Airport to NCC Access Road Phase 2 (Aranguren - Dapdap Section) Drawings - Part 1 0

advertisement
GENERAL
INDEX OF DRAWINGS
TITLE
SET NO.
GENERAL
SET NO.
DRAINAGE DRAWINGS
INDEX OF DRAWINGS (SHEET 1 OF 3)
INDEX OF DRAWINGS (SHEET 2 OF 3)
INDEX OF DRAWINGS (SHEET 3 OF 3)
GENERAL NOTES
LEGENDS AND ABBREVIATIONS
SUMMARY OF QUANTITIES (SHEET 1 OF 2)
SUMMARY OF QUANTITIES (SHEET 2 OF 2)
G-1
G-2
G-3
G-4
G-5
G-6
G-7
ROADWAY
KEY MAP, LOCATION MAP AND LAYOUT PLAN
HORIZONTAL AND VERTICAL CONTROLS, TABLE OF COORDINATES AND ELEMENTS OF CURVE
PLAN AND PROFILE STA. 1+500.000 - STA. 2+100.000
PLAN AND PROFILE STA. 2+100.000 - STA. 2+800.000
PLAN STA. 2+800.000 - STA. 3+500.000
PROFILE STA. 2+800.000 - STA. 3+500.000
PLAN AND PROFILE STA. 3+500.000 - STA. 4+200.000
PLAN AND PROFILE STA. 4+200.000 - STA. 4+900.000
PLAN AND PROFILE STA. 4+900.000 - STA. 5+600.000
PLAN STA. 5+600.000 - STA. 6+300.000
PROFILE STA. 5+600.000 - STA. 6+300.000
PLAN STA. 6+300.000 - STA. 7+000.000
PROFILE STA. 6+300.000 - STA. 7+000.000
PLAN STA. 7+000.000 - STA. 7+700.000
PROFILE STA. 7+000.000 - STA. 7+700.000
PLAN STA. 7+700.000 - STA. 8+400.000
PROFILE STA. 7+700.000 - STA. 8+400.000
PLAN STA. 8+400.000 - STA. 9+100.000
PROFILE STA. 8+400.000 - STA. 9+100.000
PLAN STA. 9+100.000 - STA. 9+800.000
PROFILE STA. 9+100.000 - STA. 9+800.000
PLAN STA. 9+800.000 - STA. 10+500.000
PROFILE STA. 9+800.000 - STA. 10+500.000
PROFILE MATCHLINE ELEVATION 200.00, STA. 9 + 800.000 - STA. 10 + 500.000
PLAN STA. 10+500.000 - STA. 11+200.000
PROFILE STA. 10+500.000 - STA. 11+200.000
PLAN AND PROFILE STA. 11+200.000 - STA. 11+900.000
PLAN STA. 11+900.000 - STA. 12+600.000
PROFILE STA. 11+900.000 - STA. 12+600.000
PLAN AND PROFILE STA. 12+600.000 - STA. 13+300.000
PLAN AND PROFILE STA. 13+300.000 - STA. 14+000.000
PLAN AND PROFILE STA. 14+000.000 - STA. 14+700.000
PLAN AND PROFILE STA. 14+700.000 - STA. 15+400.000
PLAN AND PROFILE STA. 15+400.000 - STA. 16+000.000
SCHEDULES
R-1
R-2
R-3
R-4
R-5
R-6
R-7
R-8
R-9
R-10
R-11
R-12
R-13
R-14
R-15
R-16
R-17
R-18
R-19
R-20
R-21
R-22
R-23
R-24
R-25
R-26
R-27
R-28
R-29
R-30
R-31
R-32
R-33
R-34
R-35
ROAD STANDARDS AND DETAILS
TYPICAL ROAD CROSS SECTIONS
HORIZONTAL AND VERTICAL CURVES
SUPERELEVATIONS
WIDENING AND SIGHT DISTANCE
JOINT DETAIL DRAWING CEMENT CONCRETE PAVEMENT
CONCRETE CURB AND GUTTER DETAILS
STANDARD ROAD WORK SIGN
STANDARD ROAD SIGN (REGULATORY SIGNS)
STANDARD ROAD SIGN (WARNING/INFORMATORY SIGNS)
MOUNTING SUPPORT FOR ROAD SIGN, TYP. SIGN MOUNTING DETAILS
STANDARD PAVEMENT MARKINGS (SHEET 1 OF 2)
STANDARD PAVEMENT MARKINGS (SHEET 2 OF 2)
RS-1
RS-2
RS-3
RS-4
RS-5
RS-6
RS-7
RS-8
RS-9
RS-10
RS-11
RS-12
RS-13
RS-14
TYPICAL CHAIN LINK FENCE
C O N S U L T A N T S
TITLE
DR-1
DR-2
DR-3
DR-4
DR-5
DR-6
DR-7
DR-8
DR-9
DR-10
DR-11
DR-12
DR-13
DR-14
DR-15
DR-16
DR-17
DR-18
DR-19
DR-20
DR-21
DR-22
DR-23
DR-24
DR-25
DR-26
DR-27
DR-28
DR-29
DR-30
DR-31
DR-32
DR-33
DR-34
DRAINAGE STANDARDS AND DETAILS
STANDARD DETAILS OF REINFORCED CONCRETE BOX CULVERT (RCBC)
STANDARD DETAILS OF REINFORCED CONCRETE BOX CULVERT (RCBC) BARRELS
STANDARD DETAILS OF RCBC WINGWALLS
STANDARD RCPC, METHOD OF PIPE INSTALLATION AND TYPICAL FOR CONDUITS
STANDARD REINFORCED CONCRETE HEADWALL FOR RCPC
STANDARD COMBINATION OF CURB INLET MANHOLE
MINOR DRAINAGE STRUCTURES (MISCELLANEOUS)
SIDE DITCH, BERM DITCH, VERTICAL DITCH, STEP CHANNEL
SLOPE PROTECTION DETAILS
STANDARD PROTECTION FOR DRAINAGE
CURB INLET AND RCBC DETAILS
DETAILS OF DITCHES AND CANALS
STANDARD REINFORCED CONCRETE CATCH BASIN FOR RCPC
SUBMITTED BY
DS-1
DS-2
DS-3
DS-4
DS-5
DS-6
DS-7
DS-8
DS-9
DS-10
DS-11
DS-12
DS-13
REVISIONS
A
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
SET NO.
ELECTRICAL DRAWINGS
SCHEDULE OF CROSS DRAINAGE CULVERTS
SCHEDULE OF BERM DITCH, SIDE DITCH AND CATCH BASIN
SCHEDULE OF VERTICAL DITCH
SCHEDULE OF VERTICAL DITCH
SCHEDULE OF VERTICAL DITCH
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
SCHEDULE OF DRAINAGE
DRAINAGE CROSS SECTION STA.1+500.00, STA.1+740.00, STA.1+935.00
DRAINAGE CROSS SECTION STA.2+220.00, STA.2+405.00, STA.2+900.00
DRAINAGE CROSS SECTION STA.3+040.00, STA.3+120.00, STA.3+200.00
DRAINAGE CROSS SECTION STA.3+660.00, STA.3+820.00, STA.3+930.00
DRAINAGE CROSS SECTION STA.4+120.00, STA.4+310.00, STA.4+600.00
DRAINAGE CROSS SECTION STA.5+050.00, STA.5+320.00, STA.5+545.00
DRAINAGE CROSS SECTION STA.6+740.00, STA.6+860.00, STA.7+000.00
DRAINAGE CROSS SECTION STA.7+215.00, STA.7+360.00, STA.7+580.00
DRAINAGE CROSS SECTION STA.7+705.00, STA.7+820.00, STA.7+960.00
DRAINAGE CROSS SECTION STA.8+060.00, STA.8+440.00, STA.8+630.00
DRAINAGE CROSS SECTION STA.8+755.00, STA.8+980.00, STA.9+895.00
DRAINAGE CROSS SECTION STA.10+040.00, STA.10+518.00
DRAINAGE CROSS SECTION STA.11+050.00, STA.11+190.00
DRAINAGE CROSS SECTION STA.11+270.00, STA.11+680.00, STA.11+810.00
DRAINAGE CROSS SECTION STA.12+050.00, STA.12+190.00, STA.12+640.00
DRAINAGE CROSS SECTION STA.13+020.00, STA.13+200.00, STA.13+600.00
DRAINAGE CROSS SECTION STA.13+960.00, STA.14+125.00, STA.14+170.00
DRAINAGE CROSS SECTION STA.14+520.00, STA.14+620.00, STA.14+800.00
DRAINAGE CROSS SECTION STA.15+020.00, STA.15+280.00, STA.15+420.00
DRAINAGE CROSS SECTION STA.15+660.00, STA.15+790.00, STA.15+920.00
CHECKED BY
TITLE
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DESIGN CRITERIA, LEGENDS, GENERAL NOTES AND LUMINAIRES SPECIFICATIONS
ROADWAY LIGHTING LAYOUTS, STA. 0+000.000 - STA. 1+400.000
ROADWAY LIGHTING LAYOUTS, STA. 1+400.000 - STA. 2+800.000
ROADWAY LIGHTING LAYOUTS, STA. 2+800.000 - STA. 3+500.000
ROADWAY LIGHTING LAYOUTS, STA. 3+500.000 - STA. 4+900.000
ROADWAY LIGHTING LAYOUTS, STA. 4+900.000 - STA. 5+600.000
ROADWAY LIGHTING LAYOUTS, STA. 5+600.000 - STA. 6+300.000
ROADWAY LIGHTING LAYOUTS, STA. 6+300.000 - STA. 7+000.000
ROADWAY LIGHTING LAYOUTS, STA. 7+000.000 - STA. 7+700.000
ROADWAY LIGHTING LAYOUTS, STA. 7+700.000 - STA. 8+400.000
ROADWAY LIGHTING LAYOUTS, STA. 8+400.000 - STA. 9+100.000
ROADWAY LIGHTING LAYOUTS, STA. 9+100.000 - STA. 9+800.000
ROADWAY LIGHTING LAYOUTS, STA. 9+800.000 - STA. 10+500.000
ROADWAY LIGHTING LAYOUTS, STA. 10+500.000 - STA. 11+200.000
ROADWAY LIGHTING LAYOUTS, STA. 11+200.000 - STA. 11+900.000
ROADWAY LIGHTING LAYOUTS, STA. 11+900.000 - STA. 12+600.000
ROADWAY LIGHTING LAYOUTS, STA. 12+600.000 - STA. 14+000.000
ROADWAY LIGHTING LAYOUTS, STA. 14+000.000 - STA. 15+400.000
ROADWAY LIGHTING LAYOUTS, STA. 15+400.000 - STA. 16+800.000
ROADWAY LIGHTING LAYOUTS, STA. 16+800.000 - STA. 18+200.000
ROADWAY LIGHTING LAYOUTS, STA. 18+200.000 - STA. 19+600.000
ROADWAY LIGHTING LAYOUTS, STA. 19+600.000 - STA. 19+826.284
MAIN RISER DIAGRAM
MAIN RISER DIAGRAM
MAIN RISER DIAGRAM
MAIN RISER DIAGRAM
MAIN RISER DIAGRAM
DETAILS, LIGHT POSTS, LIGHT POST CONCRETE FOUNDATION AND JUNCTION BOX
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
LANDSCAPE DRAWINGS
URBAN STREETSCAPE, TYPICAL ROAD BLOCK LENGTH SITE DEVELOPMENT PLAN
URBAN STREETSCAPE, TYPICAL WALKWAY AND BIKEWAY PAVING DETAILED PLANS
URBAN STREETSCAPE, TYPICAL ROAD BLOCK LENGTH PLANTING AND UTILITIES PLAN
URBAN STREETSCAPE, HARDSCAPE COMPONENTS DETAILED SECTIONS
F
LA-1
LA-2
LA-3
LA-4
MISCELLANEOUS
PROJECT SIGNBOARD
MATERIAL SOURCES MAP
DATE
M-1
M-2
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
E-1
E-2
E-3
E-4
E-5
E-6
E-7
E-8
E-9
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
E-18
E-19
E-20
E-21
E-22
E-23
E-24
E-25
E-26
E-27
E-28
E-29
E-30
E-31
INDEX OF DRAWINGS (Sheet 1 of 3)
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
G-1
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
INDEX OF DRAWINGS
TITLE
SET NO.
