Application Portfolio Rationalization Click to edit Master title Status Report to Executive Leadership Team style 24 Nov 2015 Click to edit Master subtitle style Pat Sarkar, VP-IT, Architecture & Strategy Enterprise Architecture: Journey to Agile Architecture Emerging standard Core standard Declining standard – Use with ARB approval Obsolete standard – Don’t Use it 3PL M&A Capability Security & Integrity Integration & Interoperability 1. Simplify 2. Optimize 3. Govern Take stock (6-9 months) Standardize (1-3 months) Rationalize (3-5 years) Business Process Catalog Manufacturing Capability Oracle EBS SharePoint 2013 Network Solutions BU SAP ERP Internet Explorer 7.0 Sybase Dell Laptop TE Connectivity Confidential & Proprietary. Do not reproduce or distribute. Oracle RDB SAP HANA Java Dev .NET Dev Cognos IBM DB2 Hadoop IBM P-Series AWS HP-UX IBM OS/360 WinTel Acquire New Expand Core Divest Old Rent/Buy/Build New Expand Core Retire Old Vital Few Standards Expand Core Decommission Old Review Emerging Expand Core Sunset/Obsolete Old Application Portfolio Rationalization – Status as of 11/23/15 Step 1. Application Inventory, Annual Cost, Map to Business Process (6-9 months) (DONE – AUG 2015) Step 2. Examine Each Business Process for Strategic Fit and Overlap of Applications (2-3 months) (DONE – NOV 2015) Step 3. Finalize Strategic Applications that will Replace Low Strategic-Fit Applications, When and How, Cost Savings, (3-4 months Concurrent with Step 4) (IN PROGRESS) Step 4. Launch new projects or extend existing projects to retire applications (2-3 Years) (IN PROGRESS) Output: 3-5 years Strategy & Roadmap for Execution 3 Status Report Summary (for Step 2 of 4) There are 948 applications in the portfolio costing $143M for support and maintenance annually There are 264 applications identified costing $18M annually, that will be retired over the next 5 years (It is not expected to save all $18M but a portion of it depending on the cost of the new applications). The team has identified 60 applications costing $10M annually, that will be retired in FY2016 and FY2017 (so-called low-hanging fruit) TBD column still has 95 applications – so far no one has been able to describe how strategic these applications are, or to assign a strategic-fit ranking Luke Dougherty (Controller) and Pat Sarkar have validated the annual costs against the budget Enterprise Architecture team would like to thank everyone who participated in this EA initiative. We hope the results will prove that this was worthwhile in that it could save TE millions of dollars annually. 4 TEIS Application List Statistics by COE COE 5 Total Apps Annual H/W for COE Cost Annual S/W Cost Annual Int Labor Annual Ext Labor Total Annual Cost GAS 250 $5,146,658 $17,651,643 $31,757,726 $10,128,656 $64,684,683 GES 82 $3,779,289 $12,420,437 $13,432,277 $1,724,099 $31,356,102 DCS 227 $3,535,182 $6,999,510 $7,248,797 $3,472,017 $21,255,506 GIS 111 $2,348,037 $10,272,808 $5,551,802 $645,000 $18,817,647 N-APAC 41 $30,421 $55,415 $181,000 $39,747 $306,583 S-APAC 192 $78,783 $65,347 $1,135,680 $128,377 $1,408,187 SRM 45 $107,000 $1,540,300 $2,758,260 $885,860 $5,291,420 All Apps 948 $15,025,370 $49,005,460 $62,065,542 $17,023,756 $143,120,128 TEIS Application List Statistics by Process Group Process Group Total Apps 89 Budget to Report 99 Concept to Market 9 Connect to Engage 156 Data to Insights 15 Demand to Build 14 ERP/Multi Processes 53 Hire to Retire 160 IT Processes & Tools 54 Lead to Quote 111 Manufacturing 80 Order to Cash 39 Procure to Pay 69 Supply Chain 948 All Apps 6 Annual H/W Cost $132,370 $1,766,764 $160,000 $2,056,796 $604,066 $5,786,377 $689,500 $1,367,428 $725,097 $1,174,335 $1,339,050 $992,507 $229,466 $17,023,756 Annual S/W Cost $1,487,523 $12,319,686 $110,260 $2,337,000 $2,640,600 $8,955,247 $419,515 $10,847,079 $4,612,560 $1,533,635 $1,189,241 $985,330 $1,567,784 $49,005,460 Annual Int Labor $1,298,563 $13,169,907 $284,450 $3,619,525 $1,562,760 $19,995,282 $2,821,250 $7,456,848 $1,279,602 $3,954,234 $2,099,192 $1,107,673 $3,416,256 $62,065,542 Annual Ext Labor $205,085 $3,450,692 $51,101 $1,367,555 $13,947 $2,609,713 $584,032 $2,508,865 $1,413,334 $1,521,454 $342,540 $469,099 $487,953 $15,025,370 Total Annual Cost $3,123,541 $30,707,049 $605,811 $9,380,876 $4,821,373 $37,346,619 $4,514,297 $22,180,220 $8,030,593 $8,183,658 $4,970,023 $3,554,609 $5,701,459 $143,120,128 Strategic-Fit Ranking of Applications in a Business Process It is a ranking between 1 and 10 that represents how strategic an application is to its business process, i.e., whether an application is going to stay with the business process in the long term or it will be replaced by a more strategic application. Strategic Fit Definition Applications with a Strategic Fit ranking of 1-4 are scheduled or being scheduled for replacement within five years 1 (lowest) This application is scheduled to be replaced by another known application within two years and/or an active replacement project in process. 2 This application is scheduled to be replaced by another known application but the replacement project will be completed in 3-4 years. 3 This application is scheduled to be replaced by another known application but the replacement project will be completed in 5 years. 4 This application is scheduled to be replaced by another known application but the replacement project is yet to be approved and funded. Any application whose Health Indicator is RED should have a Strategic Fit ranking of 4 or less. Target retirement year is FY2020. Applications with a Strategic Fit ranking of 5 are a borderline case 5 This application should be replaced but a replacement application is yet to be identified and a replacement project proposed Applications with a Strategic Fit ranking of 6-10 are strategic and will continue to be used for their business process 6 This application is currently a “legacy” or “declining” standard but no obsolesce date has been set. The vendor is viable but we would consider replacement in the future. 7 This application is currently one of the “core” standards for the functionality it provides but it could be replaced by an application with a higher strategic ranking 9-10. 8 This application is strategic and it is going to stay. This is a homegrown or vendor application and it gives TE a competitive advantage. 9 This application is strategic and it is going to stay. The vendor is a strategic, trusted tier-1 vendor, or it’s a strategic homegrown application. 10 (highest) 7 This application is TE's long-term strategic choice and the “core” standard. There are no future plans to replace it. Report#1: ARB Review Status as of 11/23/2015 – All Business Processes Application Count and Cost by Strategic-Fit Value Application Business Process IT Process Count and Cost Low Fit (1-4)* Midpoint (5) High Fit (6-10) Reviewed by EA, ARB Lead/ TBD and Strategy Leads Presenter(s) Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Luis Rocha Multiple Processes/ ERP 14 37,347 7 3,953 1 503 6 32,891 0 0 Andreas Hintz Product Development 74 23,223 11 438 14 1,278 48 21,408 1 100 Bill Webber IT Management 140 21,923 28 2,014 14 450 90 19,182 8 276 Business Analytics Brian Cozzens Dan Wiest Product Life Cycle Management Manufacturing