TO MEET ALL APPLICABLE CODES AND REQUIRED STANDARDS. WORK SHALL INCLUDE ALL REQUIRED PERMITS, LABOR MATERIALS, AND EQUIPMENT FOR A COMPLETE PROJECT. INSTALLERS ARE TO PROVIDE ALL REQUIRED DRAWINGS, CODE COMPLIANCE FORMS, CALCULATIONS AND OTHER DOCUMENTATION REQUIRED. PLUMBING P0.1 P1.1 P1.2 P1.3 P1.4 PLUMBING SCHEDULES AND DETAILS FIRST FLOOR PLUMBING DEMOLITION PLAN SECOND FLOOR PLUMBING DEMOLITION PLAN FIRST FLOOR PLUMBING PLAN SECOND FLOOR PLUMBING PLAN ELECTRICAL PROJECT LOCATION NCSD ADMINISTRATION OFFICES 12400 SE FREEMAN WAY MILWAUKIE OREGON 97222 PROJECT SITE E0.1 E1.1 E1.2 E2.0 E2.1 E2.2 E2.3 E3.1 E3.2 E6.1 E6.2 E7.1 ELECTRICAL LEGEND & SCHEDULES FIRST FLOOR ELECTRICAL DEMO PLAN SECOND FLOOR ELECTRICAL DEMO PLAN SITE ELECTRICAL PLAN FIRST FLOOR ELECTRICAL PLAN SECOND FLOOR ELECTRICAL PLAN ROOF ELECTRICAL PLAN FIRST FLOOR LIGHTING PLAN SECOND FLOOR LIGHTING PLAN ELECTRICAL ONE-LINE DIAGRAM PANEL SCHEDULES ELECTRICAL DETAILS 14019.00.L 1. LANG BATES TITLE SHEET FIRST FLOOR CODE PLAN SECOND FLOOR CODE PLAN STRUCTURAL S1.0 S1.1 S1.2 S2.1 S2.2 S3.1 S3.2 GRID BUBBLE & GRID LINE DESIGN/BUILD DEFERRED SUBMITTALS GENERAL ARCHITECTURAL STRUCTURAL ENGINEERS A101 A101 KEYNOTE TAG 8 A 1 NORTH CLACKAMAS SCHOOL DISTRICT 12451 SE FULLER ROAD MILWAUKIE , OREGON 97222 PHONE: (503) 353-6058 FAX: (503) 353-6075 CONTACT: GARRY KRYSZAK WALL SECTION FLAG A1.1 1 OWNER DOOR TAG TITLE SHEET B REVISIONS 1 A1.1 97222 D SEE SPECIFICATION SECTION 01 23 00 GENERAL NOTES ED ARC R E H T A 12400 SE FREEMAN WAY, MILWAUKIE, OREGON Plate Plastic Laminate Plywood Pair Pressure Treated Paper Towel Dispenser Combination Paper Towel Dispenser / Receptacle Partition Quarry Tile Riser Radius Roof Drain Refrigerator or Reference Reinforced Required Requirements Resilient Reverse Room Rough Opening Solid Core Seat Cover Dispenser Schedule Soap Dispenser Section Square Feet Sheathing Similar Sheet Metal Sanitary Napkin Dispenser Sanitary Napkin Receptacle Specification Stainless Steel Steel Storage Structural Suspended Tread Tongue and Groove Telephone Tempered Top Of Top of Curb Top of Pavement Top of Wall Toilet Paper Dispenser Tube Steel Typical Uniform Building Code Unless Otherwise Noted Vertical Vestibule Veneer Plaster With Water Closet Wood Water Heater Without Waterproof Weight DATE PL. PLAM PLYWD. PR. P.T. PTD PTD/R PTN. Q.T. R. RAD. R.D. REF. REINF. REQ'D. REQ'MTS. RESIL. REV. RM. R.O. S.C. S.C.D. SCHED. SD SECT. S.F. or SQ. FT. SHT'G. SIM. S.M. SND SNR SPEC. S.S. STL. STOR. STRUCT. SUSP. T. T&G TEL. TEMP. T.O. T.O.C. T.O.P. T.O.W. TPD T.S. TYP. U.B.C. U.O.N. VERT. VEST. V.P. W/ W.C. WD. W.H. W/O WP. WT. 15 APR 2015 Expansion Exterior Existing Floor Drain Foundation Fire Extinguisher Fire Extinguisher Cab. Fire Hose Cabinet Finish Floor Fluorescent Face of Concrete Face of Finish Face of Studs Foot or Feet Footing Gauge Galvanized General Contractor Glue Laminated Beam Glass Masonry Unit Gypsum Hose Bib Hollow Core Header Hollow Metal Horizontal Hour Height Inside Diameter or Inside Dimension Insulation Interior Joint Laminate Lavatory Light Maximum Machine Bolt Medium Density Overlay Mechanical Membrane Manufacturer Man Hole Minimum Miscellaneous Masonry Opening Modified Bitumen Metal Not In Contract Number Nominal Not to Scale On Center Outside Diameter Owner Furnished Contractor Installed Owner Furnished Owner Installed Opening Opposite Oregon Structural Specialty Code ST DRAWING INDEX PROJECT NUMBER P L # SQ. A.B. ACOUST. ADJ. A.F.F. ALT. ALUM. A.N.S.I. ARCH. ASPH. A/V BD. BIT. BLDG. BLK. BLKG. BM. B.O. B.O.C. BRNG. BTM. CAB. C.B. C.I. CJ CL. CLG. CLR. CMU CO COL. CONC. CONN. CONST. CONT. COORD. CORR. CTR. CUST. DBL. D.F. DIA. DIAG. DIM. DISP. DN. DR. DS DTL. DWG EJ EL. ELEC. ELEV. EQ. EXP. EXT. EXIST. F.D. FDN. F.E. F.E.C. F.H.C. FIN. FLR. FLUOR. F.O.C. F.O.F. F.O.S. FT. FTG. GA. GALV. GC G.L.B. G.M.U. GYP. H.B. H.C. HDR. H.M. HORIZ. HR. HT. I.D. INSUL. INT. JT. LAM. LAV. LT. MAX. M.B. M.D.O. MECH. MEMB. MFR. or MANUF. M.H. MIN. MISC. M.O. MOD. BIT. MTL. N.I.C. NO. or # NOM. N.T.S. O.C. O.D. O.F.C.I. O.F.O.I. OPNG. OPP. O.S.S.C. 101 C L And Angle Centerline Degrees Diameter or Round Perpendicular Plate Pound or Number Square Anchor Bolt Acoustical Adjustable Above Finish Floor Alternate Aluminum American National Standards Institute A117.1-1980 Architectural Asphalt Audio/Video Board Bituminous or Bitumen Building Block Blocking Beam Bottom Of Bottom of Curb Bearing Bottom Cabinet Catch Basin Cast Iron Control Joint Closet Ceiling Clear Concrete Masonry Unit Cleanout Column Concrete Connect or Connection Construction Continuous Coordinate Corridor Center Custodial Double Drinking Fountain Diameter Diagonal Dimension Dispenser Down Door Downspout Detail Drawing Expansion Joint Elevation Electrical Elevator Equal CONTACTS NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL C COPYRIGHT BBL ARCHITECTS & STANDARD SYMBOLS REGI S ABBREVIATIONS ON NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL T ITEC G1.0 LOCATION MAP VICINITY MAP II B (UNCHANGED) BUILDING HEIGHT 30' CONSTRUCTION TYPE IIB PRIMARY STRUCTURAL FRAME 0 HR MAXIMUM ALLOWABLE BUILDING HEIGHT 45' EXTERIOR BEARING WALLS 0 HR BUILDING AREA DATA inTERIOR BEARING WALLS 0 HR FLOOR AREA FIRST FLOOR SECOND FLOOR TOTAL THREE NEW TRANSLUCENT SKYLIGHTS AT EXISTING ROOF MECHANICAL AND ELECTRICAL MODIFICATIONS ZONING C-G GENERAL COMMERCIAL FIRE EXTINGUISHERS YES FIRE ALARM SYSTEM YES 0 HR ROOF 0 HR SITE DATA 1 2 EMERGENCY LIGHTING YES ROOFING SYSTEM CLASS A HAZARDOUS MATERIALS NO 3 4 5 6 22 FROM 2ND FLOOR A STORAGE ELEV MACHINE ROOM 154 MECHANICAL/ JANITOR 116 115 STAIR UP 153 120 ASSOC DIR HR B OCCUP 151 SF 2 100 119 HR OPEN OFFICE B OCCUP 242 SF 3 100 125 DIRECTOR HR B OCCUP 153 SF 2 100 2 3 2 WOMEN'S MEN'S 111 113 118 CONF. / OFFICE B OCCUP 122 SF 2 100 UNISEX 117 df B 107 SCH CH/ ST PLCMNT B OCCUP 337 SF 100 4 2 2 MECH ELECTRICAL 129 130 HR STORAGE 3 3 3 8 103 MAIL B OCCUP 75 SF 1 100 STAIR 150 104 PRV/CONF. B OCCUP 64 SF 1 100 106 BREAK-OUT ROOM B OCCUP 188 SF 2 100 105 CONF. B OCCUP 64 SF 1 100 2 1 21.6" 108 123 FS OPEN OFFICE B OCCUP 414 SF 5 100 STORAGE 148 B EXISTING PAVED AREA 38,995 SF (38%) NO CHANGE TO EXISTING PARKING EXCEPT AS NOTED FOR ADA SPACES AT FRONT OF EXISTING BUILDING 52,395 SF (51%) CODE PLAN LEGEND 15 2 fec 15 145 BREAK ROOM B OCCUP 479 SF 100 5 141 COMMUNITY RELATIONS B OCCUP 492 SF 100 5 2 5 140 ED. FOUND. DIRECTOR B OCCUP 120 SF 2 100 139 OFFICE B OCCUP 120 SF 100 2 PATH OF EGRESS TRAVEL 32 2 133 BUSINESS OP A B OCCUP 571 SF 6 100 X" 6 FEC FIRE EXTINGUISHER CABINET REQUIRED EXITS - OCCUPANT LOAD GREATER THAN 49 AND LESS THAN 500 = 2 EXITS MINIMUM CORRIDOR WIDTH 44" RATED CORRIDORS NOT REQUIRED STAIR 138 DIR COMM RELATIONS B OCCUP 189 SF 2 100 UP 136 EMERGENCY EXIT ILLUMINATION - EXIT ILLUMINATION SHALL BE PROVIDED THROUGHOUT TO MEET (1) Fc MIN. PER OSSC 1006, SEE ELECTRICAL DRAWINGS STORAGE 137 49 5 97 9.8" 1" 21" 3 4 5 MINIMUM EXIT WIDTH REQUIRED FOR OCCUPANT LOAD EXIT SIGN INTERNALLY OR EXTERNALLY ILLUMINATED 135 BUS. OP. DIRECTOR B OCCUP 163 SF 100 2 2 EXIT AND EGRESS LOAD C 134 CONF. B OCCUP 161 SF 100 2 D 2 ROOM NUMBER ROOM NAME / USE OCCUPANCY GROUP SQUARE FEET / AREA NUMBER OF OCCUPANTS CODE DATA LEGEND D 4/19/2015 6:57:32 PM (13%) OCCUPANCY LOAD FACTOR 13 142 FS SUPR. B OCCUP 141 SF 100 2 147B 5 1/8" = 1'-0" 49,609 SF (49%) fec 2 G2.1 EXISTING LANDSCAPE 132 BUSINESS OP B B OCCUP 1211 SF 13 100 5 STORAGE 147A FIRST FLOOR CODE PLAN 13,400 SF SITE COVERAGE 127 SHARED WORKROOM B OCCUP 263 SF 100 3 2 143 SHARED CONF. B OCCUP 160 SF 100 2 2 SND SYS 146 MEETING ROOM A-3 OCCUP 1465 SF 15 98 1 EXISTING BUILDING FOOTPRINT 121A STORAGE S OCC. 120 SF 300 1 2 144 SHARED CONF. B OCCUP 132 SF 100 2 79 FROM 1ST FLOOR 29 FROM 2ND FLOOR 1 102,004 SF 131 CFO OFFICE B OCCUP 202 SF 3 100 128 124 FS VAULT/REC B OCCUP 201 SF 100 3 122 OFFICE B OCCUP 120 SF 2 100 1 8 15 1S2E31CC fec 102 RECEPTION B OCCUP 734 SF 8 100 101 ENTRY B OCCUP 65 SF 100 1 2 126 ASSOC DIR HR B OCCUP 153 SF 2 100 121 OPEN OFFICE B OCCUP 342 SF 4 100 fec 108 COMMUNITY LIAISONS B OCCUP 372 SF 4 100 TAX MAP PARKING 107 SPACES (9'-0" WIDTH X 18'-0" LENGTH - TYPICAL) 4 ADA SPACES 1 VAN ACCESSIBLE SPACE "WHEELCHAIR USER ONLY" 4.4" A 1700, 1790 SITE AREA NON-SPRINKLERED NEW EMERGENCY GENERATOR AT EXTEROR NORTHWEST CORNER TAX LOT FIRST FLOOR CODE PLAN STOREFRONT ENTRANCE SYSTEMS AND STOREFRONT GLASS RELOCATED WITHIN THE EXISTING STRUCTURAL FRAME FLOOR 58 FROM 1ST FLOOR 39 FROM 2ND FLOOR 6 COMMON PATH OF EGRESS TRAVEL EXIST ACCESS TRAVEL DISTANCE 75' MAX. 200' MAX. REVISIONS NEW EXIT DOOR IN EXISTING CMU/BRICK WALL 3 13,400 SF 13,400 SF 26,800 SF 97222 MAXIMUM ALLOWABLE NUMBER OF STORIES ST 12400 SE FREEMAN WAY, MILWAUKIE, OREGON NEW RESTROOMS TO MEET OCCUPANT AND CODE REQUIREMENTS N/A 0 HR PER TABLE 602 0 HR DATE BASEMENT EXTERIOR NON-BEARING WALLS AND PARTITIONS INTERIOR NON-BEARING WALLS AND PARTITIONS 