TITLE
SET NO.
TITLE
SET NO.
CROSS SECTIONS (STA. 1+500.000 - STA. 16+000.00)
STA.1+500.00 TO STA.1+540.00
CS-1
STA. 4+080.00 TO STA. 4+120.00
CS-46
STA. 6+540.00 TO STA. 6+580.00
CS-91
STA.1+560.00 TO STA.1+600.00
CS-2
STA. 4+140.00 TO STA. 4+180.00
CS-47
STA. 6+600.00 TO STA. 6+640.00
CS-92
STA.1+620.00 TO STA.1+660.00
CS-3
STA. 4+200.00 TO STA. 4+240.00
CS-48
STA. 6+660.00 TO STA. 6+700.00
CS-93
STA.1+680.00 TO STA.1+720.00
CS-4
STA. 4+260.00 TO STA. 4+300.00
CS-49
STA. 6+720.00 TO STA. 6+760.00
CS-94
STA.1+740.00 TO STA.1+780.00
CS-5
STA. 4+320.00 TO STA. 4+360.00
CS-50
STA. 6+780.00 TO STA. 6+800.00
CS-95
STA.1+800.00 TO STA.1+840.00
CS-6
STA. 4+380.00 TO STA. 4+420.00
CS-51
STA. 6+820.00 TO STA. 6+840.00
CS-96
STA.1+860.00 TO STA.1+900.00
CS-7
STA. 4+440.00 TO STA. 4+480.00
CS-52
STA. 6+860.00 TO STA. 6+880.00
CS-97
STA.1+920.00 TO STA.1+960.00
CS-8
STA. 4+500.00 TO STA. 4+540.00
CS-53
STA. 6+900.00 TO STA. 6+920.00
CS-98
STA.1+980.00 TO STA. 2+020.00
CS-9
STA. 4+560.00 TO STA. 4+600.00
CS-54
STA. 6+940.00 TO STA. 6+960.00
CS-99
STA. 2+040.00 TO STA. 2+080.00
CS-10
STA. 4+620.00 TO STA. 4+660.00
CS-55
STA. 6+980.00 TO STA. 7+000.00
CS-100
STA. 2+100.00 TO STA. 2+140.00
CS-11
STA. 4+680.00 TO STA. 4+720.00
CS-56
STA. 7+020.00 TO STA. 7+040.00
CS-101
STA. 2+160.00 TO STA. 2+200.00
CS-12
STA. 4+740.00 TO STA. 4+780.00
CS-57
STA. 7+060.00 TO STA. 7+080.00
CS-102
STA. 2+220.00 TO STA. 2+260.00
CS-13
STA. 4+800.00 TO STA. 4+840.00
CS-58
STA. 7+100.00 TO STA. 7+140.00
CS-103
STA. 2+280.00 TO STA. 2+320.00
CS-14
STA. 4+860.00 TO STA. 4+900.00
CS-59
STA. 7+160.00 TO STA. 7+200.00
CS-104
STA. 2+340.00 TO STA. 2+360.00
CS-15
STA. 4+920.00 TO STA. 4+960.00
CS-60
STA. 7+220.00 TO STA. 7+260.00
CS-105
STA. 2+380.00 TO STA. 2+400.00
CS-16
STA. 4+980.00 TO STA. 5+020.00
CS-61
STA. 7+280.00 TO STA. 7+320.00
CS-106
STA. 2+420.00 TO STA. 2+440.00
CS-17
STA. 5+040.00 TO STA. 5+080.00
CS-62
STA. 7+340.00 TO STA. 7+380.00
CS-107
STA. 2+460.00 TO STA. 2+480.00
CS-18
STA. 5+100.00 TO STA. 5+140.00
CS-63
STA. 7+400.00 TO STA. 7+440.00
CS-108
STA. 2+500.00 TO STA. 2+540.00
CS-19
STA. 5+160.00 TO STA. 5+200.00
CS-64
STA. 7+460.00 TO STA. 7+500.00
CS-109
STA. 2+560.00 TO STA. 2+600.00
CS-20
STA. 5+220.00 TO STA. 5+260.00
CS-65
OVERPASS 2 ABUT. A STA. 7+501.41 TO OVERPASS 2 ABUT. B STA. 7+536.61
CS-110
STA. 2+620.00 TO STA. 2+660.00
CS-21
STA. 5+280.00 TO STA. 5+320.00
CS-66
STA. 7+540.00 TO STA. 7+560.00
CS-111
STA. 2+680.00 TO STA. 2+720.00
CS-22
STA. 5+340.00 TO STA. 5+380.00
CS-67
STA. 7+580.00 TO STA. 7+620.00
CS-112
STA. 2+740.00 TO STA. 2+760.00
CS-23
STA. 5+400.00 TO STA. 5+440.00
CS-68
STA. 7+640.00 TO STA. 7+680.00
CS-113
STA. 2+780.00 TO STA. 2+800.00
CS-24
STA. 5+460.00 TO STA. 5+480.00
CS-69
STA. 7+700.00 TO STA. 7+740.00
CS-114
STA. 2+820.00 TO STA. 2+840.00
CS-25
STA. 5+500.00 TO STA. 5+520.00
CS-70
STA. 7+760.00 TO STA. 7+800.00
CS-115
STA. 2+860.00 TO STA. 2+880.00
CS-26
STA. 5+540.00 TO STA. 5+560.00
CS-71
STA. 7+820.00 TO STA. 7+860.00
CS-116
STA. 2+900.00 TO STA. 2+920.00
CS-27
STA. 5+580.00 TO STA. 5+620.00
CS-72
STA. 7+880.00 TO STA. 7+920.00
CS-117
STA. 2+940.00 TO STA. 2+980.00
CS-28
STA. 5+640.00 TO STA. 5+680.00
CS-73
STA. 7+940.00 TO STA. 7+980.00
CS-118
STA. 3+000.00 TO STA. 3+040.00
CS-29
STA. 5+700.00 TO STA. 5+720.00
CS-74
STA. 8+000.00 TO STA. 8+040.00
CS-119
STA. 3+060.00 TO STA. UNDERPASS STA.3+100.00
CS-30
STA. 5+740.00 TO STA. 5+760.00
CS-75
STA. 8+060.00 TO STA. 8+100.00
CS-120
STA. 3+120.00 TO STA. 3+160.00
CS-31
STA. 5+780.00 TO STA. 5+800.00
CS-76
STA. 8+120.00 TO STA. 8+160.00
CS-121
STA. 3+180.00 TO STA. 3+220.00
CS-32
STA. 5+820.00 TO STA. 5+840.00
CS-77
STA. 8+180.00 TO STA. 8+220.00
CS-122
STA. 3+240.00 TO STA. 3+280.00
CS-33
STA. 5+860.00 TO STA. 5+880.00
CS-78
STA. 8+240.00 TO STA. 8+280.00
CS-123
STA. 3+300.00 TO STA. 3+340.00
CS-34
STA. 5+900.00 TO STA. 5+920.00
CS-79
STA. 8+300.00 TO STA. 8+340.00
CS-124
STA. 3+360.00 TO MARIMLA BRIDGE ABUT.A STA. 3+384.70
CS-35
STA. 5+940.00 TO STA. 5+980.00
CS-80
STA. 8+360.00 TO STA. 8+400.00
CS-125
MARIMLA BRIDGE ABUT. B STA. 3+528.70 TO STA. 3+540.00
CS-36
STA. 6+000.00 TO STA. 6+040.00
CS-81
STA. 8+420.00 TO STA. 8+460.00
CS-126
STA. 3+560.00 TO STA. 3+580.00
CS-37
STA. 6+060.00 TO STA. 6+100.00
CS-82
STA. 8+480.00 TO STA. 8+520.00
CS-127
STA. 3+600.00 TO STA. 3+640.00
CS-38
STA. 6+120.00 TO STA. 6+160.00
CS-83
STA. 8+540.00 TO STA. 8+560.00
CS-128
STA. 3+660.00 TO STA. 3+700.00
CS-39
STA. 6+180.00 TO STA. 6+200.00
CS-84
STA. 8+580.00 TO STA. 8+600.00
CS-129
STA. 3+720.00 TO STA. 3+760.00
CS-40
UNDERPASS 2 STA. 6+213.00 TO STA. 6+220.00
CS-85
STA. 8+620.00 TO STA. 8+640.00
CS-130
STA. 3+780.00 TO STA. 3+820.00
CS-41
STA. 6+240.00 TO STA. 6+280.00
CS-86
STA. 8+660.00 TO STA. 8+680.00
CS-131
STA. 3+840.00 TO STA. 3+880.00
CS-42
STA. 6+300.00 TO STA. 6+340.00
CS-87
STA. 8+700.00 TO STA. 8+720.00
CS-132
STA. 3+900.00 TO OVERPASS 1 ABUT.A STA. 3+945.40
CS-43
STA. 6+360.00 TO STA. 6+400.00
CS-88
STA. 8+740.00 TO STA. 8+760.00
CS-133
STA. 3+960.00 TO STA. 4+000.00
CS-44
STA. 6+420.00 TO STA. 6+460.00
CS-89
STA. 8+780.00 TO STA. 8+820.00
CS-134
STA. 4+020.00 TO STA. 4+060.00
CS-45
STA. 6+480.00 TO STA. 6+520.00
CS-90
STA. 8+840.00 TO STA. 8+880.00
CS-135
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
INDEX OF DRAWINGS (Sheet 2 of 3)
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
G-2
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
INDEX OF DRAWINGS
TITLE
SET NO.
TITLE
SET NO.
TITLE
SET NO.