Execution Syam Chodagiri Mark Fulton Warehouse Management 154 8,986 35 2,394 43 1,195 76 5,397 0 0 20 7,469 9 2,749 6 2,197 3 2,288 2 235 38 5,885 25 404 5 26 6 5,417 2 37 Tony Leisher Dirk Devleeschouwer 22 4,765 12 1,853 3 9 6 2,897 1 6 Lead Management Tanveer Igatpuriwala Robert Watson 13 4,058 9 1,197 0 0 4 2,861 0 0 TE.com External-facing Transactions Tanveer Igatpuriwala Robert Watson Dave Shaffer Ken Chambers 25 3,497 0 0 4 1,583 19 1,768 2 146 Organization Management Michelle Bellamy 2 3,103 0 0 0 0 2 3,103 0 0 * 8 Tony Leisher Applications with Low Strategic-Fit Value are potential candidates for consolidation, the amounts shown are annual costs, not savings Report#1 continued : ARB Review Status as of 11/23/2015 – All Business Processes Application Count and Cost by Strategic-Fit Value Application Business Process IT Process Count and Cost Low Fit (1-4)* Midpoint (5) High Fit (6-10) Reviewed by EA, ARB Lead/ TBD and Strategy Leads Presenter(s) Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Master Production Schedule Stephanie Schank 1 2,835 0 0 1 2,835 0 0 0 0 Patty Black Pricing 7 2,682 2 6 0 0 4 2,573 1 103 Sourcing and Supplier Management Tony Leisher Manufacturing Operations Management Tony Leisher Budgeting, Accounting and Reporting Chris Foreman Thomas Panikkar Sales & Operations Planning Stephanie Schank Direct Procurement Tony Leisher Order Management Patty Black Bob Gadbois Payroll Michelle Bellamy B2B Dave Shaffer * 9 18 1,939 7 87 3 37 8 1,815 0 0 37 1,930 20 1,839 5 18 5 41 7 32 23 1,917 3 5 7 148 8 1,664 5 100 8 8 1,719 1,371 1 3 119 723 6 1 1,575 29 1 4 25 619 0 0 0 0 25 1,125 8 61 6 27 4 548 7 489 12 6 729 725 0 1 0 2 10 0 462 0 2 3 267 669 0 2 0 54 Applications with Low Strategic-Fit Value are potential candidates for consolidation, the amounts shown are annual costs, not savings Report#1 continued : ARB Review Status as of 11/23/2015 – All Business Processes Application Count and Cost by Strategic-Fit Value Application Business Process IT Process Count and Cost Low Fit (1-4)* Midpoint (5) High Fit (6-10) Reviewed by EA, ARB Lead/ TBD and Strategy Leads Presenter(s) Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Marketing & Branding 4 591 0 0 2 20 2 570 0 0 Prasanna Deshmukh Thomas Panikkar Corporate Performance 7 508 3 10 1 485 0 0 3 13 Global Trade Patty Black Mike Grenier Janet Hartman Facility Management Tony Leisher Time and Attendance Michelle Bellamy Advanced Analytics Dan Wiest Quality Management Tony Leisher Inventory management Tony Leisher Legal, Compliance and Governance Andrew Merkert Bill Webber Product Configuration and Quotation Dave Shaffer * 10 19 469 7 67 0 0 9 388 3 13 26 13 2 34 11 424 404 395 382 329 7 0 0 15 3 161 0 0 109 10 4 4 1 4 6 18 16 295 13 50 5 5 1 5 2 20 322 100 135 269 10 4 0 10 0 225 65 0 124 0 18 320 2 23 2 6 13 286 1 4 8 282 0 0 2 138 4 113 2 31 Applications with Low Strategic-Fit Value are potential candidates for consolidation, the amounts shown are annual costs, not savings Report#1 continued : ARB Review Status as of 11/23/2015 – All Business Processes Application Count and Cost by Strategic-Fit Value Application Business Process IT Process Count and Cost Low Fit (1-4)* Midpoint (5) High Fit (6-10) Reviewed by EA, ARB Lead/ TBD and Strategy Leads Presenter(s) Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Supply Planning 1 245 0 0 0 0 1 245 0 0 Stephanie Schank Tony Leisher Indirect Procurement 9 236 3 10 3 10 3 216 0 0 Billing and Payment Chris Foreman Thomas Panikkar Logistics and Fulfillment Tony Leisher Sales Management Prasanna Deshmukh Recruitment and Terminations Training & Personal