15 APR 2015 NEW INTERIOR STEEL STAIR SYSTEM AT CENTER OF BUILDING 2 PROJECT NUMBER NUMBER OF STORIES NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL INTERIOR PARTITION WALL RECONFIGURATION ON THE 1ST AND 2ND FLOORS INTO OFFICES, ADMINISTRATIVE SPACES, AND ASSOCIATED SUPPORT SPACES BUILDING ELEMENT A-3, B A-3, B NONE 14019.00.L THE REMODEL CONSISTS OF: OCCUPANCY GROUP(S) UNSEPARATED USES ACCESSORY/ INCIDENTAL USES E O OR E G F CONSTRUCTION TYPE FIRE RESISTANCE REQUIREMENTS FOR BUILDING ELEMENTS TABLE 601 AT 1988 LAKE OSWEGO THE PROJECT IS A TENANT IMPROVEMENT/REMODEL OF AN EXISTING 2 STORY FACILITY FOR NORTH CLACKAMAS SCHOOL DISTRICT AT 12400 SE FREEMAN WAY, MILWAUKIE, OREGON. EXISTING MECHANICAL AND ELECTRICAL ROOMS AND EXISTING EXIT STAIRWAYS AT THE CORNERS OF THE BUILDING WILL REMAIN. DATE OF CONSTRUCTION LANG BATES BUILDING CONSTRUCTION DATA C ED ARC H TER BUILDING OCCUPANCY DATA SCOPE OF WORK SUMMARY REGI S C COPYRIGHT BBL ARCHITECTS APPLICABLE CODE 2014 OSSC ON CODE SUMMARY T ITEC G2.1 A3: ASSEMBLY 1ST FLOOR MEETING ROOM B: OFFICE 1ST FLOOR ADMIN/OFFICE B: OFFICE 2ND FLOOR ADMIN/OFFICE MIN. REQUIRED # OF FIXTURES 1,465 SF / 15 SF PER OCCUPANT = 98 OCCUPANTS 49 MALE 49 FEMALE WATER CLOSETS MALE 1/125 FEMALE 1/65 WATER CLOSETS 1/25 FOR FIRST 50 1/50 REMAINDER EXCEEDING 50 7,076 SF / 100 SF PER OCCUPANT = 71 OCCUPANTS 36 MALE 35 FEMALE WATER CLOSETS 1/25 FOR FIRST 50 1/50 REMAINDER EXCEEDING 50 1 WC FEMALE LAVATORIES 1 REQUIRED 1 REQUIRED 1 PROVIDED 1 PROVIDED M: 1 REQUIRED F: 1 REQUIRED 1 PER FLOOR REQUIRED M: 1 PROVIDED F: 1 PROVIDED 1 PER FLOOR PROVIDED LAVATORIES 1/200 8,136 SF / 100 SF PER OCCUPANT = 82 OCCUPANTS 41 MALE 41 FEMALE DRINKING FOUNTAINS WC MALE 2 REQUIRED 2 REQUIRED 2 PROVIDED (3 URINALS = 2 WC) 4 PROVIDED 2 REQUIRED 2 REQUIRED 2 PROVIDED +2 URINALS PROVIDED 4 PROVIDED E O OR E G F LAKE OSWEGO ST SEE DEMOLITION PLANS FOR REMOVED PLUMBING FIXTURES SEE FLOOR PLANS FOR NEW PLUMBING FIXTURES M: 2 REQUIRED F: 2 REQUIRED M: 2 PROVIDED F: 3 PROVIDED LAVATORIES 1/40 FOR FIRST 80 1/80 REMAINDER EXCEEDING 80 0 PER FLOOR REQUIRED M: 1 REQUIRED F: 1 REQUIRED 1 PER FLOOR PROVIDED M: 3 PROVIDED F: 3 PROVIDED LAVATORIES 1/40 FOR FIRST 80 1/80 REMAINDER EXCEEDING 80 2 AT # OF OCCUPANTS NOTE: PLUMBING FIXTURES ADDED (NET) 3 URINALS 2 LAVATORIES 1 SERVICE SINK 1 DRINKING FOUNTAIN GROUP B - BUSINESS LANG BATES PLUMBING FIXTURE COUNT (PER TABLE 2902.) OCUPPANCY ED ARC H TER C COPYRIGHT BBL ARCHITECTS APPLICABLE CODE 2014 OSSC REGI S (CONTINUED) ON CODE SUMMARY T ITEC 3 4 5 6 EXISTING AREA OF RESCUE ASSISTANCE 22 TO 1ST FLOOR A A 6.6" DN 3 207 212 WAITING AREA B OCCUP 99 SF 100 1 df 1 CONF. B OCCUP 269 SF 3 100 3 HALLWAY HALLWAY 2 218 217 SECONDARY ASSOC DIR B OCCUP 119 SF 2 100 250 fec B 201 ADMIN B OCCUP 570 SF 6 100 1 6 204 SUPERINTENDENT B OCCUP 273 SF 3 100 2 2 243 COORD SPEC ED B OCCUP 123 SF 100 2 242 WORK AREA B OCCUP 100 SF 100 1 1 2 248 STORAGE 222 OPEN TO BELOW 29 C 241 ASSOC DIR SPEC ED B OCCUP 114 SF 100 2 244 COORD SPEC ED B OCCUP 123 SF 100 2 245 COORD SPEC ED B OCCUP 121 SF 100 2 2 2 235 ASSOC DIR INST SERV B OCCUP 140 SF 2 100 246 CONF. B OCCUP 122 SF 100 2 2 247 WAITING AREA B OCCUP 94 SF 1 100 1 HALLWAY 234 ASSOC DIR ELL B OCCUP 140 SF 2 100 2 2 PATH OF EGRESS TRAVEL 2 231 ASSOC DIR T&L B OCCUP 125 SF 2 100 236 OPEN OFF INST SERV B OCCUP 1168 SF 12 100 12 MECH / ELEC 238 2 230 DIRECTOR EQ & INST B OCCUP 162 SF 100 2 4/19/2015 7:06:00 PM 1 G2.2 SECOND FLOOR CODE PLAN 1/8" = 1'-0" 3 4 HALLWAY 2 228 2 EXIT AND EGRESS LOAD C 225 DIRECTOR T&L B OCCUP 149 SF 100 2 X" MINIMUM REQUIRED EXIT WIDTH REQUIRED FOR OCCUPANT LOAD EXIT SIGN INTERNALLY OR EXTERNALLY ILLUMINATED FEC 226 OFFICE B OCCUP 151 SF 2 100 ROOF ACCESS FIRE EXTINGUISHER CABINET 229 REQUIRED EXITS - OCCUPANT LOAD GREATER THAN 49 AND LESS THAN 500 = 2 EXITS STAIR EMERGENCY EXIT ILLUMINATION - EXIT ILLUMINATION SHALL BE PROVIDED THROUGHOUT TO MEET (1) Fc MIN. PER OSSC 1006,SEE ELECTRICAL DRAWINGS 136 39 DN 11.7" D 39 TO 1ST FLOOR EXISTING AREA OF RESCUE ASSISTANCE 2 32 MINIMUM CORRIDOR WIDTH 44" RATED CORRIDORS NOT REQUIRED D 1 OCCUPANCY LOAD FACTOR CODE DATA LEGEND HALLWAY STORAGE ROOM NUMBER ROOM NAME / USE OCCUPANCY GROUP SQUARE FEET / AREA NUMBER OF OCCUPANTS 6 227 2 fec 237 224 OPEN OFFICE T & L B OCCUP 539 SF 100 6 HALLWAY 233 COORD T&L B OCCUP 131 SF 2 100 CODE PLAN LEGEND 121A STORAGE S OCC. 120 SF 300 1 OPEN TO BELOW 232 239 B 2 223 SHARED WORK B OCCUP 270 SF 100 3 HALLWAY 3 8.7" 205 2 ASSIST SUPERINTENDENT B OCCUP 169 SF 100 2 220 ELEM ASSOC DIR B OCCUP 140 SF 2 100 DN 249 155 MEETING LANDING B OCCUP 240 SF 100 3 219 ASSESSMENT COORD B OCCUP 123 SF 100 2 2 221 OFFICE B OCCUP 141 SF 2 100 STAIR 3 240 DIRECTOR SSS B OCCUP 148 SF 2 100 2 203 SHARED CONF. B OCCUP 108 SF 2 100 fec 206 WORK ROOM B OCCUP 65 SF 1 100 2 202 ASSIST SUPERINTENDENT B OCCUP 165 SF 100 2 216 SECONDARY DIR B OCCUP 186 SF 2 100 fec 3 2 SECOND FLOOR CODE FLOOR PLAN 209 5 6 COMMON PATH OF EGRESS TRAVEL EXIST ACCESS TRAVEL DISTANCE 75' MAX. 200' MAX. REVISIONS 208 97222 WOMEN 12400 SE FREEMAN WAY, MILWAUKIE, OREGON MEN 215 DATE fec 110 214 15 APR 2015 ELEV 2 ELECTRICAL 213 OPEN OFFICE B OCCUP 284 SF 100 3 PROJECT NUMBER 153 210 SHARED CONF. B OCCUP 282 SF 3 100 MECH. / JAN. NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL STAIR 211 ELEM DIRECTOR B OCCUP 164 SF 2 100 14019.00.L 22 G2.2 E O OR E G F AT LAKE OSWEGO LANG BATES ED ARC H TER REGI S C COPYRIGHT BBL ARCHITECTS ON REMOVE EXISTING CONCRETE FOR NEW LANDSCAPING SHOWN HATCHED T ITEC ST EXISTING ADA RAMP EXISTING CONCRETE SIDEWALK TO REMAIN EXISTING PARKING STRIPE ALIGN. EXISTING LANDSCAPING TO REMAIN NEW PLANTERS (2) SEE SPECIFICATIONS ALIGN. REMOVE EXISTING CONCRETE FOR NEW LANDSCAPING SHOWN HATCHED C.J. TYP. 1 A2.2 NEW CONCRETE WALKWAY INFILL AT EXISTING CONCRETE RAMP AREA 6'-10" 6'-3" 15'-3" C L EQ EQ ALIGN. 4'-6" ALIGN. EQ C L 14'-7 1/4" VERIFY NEW CONCRETE WALKWAY INFILL AT EXISTING LANDSCAPE AREA (RETAIN REMOVED LANDSCAPE FOR RELOCATION) EQ ALIGN. ENTRANCE CANOPY SHOWN DASHED ALTERNATE NO. 1 NEW 6" CONCRETE CURB - MATCH EXISTNG 3 2 A0.1 NEW CONCRETE AT ENTRANCE 1/8" = 1'-0" A0.1 NEW GENERATOR ON NEW CONCRETE PAD - SEE ELECTRICAL DRAWINGS CE PA 19 S EXISTING ADA PARKING SIGNS TO REMAIN S 5 E S REMOVE EXISTING CONCRETE FOR RELOCATED LANDSCAPING EXISTING STRIPING TO REMAIN - TYP. ES AC SP EXISTING ADA PARKING SIGNS TO REMAIN - TYP. " 18'-0 . T YP REMOVE EXISTING DOOR INFILL WITH NEW STOREFRONT PANEL INFILL EXISTING LANDSCAPING WITH NEW CONCRETE WALK EXISTING STRIPING TO REMAIN - TYP. " 10'-0 '-0" " 8 9'-0 . TYP 16 P S C A ING RK A GP TIN S I EX ES 7 SPAC CE PA 21 S 7 SPACES S Y RT E P O PR E LIN . YP T - EXISTING ADA PARKING SIGN TO REMAIN - ADD "WHEEL CHAIR USER ONLY" SIGN ALTERNATE NO. 1 - ENTRANCE CANOPY SHOWN DASHED 3 A0.1 EXISTING ADA DESIGNATED PARKING SPACE NEW SECURITY PLANTERS (2) TYP. REMOVE EXISTING ADA PARKING DESIGNATION EXISTING LOADING ZONE EXISTING PARKING EXISTING GARBAGE/RECYCLING 4/19/2015 7:22:41 PM 107 SPACES (9'-0" WIDTH X 18'-0" LENGTH - TYPICAL) 4 ADA ACCESSIBLE SPACES 1 VAN ACCESSIBLE "WHEELCHAIR USER ONLY" SPACE A0.1 SITE PLAN 1/32" = 1'-0" 97222 A0.1 NO CHANGE TO EXISTING PARKING EXCEPT AS NOTED FOR REMOVAL OF ADA PARKING DESIGNATION ON PAVEMENT AT FRONT OF BUILDING AND NEW "WHEELCHAIR USER ONLY" SIGN. 1 SITE PLAN ING RK A GP TIN S I EX REMOVE EXISTING CONCRETE FOR NEW LANDSCAPING REVISIONS REMOVE EXISTING ADA PARKING SPACE DESIGNATION S 12400 SE FREEMAN WAY, MILWAUKIE, OREGON CE PA 6S DATE S 15 APR 2015 CE PA 21 S PROJECT NUMBER EXISTING BUILDING 14019.00.L AY W N MA E E R SE F AY W AN M EE R F SE NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL NEW SIGNAGE AT EXISTING LOCATION 2 A0.1 ENLARGED SITE PLAN 1/16" = 1'-0" 2. CONTRACTOR TO PATCH, REPAIR AND PAINT (REFINISH) SURFACES AND BUILDING ELEMENTS DAMAGED BY ADDITION OR REMOVAL OF MECHANICAL AND ELECTRICAL ITEMS. 3. PATCH AND REPAIR ALL SURFACES TO MATCH EXISTING SURFACES WHERE ITEMS ARE REMOVED OR ALTERED. FIELD VERIFY EXTENT OF REQUIRED REPAIRS. 4. PROVIDE TEMPORARY BRACING AND SHORING OF EXISTING STRUCTURAL ELEMENTS AS REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION UNTIL STRUCTURAL SYSTEMS AND MODIFICATIONS ARE SECURE AND IN PLACE. 6. COORDINATE ITEMS TO BE SALVAGED TO OWNER WITH THE SPECIFICATIONS AND OWNER'S REPRESENTATIVE. 7. PROTECT ALL ITEMS NOT NOTED TO BE REMOVED (FIELD VERIFY ALL CONDITIONS) AND COORDINATE ALL WORK WITH OWNER TO MINIMIZE DISRUPTION TO EXISTING FACILITIES OPERATIONS. 8. CONTRACTOR TO VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. PROTECT UTILITIES TO REMAIN IN SERVICE. 