STA. 8+900.00 TO STA. 8+940.00
CS-136
STA.11+060.00 TO STA.11+100.00
CS-182
STA.13+760.00 TO STA.13+800.00
CS-227
STA. 8+960.00 TO STA. 9+000.00
CS-137
STA.11+120.00 TO STA.11+160.00
CS-183
STA.13+820.00 TO STA.13+860.00
CS-228
STA. 9+020.00 TO STA. 9+060.00
CS-138
STA.11+180.00 TO STA.11+220.00
CS-184
STA.13+880.00 TO STA.13+920.00
CS-229
STA. 9+080.00 TO STA. 9+100.00
CS-139
STA.11+240.00 TO STA.11+280.00
CS-185
STA.13+940.00 TO STA.13+980.00
CS-230
STA. 9+120.00 TO STA. 9+140.00
CS-140
STA.11+300.00 TO STA.11+340.00
CS-186
STA.14+000.00 TO STA.14+020.00
CS-231
STA. 9+160.00 TO STA. 9+180.00
CS-141
STA.11+360.00 TO STA.11+400.00
CS-187
STA.14+040.00 TO STA.14+060.00
CS-232
STA. 9+200.00 TO STA. 9+220.00
CS-142
STA.11+420.00 TO STA.11+460.00
CS-188
STA.14+140.00 TO STA.14+180.00
CS-233
STA. 9+240.00 TO STA. 9+280.00
CS-143
STA.11+480.00 TO STA.11+520.00
CS-189
STA.14+140.00 TO STA.14+180.00
CS-234
STA. 9+300.00 TO STA. 9+340.00
CS-144
STA.11+540.00 TO STA.11+580.00
CS-190
STA.14+200.00 TO STA.14+240.00
CS-235
STA. 9+360.00 TO STA. 9+400.00
CS-145
STA.11+600.00 TO STA.11+640.00
CS-191
STA.14+260.00 TO STA.14+300.00
CS-236
STA. 9+420.00 TO STA. 9+440.00
CS-146
STA.11+660.00 TO STA.11+700.00
CS-192
STA.14+320.00 TO STA.14+360.00
CS-237
STA. 9+460.00 TO STA. 9+480.00
CS-147
STA.11+720.00 TO STA.11+760.00
CS-193
STA.14+380.00 TO STA.14+420.00
CS-238
STA. 9+500.00 TO STA. 9+520.00
CS-148
STA.11+780.00 TO STA.11+820.00
CS-194
STA.14+440.00 TO STA.14+480.00
CS-239
STA. 9+540.00 TO STA. 9+560.00
CS-149
STA.11+840.00 TO STA.11+880.00
CS-195
STA.14+500.00 TO STA.14+540.00
CS-240
STA. 9+580.00 TO STA. 9+600.00
CS-150
STA.11+900.00 TO STA.11+940.00
CS-196
STA.14+560.00 TO STA.14+600.00
CS-241
STA. 9+620.00 TO STA. 9+640.00
CS-151
STA.11+960.00 TO STA.12+000.00
CS-197
STA.14+620.00 TO STA.14+660.00
CS-242
STA. 9+660.00 TO STA. 9+680.00
CS-152
STA.12+020.00 TO STA.12+060.00
CS-198
STA.14+680.00 TO STA.14+720.00
CS-243
STA. 9+700.00 TO STA. 9+720.00
CS-153
STA.12+080.00 TO STA.12+120.00
CS-199
STA.14+740.00 TO STA.14+780.00
CS-244
STA. 9+740.00 TO STA. 9+760.00
CS-154
STA.12+140.00 TO STA.12+180.00
CS-200
STA.14+800.00 TO STA.14+840.00
CS-245
STA. 9+780.00 TO STA. 9+800.00
CS-155
STA.12+200.00 TO STA.12+240.00
CS-201
STA.14+860.00 TO STA.14+900.00
CS-246
STA. 9+820.00 TO STA. 9+840.00
CS-156
STA.12+260.00 TO STA.12+300.00
CS-202
STA.14+920.00 TO STA.14+960.00
CS-247
STA. 9+860.00 TO STA. 9+880.00
CS-157
STA.12+320.00 TO STA.12+360.00
CS-203
STA.14+980.00 TO STA.15+020.00
CS-248
STA. 9+900.00 TO STA. 9+920.00
CS-158
STA.12+380.00 TO STA.12+420.00
CS-204
STA.15+040.00 TO STA.15+080.00
CS-249
STA. 9+940.00 TO STA. 9+960.00
CS-159
STA.12+440.00 TO STA.12+480.00
CS-205
STA.15+100.00 TO STA.15+140.00
CS-250
STA. 9+980.00 TO STA. 10+000.00
CS-160
STA.12+500.00 TO STA.12+540.00
CS-206
STA.15+160.00 TO STA.15+200.00
CS-251
STA. 10+020.00 TO STA. 10+040.00
CS-161
STA.12+560.00 TO STA.12+600.00
CS-207
STA.15+220.00 TO STA.15+260.00
CS-252
STA. 10+060.00 TO STA. 10+080.00
CS-162
STA.12+620.00 TO STA.12+660.00
CS-208
STA.15+280.00 TO STA.15+320.00
CS-253
STA. 10+100.00 TO STA. 10+120.00
CS-163
STA.12+680.00 TO STA.12+720.00
CS-209
STA.15+340.00 TO STA.15+380.00
CS-254
STA. 10+140.00 TO STA. 10+160.00
CS-164
STA.12+740.00 TO STA.12+780.00
CS-210
STA.15+400.00 TO STA.15+440.00
CS-255
STA. 10+180.00 TO STA. 10+200.00
CS-165
STA.12+800.00 TO STA.12+840.00
CS-211
STA.15+460.00 TO STA.15+500.00
CS-256
STA. 10+220.00 TO STA. 10+240.00
CS-166
STA.12+860.00 TO STA.12+900.00
CS-212
STA.15+520.00 TO STA.15+560.00
CS-257
STA. 10+260.00 TO STA. 10+280.00
CS-167
STA.12+920.00 TO STA.12+960.00
CS-213
STA.15+580.00 TO STA.15+620.00
CS-258
STA. 10+300.00 TO STA. 10+320.00
CS-168
STA.12+980.00 TO STA.13+020.00
CS-214
STA.15+640.00 TO STA.15+680.00
CS-259
STA. 10+340.00 TO STA. 10+360.00
CS-169
STA.13+040.00 TO STA.13+080.00
CS-215
STA.15+700.00 TO STA.15+740.00
CS-260
STA. 10+380.00 TO STA. 10+400.00
CS-170
STA.13+100.00 TO STA.13+140.00
CS-216
STA.15+760.00 TO STA.15+800.00
CS-261
STA. 10+420.00 TO STA. 10+440.00
CS-171
STA.13+160.00 TO STA.13+200.00
CS-217
STA.15+820.00 TO STA.15+860.00
CS-262
STA. 10+460.00 TO STA. 10+480.00
CS-172
STA.13+220.00 TO STA.13+260.00
CS-218
STA.15+880.00 TO STA.15+920.00
CS-263
STA. 10+500.00 TO STA. 10+540.00
CS-173
STA.13+280.00 TO STA.13+320.00
CS-219
STA.15+940.00 TO STA.15+980.00
CS-264
STA. 10+560.00 TO STA. 10+600.00
CS-174
STA.13+340.00 TO STA.13+380.00
CS-220
STA.16+000.00
CS-265
STA. 10+620.00 TO STA.10+640.00
CS-175
STA.13+400.00 TO STA.13+440.00
CS-221
STA. 10+660.00 TO STA.10+700.00
CS-176
STA.13+460.00 TO STA.13+500.00
CS-222
STA. 10+720.00 TO STA.10+740.00
CS-177
STA.13+520.00 TO STA.13+560.00
CS-223
BRIDGE 3 ABUT.A STA.10+752.80 TO BRIDGE 3 ABUT. B STA.10+896.80
CS-178
BRIDGE 4 ABUT.A STA.13+571.80 TO STA.13+620.00
CS-224
STA. 10+900.00 TO STA.10+920.00
CS-179
STA.13+640.00 TO STA.13+680.00
CS-225
STA. 10+940.00 TO STA.10+980.00
CS-180
STA.13+700.00 TO STA.13+740.00
CS-226
STA. 11+000.00 TO STA.11+040.00
CS-181
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
F
INDEX OF DRAWINGS (Sheet 3 of 3)
FINAL DRAWINGS
DRAWING NO.
G-3
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
GENERAL NOTES
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
G-4
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
L
E
G
E
N
D
ABBREVIATIONS:
ACP
Max
AZIM
MH
BLDG
mm
BM
Mo
BOQ
MUN
BR
N
BRDY
NB
BRGY
O.C
BVCE
OIE
BVCS
PC
BW
PCCP
CIM
PI
CL
PT
cm
PVI
CS
PVC
CU
PVT
R
D
DIST.
RC
DLI-01
RCBC
DPWH
RCPC
E
RD
e
RROW
EB
RT
ELEV.
S
EXTG
SB
g
SC
HOR
SHLDR
HW
ST
I
STA
IIE
STD
INT'L
SW
T
KMS
TBM
L
Lc
TS
Lm
VC
LT
VERT, V
LVC
W
M
WB
WW
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
LEGENDS AND ABBREVIATIONS
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
G-5
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
SUMMARY OF QUANTITIES
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
SUMMARY OF QUANTITIES (Sheet 1 of 2)
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
G-6
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
SUMMARY OF QUANTITIES
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
SUMMARY OF QUANTITIES (Sheet 2 of 2)
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
G-7
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
ROADWAY
PROJECT SITE
TARLAC
Ph
ilip
pi
ne
Se
a
So
ut
h
Ch
ina
Se
a
LUZON
VISAYAS
MINDANAO
1
-
KEY MAP
SCALE
NTS
NCC TO SCTEX
ACCESS ROAD
AIRPORT TO NCC
ACCESS ROAD
STA. 16+000-STA. 19+826.284
OLYMPIC VILAGE
ACCESS ROAD
AIRPORT TO NCC
ACCESS ROAD
STA. 1+500-STA. 16+000
AIRPORT TO NCC
ACCESS ROAD
STA. 0+000-STA. 1+500
S
TA
AG
AL
B
CE
IN
2
LOCATION MAP
-
SCALE
PR
LAYOUT PLAN
3
NTS
SCALE
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
NTS
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
F
KEY MAP AND LAYOUT PLAN
FINAL DRAWINGS
DRAWING NO.
R-1
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
Coordinates
PI
No.
NORTHING
EASTING
PI-14
1688895.515
448038.391
C O N S U L T A N T S
Azimuth
Distance
PC
406.191
7+050.504
PT
7+496.699
Radius
T
300
275.946
E
Lc
79.201
446.194
Dc
e(%)
5.5
V
(kph)
W(m)
60
0.3
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN
STA. 7 + 000.000 - STA. 7 + 700.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-14
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE
STA. 7 + 000.000 - STA. 7 + 700.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-15
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-15
1688955.599
PI-16
1689190.844
Azimuth
PT
Radius
Distance
PC
447448.473
131.799
7+746.174
7+879.056
300
447059.952
137.441
8+196.814
8+334.363
1000
E
Lc
67.549
7.327
132.883
68.883
2.364
137.549
T
Dc
V
(kph)
W(m)
5.5
60
0.3
2.1
60
0.1
e(%)
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN
STA. 7 + 700.000 - STA. 8 + 400.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-16
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE
STA. 7 + 700.000 - STA. 8 + 400.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-17
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN
STA. 8 + 400.000 - STA. 9 + 100.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-18
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE
STA. 8 + 400.000 - STA. 9 + 100.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-19
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
HORIZONTAL & VERTICAL CONTROLS
No.