Development Michelle Bellamy Sourcing and Category Management Tony Leisher MRP II Tony Leisher Asset Management Chris Foreman Thomas Panikkar * 11 Michelle Bellamy 14 206 3 11 1 21 5 60 5 113 19 8 204 194 4 2 20 5 8 3 102 71 5 1 73 10 2 2 9 107 4 140 1 14 1 3 2 123 0 0 14 110 2 43 2 6 6 44 4 16 4 83 0 0 3 47 1 36 0 0 8 58 6 34 1 3 0 0 1 21 11 57 3 7 5 40 2 11 1 0 Applications with Low Strategic-Fit Value are potential candidates for consolidation, the amounts shown are annual costs, not savings Report#1 continued : ARB Review Status as of 11/23/2015 – All Business Processes Application Count and Cost by Strategic-Fit Value Application Business Process IT Process Count and Cost Low Fit (1-4)* Midpoint (5) High Fit (6-10) Reviewed by EA, ARB Lead/ TBD and Strategy Leads Presenter(s) Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Travel and Expense Management Capital Planning and Fixed Assets Compensation and Benefits Management Credit and Accounts Receivable Process and Project Management Demand Planning & Forecasting Customer Service Chris Foreman Thomas Panikkar 6 44 2 19 0 0 3 10 1 15 Chris Foreman Thomas Panikkar 2 27 0 0 1 3 0 0 1 24 7 26 3 10 4 16 0 0 0 0 6 20 3 10 0 0 3 11 0 0 6 15 3 6 2 6 0 0 1 3 4 15 0 0 4 15 0 0 0 0 Product Costing Tony Leisher Transportation Tony Leisher 4 5 3 13 13 12 2 1 0 6 3 0 0 2 1 0 6 0 2 1 1 6 3 3 0 1 1 0 0 9 General Ledger and Intercompany Accounting Chris Foreman Thomas Panikkar 3 11 1 3 2 8 0 0 0 0 * 12 Michelle Bellamy Chris Foreman Thomas Panikkar Glenn Rebman Tony Leisher Patty Black Applications with Low Strategic-Fit Value are potential candidates for consolidation, the amounts shown are annual costs, not savings Report#1 continued : ARB Review Status as of 11/23/2015 – All Business Processes Application Count and Cost by Strategic-Fit Value Application Business Process IT Process Count and Cost Low Fit (1-4) Reviewed by EA, ARB Lead/ Midpoint (5) High Fit (6-10) TBD and Strategy Leads Presenter(s) Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Treasury Chris Foreman Thomas Panikkar 2 11 1 5 0 0 0 0 1 6 IFRS Compliance Chris Foreman Thomas Panikkar 3 10 0 0 1 3 2 6 0 0 Accounts Payable and Invoicing Chris Foreman Thomas Panikkar 4 10 2 6 0 0 1 3 1 0 Develop products & services Develop product strategy Andreas Hintz 3 8 0 0 1 3 0 0 2 5 Contract Management Patty Black Available to Promise Tony Leisher Performance Management Michelle Bellamy Demand Generation Prasanna Deshmukh 3rd Party Manufacturing Tony Leisher 0 3 0 3 0 0 18,442 2 0 1 0 1 0 204 6 0 5 0 2 0 13,793 0 0 0 0 0 0 95 0 0 0 0 0 0 2,383 Grand Total Andreas Hintz 2 6 0 2 6 1 1 5 0 1 3 1 1 2 0 2 0 2 948 143,120 264 0 0 1 3 0 0 0 0 0 0 0 0 385 108,501 264 out of 948 applications are going to be retired over the next 5 years. Another 204 applications, sitting on the fence with strategic-fit rank of 5, could be retired if solution architects can investigate and identify better applications that yield a strong business case. 13 Report # 2: Applications by COE and Strategic-Fit Ranking COE Application Count and Cost Count Application Count and Cost by Strategic-Fit Value Low Fit (1-4) Midpoint (5) High Fit (6-10) TBD Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K GAS 250 64,685 80 8,824 41 5,565 69 49,386 60 909 GES 82 31,356 12 3,172 14 3,459 52 24,251 4 475 DCS 227 21,256 44 3,622 53 3,024 118 13,834 12 776 GIS 111 18,818 19 1,624 10 1,422 63 15,549 19 223 SRM 45 5,291 5 312 3 33 37 4,946 0 0 S-APAC 192 1,408 92 732 64 204 36 472 0 0 N-APAC 41 307 12 155 19 87 10 65 0 0 Grand Total 948 204 13,793 385 108,501 95 2,383 143,120 264 18,442 264 out of 948 applications