3 4 5 6 7 8 9 10 12 13 14 15 16 17 5 6 18 19 20 21 22 119A 129A 23 OFFICE CLOSET 2 OFFICE DEMOLITION FLOOR PLAN LEGEND 1/8" = 1'-0" UP 16 EXISTING DOOR(S) T0 BE REMOVED OFFICE TYP. 136B 12 21 D EXISTING RELIGHT T0 BE REMOVED 5 6 1 FIRST FLOOR DEMOLTION PLAN 1/8" = 1'-0" E O OR E G F EXISTING WALL T0 REMAIN EXISTING WINDOW T0 REMAIN A1.1 LAKE OSWEGO EXISTING WALL T0 BE REMOVED STAIR 136 4 LANG BATES 20 EXISTING DOOR TO REMAIN 3 97222 13D OFFICE 17 12 28D 3 8 2 27D 4 OFFICE OFFICE REMOVE PORTION OF CMU 23 AND BRICK VENEER WALL FOR NEW DOOR. LOCATE EXISTING REBAR IN WALL. COORDINATE LOCATION OF NEW DOOR OPENING WITH ARCHITECT AND STRUCTURAL ENGINEER BEFORE BEGINNING DEMOLITION 12 HALLWAY 43D 1 4/19/2015 7:19:43 PM 26 C OFFICE OPEN OFFICE 35D 26 CLOSET D OFFICE FIRST FLOOR - DEMOLITION FLOOR PLAN IT 38D CLOSET 7 39D STORAGE 136A 26 12 12 8 TYP. 1 28 9 12 9 33D 26 14D 28 1 OPEN OFFICE 17 26D 9 26 OPEN OFFICE OFFICE 44D 37D 26 6 STORAGE TYP. 26 25D 7 KITCHEN 1'-11" 28 OFFICE REVISIONS 8'-6" VERIFY B 12 24D OPEN OFFICE HALLWAY 12 17 12D HALLWAY OFFICE 20D 19D 10 C 12 OFFICE 10 10 12 28 OFFICE 9 29D 6'-11" VERIFY REST ROOM BREAK ROOM 30D 12'-7" HALLWAY 10 8D 9D 40D 41D 6 JANITOR OFFICE 12 27 28 KITCHEN 9 16D 7D 13 4 31D 10 OFFICE 25 26 21D 13 28 RESTROOM 24 17'-8" VERIFY 28 CONFERENCE 10 130 IT CLOSET 15D 18D 15 129 9 13 RESTROOM OFFICE RECEPT. OFFICE 17D ENTRY STORAGE 9 15 40'-4" VERIFY STOR. 18'-10" VERIFY 9 27 IT CLOSET 8 28 ELECTRICAL 10 36D CLOSET 7 12 MEETING HALLWAY 32D 17'-4" VERIFY 12 3D 9 28 3 HALLWAY OPEN OFFICE 6D HALLWAY 4D CLOSET 2D 2 14 6 MECH 130A 2 1 6 4 7 19 11D 114 34D 112 5D 22 10D RR 112A 15 HALLWAY 21 OFFICE 18 RR 116A 19 1 ENTRY 42D OFFICE 116 114A 18 5 B TYP. OPEN OFFICE 1 1D 17 UP 16 25 115A 115 12 DATE 153A MECHANICAL/ JANITOR 24 23D 22D 153 A HALLWAY ELEV MACHINE ROOM CLOSET STAIR 14'-0" VERIFY A ST 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 4 15 APR 2015 3 PROJECT NUMBER 2 14019.00.L 1 AT 2 REMOVE EXISTING CARPET AND BASE THROUGHOUT UNLESS NOTED OTHERWISE. REMOVE EXISTING DOORS & HARDWARE, TYPICAL. SALVAGE DOORS FOR REINSTALLATION AT NEW LOCATIONS. SALVAGE HARDWARE TO OWNER. REMOVE EXISTING INTERIOR RELIGHTS, TYP. REMOVE EXISTING PACKAGED STEEL DOOR FRAMES, TYP. REMOVE WOOD PANELING AT ENTRY WALLS. REMOVE EXISTING WALLS, TYPICAL. (FULL HEIGHT). REMOVE EXISTING ELECTRICAL RECEPTACLES, SURFACE MOUNTED CONDUIT, AND ELECTRICAL DEVICES ON WALLS THROUGHOUT UNLESS OTHERWISE NOTED. SEE ELECTRICAL DRAWINGS. EXISTING CMU WALL AND BRICK VENEER TO REMAIN. REMOVE EXISTING CABINETRY. REMOVE EXISTING SINK AND CAP PIPING. SEE PLUMBING DRAWINGS. EXISTING COLUMNS, EXISTING GYPSUM BOARD AND FRAMING AT COLUMNS, OR EXISTING BRICK VENEER AT COLUMNS, TO REMAIN, TYPICAL. REMOVE EXISTING PLUMBING FIXTURES. CAP PIPING. SEE PLUMBING DRAWINGS. REMOVE EXISTING DRINKING FOUNTAIN. SEE PLUMBING DRAWINGS. REMOVE EXISTING FLOORING. EXISTING STAIRS TO REMAIN. PROTECT. EXISTING HORIZONTAL LOUVER BLINDS TO REMAIN. PULL BLINDS UP TO TOP OF WINDOW AND WRAP WITH PROTECTIVE COVER. UNWRAP AND CLEAN AFTER CONSTRUCTION IS COMPLETE, TYP. REMOVE EXISING WATER CLOSET. RETAIN FOR REINSTALLATION AFTER NEW FLOORING IS INSTALLED. REMOVE EXISTING SHEET VINYL FLOORING. EXISTING FLOORING TO REMAIN. REMOVE EXISTING ALUMINUM ENTRANCE STOREFRONT SYSTEM. REMOVE EXISTING ALUMINUM ENTRANCE / STOREFRONT SYSTEM. RETAIN FOR RELOCATION. DEMOLISH EXISTING CMU / BRICK VENEER WALL ASSEMBLY AS REQUIRED FOR NEW DOOR INSTALLATION. REMOVE EXISTING GLASS AND FRAME, AS REQUIRED, AT EXISTING ALUMINUM STOREFRONT SYSTEM FOR NEW DOOR INSTALLATION. EXISTING CARPET TO REMAIN. PROTECT. DEMOLISH EXISTING CONCRETE SLAB AS REQUIRED FOR NEW FLOOR OUTLETS - COORDINATE WITH ELECTRICAL DRAWINGS. REMOVE EXISTING SHOWER, CAP PIPING. DEMOLISH EXISTING CONCRETE SLAB AS REQUIRED FOR NEW FOOTINGS AND MECHANICAL DUCTWORK COORDINATE WITH STRUCTURAL AND MECHANICAL DRAWINGS. VERIFY ALL DIMENSIONS. ED ARC H TER 1 NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL C COPYRIGHT BBL ARCHITECTS 1. PROVIDE TEMPORARY DUSTPROOF PARTITIONS AS REQUIRED TO PROTECT ALL EXISTING AREAS FROM DAMAGE DUE TO DEMOLITION OR NEW CONSTRUCTION. REGI S DEMOLITION NOTES ON GENERAL DEMOLITION NOTES T ITEC A1.1 2. CONTRACTOR TO PATCH, REPAIR AND PAINT (REFINISH) SURFACES AND BUILDING ELEMENTS DAMAGED BY ADDITION OR REMOVAL OF MECHANICAL AND ELECTRICAL ITEMS. 3. PATCH AND REPAIR ALL SURFACES TO MATCH EXISTING SURFACES WHERE ITEMS ARE REMOVED OR ALTERED. FIELD VERIFY EXTENT OF REQUIRED REPAIRS. 4. PROVIDE TEMPORARY BRACING AND SHORING OF EXISTING STRUCTURAL ELEMENTS AS REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION UNTIL STRUCTURAL SYSTEMS AND MODIFICATIONS ARE SECURE AND IN PLACE. 6. COORDINATE ITEMS TO BE SALVAGED TO OWNER WITH THE SPECIFICATIONS AND OWNER'S REPRESENTATIVE. 3 4 5 6 7 8 9 10 7. PROTECT ALL ITEMS NOT NOTED TO BE REMOVED (FIELD VERIFY ALL CONDITIONS) AND COORDINATE ALL WORK WITH OWNER TO MINIMIZE DISRUPTION TO EXISTING FACILITIES OPERATIONS. 8. CONTRACTOR TO VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. PROTECT UTILITIES TO REMAIN IN SERVICE. 11 12 13 14 1 2 3 4 5 6 15 16 17 18 19 20 21 A A 7 17 25 STAIR 12 250A 153 110 23 12 ELEV MECH. / JAN. 14 214 TYP. ELECTRICAL 22 18 MEN WOMEN 208 209 22 215 23 70D 7 214A DN 24 25 IT ROOM 24 G OF OR E LAKE OSWEGO AT E 2 REMOVE EXISTING CARPET AND BASE THROUGHOUT UNLESS NOTED OTHERWISE. REMOVE EXISTING DOORS & HARDWARE, TYPICAL. SALVAGE DOORS FOR REINSTALLATION AT NEW LOCATIONS. SALVAGE HARDWARE TO OWNER. REMOVE EXISTING INTERIOR RELIGHTS. REMOVE EXISTING PACKAGED STEEL DOOR FRAMES. REMOVE EXISTING WALLS, TYPICAL. (FULL HEIGHT). REMOVE EXISTING ELECTRICAL RECEPTACLES AND ELECTRICAL DEVICES ON WALLS. SEE ELECTRICAL DRAWINGS. REMOVE EXISTING COUNTERTOPS. EXISTING COLUMNS, EXISTING GYPSUM BOARD AND FRAMING AT COLUMNS, TO REMAIN, TYPICAL. REMOVE EXISTING CABINETRY. REMOVE EXISTING SINK AND CAP PIPING. SEE PLUMBING DRAWINGS. REMOVE EXISTING FRAMED LOW WALL, PLATFORM, AND STEPS. REMOVE EXISTING SINKS. PIPING TO REMAIN FOR CONNECTION TO NEW SINKS AT SAME LOCATION. SEE PLUMBING DRAWINGS. EXISTING ELECTRICAL CLOSET, AND ELECTRICAL PANEL TO REMAIN. SEE ELECTRICAL DRAWINGS. EXISTING HORIZONTAL LOUVER BLINDS TO REMAIN. PULL BLINDS UP TO TOP OF WINDOW AND WRAP WITH PROTECTIVE COVER. UNWRAP AND CLEAN AFTER CONSTRUCTION IS COMPLETE, TYPICAL. REMOVE EXISTING DRINKING FOUNTAIN. SEE PLUMBING DRAWINGS. REMOVE ELECTRICAL CLOSET AND ELECTRICAL PANEL. SEE ELECTRICAL DRAWINGS FOR RELOCATION. REMOVE EXISTING ELECTRICAL PANEL. SEE ELECTRICAL DRAWINGS FOR RELOCATION, REMOVE EXISTING RAISED FLOORING AND FLOORING SUPPORT SYSTEM. REMOVE EXISTING HANDRAIL. REMOVE ALL ELECTRICAL DEVICES. SEE ELECTRICAL DRAWINGS. REMOVE EXISTING FLOOR/METAL DECK ASSEMBLY. REMOVE PORTION OF EXISTING ELECTRICAL DUCT SYSTEM IN FLOOR. PROVIDE TEMPORARY BRACING AND SHORING AS REQUIRED. SEE GENERAL DEMOLITION NOTES. VERIFY ALL DIMENSIONS BEFORE BEGINNING DEMOLITION. LANG BATES 1 ED ARC R E H T C COPYRIGHT BBL ARCHITECTS 1. PROVIDE TEMPORARY DUSTPROOF PARTITIONS AS REQUIRED TO PROTECT ALL EXISTING AREAS FROM DAMAGE DUE TO DEMOLITION OR NEW CONSTRUCTION. REGI S DEMOLITION NOTES ON GENERAL DEMOLITION NOTES T ITEC ST REMOVE PORTION OF EXISTING WALL FOR NEW DOOR OPENING. REMOVE EXISTING FRAMED WALL TO EXPOSE EXISTING WINDOWS. SALVAGE EXISTING DATA RACK TO OWNER. EXISTING FLOORING TO REMAIN. PROTECT. 2 208A 1 HALLWAY 8 53D 8 5 B 9 BREAK ROOM 21 2 38'-2" VERIFY OFFICE 4 OPEN OFFICE 9 OFFICE 59D 57D 18'-1" VERIFY 14 3 58D HALLWAY ELEC 16 CLOSET 21 CLOSET 1 9 6 54D 6 9 56D TYP. OPEN OFFICE OFFICE OFFICE 68D 30'-3" VERIFY 8OFFICE 8 3 OFFICE 5 1 2 6 OPEN OFFICE 64D OFFICE OFFICE VEST. 62D 6 CONFERENCE PLATFORM 63D 11 MECH / ELEC 14 13 DEMOLITION FLOOR PLAN LEGEND STAIR EXISTING DOOR(S) T0 BE REMOVED 136 25 TYP. 229A DN EXISTING WALL T0 BE REMOVED EXISTING RELIGHT T0 BE REMOVED EXISTING DOOR TO REMAIN 4/20/2015 4:46:30 PM 1 2 3 4 5 6 EXISTING WALL T0 REMAIN EXISTING WINDOW T0 REMAIN 1 A1.2 SECOND FLOOR DEMOLITION PLAN 1/8" = 1'-0" REVISIONS D DATE D 15 APR 2015 238A 5 238 5 HALLWAY 61D 4 228A 66D C 60D 65D C 8 8 PROJECT NUMBER TYP. 39'-3" VERIFY STORAGE 14 9 67D 14019.00.L RECEPT. 10 OPEN OFFICE 69D 9'-3" VERIFY SECOND FLOOR - DEMOLITION FLOOR PLAN 206A HALLWAY 13 ELEC CLOSET RECEPT. 97222 B 3 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 8 5 1 52D 4 4 15 D 0 5 OPEN OFFICE 23'-11" 5 1D 16'-6" VERIFY BREAK ROOM 19 209A NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 2 55D 10 16'-1" VERIFY 9 20 A1.2 3. PATCH AND REPAIR ALL SURFACES TO MATCH EXISTING SURFACES WHERE ITEMS ARE REMOVED OR ALTERED. FIELD VERIFY EXTENT OF REQUIRED REPAIRS. 5 4. PROVIDE TEMPORARY BRACING AND SHORING OF EXISTING STRUCTURAL ELEMENTS AS REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION UNTIL STRUCTURAL SYSTEMS AND MODIFICATIONS ARE SECURE AND IN PLACE. 6 7 6. COORDINATE ITEMS TO BE SALVAGED TO OWNER WITH THE SPECIFICATIONS AND OWNER'S REPRESENTATIVE. 8 7. PROTECT ALL ITEMS NOT NOTED TO BE REMOVED (FIELD VERIFY ALL CONDITIONS) AND COORDINATE ALL WORK WITH OWNER TO MINIMIZE DISRUPTION TO EXISTING FACILITIES OPERATIONS. 8. CONTRACTOR TO VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. PROTECT UTILITIES TO REMAIN IN SERVICE. 