BM - 03.
EASTING
AMSL
HORIZONTAL & VERTICAL CONTROLS
No.
DESCRIPTION
NORTHING
EASTING
1699079.389
448617.881
92.748
BM - 32.
1689213.539
447008.667
206.467
1699060.629
448704.496
91.6845
Concrete nail centered on a 20x20 cm
concrete putty set flushed and drilled on
concrete pedestal with markings CGC,BM-02
2017.
BM - 33.
1688932.019
447750.355
130.819
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-33"
1688875.025
447705.247
131.903
448894.675
65.129
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-03 2017.
BM - 34.
1697963.203
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-34"
BM - 35.
1687954.288
448462.969
201.052
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-35"
1697834.737
448992.144
64.4673
1687872.637
448421.245
206.638
1697406.647
448599.000
79.282
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-05 2017.
BM - 36.
BM - 05.
Concrete nail centered on a 25x25x100 cm
concrete putty protruding 20 cm on ground with
marking "BCDA-7, 2014".
BM - 38.
1687279.504
449998.305
86.481
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking "CGC, BM-38 2017".
BM - 06.
1697445.249
448682.773
80.711
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-06 2017.
1687134.174
450569.67
89.29
1696262.273
448672.867
58.764
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-08 2017.
BM - 39A.
BM - 08.
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-39A"
BM - 40A.
1687177.452
450652.532
87.52
69.7285
Concrete nail centered on a 20x20 cm
concrete putty set flushed and drilled on
concrete pavement with markings CGC,BM-09
2017.
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-40A"
BM - 41A.
1686331.395
450673.842
89.943
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-41A"
71.163
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-10 2017.
BM - 42A.
1689709.066
445900.569
258.402
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-42A"
69.1675
Concrete nail centered on a 20x20 cm
concrete putty set flushed and drilled on
concrete headwall with markings CGC, BM-11
2017.
BM - 44A.
1685320.276
450941.615
94.515
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking "CGC, BM-44A 2017".
BM - 45.
1684308.342
451255.143
122.5798
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking "CGC, BM-45 2017".
BM - 11.
BM - 12.
1695356.731
1695287.878
1694543.640
1694447.189
448268.725
448167.898
447493.744
447368.522
71.163
Concrete nail centered on a 20x20 cm
concrete putty set flushed and drilled on
concrete headwall with markings CGC,BM-12
2017.
BM - 28.
1690516.022
445347.922
156.633
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-28 2017.
BM - 46.
1684404.775
451367.177
121.654
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking "CGC, BM-46 2017".
BM - 29.
1689881.717
445931.033
255.213
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-29 2017.
BM - 47.
1683402.967
451766.466
124.735
BM - 30.
1686394.717
450792.716
87.608
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-30 2017.
Concrete nail centered on a 20x20 cm
concrete putty set flushed and drilled on
concrete pedestal with markings "CGC,BM-47
2017".
BM - 48.
1683287.959
451675.780
126.5916
Concrete nail centered on a 20x20 cm
concrete putty set flushed and drilled on
concrete pedestal with markings "CGC,BM-48
2017".
BM - 31.
1689269.822
447085.127
200.796
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-31"
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
-
DESCRIPTION
Mark is the head of a concrete nail encircled
with red paint and drilled on concrete pedestal
with marking "BM-32"
BM - 04.
BM - 10.
DATE:
AMSL
Concrete nail centered on a 20x20x150 cm
concrete putty protruding 50 cm on ground with
marking CGC 01.
Concrete nail centered on a 20x20x100 cm
concrete putty protruding 20 cm on ground with
marking CGC, BM-04 2017.
BM - 09.
C O N S U L T A N T S
NORTHING
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
HORIZONTAL AND
VERTICAL CONTROLS
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
R-2
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN
STA. 9 + 100.000 - STA. 9 + 800.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-20
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE
STA. 9 + 100.000 - STA. 9 + 800.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-21
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-17
1690659.246
445251.491
Azimuth
Distance
PC
PT
1754.152
9+513.857
11+387.452
Radius
1500
T
E
Lc
1081.16 283.144
Dc
1873.594
e(%)
NC
V
(kph)
W(m)
60
0.0
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN
STA. 9 + 800.000 - STA. 10 + 500.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-22
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
MATCHLINE ELEVATION 200.00 (SEE SHEET R-24)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE
STA. 9 + 800.000 - STA. 10 + 500.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-23
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE MATCHLINE ELEVATION 200.00
STA. 9 + 800.000 - STA. 10 + 500.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-24
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-17
1690659.246
445251.491
Azimuth
Distance
PC
1754.152
9+513.857
SUBMITTED BY
PT
Radius
11+387.452
1500
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
T
E
1081.16 283.144
Lc
Dc
e(%)
1873.594
NC
DATE
V
(kph)
W(m)
60
0.0
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN
STA. 10 + 500.000 - STA. 11 + 200.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-25
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE
STA. 10 + 500.000 - STA. 11 + 200.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-26
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-18
1691981.009
445749.397
Azimuth
Distance
PC
247.334
11+594.637
SUBMITTED BY
PT
11+842.252
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
Radius
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
1500
T
124.090
E
Lc
5.107
247.615
Dc
e(%)
NC
DATE
V
(kph)
W(m)
60
0.0
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN AND PROFILE
STA. 11 + 200.000 - STA. 11 + 900.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-27
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-19
1692451.752
446014.247
Azimuth
Distance
PC
145.299
12+185.495
Radius
PT
12+330.922
1000
E
Lc
2.642
145.427
T
72.842
SUBMITTED BY
Dc
e(%)
2.1
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
V
(kph)
W(m)
60
0.1
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN
STA. 11 + 900.000 - STA. 12 + 600.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-28
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PROFILE
STA. 11 + 900.000 - STA. 12 + 600.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-29
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-20
1692810.946
PI-21
1693057.709
Azimuth
Radius
Distance
PC
PT
446285.311
100.537
12+657.778
12+758.334
1500
446446.782
144.130
12+930.787
13+074.973
1500
E
Lc
50.297
0.843
100.556
72.148
1.732
144.185
T
Dc
V
(kph)
W(m)
NC
60
0.0
NC
60
0.0
e(%)
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN AND PROFILE
STA. 12 + 600.000 - STA. 13 + 300.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-30
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
Coordinates
PI
No.
NORTHING
EASTING
PI-22
1693564.415
446852.822
133.468
13+585.263
13+718.830
1000
PI-23
1693776.346
446980.433
116.846
13+840.810
13+957.722
1000
Azimuth
C O N S U L T A N T S
Distance
PC
PT
Radius
E
Lc
66.883
2.229
133.567
58.523
1.708
116.912
T
Dc
V
(kph)
W(m)
2.1
60
0.1
2.1
60
0.1
e(%)
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN AND PROFILE
STA. 13 + 300.000 - STA. 14 + 000.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-31
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-24
1693951.267
PI-25
1694257.563
SUBMITTED BY
Azimuth
PC
447059.615
264.624
13+957.722
14+223.124
1000
447312.658
137.552
14+418.000
14+555.661
1000
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
PT
Radius
Distance
DATE
E
Lc
133.486
8.792
265.402
68.939
2.368
137.661
T
Dc
V
(kph)
W(m)
2.1
60
0.1
2.1
60
0.1
e(%)
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN AND PROFILE
STA. 14 + 000.000 - STA. 14 + 700.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-32
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TABLE OF COORDINATES AND ELEMENTS OF CURVE
C O N S U L T A N T S
Coordinates
PI
No.
NORTHING
EASTING
PI-26
1694673.030
447765.249
Azimuth
Distance
PC
100.740
15+050.658
PT
15+151.440
Radius
1000
T
50.434
E
Lc
1.269
100.782
Dc
SUBMITTED BY
e(%)
2.1
V
(kph)
W(m)
60
0.1
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN AND PROFILE
STA. 14 + 700.000 - STA. 15 + 400.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-33
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
PLAN AND PROFILE
STA. 15 + 400.000 - STA. 16 + 000.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
R-34
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
SCHEDULE OF GUARD RAIL
SCHEDULE OF WARNING SIGN
SCHEDULE OF RUMBLE STRIPS
C O N S U L T A N T S
SCHEDULE OF GROUTED RIPRAP
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
SCHEDULES
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
R-35
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
GENERAL PLAN
GENERAL ELEVATION
GENERAL SECTION
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-01
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
DECK SLAB PLAN
LONGITUDINAL SECTION
TYPICAL DRAIN & JOINTS DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-02
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
CROSS SECTION
TRANSVERSE SECTION
SHEAR KEY & DRIP GROOVE DETAIL
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-03
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
F
TYPE VI GIRDER ELEVATION AND SECTIONS
DRAFT DRAWING
DRAWING NO.
P3B3-04
D
E
DRAWING STATUS
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
AS SHOWN
PROJECT CODE
F
TYPE VI GIRDER DETAILS
DRAFT DRAWING
DRAWING NO.
P3B3-05
D
E
DRAWING STATUS
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
SCHEDULE OF REINFORCEMENTS FOR DECK SLAB & DIAPHRAGMS
BAR BENDING
DIAGRAM
DECKSLAB
A
a
B
a
C
b
a
SCHEDULE OF REINFORCEMENTS
& SUMMARY OF QUANTITIES FOR ONE (1) PRESTRESSED GIRDER ONLY
a
D
BAR BENDING
DIAGRAM
A
a
b
c
a
DIAPHRAGMS
a
B
a
b
E
b
b
b
c
a
C
c
a
a
D
d
b
b
c
a
F
b
c
a
E
b
G
b
a
e
c
b
f
d
d
e
F
c
b
a
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-06
A1
DIAPHRAGM ELEVATION AND DETAILS
DATE APPROVED DATE REVISED
CONCRETE POURING SEQUENCE
SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
ABUTMENT PLAN AND ELEVATION
SHEAR BLOCK DETAIL
WINGWALL PLAN
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-07
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
BACKWALL, COPING AND WINGWALL DETAILS
SCHEDULE OF REINFORCEMENTS
FOR ABUTMENT "A" AND "B"
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-08
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
SCHEDULE OF REINFORCEMENT FOR ONE (1) BORED PILE AT PIER ONLY
BAR BENDING
DIAGRAM
BAR
MARK
SIZE
(mm)
SPACING
(mm)
QTY
BAR
SHAPE
BAR DIMENSION
ALL DIMENSIONS ARE OUT TO OUT OF BARS
a
b
c
d
e
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg./m.)
TOTAL
WEIGHT
(kg.)
VOLUME
CONCRETE
(cu.m.)
a
b
A
a
B
a
C
b
c
e
d
D
a
b
E
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.1+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-09
A1
PIER 1 BORED PILE
DATE APPROVED DATE REVISED
SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES
-
-
REV.