are going to be retired over the next 5 years. Another 204 applications, sitting on the fence with strategic-fit rank of 5, could be retired if solution architects can investigate and identify better applications that yield a strong business case. 14 Report # 3: Applications To Be Retired by COE and Retirement Year COE All Applications Count and Cost Application Count/Cost with Strategic Fit (1-4) by Retirement Year FY2016 FY2017 FY2018 FY2019 FY2020 Cost Cost Cost Cost Cost Count Count Count Count Count $K $K $K $K $K 20 3,420 7 3,093 0 0 0 0 53 2,312 Count Cost $K GAS 250 64,685 GES 82 31,356 1 10 1 1 0 0 0 0 10 3,161 DCS 227 21,256 8 1,331 3 1,583 0 0 0 0 33 708 GIS 111 18,818 5 189 5 743 1 21 0 0 8 671 SRM 45 5,291 2 43 0 0 0 0 0 0 3 269 S-APAC 192 1,408 2 6 3 10 13 41 0 0 74 675 N-APAC 41 307 1 98 2 13 0 0 0 0 9 45 Grand Total 948 143,120 39 5,096 21 5,442 14 62 0 0 190 7,841 How to read this report: The Grand Total shows that out of 948 applications (annual maintenance cost $143M), 39 will be retired in FY2016 (annual cost $5M), 21 in FY2017 (annual cost $5.4M), 14 in FY2018 ($62K), none in FY2019, and 190 in FY2020 ($7.8M). GAS row shows that this COE’s 250 applications cost $64.7 million annually to support, 53 of which will be retired by FY2020. This plan can be significantly improved by retiring more applications in FY2017/FY2018/FY2019 rather than in FY2020 – it will require new projects to be launched in those years. Cost savings will be a portion of annual costs. 15 Report # 4: Applications To Be Retired by Process Group and Retirement Year PROCESS GROUP Application Count/Cost with Strategic Fit (1-4) by Retirement Year All Application Count and Cost FY2016 FY2017 FY2018 FY2019 FY2020 Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K 14 37,347 0 0 3 2,995 0 0 0 0 4 958 99 30,707 2 10 2 1 0 0 0 0 16 3,176 161 22,182 11 372 3 725 2 24 0 0 17 923 156 9,381 2 110 2 1,569 0 0 0 0 31 714 112 8,192 3 982 6 59 1 3 0 0 50 1,305 54 8,031 5 1,186 0 0 0 0 0 0 6 17 69 5,701 9 1,415 0 0 5 16 0 0 17 540 79 4,968 0 0 1 8 1 3 0 0 20 102 14 4,813 1 119 0 0 0 0 0 0 0 0 53 4,514 2 43 1 14 2 6 0 0 2 6 39 3,555 1 714 2 68 1 3 0 0 11 40 89 3,124 3 145 0 0 2 6 0 0 15 58 9 606 0 0 1 3 0 0 0 0 1 3 948 143,120 39 5,096 21 5,442 14 62 0 0 190 7,841 Grand Total How to read this report: The Grand Total shows that out of 948 applications (annual maintenance cost $143M), 39 will be retired in FY2016 (annual cost $5M), 21 in FY2017 (annual cost $5.4M), 14 in FY2018 ($62K), none in FY2019, and 190 in FY2020 ($7.8M). The “Concept to Market” row shows that this Process Group costs $30.7 million annually to support 99 applications, 16 of which will be retired by FY2020. This plan can be significantly improved by retiring more applications in FY2017/FY2018/FY2019 rather than in 16 FY2020 – it will require new projects to be launched in those years. ERP/ Multi Processes Concept to Market IT Processes & Tools Data to Insights Manufacturing Lead to Quote Supply Chain Order to Cash Demand to Build Hire to Retire Procure to Pay Budget to Report Connect to Engage Report # 5: List of 60 Applications by COE with Retirement Year FY2016 and FY2017 COE DCS DCS DCS DCS DCS Application Name Process Group Total Annual Cost Retirement Year Lead to Quote Lead to Quote Lead to Quote Lead to Quote Data to Insights $ $ $ $ $ 521,147 278,593 256,023 130,072 105,200 FY16 FY16 FY16 FY16 FY16 DCS SFDC - ENERGY SFDC - CENTRAL ORG SFDC - AD&M SFDC - CIRCUIT PROTECTION Trends Analytics TYCO ELECTRONICS LEARNING MANAGEMENT SYSTEM (GEN21) Hire to Retire $ 40,000 FY16 DCS SFDC - EXECUTIVE DASHBOARD Lead to Quote $ 