1 2 3 4 5 9 10 11 G OF OR E AT E 4 LAKE OSWEGO 2. CONTRACTOR TO PATCH, REPAIR AND PAINT (REFINISH) SURFACES AND BUILDING ELEMENTS DAMAGED BY ADDITION OR REMOVAL OF MECHANICAL AND ELECTRICAL ITEMS. REMOVE EXISTING ACOUSTICAL CEILING TILE. REMOVE EXISTING T-BAR CEILING GRID, TYPICAL. REMOVE EXISTING HVAC GRILLES. SEE MECHANICAL DRAWINGS. REMOVE EXPOSED CONDUIT AND ELECTRICAL DEVICES AT EXISTING CEILINGS. SEE ELECTRICAL DRAWINGS. REMOVE EXISTING GYPSUM BOARD CEILING. COORDINATE WITH DEMOLITION OF EXISTING DUCTWORK AND GRILLES. SEE MECHANICAL DRAWINGS. REMOVE EXISTING WALLS, TYPICAL. (FULL HEIGHT). REMOVE EXISTING LIGHT FIXTURES. SALVAGE FOR REINSTALLATION. COORDINATE DEMOLITION WITH ELECTRICAL DRAWINGS. REMOVE EXISTING METAL/DECK / FLOOR ASSEMBLY ABOVE. PROVIDE TEMPORARY BRACING AND SHORING AS REQUIRED. SEE GENERAL DEMOLITION NOTES. SEE SHEET A1.2 SECOND FLOOR DEMOLITION FLOOR PLAN. LANG BATES 1 2 3 ED ARC R E H T C COPYRIGHT BBL ARCHITECTS 1. PROVIDE TEMPORARY DUSTPROOF PARTITIONS AS REQUIRED TO PROTECT ALL EXISTING AREAS FROM DAMAGE DUE TO DEMOLITION OR NEW CONSTRUCTION. REGI S DEMOLITION NOTES ON GENERAL DEMOLITION NOTES T ITEC ST EXISTING CEILING TO REMAIN. EXISTING LIGHT FIXTURES TO REMAIN. REMOVE EXISTING WOOD PANELLING, TYP. 6 A A 9 ELEV MACHINE 10 ROOM 10 3 4 9 9 6 10 RR RR 112 114 9 5 IT CLOSET 10 6 STORAGE OFFICE OFFICE OFFICE B BREAK ROOM CLOSET 7 2 IT CLOSET HALLWAY HALLWAY OPEN OFFICE 10 7 4 ENTRY 1 9 130 STORAGE KITCHEN REST ROOM OFFICE B RESTROOM OFFICE RESTROOM RECEPT. HALLWAY ENTRY 8 CONFERENCE OFFICE 5 HALLWAY JANITOR OFFICE HALLWAY 4 KITCHEN 3 4 OPEN OFFICE OPEN OFFICE REMOVE 2' X 4' ACOUSTIC CEILING TILE GRID STAIR REMOVE 2' X 2' ACOUSTIC CEILING TILE GRID 136 OFFICE CLOSET D DEMOLITION REFLECTED CEILING PLAN LEGEND HALLWAY OFFICE 7 IT CLOSET 7 OFFICE 5 C OFFICE 6 HALLWAY CLOSET 6 3 OPEN OFFICE OFFICE C STORAGE STORAGE HALLWAY OFFICE OFFICE OFFICE 9 REMOVE 2' X 4' TROFFER DIFFUSER 10 D REMOVE 2' X 2' FLUORESCENT LIGHT FIXTURE REMOVE SUSPENDED LIGHT FIXTURE EXISTING WALL T0 BE REMOVED 1 2 3 4 5 6 EXISTING WALL T0 REMAIN 4/20/2015 4:48:10 PM EXISTING WINDOW T0 REMAIN 1 A1.3 FIRST FLOOR - DEMOLITION REFLECTED CEILING PLAN 1/8" = 1'-0" FIRST FLOOR - DEMOLITION REFLECTED CEILING PLAN OFFICE 8 REVISIONS CLOSET 97222 4 DATE 4 12400 SE FREEMAN WAY, MILWAUKIE, OREGON OFFICE 15 APR 2015 MEETING PROJECT NUMBER 7 NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 3 14019.00.L 2 129 10 ELEV 110 1 116 115 11 153 OFFICE HALLWAY 10 OFFICE ELECTRICAL 9 CLOSET STAIR MECH OPEN OFFICE STORAGE 9 MECHANICAL/ JANITOR A1.3 2. CONTRACTOR TO PATCH, REPAIR AND PAINT (REFINISH) SURFACES AND BUILDING ELEMENTS DAMAGED BY ADDITION OR REMOVAL OF MECHANICAL AND ELECTRICAL ITEMS. 3. PATCH AND REPAIR ALL SURFACES TO MATCH EXISTING SURFACES WHERE ITEMS ARE REMOVED OR ALTERED. FIELD VERIFY EXTENT OF REQUIRED REPAIRS. 4. PROVIDE TEMPORARY BRACING AND SHORING OF EXISTING STRUCTURAL ELEMENTS AS REQUIRED FOR DEMOLITION OR NEW CONSTRUCTION UNTIL STRUCTURAL SYSTEMS AND MODIFICATIONS ARE SECURE AND IN PLACE. 6. COORDINATE ITEMS TO BE SALVAGED TO OWNER WITH THE SPECIFICATIONS AND OWNER'S REPRESENTATIVE. 4 REMOVE EXISTING LIGHT FIXTURES WITH INTEGRAL VENTILATION GRILLES AND INFILL PANELS. SALVAGE FOR REINSTALLATION. COORDINATE DEMOLITION AND REINSTALLATION WITH ELECTRICAL DRAWINGS AND MECHANICAL DRAWINGS. 5 6 REMOVE EXISTING LIGHT FIXTURES REMOVE EXISTING HVAC GRILLES. SEE MECHANICAL DRAWINGS. REMOVE ELECTRICAL DEVICES AT EXISTING CEILING. SEE ELECTRICAL DRAWINGS. REMOVE EXISTING WALLS, TYPICAL. (FULL HEIGHT). EXISTING CEILING TO REMAIN. EXISTING LIGHT FIXTURES TO REMAIN. OPENING FOR NEW SKYLIGHT ABOVE SHOWN DASHED. COORDINATE OPENING SIZE WITH SKYLIGHT CURB DIMENSION. REMOVE EXISTING ACOUSTICAL CEILING TILES AS REQUIRED FOR NEW LIGHTING, TYPICAL. SALVAGE UNDAMAGED TILES FOR RELOCATION. SEE ELECTRICAL DRAWINGS. REMOVE EXISTING T-BAR CEILING. 7 7. PROTECT ALL ITEMS NOT NOTED TO BE REMOVED (FIELD VERIFY ALL CONDITIONS) AND COORDINATE ALL WORK WITH OWNER TO MINIMIZE DISRUPTION TO EXISTING FACILITIES OPERATIONS. 8. CONTRACTOR TO VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO START OF DEMOLITION. PROTECT UTILITIES TO REMAIN IN SERVICE. 8 9 10 11 12 13 1 2 3 4 5 G OF OR E LAKE OSWEGO AT E 2 3 REMOVE EXISTING ACOUSTICAL CEILING TILE. SALVAGE FOR REINSTALLATION. EXISTING T-BAR CEILING GRID TO REMAIN. REMOVE PORTION OF EXISTING T-BAR CEILING GRID AS REQUIRED FOR INSTALLATION OF NEW DUCT WORK. RETAIN UNDAMAGED TILES FOR REINSTALLATION OR RELOCATION. SEE MECHANICAL DRAWINGS. LANG BATES 1 ED ARC R E H T C COPYRIGHT BBL ARCHITECTS 1. PROVIDE TEMPORARY DUSTPROOF PARTITIONS AS REQUIRED TO PROTECT ALL EXISTING AREAS FROM DAMAGE DUE TO DEMOLITION OR NEW CONSTRUCTION. REGI S SHEET NOTES ON GENERAL DEMOLITION NOTES T ITEC ST 6 GENERAL NOTES 1. A TOTAL OF REMOVED T-BAR CEILING GRID SHALL NOT EXCEED 49% OF EXISTING A 9 9 9 2 STAIR 10 153 ELEV 110 MEN WOMEN 208 209 9 10 MECH. / JAN. ELECTRICAL 214 215 5 IT ROOM 10 10 12 BREAK ROOM OPEN OFFICE 1 HALLWAY 4 5 8 13 6 8 2 RECEPT. 3 7 B B 5 OPEN OFFICE 5 8 6 6 13 OFFICE 10 7 7 OFFICE OPEN OFFICE OFFICE OFFICE OFFICE C C OFFICE 5 10 5 HALLWAY STORAGE 8 12 2 OPEN OFFICE OFFICE 2 OFFICE VEST. 1 10 10 2 3 DEMOLITION REFLECTED CEILING PLAN LEGEND CONFERENCE 9 MECH / ELEC 238 10 ROOF ACCESS STAIR 229 136 REMOVE 2' X 4' ACOUSTIC CEILING TILE GRID D REMOVE 2' X 4' TROFFER DIFFUSER REMOVE SUSPENDED LIGHT FIXTURE EXISTING WALL T0 BE REMOVED 2 3 4 5 14019.00.L D 1 SECOND FLOOR - DEMOLITION REFLECTED CEILING PLAN 4 13 4 11 REVISIONS HALLWAY 97222 1 11 DATE CLOSET 1 15 APR 2015 11 12 12400 SE FREEMAN WAY, MILWAUKIE, OREGON BREAK ROOM PROJECT NUMBER 1 HALLWAY RECEPT. OPEN OFFICE NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 1 6 4/20/2015 4:50:53 PM EXISTING WALL T0 REMAIN EXISTING WINDOW T0 REMAIN 1 A1.4 SECOND FLOOR - DEMOLITION REFLECTED CEILING PLAN 1/8" = 1'-0" EXISTING 2' X 4' TROFFER DIFFUSER TO REMAIN A1.4 092901 5/8" TYPE 'X' ONE SIDE NOT AT SIM. 5/8" TYPE 'X'PAINT - ONE SIDE NOT AT SIM. 5/8" TYPE 'X'PAINT 092313 092901 064102 5/8" - ONE SIDE AT SIM. ONLY 092313 5/8" TYPE 'X' ONE SIDE 5/8" TYPE 'X'PAINT A C B 092901 5/8" TYPE 'X'ONE SIDE 5/8" - ONE SIDE 092313 6 A4.1 NOTE: SEE FOR P-LAM WAINSCOT DETAIL WALL TYPES 6 A4.1 NOTE: SEE E D 092901 092313 092313 G F AIR GAP - VERIFY DEPTH FOR ALIGNMENT PURPOSES FOR P-LAM WAINSCOT DETAIL 5/8" TYPE 'X'PAINT 092901 042201 ALIGN WITH EXISTING CMU SEE STRUCTURAL 7 A4.1 NOTE: SEE ST 092101 1/2" - PAINT 5/8" TYPE 'X'PAINT 064106 064106 NONE AT SIM. 064106 AT SIM. ONLY 092901 092101 1/2" - ONE SIDE 092901 AT SIM. ONLY 042201 ALIGN WITH EXISTING CMU - SEE STRUCTURAL 3 5/8" AT 16" O.C. 3 5/8" AT 16" O.C. 064102 5/8" TYPE 'X'ONE SIDE 092901 1 5/8" AT 16" O.C. 092905 092905 3 5/8" AT 16" O.C. 092905 092901 092901 092905 7/8" HORIZ. E O OR E G F 7/8" HORIZ. 6" AT 16" O.C. AT 074108 LAKE OSWEGO 074108 LANG BATES 3 5/8" AT 16" O.C. ED ARC H TER C COPYRIGHT BBL ARCHITECTS 3 5/8" AT 16" O.C. 092905 1 5/8" AT 16" O.C. REGI S 092905 ON 092905 092905 T ITEC FOR P-LAM WALL COVER DETAIL I H NOTE: SEE 7 A4.1 FOR P-LAM WALL COVER DETAIL 1 1/2" = 1'-0" 30'-0" A1.6 A3.1 OPP. A C A 148A SND SYS A 2'-4" 2'-7 3/4" 3'-0" 10 HALLWAY 147A 149 A A 146A ALIGN A STORAGE B 146F A J C B A A 147A 146G A A J 147B J 148 8" 3'-0" 7'-0" 5'-10" 5'-2" 2'-7" 5'-10" 8'-8 1/2" 9 1/2" 29'-0" MEETING ROOM 7 1'-8" 5'-10" 8 8 A4.3 AS REQ'D C 10'-1 1/2" 143 13'-4" SHARED CONF. 151A A A B COMMUNITY RELATIONS B BREAK ROOM 146D 146E 4 4/20/2015 6:14:56 PM 2 139A 5'-2" 11 1/2" 6 B 3 ALIGN 126A 140 OFFICE E 13'-8 1/2" A DIR COMM RELATIONS 138 3 3 A1.6 A1.6 129A A 4'-10 1/2" 1'-0" ALIGN C CONF. F 134 3 A A 7 A BUSINESS OP A 135A 133 F A1.6 BUS. OP. DIRECTOR 135 5'-0" 7'-0 1/2" 17'-11 1/2" 10'-2" STAIR UP A 136 3 137 137A D 9 11 1/2" 19'-2 1/2" 4 5 CONCRETE MASONRY UNITS PARTICLEBOARD HIGH PRESSURE LAMINATE [(ALL SURFACES AND EDGES)] METAL FURRING STEEL AND GYPSUM COMPOSITE PANEL ACOUSTICAL INSULATION GYPSUM BOARD METAL STUDS STORAGE SIM. 9'-10" 1 A2.1 fec 139 A4.3 2 A2.1 3 6 ED. FOUND. DIRECTOR 140A A 5 A4.3 134A F 7 145B 132 FS SUPR. A 6 4 D 142 G 141 8 D G A A A4.3 074108 092101 092313 092901 092905 BUSINESS OP B A A F 042201 064102 064106 .1'-0" 7 9'-0" 6 KEYNOTES ALIGN 144A A 5 1/2" 15'-8" 10'-2 1/2" A SHARED CONF. A A B 11 I 6 A F 13'-4" 6'-1" 10'-0" 144 145 8 A4.3 6'-7" F 7 13 5 7 C SIM. 5'-2" 146 SIM. F A B A ALIGN 21'-2 1/2" 123 A B ALIGN A 10'-7" 117A 6'-10" 151 H 8'-4 1/2" A A4.3 A1.6 124A FS OPEN OFFICE 1'-8" 6 3 A HALLWAY I B A SHARED WORKROOM 127 124 B 11 1/2" 1'-8 1/2" 10'-3" 8 B ALIGN 11'-2 1/2" A 1 1/2" 11'-2 1/2" 11 11 12 13 ALTERNATE NO. 8 - NEW INTERIOR ALUMINUM ENTRANCE / STOREFRONT SYSTEM - SHOWN DASHED. SEE SPECIFICATION. RELOCATED EXISTING ALUMINUM ENTRANCE IN NEW STOREFRONT SYSTEM. INFILL EXISTING ALUMINUM STOREFRONT ENTRANCE FRAME WITH NEW GLASS. MATCH EXISTING. SEE