-
SCHEDULE OF REINFORCEMENT FOR ONE (1) BORED PILE AT PIER ONLY
BAR BENDING
DIAGRAM
BAR
MARK
SIZE
(mm)
SPACING
(mm)
QTY
BAR
SHAPE
BAR DIMENSION
ALL DIMENSIONS ARE OUT TO OUT OF BARS
a
b
c
d
e
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg./m.)
TOTAL
WEIGHT
(kg.)
VOLUME
CONCRETE
(cu.m.)
a
b
A
a
B
a
C
b
c
e
d
D
a
b
E
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.1+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-10
A1
PIER 2 BORED PILE
DATE APPROVED DATE REVISED
SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES
-
-
REV.
-
SCHEDULE OF REINFORCEMENT FOR ONE (1) BORED PILE AT PIER ONLY
BAR BENDING
DIAGRAM
BAR
MARK
SIZE
(mm)
SPACING
(mm)
QTY
BAR
SHAPE
BAR DIMENSION
ALL DIMENSIONS ARE OUT TO OUT OF BARS
a
b
c
d
e
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg./m.)
TOTAL
WEIGHT
(kg.)
VOLUME
CONCRETE
(cu.m.)
a
b
A
a
B
a
C
b
c
e
d
D
a
b
E
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.1+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-11
A1
PIER 3 BORED PILE
DATE APPROVED DATE REVISED
SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES
-
-
REV.
-
SCHEDULE OF REINFORCEMENT FOR ONE (1) BORED PILE AT ABUTMENT ONLY
BAR BENDING
DIAGRAM
BAR
MARK
SIZE
(mm)
SPACING
(mm)
QTY
BAR
SHAPE
BAR DIMENSION
ALL DIMENSIONS ARE OUT TO OUT OF BARS
a
b
c
d
e
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg./m.)
TOTAL
WEIGHT
(kg.)
VOLUME
CONCRETE
(cu.m.)
a
b
A
a
B
a
C
b
c
e
d
D
a
b
E
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.1+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-12
A1
ABUTMENT BORED PILE
DATE APPROVED DATE REVISED
SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
PIER COLUMN PLAN AND ELEVATION
COLUMN SECTION
COPING SECTION
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-13
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-14
A1
PIER COLUMN AND COPING SECTION
DATE APPROVED DATE REVISED
SCHEDULE OF REINFORCEMENT AND SUMMARY OF QUANTITIES
-
-
REV.
-
SCHEDULE OF REINFORCEMENTS FOR ONE APPROACH SLAB ONLY
a
A
a
B
b
a
b
C
c
a
d
D
b
f
e
c
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.10+500-KM.16+000) - BRIDGE 3
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B3-15
A1
APPROACH SLAB DETAILS
DATE APPROVED DATE REVISED
SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
GENERAL ELEVATION
GENERAL PLAN
GENERAL SECTION
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-01
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
DECK SLAB PLAN
LONGITUDINAL SECTION
TYPICAL DRAIN AND JOINT DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-02
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
CROSS SECTION
TRANSVERSE SECTION
SHEAR KEY AND DRIP GROOVE DETAIL
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-03
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
AS SHOWN
PROJECT CODE
D
E
F
TYPE VI GIRDER DETAILS
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3B4-04
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
AS SHOWN
PROJECT CODE
F
DRAFT DRAWING
DRAWING NO.
P3B4-05
D
E
DRAWING STATUS
TYPE VI GIRDER DETAILS
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
SCHEDULE OF REINFORCEMENTS
& SUMMARY OF QUANTITIES FOR ONE (1) PRESTRESSED GIRDER ONLY
BAR BENDING
DIAGRAM
A
a
a
B
b
b
b
C
c
a
a
D
b
c
a
b
c
E
b
c
d
e
F
b
a
SCHEDULE OF REINFORCEMENTS FOR DECK SLAB & DIAPHRAGMS
BAR BENDING
DIAGRAM
DECKSLAB
A
a
B
a
a
b
C
b
a
a
D
a
c
b
DIAPHRAGMS
E
b
c
a
d
F
a
b
G
a
e
b
f
d
c
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
DIAPHRAGM DETAILS
SCHEDULE OF REINFORCEMENTS FOR SLAB,
DIAPHRAGM AND GIRDER
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-06
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
ABUTMENT A DETAILS
ABUTMENT SECTION, WINGWALL DETAILS
BACK WALL AND COPING DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-07
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
SCHEDULE OF REINFORCEMENTS FOR SUBSTRUCTURE FOR ABUTMENT "A" ONLY
BAR BENDING
DIAGRAM
REINFORCING STEEL BARS
MARK
A
b
SIZE
(mm)
ALL DIMENSIONS ARE OUT TO OUT OF REBARS
TYPE
SPACING
(mm)
QUANTITY
a
b
c
d
e
f
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg/m)
TOTAL
WEIGHT
(kg)
CONCRETE
VOLUME
(cu.m)
FOR ABUTMENT A ONLY
a
c
B
a
e
b
f
d
c
C
b
a
c
D
b
c
a
d
E
e
a
b
F
b
c
a
d
G
b
a
c
H
a
b
b
I
c
a
d
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
ABUTMENT PLAN
SHEAR BLOCK DETAILS
SCHEDULE OF REINFORCEMENT FOR ABUT. A
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-08
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
ABUTMENT B DETAILS
ABUTMENT SECTION, WINGWALL DETAILS
BACK WALL AND COPING DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-09
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
SCHEDULE OF REINFORCEMENTS FOR SUBSTRUCTURE FOR ABUTMENT "A" ONLY
BAR BENDING
DIAGRAM
REINFORCING STEEL BARS
MARK
A
b
SIZE
(mm)
ALL DIMENSIONS ARE OUT TO OUT OF REBARS
TYPE
SPACING
(mm)
QUANTITY
a
b
c
d
e
f
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg/m)
TOTAL
WEIGHT
(kg)
CONCRETE
VOLUME
(cu.m)
FOR ABUTMENT B ONLY
a
c
B
a
e
b
f
d
c
C
b
a
c
D
b
c
a
d
E
e
a
b
F
b
c
a
d
G
b
a
c
H
a
b
b
I
c
a
d
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
ABUTMENT PLAN
SHEAR BLOCK DETAILS
SCHEDULE OF REINFORCEMENT FOR ABUT. B
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-10
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
SCHEDULE OF REINFORCEMENTS FOR ONE APPROACH SLAB ONLY
a
A
a
B
b
a
b
C
c
a
d
D
b
f
e
c
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-11
APPROACH SLAB DETAILS
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
SCHEDULE OF REINFORCEMENT FOR BORED PILE AT ABUTMENT
BAR BENDING
DIAGRAM
a
b
A
a
B
a
C
BAR
MARK
SIZE
(mm)
SPACING
(mm)
QTY
BAR
SHAPE
BAR DIMENSION
ALL DIMENSIONS ARE OUT TO OUT OF BARS
a
b
c
d
e
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg./m.)
TOTAL
WEIGHT
(kg.)
VOLUME
CONCRETE
(cu.m.)
b
c
d
PITCH
e
a
b
D
a
b
E
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
AS SHOWN
PROJECT CODE
F
DRAFT DRAWING
DRAWING NO.
P3B4-12
D
E
DRAWING STATUS
BORED PILE DETAILS
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
CHECKED BY
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
APPROVED BY
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
B
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
C
SHEET CONTENT
A
D
E
F
TYPICAL SECTION AT ABUTMENT
DETAILS OF RUBBLE CONCRETE
DETAILS OF SIDE DRAIN
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P3B4-13
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
MARIMLA BRIDGE
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM.1+500.00 TO KM.16+000.00)
SHEET CONTENT
GENERAL INDEX OF DRAWINGS
VICINITY MAP
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
GENERAL PLAN
GENERAL ELEVATION
GENERAL SECTION
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-01
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
DECK SLAB PLAN
LONGITUDINAL SECTION
TYPICAL DRAINS AND JOINTS DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-02
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
CROSS SECTION
TRANSVERSE SECTION
SHEAR KEY & DRIP GROOVE DETAIL
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-03
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
SCALE
AS SHOWN
PROJECT CODE
F
TYPE VI GIRDER ELEVATION AND SECTIONS
DRAFT DRAWING
DRAWING NO.
P304-04
D
E
DRAWING STATUS
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
AS SHOWN
PROJECT CODE
F
TYPE VI GIRDER DETAILS
DRAFT DRAWING
DRAWING NO.
P3O4-05
D
E
DRAWING STATUS
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
SCHEDULE
DIAGRAM
OF REINFORCEMENTS FOR DECK SLAB & DIAPHRAGMS
BAR BENDING
DECKSLAB
A
a
B
a
a
b
C
b
a
a
SCHEDULE OF REINFORCEMENTS & SUMMARY OF QUANTITIES FOR ONE (1) PRESTRESSED GIRDER ONLY
D
a
BAR BENDING
DIAGRAM
A
c
a
B
a
b
b
DIAPHRAGMS
b
E
b
b
C
c
a
D
d
b
a
c
a
b
F
E
F
a
b
c
b
c
a
a
c
d
d
c
b
b
G
a
G
b
H
b
c
a
e
b
a
b
f
d
d
e
c
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-06
A1
DIAPHRAGM ELEVATION AND DETAILS
DATE APPROVED DATE REVISED
CONCRETE POURING SEQUENCE
SCHEDULE OF REINFORCEMENTS AND SUMMARY OF QUANTITIES
-
REV.
-
SCHEDULE OF REINFORCEMENTS FOR SUBSTRUCTURE FOR ABUTMENT "A" ONLY
BAR BENDING
DIAGRAM
REINFORCING STEEL BARS
MARK
A
b
SIZE
(mm)
ALL DIMENSIONS ARE OUT TO OUT OF REBARS
TYPE
SPACING
(mm)
QUANTITY
a
b
c
d
e
f
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg/m)
TOTAL
WEIGHT
(kg)
CONCRETE
VOLUME
(cu.m)
FOR ABUTMENT A ONLY
a
c
B
a
e
b
f
d
c
C
b
a
c
D
b
c
a
d
E
e
a
b
F
b
c
a
d
G
b
a
c
H
a
b
b
I
c
a
d
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
ABUTMENT PLAN
SHEAR BLOCK DETAILS
SCHEDULE OF REINFORCEMENT FOR ABUT. A
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-07
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
ABUTMENT A DETAILS
ABUTMENT SECTION, WINGWALL DETAILS
BACK WALL AND COPING DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-08
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
SCHEDULE OF REINFORCEMENTS FOR SUBSTRUCTURE FOR ABUTMENT "B" ONLY
BAR BENDING
DIAGRAM
REINFORCING STEEL BARS
MARK
A
b
SIZE
(mm)
ALL DIMENSIONS ARE OUT TO OUT OF REBARS
TYPE
SPACING
(mm)
QUANTITY
a
b
c
d
e
f
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg/m)
TOTAL
WEIGHT
(kg)
CONCRETE
VOLUME
(cu.m)
FOR ABUTMENT B ONLY
a
c
B
a
e
b
f
d
c
C
b
a
c
D
b
c
a
d
E
e
a
b
F
b
c
a
d
G
b
a
c
H
a
b
b
I
c
a
d
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
ABUTMENT B PLAN
SHEAR BLOCK DETAILS
SCHEDULE OF REINFORCEMENT FOR ABUT. B
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-09
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
ABUTMENT B DETAILS
ABUTMENT SECTION, WINGWALL DETAILS
BACK WALL AND COPING DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-10
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
SCHEDULE OF REINFORCEMENT FOR BORED PILE AT ABUTMENT
BAR BENDING
DIAGRAM
a
b
A
a
B
a
C
BAR
MARK
SIZE
(mm)
SPACING
(mm)
QTY
BAR
SHAPE
BAR DIMENSION
ALL DIMENSIONS ARE OUT TO OUT OF BARS
a
b
c
d
e
LOCATION
BAR
LENGTH
(m)
TOTAL
LENGTH
(m)
UNIT
WEIGHT
(kg./m.)