1 FY16 DCS GET A ROOM IT Processes & Tools $ 1 FY16 DCS DCS IBM COGNOS 10 APPLICATION AND REPORTING DST DATA SUBMISSION TOOL FOR HR Data to Insights Hire to Retire $ $ 1,560,000 13,800 FY17 FY17 DCS GAS GAS GAS GAS GAS GAS GAS GAS GAS GAS ENVISN - COGNOS ADMINISTRATION TOOL MOVE PURCHASING(POLIS) AMP MANUFACTURING SYSTEM (AMS) SHOP FLOOR CONTROL (HP3000) ENVIRONMENTAL, HEALTH AND SAFETY STATISTICAL WEB APPLICATION HP PPM (VANILLA) Easy Vista FOREIGN TRADE COMPLIANCE ZOE Data to Insights Supply Chain Procure to Pay Manufacturing Manufacturing Budget to Report Demand to Build IT Processes & Tools IT Processes & Tools Supply Chain Supply Chain $ $ $ $ $ $ $ $ $ $ $ 9,400 1,250,000 714,172 714,172 267,900 141,000 119,100 108,002 30,000 25,000 13,432 FY17 FY16 FY16 FY16 FY16 FY16 FY16 FY16 FY16 FY16 FY16 GAS I-XPORT Supply Chain $ 7,500 GAS In-Trade Supply Chain $ GAS In-Trade - Juarez Supply Chain GAS Codice GAS COE Process Group Total Annual Cost Retirement Year IT Processes & Tools ERP/ Multi Processes ERP/ Multi Processes ERP/ Multi Processes Procure to Pay $ $ $ $ $ 4 2,100,004 820,000 74,500 63,000 FY16 FY17 FY17 FY17 FY17 GAS HP PPM (LEGACY MERCURY) TE UK LEGACY Ampics South America P3 eQuote QUALITY NON-CONFORMING AND ENGINEERING AUDIT (LINCS) Manufacturing $ 30,000 FY17 GAS GAS GES RPC CAS LEANKM - Pumacy Procure to Pay Concept to Market Concept to Market $ $ $ 5,200 100 10,001 FY17 FY17 FY16 GES GIS PART INQUIRY INTERNAL ENTEPRISE PORTAL Concept to Market IT Processes & Tools $ $ 1,001 115,000 FY17 FY16 GIS EXTERNAL COLLABORATION WORKSPACES IT Processes & Tools $ 70,000 FY16 GIS BISCOM FAX SERVER IT Processes & Tools $ 1,800 FY16 GIS GIS GIS GIS GIS GIS ESKER FAX-SERVER CodeSoft Remedy SHAREPOINT 2010 WEBSPHERE APPLICATION SERVER Andon IT Processes & Tools Manufacturing IT Processes & Tools IT Processes & Tools IT Processes & Tools Manufacturing $ $ $ $ $ $ 1,800 100 331,000 226,000 168,000 10,000 FY16 FY16 FY17 FY17 FY17 FY17 FY16 GIS N-APAC Guard2 JCDC WAREHOUSE Manufacturing Supply Chain $ $ 8,000 97,603 FY17 FY16 6,480 FY16 N-APAC Order to Cash $ 7,521 FY17 $ 6,000 FY16 N-APAC DIPS Goods Return Request and Status Management System Manufacturing $ 5,000 FY17 Supply Chain $ 5,500 FY16 S-APAC Meeting room Booking system Budget to Report $ 3,195 FY16 BUSINESS OBJECTS FOR TAX DEPT Data to Insights $ 5,000 FY16 S-APAC Hire to Retire $ 3,195 FY16 GAS SEER Supply Chain $ 3,384 FY16 S-APAC Selling Meals System SD Track - Customer Master Creation Tracking System Connect to Engage $ 3,175 FY17 GAS IFX - INTERNET FILE TRANSFER IT Processes & Tools $ 2,003 FY16 S-APAC QA Checker System and OGP Report Manufacturing $ 3,165 FY17 GAS Sage Budget to Report $ 1,000 FY16 Project Sheet AUT Concept to Market $ 90 FY16 S-APAC SRM SRM SPC Chart System Trustwave Network DLP - Vericept CPI - Computer Packages Inc Manufacturing IT Processes & Tools IT Processes & Tools $ $ $ 3,165 23,000 20,000 FY17 FY16 FY16 17 GAS GAS GAS GAS GAS GAS Application Name Report # 6: All BU-Managed Applications by Segment and Strategic Fit Application Count and Cost by Strategic-Fit Value SEGMENT Application Count and Cost Low Fit (1-4) Midpoint (5) High Fit (6-10) TBD Count Cost $K Count Cost $K Count Cost $K Count Cost $K Count Cost $K Global 13 1,160 1 0 1 260 9 840 2 60 Communications 6 905 0 0 1 205 1 679 4 21 Transportation 18 904 4 622 3 124 2 67 9 91 Industrial 37 719 15 402 6 12 7 124 9 182 Grand Total 74 3,688 20 1,024 11 601 19 1,709 24 354 BU-managed applications are in BU budgets, not in TEIS budget. This is not a complete list of all BU-managed applications, just the ones TEIS is aware of. 18