SPECIFICATION. INFILL EXISTING ALUMINUM STOREFRONT FRAME WITH NEW ALUMINUM STOREFRONT ENTRANCE DOOR. NEW HOLLOW METAL DOOR AND FRAME AT EXISTING CMU / BRICK VENEER WALL. CUSTOM CASEWORK. SEE INTERIOR ELEVATIONS. MARKERBOARD. SEE SPECIFICATION FOR LOCATION, NUMBER, SIZE, AND MOUNTING HEIGHT INFORMATION. FABRIC WRAPPED WALL PANEL (TACKABLE). SEE SPECIFICATION FOR LOCATION, NUMBER, SIZE AND MOUNTING HEIGHT INFORMATION. NEW CARD READER. SEE ELECTRICAL DRAWINGS. NEW SPANDREL GLASS UNITS IN NEW STOREFRONT SYSTEM. LINE OF OPENING ABOVE SHOWN DASHED. LINE OF OPENING ABOVE SHOWN DASHED. NEW WALL TO UNDERSIDE OF EXSTING STAIRS. NEW CONCRETE INFILL TO LEVEL WITH EXISTING FLOOR SLAB. 14019.00.L 101A 101 A 105 FS VAULT/REC B A4.2 106 A 122 A 1 11 CONF. A I 150 1 A1.6 F 152 BREAK-OUT ROOM 131 A 8'-6 1/2" 2 104 STAIR 4'-4" 101B 103 128 9 10 CFO OFFICE 9'-5 1/2" 4 102 146B 9 9 7" '- 9 1/2" 8'-6"± ENTRY ALIGN RECEPTION A4.3 143A A 4 6 1 '- A HR STORAGE 128A A OFFICE 8" 6'-9 1/2" ALIGN 11 1/2" 121 fec A3.1 MAIL A PRV/CONF. G 2" 1/ I F OPEN OFFICE HALLWAY I 12'-4" 1 3 '- 6 11'-2" 8'-8 1/2" 3 42° 30'-0" A " 122A 6 151B fec 6'-8" C ALIGN 7'-0" 9 D A 8'-5" 7A 10 3 8'-4" 103A 6 107 A2.1 7'-2 1/2" C 145A B ALIGN 7'-6" A 113A 147B A4.3 D A CONF. / OFFICE 130A 3 118 ALIGN SCH CH/ ST PLCMNT B A STORAGE 2 A 111A 6 4'-9 1/2" B A 6 5'-0" MIN. CLR. D 8 1/2" 117 A 104A A UNISEX 6 7 8 G H 4 5 131A 113 130 9'-7" 111 109 E 118A 129 142A MEN'S B 11'-8 1/2" WOMEN'S B A 7 1/2" 116A A 146C HALLWAY 108 B ALIGN 105A A 114A 1'-1 1/2" COMMUNITY LIAISONS B 6'-1 1/2" 5'-6" 12'-4 1/2" 126 A A G A4.1 ELECTRICAL 8'-5" 1 SIM. B B MECH 9'-6" 114 112A 8'-3 1/2" 2'-5"± 112 ALIGN fec 29'-0" 3 RR 13'-10" B RR A 119 ALIGN 110 125 ASSOC DIR HR 120 138A ELEV . 9'-2 1/2" B . HR OPEN OFFICE 116 DIRECTOR HR ASSOC DIR HR 120A UP 115A 115 1 11'-0" 153A 3 A 19'-9 1/2" 12 B 119A A 2 9 MECHANICAL/ JANITOR 10'-0 1/2" 153 B 1'-0" 14'-2"± A1.6 2'-2" 7'-10 1/2" 154 STAIR ELEV MACHINE ROOM 154A 14'-2 1/2" 125A 4'-9" STORAGE 13'-11 1/2" 2 1 FIRST FLOOR PLAN A3.1 REVISIONS A3.1 SHEET NOTES 97222 4 A2.1 3 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 3 DATE 1 15 APR 2015 2 7 1/2" A 30'-0" 9'-5 1/2" 5'-4 1/2" 30'-0" 6 PROJECT NUMBER 30'-0" 5 136A 30'-0 5/8" 4 NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 3 136B ALIGN 2 10'-0 1/2" 1 6 A1.5 1 A1.5 FIRST FLOOR PLAN 1/8" = 1'-0" 3" 4 NEW STOREFRONT ENTRANCE SYSTEM 1" NEW ACOUSTIC PARTITION CLOSURE SEE SPECIFICATIONS 1" SEE FLOOR PLAN FOR WALL TYPE 2 A1.6 SEE FLOOR PLAN FOR WALL TYPE EXISTING STOREFRONT WINDOW SEALANT AT PARTITION EDGE CONDITIONS EXISTING SILL BELOW EXISTING SILL BELOW PARTITION WALL AT MULLION 3 3" = 1'-0" A1.6 1 A1.6 3 30'-0 1/2" 5 30'-0" 2 1 A3.1 A2.1 G 3" = 1'-0" 4 30'-0" OF OR E PARTITION WALL AT GLAZING 4 3" = 1'-0" 2 SEE FLOOR PLAN FOR WALL TYPE EXISTING SILL BELOW SEALANT AT PARTITION EDGE CONDITIONS PARTITION WALL AT GLAZING ST 2 1/2" VERIFY NEW INSULATED SPANDREL GLASS SEE SPECIFICATIONS 1" SKYLIGHT OPENING ABOVE SHOWN DASHED CUSTOM CASEWORK. SEE INTERIOR ELEVATIONS. MARKERBOARD. SEE SPECIFICATION FOR LOCATION, NUMBER, SIZE, AND MOUNTING HEIGHT INFORMATION FABRIC WRAPPED WALL PANEL (TACKABLE). SEE SPECIFICATION FOR LOCATION, NUMBER, SIZE, AND MOUNTING HEIGHT INFORMATION LAKE OSWEGO 1 2 3 LANG BATES METAL CLOSURE CHANNEL PAINT TO MATCH DOOR AND RELIGHT FRAMES SEALANT AT ALL EDGES AT E EXISTING MULLION SHEET NOTES ED ARC R E H T NEW ACOUSTIC PARTITION CLOSURE SEE SPECIFICATIONS 3" VERIFY 3" C COPYRIGHT BBL ARCHITECTS 3" VERIFY BACKER ROD AND SEALANT T ITEC REGI S EXISTING STOREFRONT WINDOW NEW ACOUSTIC PARTITION CLOSURE SEE SPECIFICATIONS METAL CLOSURE CHANNEL - PAINT TO MATCH DOOR AND RELIGHT FRAMES SEALANT AT ALL EDGES EXISTING STOREFRONT WINDOW - NEW GLAZING AND STOREFRONT SILL AT SIM. ONLY ON METAL CLOSURE CHANNEL PAINT TO MATCH DOOR AND RELIGHT FRAMES SEALANT AT ALL EDGES 6 30'-0" 30'-0" 3 4 A3.1 A3.1 2 2'-6" 5 2 A1.6 3 2 A1.6 A1.6 2'-6" 3'-0" A A 4'-7" 214A 216A A ASSOC DIR INST SERV ASSOC DIR ELL 235 234 A 13'-4" G A 9'-10 1/2" HALLWAY 232 A A2.1 5'-6 1/2" 5'-3" G F A ASSOC DIR T&L A ALIGN C 225A DIRECTOR T&L F 225 2 EXISTING WALL ASSEMBLY A1.6 A A 226A F 231 DIRECTOR EQ & INST 2'-6 1/2" 16'-8" A A 10'-4 1/2" 236 T&L 233 A F A 4" A ALIGN COORD 3 ALIGN HALLWAY OFFICE 228 226 A 229A 230 SEALANT TYP. ALL EDGES STAINLESS STEEL SHEET WRAP AT ALL EXPOSED EDGES 1/2" PLYWOOD STAIR 3 5/8" METAL FRAMING NEW MOP SINK 136 DN B 2'-6 1/2" D D ROOF ACCESS 2 A1.6 2 229 A2.1 4" COVED RUBBER BASE 4/20/2015 5:33:38 PM 1 2 3 4 5 6 NOTE: CHASE WALL DIMENSIONS 3'-0" HIGH X 3'-0" WIDE FIRST FLOOR 0' - 0" 1 A1.6 SECOND FLOOR PLAN 1/8" = 1'-0" 5 A1.6 MOP SINK CHASE WALL 3" = 1'-0" 97222 SECOND FLOOR PLAN 13'-4" 224 REVISIONS 2 227 12400 SE FREEMAN WAY, MILWAUKIE, OREGON B OPEN OFFICE T&L 11 1/2" A4.3 HALLWAY DATE 5'-5" B 15 APR 2015 13'-5" 4'-5 1/2" 2'-6 1/2" 11'-9" 8'-7" D OPEN TO BELOW 3'-0 1/2" 13 16'-9 1/2" 222A 222 OPEN OFF INST SERV 237 9'-7" PROJECT NUMBER A STORAGE 216 ALIGN 9'-2 1/2" 6'-5" 4'-8" 9'-6 1/2" 217 NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 9'-4" SECONDARY SECONDARY ASSOC DIR DIR 14019.00.L 10'-0" 1 SHARED WORK 223 F 7 1/2" 9'-11" A 9'-7 1/2" 10'-0" A 217A 9'-6" 221A 203A G 247 A 228A 8'-1" A STORAGE 2'-4 1/2" WAITING AREA ALIGN G 231A F B B 2 A 246 A B 215A ALIGN A ALIGN A A 219 230A 245 B A A 4'-7 1/2" 11" 8" 220 248 CONF. COORD SPEC ED 9'-3" 238 A 237A 4'-0" 5'-1" MECH / ELEC OPEN TO BELOW 19'-3" 9'-11 1/2" fec 249 A 244 A G 239 A 238A 9'-6" 242 HALLWAY F COORD SPEC ED 243 13'-3" 241A 2'-6 1/2" 8'-2 1/2" 240A A 221 ASSESSMENT COORD 9'-6" 150 B COORD SPEC ED WORK A AREA OFFICE 9'-4" STAIR A B HALLWAY H ALIGN 234A 241 A4.3 A ELEM ASSOC DIR A STAIR F A A 244A 240 14 G fec 7'-9 1/2" C 243A ASSOC DIR SPEC ED ALIGN H 2 DIRECTOR SSS 11'-6 1/2" C A1.6 1 247A 8" F 6'-0" A fec 205A A4.3 C 9'-2" A B 1 MEETING LANDING A 3 4 155 10 A A 3'-0" 2'-6 1/2" 3 A 246A 9'-10" A2.1 205 18'-4 1/2" A 10'-0" A 15'-6 1/2" A A A ASSIST SUPERINTENDENT H D C A 202A 245A ° 45 ALIGN 20 4 A D fec ALIGN 7 1/2" 13'-0 1/2" 5'-10 1/2" 4" 10'-2 1/2" 235A A4.2 1 4 1 A 2'-8" A3.1 3'-7" 204 A B 203 HALLWAY 218 4'-6" SUPERINTENDENT SHARED CONF. 202 12'-5" 11 A4.3 201 ASSIST SUPERINTENDENT A 4'-4" 2 A G 14'-2 1/2" 206A A A G 212 218A H ADMIN 6'-10 1/2" A I 7 1/2" 8'-5 1/2" 10'-8 1/2" 15'-7 1/2" 10'-11" B 14'-4 1/2" 4'-1 1/2" A 207B ALIGN 206 201A 1'-8" 3 5'-4 1/2" WORK ROOM 4'-10" 250 I 210 213 219A 208A 2 207 29'-0" 209A WAITING 17'-8" AREA 7'-5" 2 A 215 ALIGN OPEN OFFICE 233A A5.2 SHARED CONF. A 211 211A A5.2 2 ELECTRICAL 214 ELEM DIRECTOR 220A 3 A4.3 10'-5" 3 HALLWAY CONF. 30'-0" 209 12'-2" 10'-4" 208 12 D 3'-0 1/2" 110 WOMEN 3 14'-10" ELEV. MEN 5 1/2" 207A 17'-2 1/2" A5.2 fec 29'-0" A 2'-6 1/2" A5.2 MECH. / JAN. 6 1/2" 250A 153 7 210A STAIR 7 5'-3 1/2" DN A1.6 VERTICAL STRUT OF EMT CONDUIT METAL STUD OR MFR. PROPRIETARY COMPRESSION POST 3. SPREADER BARS ARE NOT REQUIRED WHERE MAIN GRID OR CROSS TEES ARE WITHIN 8" OF WALL. MA X. SPLAY WIRES TO BE (4) 12 GA. WIRES AT 90° APART, IN PLAN, RIGID BRACING MAY BE USED IN LIEU OF SPLAY WIRES 1" 2"MAX. TYP. CONSTRUCTION FOR ACOUSTIC TILE CEILINGS 2 3 A ELEV MACHINE ROOM STORAGE 154 EXIST STAIR 110 HR OPEN OFFICE 116 EXIST ELEV 4 MECHANICAL/ JANITOR 115 153 119 RR RR 112 114 EXIST G OF OR E AT E 5. ALL WIRES TO BE TIED WITH (3) TIGHT TURNS AROUND ITSELF WITHIN 3". CROSS TEES OR CHANNELS AT 24" O.C. 5 ASSOC DIR HR DIRECTOR HR ASSOC DIR HR 120 125 126 11'-0" 11'-0" 6 A 11'-0" EXIST REFLECTED CEILING PLAN LEGEND CFO OFFICE 131 MEN'S 108 111 113 11'-0" CONF. / OFFICE 117 8'-0" WOMEN'S 118 8'-0" 122 11'-0" SHARED WORKROOM FS VAULT/REC OFFICE NEW 2" X 4" ACOUSTIC CEILING TILE GRID 11'-0" 127 NEW GYP. BD. CEILING 124 11'-0" 104 8'-0" 8'-0" BREAK-OUT ROOM CONF. 106 STAIR 102 150 13'-0" ALTERNATE CJ NO. 1 CJ NEW LED PENDANT LIGHT FIXTURE OPEN 11'-0" HALLWAY 149 NEW RECESSED LED DOWNLIGHT FIXTURE 11'-0" OPEN CJ CJ 101 132 HALLWAY 8'-0" CJ CJ RECEPTION 11'-0" NEW 2' X 2' SURFACE MOUNTED LED LIGHT FIXTURE 151 105 11'-0" BUSINESS OP B SHARED CONF. SHARED CONF. FS SUPR. 144 143 142 11'-0" 11'-0" NEW 1' X 1' SURFACE MOUNTED WALL LED LIGHT FIXTURE NEW DIRECT/INDIRECT WALL LED LIGHT FIXTURE 11'-0" C C CONF. ED. FOUND. DIRECTOR 11'-0" . . EQ EQ 140 COMMUNITY RELATIONS ALIGN EQ 146 . EQ EQ EQ MEETING ROOM EQ 11'-0" . . . EQ 141 145 11'-0" 133 BUS. OP. DIRECTOR 11'-0" 139 135 11'-0" 11'-0" STAIR EXIST 136 EQ EQ EQ 138 ALIGN NEW EXIT SIGN - SEE ELECTRICAL DRAWINGS NEW EXHAUST GRILLE SEE MECHANICAL DRAWINGS DIR COMM RELATIONS ALIGN OPENING FOR CONCEALED MOTORIZED PROJECTION SCREEN - VERIFY DIMENSIONS AND LOCATION 11'-0" EQ 11'-0" 11'-0" BUSINESS OP A 11'-0" OFFICE BREAK ROOM EQ 11'-0" NEW DIRECT/INDIRECT PENDANT LED LIGHT FIXTURE 134 EXIST STORAGE 11'-0" ALIGN NEW SUPPLY AIR GRILLE SEE MECHANICAL DRAWINGS NEW RETURN AIR GRILLE SEE MECHANICAL DRAWINGS 137 D D EQ EQ EQ EQ EQ NEW LINEAR SLOT DIFFUSER SEE MECHANICAL DRAWINGS EQ 1'-0" PROJECTOR SCREEN SLOT SEE LEGEND NEW FINISH CEILING HEIGHT ABOVE FINISH FLOOR NEW WALL TO STRUCTURE NEW WALL EXTENDING ABOVE CEILING 1 2 3 4 5 6 NEW WALL TO THE UNDERSIDE OF CEILING NEW OPERABLE PARTITIONS SEE STRUCTURAL FIRST FLOOR - REFLECTED CEILING PLAN 1/8" = 1'-0" FIRST FLOOR - REFLECTED CEILING PLAN 103 123 REVISIONS PRV/CONF. 97222 MAIL FS OPEN OFFICE 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 152 OPEN NEW 2' X 2' DIRECT/INDIRECT LED LIGHT FIXTURE CJ CJ CJ 13'-0" CJ HALLWAY B 11'-0" DATE 11'-0" CJ PROJECT NUMBER B 11'-0" 130 128 EXIST COMMUNITY LIAISONS 148 129 HR STORAGE 11'-0" SND SYS ELECTRICAL EXIST UNISEX ENTRY MECH EXIST 8'-0" 4/20/2015 4:52:33 PM LAKE OSWEGO CEILING PANELS NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL EXIST 1 LANG BATES MAIN RUNNERS AT 48" O.C. TO BE CLASSIFIED (HD) HEAVY DUTY 1 1/2" = 1'-0" 1 A1.7 ED ARC R E H T . 