TOTAL
WEIGHT
(kg.)
VOLUME
CONCRETE
(cu.m.)
b
c
d
PITCH
e
a
b
D
a
b
E
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
AS SHOWN
PROJECT CODE
D
E
F
BORED PILE DETAILS
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
SIZE
P3O4-11
A1
DATE APPROVED DATE REVISED
-
-
REV.
-
SCHEDULE OF REINFORCEMENTS FOR ONE APPROACH SLAB ONLY
a
A
a
B
b
a
b
C
c
a
d
D
b
f
e
c
C O N S U L T A N T S
SUBMITTED BY
DESIGNED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
SHEET CONTENT AIRPORT TO NCC (KM.1+500-KM.16+000) - OVERPASS 4
APPROACH SLAB DETAILS
AS SHOWN
PROJECT CODE
DRAWING STATUS
DRAFT DRAWING
DRAWING NO.
P304-12
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROADS
KM. 1+500.00 TO KM. 16+000.00
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM. 1+500.00 - KM. 16+000.00)
BRIDGE NO. 2
APPROACH SLAB
BRIDGE
APPROACH SLAB
"A"
"B"
:
:
:
STA. 3+378.70 - STA. 3+384.70
STA. 3+384.70 - STA. 3+528.70
STA. 3+528.70 - STA. 3+534.70
TOTAL LENGTH
=
=
=
=
6.00 m
144.0 m
6.00 m
156.0 m
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM. 1+500.00 - KM. 16+000.00)
BRIDGE NO. 3
APPROACH SLAB
BRIDGE
APPROACH SLAB
"A"
"B"
:
:
:
STA. 10+746.80 - STA. 10+752.80
STA. 10+752.80 - STA. 10+896.80
STA. 10+896.80 - STA. 10+902.80
TOTAL LENGTH
=
=
=
=
6.00 m
144.0 m
6.00 m
156.0 m
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM. 1+500.00 - KM. 16+000.00)
BRIDGE NO. 4
APPROACH SLAB
BRIDGE
APPROACH SLAB
"A"
"B"
:
:
:
STA. 13+565.80 - STA. 13+571.80
STA. 13+571.80 - STA. 13+608.40
STA. 13+608.40 - STA. 13+614.40
TOTAL LENGTH
=
=
=
=
6.00 m
36.60 m
6.00 m
48.60 m
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM. 1+500.00 - KM. 16+000.00)
OVERPASS 1
BRIDGE CROSSING ROAD 1
APPROACH SLAB
BRIDGE
APPROACH SLAB
"A"
"B"
:
:
:
:
STA. 3+100.00
STA. -0+026.93 - STA. -0+032.93
STA. -0+032.93 - STA. 0+032.93
STA. 0+032.93 - STA. 0+038.93
TOTAL LENGTH
=
=
=
=
6.00 m
65.86 m
6.00 m
77.86 m
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM. 1+500.00 - KM. 16+000.00)
OVERPASS 2
APPROACH SLAB
BRIDGE
APPROACH SLAB
"A"
"B"
:
:
:
STA. 3+908.10 - STA. 3+914.10 =
STA. 3+914.10 - STA. 3+945.40 =
STA. 3+945.40 - STA. 3+951.40 =
TOTAL LENGTH =
6.00 m
31.30 m
6.00 m
43.3 m
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM. 1+500.00 - KM. 16+000.00)
OVERPASS 3
BRIDGE CROSSING ROAD 1
APPROACH SLAB
BRIDGE
APPROACH SLAB
"A"
"B"
:
:
:
:
STA. 6+213.00
STA. -0+026.43 - STA. -0+032.43
STA. -0+032.43 - STA. 0+032.43
STA. 0+032.43 - STA. 0+038.43
TOTAL LENGTH
=
=
=
=
6.00 m
64.86 m
6.00 m
76.86 m
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC (KM. 1+500.00 - KM. 16+000.00)
OVERPASS 4
APPROACH SLAB
BRIDGE
APPROACH SLAB
"A"
"B"
:
:
:
STA. 7+495.41 - STA. 7+501.41
STA. 7+501.41 - STA. 7+535.61
STA. 7+535.61 - STA. 7+541.61
TOTAL LENGTH
=
=
=
=
6.00 m
34.20 m
6.00 m
46.20 m
ROAD STANDARDS AND DETAILS
TOTAL=68.00 (MIN.)
5.00
1.50
3.60
2.50
SIDEWALK
GREEN
BICYCLE
GREEN
2.0 %
LEVEL
0%
2.0 %
3.50
3.50
3.50
1.80
3.50
20.00 R.O.W.
3.50
3.50
CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY MEDIAN CARRIAGEWAY CARRIAGEWAY CARRIAGEWAY
LEVEL
0%
2.0 %
2.0 %
2.0 %
2.0 %
0%
2.0 %
2.0 %
2.50
3.60
1.50
5.00
GREEN
BICYCLE
GREEN
SIDEWALK
2.0 %
LEVEL
0%
LEVEL
0%
3.50
6.50
6.50
RAIL RIGHT OF WAY
RAIL RIGHT OF WAY
LOT BOUNDARY
LOT BOUNDARY
48.00 METERS R.O.W.(MIN.)
2.0 %
:1
1.5
TRACK CL
ITEM 104 (2)a EMBANKMENT FROM BARROW ( COMMON SOIL)
ITEM 311(1)f1 PORTLAND CEMENT CONCRETE PAVEMENT(PCCP)300mm
SEE LANDSCAPE DRAWINGS
ITEM 200(1) AGGREGATE SUBBASE COURSE 300mm
ITEM 622(1) BIO ENGINEERING SOLUTION (COCO-NET 700 GNC)
ITEM 622(3)a BIO ENGINEERING SOLUTION
(VEGETATION HYDROSEEDING GRASS COVER)
TYPICAL CROSS SECTION (INSIDE & OUTSIDE THE CITY)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
F
TYPICAL ROAD CROSS SECTION
FINAL DRAWINGS
DRAWING NO.
RS-1
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
NOTE:
3b
RS-1
0
1
PLAN VIEW
2
RS-10
RS-10
SIGN POSITIONS
NOT
TO
3a
SCALE
4
ELEVATION
RS-10
3b
FRICTION CAP DETAIL
SECTION
RS-10
RS-10
NOTES:
3
SIGN POST & STUB POST DETAIL
RS-10
PROCEDURE FOR ASSEMBLY OF BASE CONNECTION:
5
SHIM DETAIL
RS-10
NOTES:
6
INSTALLATION DETAILS (TYPE 'A')
7
RS-10
INSTALLATION DETAILS (TYPE 'B')
RS-10
TYPICAL SIGN MOUNTING DETAILS
NOT
C O N S U L T A N T S
TO
SCALE
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
MOUNTING/SUPPORT FOR ROAD SIGN
TYPICAL SIGN MOUNTING DETAILS
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-10
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1E
RS-11
85
MIN. SIGHT
PERCENTILE
DISTANCE
SPEED
(1.15m to 1.15m)
(Km/h)
(m)
NOTE:
MIN. LENGTH
OR
BARRER LINE
L (m)
CHEVRON MARKINGS
NOT
TO
SCALE
MIN. DISTANCE
BETWEEN
BARRER LINE
(m)
NO-PASSING LINES ON HORIZONTAL CURVES
(OVERLAPPING TYPE)
NOT
TO
SCALE
CHEVRON MARKINGS NEAR OBSTRUCTION
1D
RS-11
RAMPS &
OTHER ROADS
(60 KPH OR LESS)
NOT
TO
SCALE
BYPASS
MAINLINE
(GREATER THAN 60 KPH)
NOTE:
NO-PASSING LINES ON HORIZONTAL CURVES
NOT
TO
RS-11
1
RS-11
C O N S U L T A N T S
CHEVRON MARKINGS AT INTERSECTION
1C
SCALE
NOT
TO
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
TO
SCALE
SCALE
SUBMITTED BY
DATE:
NOT
STANDARD PAVEMENT MARKINGS
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD PAVEMENT MARKINGS
Sheet 1 of 2
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-11
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
PAVEMENT MARKINGS AT SIGNALIZED INTERSECTION
1E
NOT
RS-12
SCALE
MAIN LINE
1B
RS-12
TO
NOT
TO
SCALE
PAVEMENT MARKINGS AT UNSIGNALIZED INTERSECTION
1D
RS-12
NOT
TO
SCALE
RAMPS AND CROSS ROADS
1A
RS-12
NOT
TO
SCALE
1C
RS-12
STANDARD PAVEMENT ARROWS
NOT
TO
SCALE
STANDARD PAVEMENT MARKINGS
NOT
TO
SCALE
NOTE:
PEDESTRIAN CROSSING
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD PAVEMENT MARKINGS
Sheet 2 of 2
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-12
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
A4
RS-13
A6
A7
RS-13
RS-13
A3
ELEVATION
SCALE
RS-13
1:20
SECTION
A4
SCALE
RS-13
1:10
ELEVATION POST
A5
RS-13
SCALE
1:10
ELEVATION POST
A6
RS-13
SCALE
1:4
P L A N
A2
SCALE
RS-13
1:20
PLAN
A7
RS-13
SECTION POST
SCALE
1:10
FLEX-BEAM END DETAIL
A8
RS-13
SCALE
1:10
ELEVATION
GENERAL NOTES :
SECTION
PLAN B (BRIDGE)
A9
RS-13
A1
RS-13
PERSPECTIVE
N
T
A
S
NOT
TO
SCALE
A10
GUARDRAILS ALONG BOX CULVERT AND BRIDGE APPROACHES
RS-13
NOT
SCALE
AS
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
SCALE
SHOWN
SUBMITTED BY
PRESIDENT - UICI
TO
STANDARD FLEX-BEAM GUARDRAIL AND GUIDE POST
RS-13
C O N S U L T A N T S
PLAN A (BOX CULVERT)
GUIDE POST DETAIL
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD FLEX-BEAM, GUARDRAIL
AND GUIDE POST
SCALE
AS SHOWN
PROJECT CODE
-
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-13
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
TYPICAL CHAIN LINK FENCE
SCALE
AS SHOWN
PROJECT CODE
-
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-14
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
CLOTHOIDS FORMULAS ( SYMMETRICAL METHOD )
FORMULA:
WHERE :
WHERE :
NOTE:
1
NOTE:
HORIZONTAL CURVE
3
VERTICAL CURVE
CURVE DIAGRAM ( SYMMETRICAL CLOTHOIDS )
CLOTHOIDS DEFINITIONS
FORMULA:
4
2
C O N S U L T A N T S
SYMMETRICAL PARABOLIC CURVE
SECTION
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
HORIZONTAL AND VERTICAL CURVES
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
RS-2
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
NOTES :
1
2
METRIC
3
5
LEGEND :
e max
R
Vd
e
L
4
=
=
=
=
=
NC
=
RC
=
Use of e max
C O N S U L T A N T S
8%
radius of curve
assumed design speed
rate of superelevation
minimum length of runoff (does not include tangent runout) as
discussed in "Tangent-to-Curve Transition" section
normal crown section
remove adverse crown, superelevation at normal crown slope
= 4% should be limited to urban conditions
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
SUPERELEVATIONS
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
RS-3
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
WIDENING ALONG CURVE
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
F
WIDENING AND SIGHT DISTANCE
FINAL DRAWINGS
DRAWING NO.
