1. The purpose of Six Sigma is to: Top of Form fix defects. reduce variation. perform project management. calculate standard deviation. Bottom of Form Explanations:Answer: (b) The purpose of Six Sigma is to reduce variation from any process and product. As variation is reduced, the quality is increased. 2. What is Six Sigma? Top of Form A business philosophy focusing on improvement A project management model A defects reduction technique that is six times better than average A measurement system Bottom of Form Explanations:Answer: (a) Six Sigma is a business philosophy focused on driving continuous and breakthrough improvement. 3. DMAIC stands for: Top of Form Design, Measure, Analyze, Improve, Control Define, Measure, Analyze, Improve, Control Double Measurement And Instructions Checklist Definition, Measurements, Analysis, Improvements, and Control Bottom of Form Explanations:Answer: (b) DMAIC is a Six Sigma problem solving methodology that stands for Define, Measure, Analyze, Improve, and Control. 4. DFSS stands for: Top of Form Design and Fix using Six Sigma Develop Fast using Six Sigma Define Futuristic Service and Solutions Design For Six Sigma Bottom of Form Explanations:Answer: (d) DFSS is Six Sigma methodology that stands for "Design for Six Sigma" used while designing new processes. 5. Six Sigma Level can be achieved by having: Top of Form less than 3.4 defects per million opportunities. six times better quality than competitors. six levels of testing and validation before release. Six Nines Quality (99.9999%). Bottom of Form Explanations:Answer: (a) If your process is delivering less than 3.4 defects per million opportunities, then you can call your process as performing at Six Sigma level. 6. DMADV stands for : Top of Form Design, Measure, Analyze, Develop, Verify Develop Measurement and Analysis Department for Verification Define, Measure, Analyze, Design, Verify Design, Measure, Analyze, Define, Validate Bottom of Form Explanations:Answer: (c) DMADV is Six Sigma methodology that is used when developing a new process. It stands for "Define, Measure, Analyze, Design, and Verify." 7. The purpose of Toll Gate review is to: Top of Form confirm if the earlier phase was completed successfully. get a formal sign-off from the stakeholders. review progress and kick off the next phase. All of the above Bottom of Form Explanations:Answer: (d) It is all of the above. The purpose of the Tollgate is to ensure plans are completed successfully, acquire formal sign-off from stakeholders and then review the progress and kick off the next phase. 8. What is the primary role of Master Black Belt? Top of Form Provide budget for the projects Coach, mentor, and train Black Belts Be a master in Six Sigma implementation Review projects Bottom of Form Explanations:Answer: (b) The primary role of Master Black Belt is to provide guidance, train, coach, and mentor Black Belts for Six Sigma projects. 9. Which role performs the following responsibilities: "Evangelize Six Sigma, provide resources and resolve any cross-functional issues"? Top of Form Sponsor Senior Executive Master Black Belt Champion Bottom of Form Explanations:Answer: (d) It is the Champion that is responsible for evangelizing Six Sigma and providing resources and support for Six Sigma projects 10. A Black Belt is expected to deliver what types of results from Six Sigma projects? Top of Form At least 200,000 USD as annual benefit Have everybody in the organization trained on Six Sigma Large projects Defects reduction projects Bottom of Form Explanations:Answer: (a) Six Sigma Black Belt level projects are expected to provide returns of more than 200,000 USD annually.