3" MAX. 45° MIN. AT COUNTER SLOPING WIRES 14019.00.L 2 PERIMETER ANGLE POP RIVIT TO GRID AT ATTACHED SIDES ST HANGER WIRES SUPPORTING MAIN RUNNERS AT 48" O.C. MAX. FOR 12 GA. 60" O.C. MAX. FOR 10 GA. 4. HANGER WIRES TO BE PLUMB TO WITHIN 1 IN 6 UNLESS COUNTER SLOPING WIRES ARE PROVIDED. MAIN RUNNER A1.7 2. TOTAL WEIGHT OF CLG. INCLUDING LIGHTS AND AIR TERMINALS NOT TO EXCEED 4 P.S.F. 3. PARTITIONS TIED TO THE CEILING SHALL BE LATERALLY BRACED TO STRUCTURE INDEPENDENT OF THE LATERAL BRACING FOR THE CEILING. BERC II CLIPS HANGER CONNECTION DEVICE SHALL BE CAPABLE OF SUPPORTING NOT LESS THAN 100 LBS. . 45 ° 3. CEILINGS WITH PLENUMS LESS THAN 12" FROM THE SUPPORTING STRUCTURE ARE NOT REQUIRED TO HAVE LATERAL BRACING. HANGER WIRE WITHIN 8" OF PERIMETER AT MAIN RUNNERS 8" MAX. SUPPORTING STRUCTURE 3" MAX. 2. ONE END OF THE CEILING GRID MEMBERS SHALL BE ATTACHED TO THE PERIMETER ANGLE, THE OTHER END SHALL HAVE 3/4" CLEARANCE FROM THE WALL AND BE FREE TO SLIDE. VERTICAL HANGING WIRE 2. LATERAL FORCE BRACING TO BE AT 12'-0" O.C. MAXIMUM AND SHALL BEGIN NOT MORE THAN 6'-0" FROM THE PERIMETER. SUPPORTING STRUCTURE GENERAL REQUIREMENTS 1. INSTALL CEILINGS IN ACCORDANCE WITH THE REQUIREMENTS OF OSSC SECTIONS 803.9.1.1 AND 1705, ASCE 705, ASTM C635, AND ASTM C636, AND NWCB 401-OREGON. 15 APR 2015 C COPYRIGHT BBL ARCHITECTS PERIMETER ATTACHMENT 1. THE GRID SHALL BE ATTACHED TO THE PERIMETER ANGLE AT TWO ADJACENT WALLS. LATERAL BRACING CONNECTIONS SHALL BE CAPABLE OF SUPPORTING NOT LESS THAN 200 LBS. REGI S SUPPORTING STRUCTURE LATERAL BRACING 1. LATERAL BRACING IS REQUIRED FOR CEILINGS OVER 144 S.F. AND NOT REQUIRED FOR CEILINGS LESS THAN 144 S.F. WHEN SURROUNDED BY WALLS AT ALL PERIMETER AND BRACED TO STRUCTURE. T ITEC ON 100 LB. MIN. DESIGN LOAD EXISTING WALL ASSEMBLY TO REMIAN A1.7 HANGER WIRE WITHIN 8" OF PERIMETER AT LAIN RUNNERS PERIMETER ATTACHMENT THE GRID SHALL BE ATTACHED TO THE PERIMETER AT ADJACENT WALLS. 3. PARTITIONS TIED TO THE CEILING SHALL BE LATERALLY BRACED TO STRUCTURE INDEPENDENT OF THE CEILING. PERIMETER CHANNEL ALL SIDES 45° MIN. AT COUNTER SLOPING WIRES 1/4" MAIN RUNNERS AT 48" O.C. TO BE CLASSIFIED (HD) HEAVY DUTY 5. ALL WIRES TO BE TIED WITH (3) TIGHT TURNS AROUND ITSELF WITHIN 3". TYP. CONSTRUCTION FOR SUSPENDED GYP. BD. CEILING 2 3 4 5 2 3 4 A3.1 A3.1 A3.1 A EXIST STAIR MEN WOMEN SHARED CONF. 153 208 209 210 211 213 EXIST EXIST EXIST OPEN OFFICE MECH. / JAN. ELECTRICAL 214 215 G EXIST NEW GYP. BD. CEILING SECONDARY DIR 212 SECONDARY ASSOC DIR 9'-0" NEW DIRECT/INDIRECT PENDANT LED LIGHT FIXTURE - SEE PLAN FOR DIAMETER SIZE EXIST 217 ADMIN 201 202 EXIST EXIST WORK ROOM SHARED CONF. HALLWAY 203 248 EXIST 24" 32" 1 SUPERINTENDENT A3.1 204 EXIST 72" EXIST ASSIST SUPERINTENDENT C 32" ASSOC DIR SPEC ED 240 COORD SPEC ED EXIST 241 EXIST EXIST VARIES NEW RECESSED LED DOWNLIGHT FIXTURE OPEN OFFICE T&L 223 224 222 NEW DIRECT/INDIRECT WALL LED LIGHT FIXTURE EXIST EXIST EXIST 32" 205 DIRECTOR SSS EXISTING 2' X 4' TROFFER DIFFUSER - SEE LIGHTING PLAN EXIST SHARED WORK STORAGE B 219 220 56" VARIES ASSESSMENT COORD ELEM ASSOC DIR EXIST ALIGN FRAMING 206 EXIST 221 EXIST ALIGN B ASSIST SUPERINTENDENT NEW OR RELOCATED 2' X 4' TROFFER DIFFUSER - SEE LIGHTING PLAN OFFICE 243 WORK AREA COORD SPEC ED 244 NEW EXIT SIGN - SEE ELECTRICAL DRAWINGS LINE OF SKYLIGHT FRAMING BEYOND COORD SPEC ED 245 CONF. WAITING AREA 246 247 EXIST EXIST 242 EXIST EXIST EXIST ASSOC DIR INST SERV ASSOC DIR ELL 235 234 COORD EXIST EXIST NEW EXHAUST GRILLE - SEE MECHANICAL DRAWINGS EXIST T&L 233 NEW RETURN AIR GRILLE SEE MECHANICAL DRAWINGS DIRECTOR T&L HALLWAY NEW LINEAR SLOT DIFFUSER SEE MECHANICAL DRAWINGS 225 EXIST EXIST EXIST ASSOC DIR T&L STORAGE OPEN OFF INST SERV NEW TRANSLUCENT ROOF SKYLIGHT SYSTEM OFFICE 231 236 EXIST C EXIST 232 237 NEW SUPPLY AIR GRILLE SEE MECHANICAL DRAWINGS 226 DIRECTOR EQ & INST EXIST MECH / ELEC 1'-0" 230 238 NEW FINISH CEILING HEIGHT ABOVE FINISH FLOOR EXIST EXIST EXIST NEW WALL TO STRUCTURE STAIR 136 D D NEW WALL EXTENDING ABOVE CEILING NEW WALL TO THE UNDERSIDE OF CEILING ROOF ACCESS NEW OPERABLE PARTITIONS SEE STRUCTURAL 229 EXISTING WALL ASSEMBLY TO REMIAN 1 2 3 4 5 6 EXISTING 18" X 60" ACOUSTIC CEILING TILE GRID SECOND FLOOR - REFLECTED CEILING PLAN 1/8" = 1'-0" SECOND FLOOR - REFLECTED CEILING PLAN 218 216 REVISIONS 250 EXIST EXIST 97222 HALLWAY 12400 SE FREEMAN WAY, MILWAUKIE, OREGON HALLWAY DATE CONF. EXIST 15 APR 2015 WAITING AREA 207 NEW 20" X 60" ACOUSTIC CEILING TILE GRID PROJECT NUMBER EXIST EXIST EXIST ELEM DIRECTOR REFLECTED CEILING PLAN LEGEND NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL ELEV 110 4/20/2015 4:54:10 PM OF OR E 6 A 1 LAKE OSWEGO 1 1/2" = 1'-0" 1 A1.8 LANG BATES CEILING PANELS 14019.00.L 2 CEILING PANELS CONTROL JOINTS CONTROL JOINTS SHALL BE INSTALLED AT LOCATIONS SHOWN ON REFLECTED CEILING PLAN. CROSS TEES OR CHANNELS AT 24" O.C. A1.8 ST METAL CONTROL JOINT BEAD . 4. HANGER WIRES TO BE PLUMB TO WITHIN 1 IN 6 UNLESS COUNTER SLOPING WIRES ARE PROVIDED. HANGER WIRES SUPPORTING MAIN RUNNERS AT 48" O.C. MAX. FOR 12 GA. 60" O.C. MAX. FOR 10 GA. AT E MAIN RUNNERS AT 48" O.C. TO BE CLASSIFIED (HD) HEAVY DUTY HANGER CONNECTION DEVICE SHALL BE CAPABLE OF SUPPORTING NOT LESS THAN 100 LBS. 2. TOTAL WEIGHT OF CLG. INCLUDING LIGHTS AND AIR TERMINALS NOT TO EXCEED 4 P.S.F. 8" MAX. CROSS TEES OR CHANNELS AT 24" O.C. SUPPORTING STRUCTURE ED ARC R E H T . 3" MAX. SUPPORTING STRUCTURE 3" MAX. C COPYRIGHT BBL ARCHITECTS GENERAL REQUIREMENTS 1. INSTALL CEILINGS IN ACCORDANCE WITH THE REQUIREMENTS OF OSSC SECTIONS 803.9.1.1 AND 1705, ASCE 705, ASTM C635, AND ASTM C636, AND NWCB 401-OREGON. REGI S LATERAL BRACING CEILINGS CONSTRUCTED OF GYP. BD., SCREW ATTACHED TO SUSPENDED MEMBERS EXTENDING FROM WALL TO WALL DO NOT REQUIRE LATERAL BRACING. T ITEC ON 100 LB. MIN. DESIGN LOAD A1.8 2 3 30'-0" 4 30'-0" NEW MECHANICAL EQUIPMENT AREA - SEE MECHANICAL DRAWINGS FOR DEMOLITION AND NEW EQUIPMENT LOCATIONS 30'-0" 5 G OF OR E AT E LAKE OSWEGO LANG BATES ED ARC R E H T C COPYRIGHT BBL ARCHITECTS 1 CRICKET ELASTOMERIC MEMBRANE ROOFING SYSTEM TRANSLUCENT ROOF SKYLIGHT SYSTEM REGI S 075105 075301 084502 ON KEYNOTES T ITEC ST 6 30'-0" 30'-0" 2 1 3 4 A3.1 A2.1 A3.1 A3.1 SEE 7/A1.11 (SIM.) FOR CURB AT NEW MECHANICAL EQUIPMENT A PV 29'-0" PV NEW MECHANICAL EQUIPMENT AREA - SEE MECHANICAL DRAWINGS FOR DEMOLITION AND NEW EQUIPMENT LOCATIONS PV PV SEE 7/A1.11 (SIM.) FOR CURB AT NEW MECHANICAL EQUIPMENT PV 084502 1 A5.1 A5.1 SLOPE SIM. SIM. 11 EXIST. SLOPE C . 10'-0" B A6.2 RIDGE 17 17 A5.1 TYP. A5.1 TYP. 17 A5.1 1 A5.1 SIM. 075301 REMOVE PORTION OF EXIST. BALLAST, EPDM ROOFING, AND INSULATION DOWN TO EXIST. ROOF DECK - PROVIDE NEW INSULATION AND COVER BOARD TO MATCH EXIST. INSULATION THICKNESS, EPDM ROOFING, AND GRAVEL BALLAST TO MATCH EXIST. - TIE INTO EXIST. ROOFING PER MFR. TYP. EXIST. SLOPE . 