RS-4
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
NOTE:
1E
1D
1C
1K
1B
1L
1F
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
JOINT DETAIL DRAWINGS
CEMENT CONCRETE PAVEMENT
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-5
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1c
TYPE "C"
2c
TYPE "B"
RS-6
RS-6
3
RS-6
1b
TYPE "B"
2b
RS-6
CONCRETE DROP CURB AND GUTTER (MODIFIED)
NOT
TO
TYPE "B"
4a
RS-6
SCALE
TYPE "A"
RS-6
1a
TYPE "A"
2a
RS-6
1
RS-6
TYPE "A"
4b
RS-6
TYPE "B"
RS-6
COMBINATION CONCRETE CURB AND GUTTER
NOT
TO
SCALE
COMBINATION CONCRETE CURB AND SIDE STRIP
2
NOT
RS-6
C O N S U L T A N T S
TO
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
4
SCALE
RS-6
DATE
CONCRETE CURB
NOT
TO
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
F
CONCRETE CURB AND GUTTER DETAILS
FINAL DRAWINGS
DRAWING NO.
RS-6
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
ROAD WORK
DETOUR
WORKMEN
AHEAD
AHEAD
T1 - 1
AHEAD
T1 - 5
ROAD CLOSED
T1 - 6
LANE CLOSED
T2 - 2
T2 - 4
SURVEYORS
EXCAVATION
DRIVE SLOWLY
ON ROAD
T2 - 6
T2 - 7
T2 - 8
DETOUR
DETOUR
T4 - 1L
T4 - 1R
T4 - 2
T4 - 3
DETAIL OF ARROW
TYPE 1 BARRICADE
1
RS-7
C O N S U L T A N T S
ROAD WORK SIGN DETAILS
NOT
TO
SCALE
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
SCALE
AS SHOWN
PROJECT CODE
F
STANDARD ROAD WORK SIGN
FINAL DRAWINGS
DRAWING NO.
RS-7
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
MAX
max.
KPH
C O N S U L T A N T S
max.
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD ROAD SIGN
(REGULATORY SIGNS)
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-8
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
A1
SECTION ELEV. A1
SIGNS :
NOTE :
CAPAS
SCTEX
BAMBAN
CLARK
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD ROAD SIGNS
(WARNING/INFORMATORY SIGNS)
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
RS-9
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.7+215.00,STA.7+360.00,STA.7+580.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-22
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.7+705.00,STA.7+820.00,STA.7+960.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-23
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.8+060.00,STA.8+440.00,STA.8+630.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-24
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.8+755.00,STA.8+980.00,STA.9+895.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-25
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.10+040.00,STA.10+518.00
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-26
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.11+050.00,STA.11+190.00
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-27
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.11+270.00,STA.11+680.00,STA.11+810.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-28
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.12+050.00,STA.12+190.00,STA.12+640.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-29
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.13+020.00,STA.13+200.00,STA.13+600.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-30
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.13+960.00,STA.14+125.00,STA.14+170.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-31
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.14+520.00,STA.14+620.00,STA.14+800.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-32
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.15+020.00,STA.15+280.00,STA.15+420.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-33
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE CROSS SECTION
STA.15+660.00,STA.15+790.00,STA.15+920.00
SCALE
1:600 M
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DR-34
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
500
L
W
Z
L1
X
LEGEND :
t1
W
X
Wc
H
L
t1
t2
Z
B
h
t
O
oC
t2
9
DS-01
h
INVERT ELEVATION
(LEFT)
EXPANSION
JOINT
EXPANSION
JOINT
9
DS-01
SLOPE
SLOPE
OUTLET
HAND-LAID STONE
250mm AVE. DIAMETER
(22.68kg. AVE. WEIGHT)
ALTERNATIVE
U-TYPE WINGWALL
t
t
INLET
INVERT ELEVATION
(RIGHT)
WIDTH OF ROADWAY FORMATION
WIDTH OF SHOULDER
WIDTH OF CARRIAGEWAY
COVER ABOVE THE CULVERT
TOTAL LENGTH OF BARREL
SLOPE OF CARRIAGEWAY
SLOPE OF SHOULDER
[(H+t) - (B+200)] tan O
xt +0.5t
Wc1
2
HEIGHT OF CULVERT OPENING
THICKNESS OF CULVERT WALL OR SLAB
SLOPE OF EMBANKMENT
ANGLE OF SKEW
LENGTH
CL OF ROADWAY
t1
t2
t
Wc
X
S
Z
TO
DS-01
SCALE
NOT
TO
L2
NOT
DS-01
o
6
TYPICAL ROAD CROSS-SECTION
1
SCALE
500
50 mm LEAN CONCRETE
FORMED RUBBER
300
500
@ 500
RUBBER WATERSTOP (300X7)
1500
500
WITH SEALANT FILLER
480
200
FILLER @ 500
200
t
600
12D
150
150
50 mm LEAN CONCRETE
50mm LEAN CONCRETE
DETAIL
9
NOT
DS-01
150
BAR @ 500
FORMED RUBBER
L1
R
20
480
TO
USE SAME SIZE BARS AND SPACING
AS REGULAR DECK
SCALE
3OO
100
200
t + 300
DETAIL
4
NOT
DS-01
TO
SCALE
2 - 2400 x 2750
11.30
10.76
24+420.00
2 - 3000 x 2750
11.00
10.50
25+260.00
2 - 3000 x 3000
14.40
13.48
25+486.00
3 - 3000 x 2750
15.80
14.70
26+423.00
2 - 2400 x 2750
9.80
9.45
32+415.00
2 - 1800 x 2100
7.80
7.70
32+830.00
3 - 4000 x 4500
23.40
21.35
35+115.00
2 - 2400 x 2750
12.30
11.64
35+557.00
1 - 3000 x 2100
10.30
9.89
36+162.00
1 - 3000 x 2750
15.50
14.44
37+450.00
3 - 3000 x 2750
16.35
15.18
DS-01
NOT
TO
NOTES:
SCALE
1. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS
OTHERWISE SPECIFIED.
2. MINIMUM CONCRETE COVER SHALL BE 40mm
H
SEE DETAIL
t
THE DESIGN CONSULTANTS SHALL BE HELD
FULLY RESPONSIBLE FOR FAILURE OF THE
FACILITY DUE TO FAULTY DESIGN EXCEPT FOR
CHANGES MADE WITHOUT THE CONFORMITY OF
THE CONSULTANTS.
L2
L1
DETAIL
5
NOTE :
3
19+670.00
A
S
ROUND TO APPROXIMATE 150mm RADIUS
(FOR INLET PORTION ONLY)
DS-01
VOLUME
(m3)
STRUCTURE
t
200
E
SR
t
350
200
BARREL REINFORCEMENT
LENGTH
(m)
STATION
ED
IR
QU
300
100
12D
1000
QUANTITIES FOR HAND-LAID STONE PROTECTION
BOTTOM OF SLAB
200
500
2000
20
COVER BY 30mm.
E M B A N K M E N T
o
7
CLEAR WHEN HEIGHT OF FILL H=0 INCREASE
5
DS-01
DS-01
NOT
TO
SCALE
t
3. PROVIDE 100mm GRANULAR BEDDING MATERIAL
(FOUNDATION FILL)
USE SAME SIZE BARS AND
SPACING AS REGULAR DECK
4. PROVIDE EXPANSION JOINT AT AN INTERVAL
ED
EQUAL TO 20m.
R
EQ
U
IR
5. FOR DOUBLE AND TRIPLE BARREL INSTALLATION,
PROVIDE WATERSTOP AT INTERMEDIATE WALLS.
AS
h+t
1000
E
600
h
a
BL
IA
AR
=V )
TH
LE
G
AB
N
LE E T
E
(S
EXPANSION JOINT WITH
FORMED RUBBER
HAND-LAID STONE
250mm AVE. DIAMETER
(22.68kg. AVE. WEIGHT)
NATURAL GROUND
6. FOR CULVERTS WITH A VELOCITY GREATER THAN OR EQUAL TO 2.00m/s,
SLOPE
300
1000
50mm LEAN CONCRETE
1000
150
t
500
PROVIDE HAND-LAID STONE PROTECTION AT OUTLET. SEE TABLE
SEE DETAIL
800
4
DS-01
t
1500
500
150
L2
S
200
350
200
SECTION
3
PART SECTION ALONG CL OF CULVERT
2
DS-01
NOT
TO
NOT
t
DS-01
SCALE
SCALE
STANDARD DETAILS OF REINFORCED CONCRETE BOX CULVERT (RCBC)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
o
8
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DS-01
DATE
NOT
TO
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD DETAILS OF REINFORCED
CONCRETE BOX CULVERT (RCBC)
SCALE
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-01
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
EDGE OF
SHOULDER
EDGE OF
SHOULDER
a
NOTES :
1000
1000
4000
1000
1000
2000
1000
500
3000
1000
500
4000
1000
500
WIRE MESH GABIONS
300mm GROUTED
STONE RIPRAP
WEEPHOLES
SCALE
T
EN
NT
KM
AN
E
OP
B
EM
MB
EE
OP
SL
ROCK
BACKING
E
KM
AN
SL
PIPE
DIAMETER
STRAIGHT HEADWALL
FLOW
CLASS 'A'
L
SCALE
B
3B SECTION
DS-10
SL
SCALE
PE
O
DS-10
1250
SHOWN
1250
400
1250
AS
T
500
1:1<1:2 FOR SLOPE
(1:H)
N
ME
NK
(NUMBER OF STEPS IS VARIABLE)
OP
DS-10
LENGTH, L
1600
3800
SECTION F
KM
AN
OF
EN
B
EM
H
1
S
400
STRAIGHT HEADWALL
500
DS-10
SCALE
1:50
RIVER BANK
500
(ITEM 509)
PROVIDE
/
100mm 0 PVC PIPE
WEEPHOLES AT 2000 STAGGERED
3-LAYERS
GABIONS
PROVIDE
GEOTEXTILE
MATERIAL
ORIGINAL
GROUND
500
1000
500
NOTE :
GRANULAR
FILL
GEOTEXTILE
TYPE GB-R3
PROVIDE
GEOTEXTILE
MATERIAL
WIRE MESH
C5 GABIONS BOX IN STRUCTURES
STONE MASONRY
W A L L
GROUTED RIPRAP CHUTE WITH
STONE MASONRY PROTECTION
A4
DS-10
SCALE
DS-10
GROUTED RIPRAP CHUTE WITH HAND-PLACED
DUMPED STONES PROTECTION
NOT
SCALE
C
DS-10
SUBMITTED BY
REVISIONS
A
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
2-LAYER
GABIONS
VARIABLE
DIMENSIONS OF
GABIONS
PROVIDE
GEOTEXTILE
MATERIAL
TYPE GB-R1
TYPE GB-R2
WIRE MESH
C6 GABIONS BOX UNCLASSIFIED
1:10
SCALE
TO
CHECKED BY
500
1000
F
400
-
1:50
0
30
VARIABLE
(4.0m MAXIMUM)
VARIABLE
1500
NATURAL GROUND
WIRE MESH
GABIONS
DATE:
1/2t
SCALE
DETAILS OF
C4 GABION MATTRESS
STANDARD GABIONS BOX
1000x1000x2000
100
100 mm
LEAN CONCRETE
1500
C O N S U L T A N T S
WEEP HOLE
PROVIDE
GEOTEXTILE MATERIAL
NOTE :
450
VARIABLE
(1500 MINIMUM)
(4.0m MINIMUM)
0
30
750
(MIN.)