075105 12'-10 1/2" 10'-0" TYP. 29'-0" 075301 REMOVE PORTION OF EXIST. BALLAST, EPDM ROOFING, AND INSULATION DOWN TO EXIST. ROOF DECK - PROVIDE NEW INSULATION AND COVER BOARD TO MATCH EXIST. INSULATION THICKNESS, EPDM ROOFING, AND GRAVEL BALLAST TO MATCH EXIST. - TIE INTO EXIST. ROOFING PER MFR. 7'-2 1/2" 10'-6" 9'-7" 20'-0 1/2" 075301 REMOVE PORTION OF EXIST. BALLAST, EPDM ROOFING, AND INSULATION DOWN TO EXIST. ROOF DECK - PROVIDE NEW INSULATION AND COVER BOARD TO MATCH EXIST. INSULATION THICKNESS, EPDM ROOFING, AND GRAVEL BALLAST TO MATCH EXIST. - TIE INTO EXIST. ROOFING PER MFR. 075105 075105 3 A2.1 NEW MECHANICAL EQUIPMENT AREA - SEE MECHANICAL DRAWINGS FOR DEMOLITION AND NEW EQUIPMENT LOCATIONS 4/20/2015 4:20:53 PM SEE 7/A1.11 (SIM.) FOR CURB AT NEW MECHANICAL EQUIPMENT 2 A2.1 14019.00.L D 97222 ROOF PLAN SLOPE 2" / 12" REVISIONS 1 1 12400 SE FREEMAN WAY, MILWAUKIE, OREGON SLOPE 2" / 12" DATE 2" / 12" 4 A2.1 A5.1 084502 1 A3.1 1 A5.1 15 APR 2015 1 PROJECT NUMBER 10'-0" TYP. A5.1 10'-0" 30'-0" 084502 NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL B A1.9 1 A1.9 ROOF PLAN 1/8" = 1'-0" 4 5 6 7 8 (2) LAYERS OF 2" RIGID INSULATION BOARD - COMBINED R-VALUE OF RIGID INSULATION AND COVER BOARD IS R-20 MIN. 2 A1.10 VAPOR RETARDER 9 10 053001 EXISTING G OF OR E LANG BATES LAKE OSWEGO AT E TAPERED EDGE ED ARC R E H T C COPYRIGHT BBL ARCHITECTS COVER BOARD 075201 NEW ROOF. NEW SKYLIGHT - BASE BID. REINSTALL EXISTING ROOF TOP VENTS ATOP RAISED CURB - MODIFY ELECTRICAL CONNECTIONS AND/OR HVAC CONNECTIONS AS REQUIRED TO ACCOMMODATE RAISED CURB - SEE 6/A1.11. PROVIDE NEW WOOD CURB AND SHEET METAL VENT TO MATCH EXISTING - SEE 7/A1.11. EXISTING MECHANICAL PLATFORM STRUCTURE TO REMAIN - PROVIDE LIQUID FLASHING AROUND 4"x4" HSS COLUMNS - SEE 5/A1.11. EXISTING PLUMBING VENT - PROVIDE PIPE BOOT AND METAL COLLAR AROUND PIPE - SEE 8/A1.11. EXTEND EXISTING PLUMBING VENT AS REQUIRED FOR NEW INSULATION THICKNESS - PROVIDE PIPE BOOT AND METAL COLLAR AROUND PIPE - SEE 8/A1.11. NEW ROOF DRAIN AND OVERFLOW ROOF DRAIN CONNECT TO EXISTING PLUMBING. EXISTING ROOF HATCH. SEE 7/A1.11 (SIM.) FOR NEW MECHANICAL EQUIPMENT CURB. REGI S 1 2 3 ON SHEET NOTES TAPERED INSULATION WHERE SHOWN ON ROOF PLAN T ITEC ST ROOF ASSEMBLY 3" = 1'-0" KEYNOTES 1 2 3 30'-0" 4 30'-0" 30'-0" 2 NEW MECHANICAL EQUIPMENT AREA - SEE MECHANICAL DRAWINGS FOR DEMOLITION AND NEW EQUIPMENT LOCATIONS A1.11 . . 6 A1.11 3 A1.11 A1.11 . 8 PV 8 29'-0" . 3 3 3 A1.11 A1.11 . 8 15'-8"± 3 A3.1 SIM. TYP. E OP SL 2":12" 1/ A1.11 A3.1 SL OP E 1/2 ":12 " 3 A2.1 4 SL OP E 1/2 ":12 " . 3 30'-0" METAL ROOF DECK MODIFIED BITUMINOUS MEMBRANE ROOFING SYSTEM CRICKET TRANSLUCENT ROOF SKYLIGHT SYSTEM 2 E OP SL 2":12" 1/ E OP SL 2":12" 1/ A 1 6 30'-0" A3.1 SL OP E 1/2 ":12 " 10 5 053001 075201 075205 084502 PV PV 3 3 3 6 PV 2 A1.11 30'-0" A1.11 1 A3.1 4 4 4 A1.11 A1.11 A1.11 TYP. ALT. NO. 2 5 10 A4.3 4 C A2.1 11 SLOPE C TYP. ALT. NO. 2 B A6.2 . RIDGE 2 SLOPE . 3 A2.1 5 3 5 084502 BASE BID 4 5 2 075205 084502 BASE BID 4 TYP. ALT. NO. 2 084502 BASE BID 075205 2 075205 075201 3 A1.11 A1.11 NEW MECHANICAL EQUIPMENT AREA - SEE MECHANICAL DRAWINGS FOR DEMOLITION AND NEW EQUIPMENT LOCATIONS 8 . . 2 A2.1 2 A1.11 SIM. TYP. 3 3 A1.11 A1.11 15'-9"± SL OP E 1/2 ":12 " SL OP E 1/2 ":12 " 15'-9"± 23'-1"± 29'-0" . 3 9 E OP SL ":12" 1/2 8 10 4/20/2015 4:32:56 PM 1 3 E OP SL 2":12" 1/ D TYP. . ROOF REPLACEMENT PLAN 2 REVISIONS TYP. 97222 5 5 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 3 5 DATE 3 15 APR 2015 B PROJECT NUMBER PV NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 3 14019.00.L 7 NEW MECHANICAL 10 EQUIPMENT AREA - SEE MECHANICAL DRAWINGS FOR DEMOLITION AND NEW EQUIPMENT LOCATIONS A1.10 1 A1.10 ROOF REPLACEMENT PLAN - ALTERNATE NO. 2 1/8" = 1'-0" 4 9 2 TYP . 6 6 9 PV 2 3 4 DEMOLISH EXISTING COPING AT PARAPET. REMOVE EXISTING CONCRETE PAVER WALKPADS. REMOVE EXISTING ROOF DRAIN BODY, STRAINER, CLAMPING RING, AND OVERFLOW COLLAR (ON OVERFLOW DRAINS) - PROTECT EXISTING PIPING. REMOVE EXISTING FLANGED VENT. EXISTING ROOF TOP VENT TO BE REMOVED SALVAGE FOR REINSTALLATION. EXISTING MECHANICAL PLATFORM STRUCTURE TO REMAIN. EXISTING SATELLITE DISH AND BALLAST TO BE REMOVED. NEW MECHANICAL EQUIPMENT AREA SHOWN DASHED. SEE MECHANICAL DRAWINGS FOR DEMOLITION AND NEW EQUIPMENT LOCATIONS. 5 6 7 7 PV 8 8 B 9 6 6 2 DEMO EXISTING ROOFING, AND INSULATION DOWN TO EXISTING ROOF DECK. REMOVE EXISTING GRAVEL BALLAST (±2" RIVER ROCK), EXISTING MOSS, AND OTHER ORGANIC GROWTH/DEBRIS PRIOR TO ROOFING DEMOLITION. PV PV 6 1 6 A PV 061101 061121 061602 072101 075201 075206 076208 076210 076216 076220 076501 084502 092901 092905 221401 221402 G OF OR E LANG BATES KEYNOTES DEMOLITION NOTES 6 AT E 5 LAKE OSWEGO 4 ED ARC R E H T C COPYRIGHT BBL ARCHITECTS 3 REGI S 2 ON 1 T ITEC ST WOOD FRAMING PRESSURE TREATED NAILER PLYWOOD WALL SHEATHING THERMAL BLANKET INSULATION MODIFIED BITUMINOUS MEMBRANE ROOFING SYSTEM CANT STRIP PREFINISHED SM. COPING WITH 1" STANDING SEAMS AT 10'-0" O.C. MAX - EQUALLY SPACED BETWEEN CORNERS FASTENER W/NEOPRENE WASHER OR RIVET [AT 12" O.C. MAX.] PREFINISHED SHEET METAL FLASHING CONTINUOUS CLEAT FLEXIBLE FLASHING TRANSLUCENT ROOF SKYLIGHT SYSTEM GYPSUM BOARD METAL STUDS ROOF DRAIN ROOF OVERFLOW DRAIN 7 7 5 6 1 C 2 5 3 6 TYP. EXIST. ROOF TOP MECH. UNIT REMOVE AND REINSTALL ON MODIFIED CURB - MODIFY DUCTWORK AND OTHER CONNECTIONS AS REQUIRED D 2 061101 4 TYP. 1/16" = 1'-0" 061602 F.R.T. EXIST. PARAPET FRAMING 075206 072101 BASE BID 092905 6" METAL STUDS AT 16" O.C. BASE BID EXIST. ROOF STRUCTURE 6 A1.11 092901 PAINT BASE BID EXIST. METAL ROOF DECK EXIST. ROOF STRUCTURE 092905 PAINT BASE BID EXIST. ROOF STRUCTURE A1.11 PARAPET 4 A1.11 1 1/2" = 1'-0" 061101 2x SKYLIGHT CURB 076216 1 1/2" = 1'-0" 061602 F.R.T. 061101 2x12 2" COLLAR AT OVERFLOW DRAIN TAPERED EDGE 075201 EXIST. MECHANICAL PLATFORM STRUCTURE LIQUID MEMBRANE 8" 8" MIN. 075201 NEW MECHANICAL UNIT/EQUIPMENT CURB FURNISHED BY MECHANICAL CONTRACTOR AND INSTALLED BY GENERAL CONTRACTOR AT 7/A1.11 SIM. 221401 221402 4/20/2015 4:31:39 PM 3 A1.11 ROOF DRAINS 1 1/2" = 1'-0" EXIST. ROOF STRUCTURE 5 A1.11 MECHANICAL PLATFORM STRUCTURE 1 1/2" = 1'-0" 8 PLUMBING VENT 3" = 1'-0" EXIST. HSS COLUMN EXIST. METAL ROOF DECK CONNECT NEW ROOF DRAINS TO EXIST. PIPES 3" NOTE: INSTALL PIPE EXTENSION TO EXISTING PIPE AS REQUIRED TO ACCOMMODATE NEW INSULATION REQUIREMENTS A1.11 NEW SQUARE-TO-ROUND SHEET METAL WEATHERHEAD - MODIFY CONNECTIONS AS REQUIRED OR NEW MECHANICAL EQUIPMENT AT 7/A1.11 SIM. LEAD FLASHING 075201 3" = 1'-0" 4" 2 EXIST. MECHANICAL CURB 3" EXIST. ROOF STRUCTURE 7 A1.11 NEW MECHANICAL CURB 3" = 1'-0" REVISIONS 075206 8" MIN. 075206 FIRE RETARDANT PLYWOOD ROOF REPLACEMENT DEMOLITION AND NEW DETAILS 061602 BASE BID DATE 076216 NEW MFR. SEALANT 97222 NEW FLASHING SHEET NEW MFR. SEALANT NEW ROOFING SYSTEM 076210 BASE BID EXIST. PLYWOOD SHEATHING TO REMAIN 075201 NEW PREMOLDED PIPE FLASHING 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 076216 BASE BID EXIST. METAL ROOF PANELS TO REMAIN PROTECT EXIST. PIPE PENETRATION 075201 076501 BASE BID EXIST. SM. FLASHING TO REMAIN - PROTECT NEW STAINLESS STEEL CLAMPING BAND 15 APR 2015 076220 BASE BID NEW SHEET METAL HOOD PROJECT NUMBER 076208 8" MIN. 076501 BY SKYLIGHT MFR. - BASE BID 8" MIN. 076210 EXIST. WOOD CURB - VERIFY EXIST. CURB CONSTRUCTION 084502 061121 NEW CONTINUOUS SEALANT TOOLED TO DRAIN NEW CONTINUOUS SEALANT TOOLED TO DRAIN NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL A1.11 ROOF DEMOLITION - ALTERNATE NO. 2 4" 1 2x - COORDINATE W/EXIST. CURB 076216 14019.00.L 9 A1.11 G OF OR E AT E LAKE OSWEGO LANG BATES ED ARC R E H T C COPYRIGHT BBL ARCHITECTS ON T ITEC ST REGI S NEW TRANSLUCENT ROOF SKYLIGHT SYSTEM BEYOND 6 5 4 3 2 1 T.O. PARAPET 30' - 4" ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" SECOND FLOOR 15' - 0" B.O. CEILING (FIRST FLOOR) 11' - 0" FIRST FLOOR 0' - 0" EXISTING BUILDING EXTERIOR 1 A2.1 WEST ELEVATION 1/8" = 1'-0" NEW TRANSLUCENT ROOF SKYLIGHT SYSTEM BEYOND 1 2 3 4 5 6 T.O. PARAPET 30' - 4" ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" NEW GLAZING IN EXISTING STOREFRONT AT REMOVED DOOR LOCATION EAST ELEVATION A2.1 1/8" = 1'-0" D C B A A B C D T.O. PARAPET 30' - 4" T.O. PARAPET 30' - 4" ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" SECOND FLOOR 15' - 0" SECOND FLOOR 15' - 0" B.O. CEILING (FIRST FLOOR) 11' - 0" B.O. CEILING (FIRST FLOOR) 11' - 0" K 4/20/2015 8:44:35 AM EXISTING BUILDING EXTERIOR 3 A2.1 NORTH ELEVATION 1/8" = 1'-0" FIRST FLOOR 0' - 0" EXISTING BUILDING EXTERIOR 4 A2.1 SOUTH ELEVATION 1/8" = 1'-0" 97222 EXTERIOR ELEVATIONS NEW DOOR IN EXISTING STOREFRONT REVISIONS 2 CUT OPENING IN EXISTING CMU/BRICK WALL FOR NEW H.M. DOOR AND FRAME SEE STRUCTURAL DRAWINGS 12400 SE FREEMAN WAY, MILWAUKIE, OREGON EXISTING BUILDING EXTERIOR DATE FIRST FLOOR 0' - 0" 15 APR 2015 A6.2 PROJECT NUMBER 8 14019.00.L B.O. CEILING (FIRST FLOOR) 11' - 0" NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL SECOND FLOOR 15' - 0" FIRST FLOOR 0' - 0" NEW GLAZING IN EXISTING STOREFRONT AT REMOVED DOOR LOCATIONS RELOCATED EXISTING STOREFRONT ENTRANCE SYSTEM IN NEW STOREFRONT A2.1 G OF OR E AT E LANG BATES ED ARC R E H T LAKE OSWEGO ST A2.2 LINE OF GLASS CANOPY ABOVE 10'-8" 5 A2.2 6x6 STEEL HSS COLUMN, TYP. OF (4) SEE STRUCTURAL, PAINT STEEL TEE SEE STRUCTURAL, PAINT STEEL HSS COLUMN BELOW SEE STRUCTURAL, PAINT 6 A2.2 4 SLOPE A2.2 NEW CURB - INFILL TOMATCH EXISTING STEEL HSS FRAME BELOW SEE STRUCTURAL, PAINT . 1/4" : 12" LAMINATED SAFETY GLASS LINE OF EXISTING BUILDING 10'-0" STEEL TEE SEE STRUCTURAL, PAINT STEEL HSS COLUMN BELOW SEE STRUCTURAL, PAINT LINE OF GLASS CANOPY ABOVE 10" 6'-10" VERIFY RIDGE SURFACE MOUNTED LIGHT FIXTURE BELOW SEE ELECTRICAL 1/2" : 12" . RELOCATED EXISTING STOREFRONT/ ENTRANCE SYSTEM EXISTING CURB SLOPE 1/4" : 12" SLOPE SURFACE MOUNTED LIGHT FIXTURE - CONCEAL WIRING IN TUBE STEEL FRAMEWORK TYP. OF (2) 3'-6" A2.2 6x12 STEEL HSS FRAME SEE STRUCTURAL, PAINT . 3'-6" 10'-6" 10'-6" 11'-2" A2.2 DIVERTER ANGLE 6X12 STEEL HSS FRAME SEE STRUCTURAL, PAINT 6 A2.2 4 STAINLESS STEEL POINT FITTING AND RISER - TYP. 9" SILICONE BUTT JOINT - TYP. 10'-0" LINE OF SOFFIT ABOVE 4 3'-11" . 10'-0" 8" 3'-11" 9" 1/2" : 12" 10'-8" 6 A2.2 10'-0" A2.2 SLOPE 5 11'-2" CONCRETE FOOTING, TYP. SEE STRUCTURAL 3'-6" C COPYRIGHT BBL ARCHITECTS REGI S 5 ON NEW CONCRETE WALKWAY T ITEC LINE OF EXISTING BUILDING LINE OF EXISTING BUILDING 1 A2.2 CANOPY PLAN CANOPY FRAME PLAN 2 1/4" = 1'-0" A2.2 CANOPY GLASS PLAN 3 1/4" = 1'-0" A2.2 1/4" = 1'-0" SILICONE BUTT JOINT TYP. STAINLESS STEEL POINT FITTING AND RISER - TYP. 5 A2.2 STEEL HSS FRAME - SEE STRUCTURAL (PAINT) STEEL TEE SEE STRUCTURAL (PAINT) GLASS SUPPORT DETAIL 3" = 1'-0" SURFACE MOUNTED LIGHT FIXTURE - SEE ELECTRICAL A B C D T.O. PARAPET 30' - 4" STEEL COLUMN SEE STRUCTURAL (PAINT) ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" PLANTER BASE BID 97222 ENTRANCE CANOPY . LINE OF EXISTING BUILDING OVERHANG 4 LINE OF EXISTING BUILDING SECOND FLOOR 15' - 0" A2.2 B.O. CEILING (FIRST FLOOR) 11' - 0" REVISIONS 1/4":12" STEEL TEE SEE STRUCTURAL (PAINT) 12400 SE FREEMAN WAY, MILWAUKIE, OREGON DIVERTER ANGLE DATE LAMINATED SAFETY GLASS CANOPY 4" STEEL HSS SEE STRUCTURAL, PAINT 15 APR 2015 10'-0" STEEL HSS SEE STRUCTURAL, PAINT PROJECT NUMBER 4" LAMINATED SAFETY GLASS 14019.00.L 10'-8" STAINLESS STEEL POINT FITTING AND RISER - TYP. NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL LAMINATED SAFETY GLASS STAINLESS STEEL POINT FITTING AND RISER - TYP. FIRST FLOOR 0' - 0" 4/19/2015 6:40:29 PM NEW FOOTING SEE STRUCTURAL 4 A2.2 SECTION 1/2" = 1'-0" NEW ENTRANCE CANOPY ALTERNATE NO. 1 EXISTING FOOTINGSEE STRUCTURAL 6 A2.2 ENTRANCE CANOPY ELEVATION - ALTERNATE NO. 1 1/8" = 1'-0" PLANTER - SHOWN DASHED, BASE BID A2.2 A3.4 A3.4 A3.3 3 A3.4 4 2 1 A3.4 T.O. PARAPET 30' - 4" G OF OR E 5 AT E 4 A3.4 3 LAKE OSWEGO 5 2 LANG BATES 1 ED ARC R E H T C COPYRIGHT BBL ARCHITECTS 2 A3.1 REGI S 3 A3.1 ON 3 6 4 A3.1 T ITEC ST ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" OPEN OFFICE T&L HALLWAY STORAGE 224 227 222 MEETING LANDING SUPERINTENDENT ADMIN 204 201 155 SECOND FLOOR 15' - 0" B.O. CEILING (FIRST FLOOR) 11' - 0" RECEPTION 102 BUSINESS OP B FS OPEN OFFICE 132 HALLWAY PRV/CONF. MAIL 151 104 103 123 FIRST FLOOR 0' - 0" NEW P-LAM PANEL. SEE 1/8" = 1'-0" B A3.3 C 2 D A A3.3 B 1 3 4 A3.1 A3.2 A3.2 C D T.O. PARAPET 30' - 4" T.O. PARAPET 30' - 4" ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" MEN HALLWAY ADMIN 208 250 201 ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" COORD SPEC ED OPEN OFF INST SERV SHARED CONF. HALLWAY OPEN OFF INST SERV 244 236 210 248 236 MEETING LANDING SECOND FLOOR 15' - 0" 155 SECOND FLOOR 15' - 0" B.O. CEILING (FIRST FLOOR) 11' - 0" ELEV MACHINE ROOM RR 115 112 MAIL HALLWAY WOMEN'S 111 MEETING ROOM HALLWAY 103 152 B.O. CEILING (FIRST FLOOR) 11' - 0" 146 149 HR OPEN OFFICE HALLWAY HALLWAY COMMUNITY RELATIONS 119 151 151 141 FIRST FLOOR 0' - 0" 2 A3.1 SECTION THROUGH SKYLIGHT SOUTH A3.1 1 A3.2 A B 1 2 A3.1 A3.2 C D T.O. PARAPET 30' - 4" ROOF 27' - 6" B.O. CEILING (SECOND FLOOR) 24' - 0" OPEN OFFICE ASSESSMENT COORD 213 219 COORD 233 T&L ASSOC DIR T&L DIRECTOR EQ & INST 231 230 145 FIRST FLOOR 0' - 0" 3 1/8" = 1'-0" BREAK ROOM SECTION THROUGH SKYLIGHT NORTH 1/8" = 1'-0" BUILIDNG SECTIONS A A3.1 97222 1 1 12400 SE FREEMAN WAY, MILWAUKIE, OREGON A3.1 SECTION THROUGH SKYLIGHTS NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 1 3 A4.2 126 132 133 4/20/2015 9:47:09 AM FIRST FLOOR 0' - 0" 4 A3.1 SECTION THROUGH SKYLIGHT MID 1/8" = 1'-0" REVISIONS BUSINESS OP A DATE BUSINESS OP B 15 APR 2015 ASSOC DIR HR 14019.00.L B.O. CEILING (FIRST FLOOR) 11' - 0" PROJECT NUMBER SECOND FLOOR 15' - 0" A3.1 A5.1 1 084502 SIM. OPP. 265100 A5.1 G OF OR E AT E LAKE OSWEGO LANG BATES ED ARC R E H T C COPYRIGHT BBL ARCHITECTS A5.1 1 084502 084502 CAST-IN-PLACE CONCRETE SLAB CONCRETE FOOTING STEEL BEAM METAL FLOOR DECK COLD-FORMED METAL FRAMING FIRE RETARDANT TREATED PLYWOOD THERMAL BLANKET INSULATION CRICKET PACKAGED STEEL RELITE FRAME ASSEMBLY TRANSLUCENT ROOF SKYLIGHT SYSTEM GYPSUM BOARD SUSPENDED ACOUSTIC PANEL CEILING SYSTEM INTERIOR LIGHTING REGI S 1 033001 033004 051213 053003 054001 061604 072101 075205 081702 084502 092901 095404 ON KEYNOTES T ITEC ST SIM. OPP. T.O. PARAPET 30' - 4" 061604 072101 054001 075205 072101 072101 EXISTING ROOF MODIFY AT SKYLIGHT PER DETAIL EXISTING STEEL JOISTS 45° MIN. BRACING AT 48" O.C., TYP. 2'-0" 092901 EXISTING STEEL JOIST 054001 054001 2'-9" 4'-10" EXISTING CEILING B.O. CEILING (SECOND FLOOR) 24' - 0" B.O. CEILING (SECOND FLOOR) 24' - 0" 081702 2 3 A5.1 B.O. CEILING (FIRST FLOOR) 11' - 0" SIM. OPP. 081702 054001 OPEN TO OPEN OFFICE 224 OPEN TO OPEN OFFICE 224 092901 WALL SECTION 3 A3.2 GLASS RAILING SYSTEM 3/4" = 1'-0" SEE PLAN FOR WALL TYPE SEE PLAN FOR WALL TYPE 033001 051213 053003 GUARDRAIL BEYOND GUARDRAIL BEYOND 084502 095404 1 A5.1 SIM. OPP. VARIES 092901 4 4 T.O. PARAPET 30' - 4" 054001 061604 072101 075205 A5.1 A5.1 SIM. OPP. SECOND FLOOR 15' - 0" EXISTING FLOOR STRUCTURE SECOND FLOOR 15' - 0" REMOVE PORTION OF EXIST. FLOOR EXISTING STEEL BEAM BEYOND EXISTING FLOOR STRUCTURE REMOVE PORTION OF EXIST. FLOOR 051213 EXISTING STEEL BEAM SEE FLOOR PLAN FOR WALL TYPE EXISTING ROOF STRUCTURE 054001 092901 054001 EXISTING STEEL JOISTS 092901 45° MIN. BRACING AT 48" O.C., TYP. SEE STRUCTURAL EXISTING STEEL BEAM BEYOND EDGE BEYOND 092901 2 A5.1 4/20/2015 4:55:02 PM A3.2 WALL SECTION 3/4" = 1'-0" 092901 092901 B.O. CEILING (FIRST FLOOR) 11' - 0" 033001 B.O. CEILING (FIRST FLOOR) 11' - 0" 2 095404 1 054001 EDGE BEYOND 2 A3.2 WALL SECTION 3/4" = 1'-0" FIRST FLOOR 0' - 0" B.O. CEILING (SECOND FLOOR) 24' - 0" 2 095404 A5.1 A5.1 SIM. OPP. OPP. 4 A3.2 WALL SECTION 3/4" = 1'-0" EXISTING FLOOR STRUCTURE 033004 5 A3.2 WALL SECTION WALL SECTIONS A5.1 EXISTING CEILING A5.1 REVISIONS EDGE BEYOND EDGE BEYOND 3 97222 B.O. CEILING (SECOND FLOOR) 24' - 0" EXISTING CEILING A4.2 054001 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 265100 5 092901 DATE 265100 15 APR 2015 092901 3 45° MIN. BRACING AT 48" O.C., TYP. PROJECT NUMBER EXISTING STEEL JOISTS NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 2'-0" 092901 14019.00.L 054001 061604 VARIES 061604 VARIES 45° MIN. BRACING AT 48" O.C., TYP. EXISTING ROOF MODIFY AT SKYLIGHT PER DETAIL T.O. PARAPET 30' - 4" VARIES 054001 T.O. PARAPET 30' - 4" 3/4" = 1'-0" A3.2 1 A5.1 084502 SIM. VARIES 092901 2'-0" 072101 4'-7 1/2" VERIFY 054001 A5.1 G OF OR E AT E LAKE OSWEGO LANG BATES T.O. PARAPET 30' - 4" 054001 061604 EXISTING ROOF MODIFY AT SKYLIGHT PER DETAIL 45° MIN. BRACING AT 48" O.C., TYP. 092925 EXISTING STEEL BEAM 4'-6" VERIFY B.O. CEILING (SECOND FLOOR) 24' - 0" B.O. CEILING (SECOND FLOOR) 24' - 0" 5 EXSTING CEILING . 092901 075205 5 " E 2":12 SLOP 072101 T.O. PARAPET 30' - 4" EXISTING CEILING 061604 092925 5 084502 072101 T.O. PARAPET 30' - 4" 054001 SIM. 092901 SIM. OPP. 061604 45° MIN. BRACING AT 48" O.C., TYP. 084502 A5.1 VARIES EXISTING STEEL JOIST A5.1 ST VARIES 1 EXISTING ROOF MODIFY AT SKYLIGHT PER DETAIL 1 C 2'-0" B ED ARC R E H T C COPYRIGHT BBL ARCHITECTS 072101 075205 081701 081702 084502 092901 092925 093014 095404 STEEL BEAM COLD-FORMED METAL FRAMING FIRE RETARDANT TREATED PLYWOOD HIGH PRESSURE LAMINATE [(ALL SURFACES AND EDGES)] THERMAL BLANKET INSULATION CRICKET PACKAGED STEEL DOOR FRAME ASSEMBLY PACKAGED STEEL RELITE FRAME ASSEMBLY TRANSLUCENT ROOF SKYLIGHT SYSTEM GYPSUM BOARD SUSPENDED GYPSUM BOARD CEILING SYSTEM COVED BASE SUSPENDED ACOUSTIC PANEL CEILING SYSTEM REGI S 051213 054001 061604 064106 ON KEYNOTES T ITEC EXISTING CEILING A5.1 45° MIN. BRACING AT 48" O.C., TYP. 054001 092901 2 A5.1 SIM. OPP. B.O. CEILING (SECOND FLOOR) 24' - 0" 081702 EXISTING CEILING 092901 ADMIN 1'-11 3/4" A5.1 B.O. CEILING (FIRST FLOOR) 11' - 0" 064106 6 054001 A5.1 092901 B.O. CEILING (FIRST FLOOR) 11' - 0" 095404 SIM. OPP. 8 092901 A5.1 8 SIM. OPP. 4'-4 1/2" 092925 4'-11" 4'-11" 12'-11" 7 A5.1 3'-5 1/2" VERIFY SECOND FLOOR 15' - 0" 081701 HALLWAY 054001 EXISTING FLOOR STRUCTURE 092925 A5.1 EXISTING STEEL BEAM 054001 EDGE BEYOND 152 092901 092901 092901 B.O. CEILING (FIRST FLOOR) 11' - 0" 4/20/2015 4:56:12 PM EXISTING FLOOR STRUCTURE 1 A3.3 WALL SECTION 1/2" = 1'-0" 095404 97222 WALL SECTIONS 9 3'-4 1/2" 054001 092925 092925 A5.1 6 092901 A5.1 3'-6" SEE STRUCTURAL 092901 092925 10 2'-0 1/4" 051213 SECOND FLOOR 15' - 0" REVISIONS SECOND FLOOR 15' - 0" 12400 SE FREEMAN WAY, MILWAUKIE, OREGON 093014 DATE 45° MIN. BRACING AT 48" O.C., TYP. SOFFIT HANGER WIRE 092901 15 APR 2015 054001 EXISTING FLOOR STRUCTURE EXISTING FLOOR STRUCTURE 093014 PROJECT NUMBER 092901 SEE PLAN FOR WALL TYPE 45° MIN. BRACING AT 48" O.C., TYP. 054001 14019.00.L SEE PLAN FOR WALL TYPE SOFFIT HANGER WIRE NORTH CLACKAMAS SCHOOL DISTRICT NEW ADMINISTRATION BUILDING REMODEL 201 EXISTING FLOOR STRUCTURE FIRST FLOOR 0' - 0" FIRST FLOOR 0' - 0" 2 A3.3 WALL SECTION 1/2" = 1'-0" A3.3 3 A3.3 WALL SECTION 3/4" = 1'-0"