TO
3:2<1:H<1:1
GROUTED RIPRAP
D
NOT
NOTE:
3:2<1:H<1:1
DETAILS OF
C2 GROUTED RIPRAP
REFER STANDARD DSAWING FOR DETAILS
DS-10
DS-10
H
1
TYPE GM-S
PIPE
DIAMETER
PIPE
DIAMETER
FLOW
GROUTED RIPRAP
A3
OF
TYPE SM-C
REFER STANDARD DSAWING FOR DETAILS
PROVIDE 100mm 0 PVC PIPE
WEEPHOLES AT 2000 STAGGERED
PE
BA
EM
O
SL
WEEP HOLE
STRAIGHT HEADWALL
NOTE :
NT
ME
NK
STONE SIZE
NOTE:
CONSTRUCTION JOINT
600
CONSTRUCTION JOINT
T
CLASS "A"
GROUTED
RIPRAP
PE
LO
in.
m
00
SECTION G AND H
GABION FOOT
PROTECTION ( THICKNESS
H=VARIABLE
2990
1220
1/2t
2330
1300
150
1000
910
1:50
n.
610
SCALE
mi
DOUBLE
00
SINGLE
C3 DETAIL OF GABIONS BOX
DS-10
t=3
PIPE
DIAMETER
300
PIPE DIAMETER + 2600
100
TYPE GB-S
1:50
t=3
1000
SCALE
EDGE OF
SHOULDER
150
300
300
G
100 mm
LEAN CONCRETE
1
1000
400
VAR
600
100
H
FLOW
1000
TYPE SM-C
1400
400
SECTION D
H
CLASS "A"
GROUTED
RIPRAP
C1 PARTIAL ELEVATION
PIPE DIAMETER
+ 600
PIPE DIAMETER + 1200
SCALE
TO
H=5000(MAX)
PIPE DIAMETER
+ 600
NOT
SHALL BE PLACED AT
LEAST FOR EVERY 2.50m.
500
500
DS-10
SCALE
TO
450
NOT
RIPRAP (DUMPED STONES) PROTECTION
OF
SL
2500
GROUTED STONE MASONRY STEP PROTECTION A2
E
BA
EM
in.
GROUTED STONE MASONRY STEPS (2000 X 1000)
m
00
t=5
1500
DS-10
1:80
NOTE:
HAND-PLACED STONES
254mm AVERAGE DIAMETER
(22.68kg AVERAGE WEIGHT)
COMPACTED FILL
A1
SCALE
EMBANKMENT SLOPE PROTECTION DETAILS
1
500
CLASS 'B'
1300
1:80
NATURAL GROUND
1:
500
DS-10
400
1250
NATURAL GROUND
ROCK
BACKING
B1 SECTION
L
(V
(S AR
EE IA
TA BL
BL E)
E)
E
+
D
IA
M
60 ETE
0
R
FLOW
=
PI
P
REFER STANDARD DSAWING FOR DETAILS
PIPE
DIAMETER
STRAIGHT HEADWALL
REFER STANDARD DSAWING FOR DETAILS
500mm GROUTED
STONE RIPRAP
WEEPHOLES
600
TO
600
NOT
:1
1.5
1000
1000
3000
1:
1
1000
300
b
b
2000
DSAIN OR WEEPHOLES SHALL BE PROVIDED IN SLOPE
OF EMBANKMENT AT THE LOCATION SHOWN ON THE PLANS.
NOT LESS THAN 600mm OF ROCK BACKING SHALL BE
PROVIDED AT EACH DSAIN OR WEEPHOLES TO INSURE PROPER
OPERATION. THE DSAIN ROCK BACKING SHALL EXTEND TO
AT LEAST 300mm ABOVE THE DSAIN OR WEEPHOLES.
H=5000(MAX)
c
c
H=5000(MAX)
SIZE OF GABION
a
DS-10
SCALE
1:10
EMBANKMENT SLOPE PROTECTION DETAILS
SCALE
AS
DATE
SHOWN
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD PROTECTION
FOR DRAINAGE STRUCTURES
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-10
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
150
150
1200
2@150
= 300
PROVIDE PAVING NOTCH
FOR CULVERTS AT GRADE
EXISTING RCBC
150
2@225
150
2@150
= 450
7
1
4
2
3
= 300
(3 TOP BARS & 3 BOTTOM BARS FOR TOP & BOTTOM SLABS)
2
150
1
3
7
150
150 150
5@150=750
225
225
ALL OTHER REINFORCING BARS SHALL BE PERPENDICULAR OR PARALLEL,
AS THE CASE MAYBE, TO BOX AXIS.
6
20 X 20 HAUNCH
4
CONSTRUCTION
JOINT
5
5@150=750
225
225
PART SHOWING
TOP BARS
PART SHOWING
BOTTOM BARS
150
CONSTRUCTION
JOINT
20
2
PARTIAL PLAN
NOT
TO
RCBC
2@150
= 300
150
5
SINGLE
SKEWED BOX CULVERT ONLY
REINFORCING
STEEL
EXCAVATION
FOUNDATION
F I L L
(m )3
(kg)
(m )3
1.20
0.95
132.59
0.67
0.27
0.90
0.85
127.30
0.67
0.27
0.60
0.75
122.01
0.67
0.27
(m )3
150 FOUNDATION FILL
FOR ENTIRE AREA
200
ADDITIONAL WEIGHT OF REINFORCEMENT PER END OF BOX CULVERT
0.50% (MIN)
0.50% (MIN)
150
200
LADDER RUNG
98.5 kgs.
120.5 kgs.
=
=
9
46.5 kgs.
57.0 kgs.
SINGLE BARREL
COMMON TO ALL
HEIGHT OF CELL
MANHOLE
150
CONCRETE
CLASS "A"
REINFORCING
STEEL
(m )3
(kg)
(m )3
1.73
57.94
3.64
EXCAVATION
200
PARTIAL SECTION "A"
3
RCBC
150 200
(MIN)
NOT
NUMBER OF CELLS
NUMBER OF WALLS
100
7
100
70
=
=
(1200 X C + 160n) - 80
1
1
SCALE
32
-
300
2200
2
1:20
3
5
4
6
2
RC BOX CULVERT DETAIL
-
SCALE
SUBMITTED BY
A
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
9
10
80
AS-SHOWN
REVISIONS
CHECKED BY
350
80
150
520
800
C O N S U L T A N T S
8
0
(1200 X C + 160n) - 80
CURB INLET DETAIL
(LENGHT OF BARREL) - 100
50
C
n
1
1
SCALE
230
H + 250
1:20
H + 250
SCALE
80
520
130
SECTION "A"
-
TO
BAR BENDING DIAGRAM
(1200 X C + 160n) - 80
130
1B
@
8
WINGWALL, APRON AND END TOE FOR BOTH ENDS
VARIES
300
BARREL
(METER)
500
150
600
(MIN)
300
H
VARIES
(PER LINEAR METER OF LENGTH)
CONCRETE
CLASS "A"
HEIGHT OF CELL "H"
=
=
700
PARTIAL
WINGWALL
180
ESTIMATE OF QUANTITIES
70
LADDER RUNG
150
@
10% SLOPE
1350
5
FINISHED GRADE
10
SCALE
150
70
TO
1:20
70
5
WORKING LINE OF
WINGWALL
= 300
830 UPSTREAM
850
5
END OF BOX CULVERT
150
70
CONC. CURB
& GUTTER
SCALE
NOT
PRECAST 3-EQUAL SIZE
MANHOLE COVER TYPE I
PLAN
-
= 450
SECTION (RCBC)
1
150
2@150
500
1A
FINISHED GRADE
1200
2@225
SCALE
2000 APRON
800 UPSTREAM SIDE
1200 DOWNSTREAM SIDE
(CREEP WALL)
180
SKEWED BOX CULVERT ONLY
150 FOUNDATION FILL
FOR ENTIRE AREA
1230 DOWNSTREAM
150
RCPC
MIN. SLOPE
0.50%
SKEW
NOTE:
H
700
VARIES (FIELD VERIFY)
150
190
700
210
150
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 5 - MACARTHUR TO NCC ACCESS ROAD
SHEET CONTENT
D
E
F
CURB INLET AND RCBC DETAIL
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-11
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
DETAILS OF DITCHES AND CANAL
SCALE
DRAWING STATUS
1:200 M
PROJECT CODE
DRAWING NO.
-
DS-12
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
200
t
S
4
t
3.00
t
S/4
(TYPICAL)
200
5
5
4a
PAVING NOTCH
PROVIDE WHERE APPROACH
SLAB IS REQUIRED
8
6
S/5
7
200
S/4
(TYPICAL)
5
S/5
PAVING NOTCH, PROVIDE WHERE
REQUIRED
APPROACH SLAB IS
4
250
250
2
100
h/4
150
h/4
250
t
t
150
100
3
t
S
250
200
t
1
3
250
250
3
(TYPICAL)
c
2
c
BAR DIAGRAMS - SINGLE BARREL
h
h
2
1
1
CONSTRUCTION JOINT
CONSTRUCTION JOINT
7
2
1
t
t
250
250
h/4
h/4
3
8
200
SINGLE BARREL SECTION
NOT
S
t
8
6
4b
200
S/4
(TYPICAL)
S/5
7
t
1:30
4a
PAVING NOTCH
PROVIDE WHERE APPROACH
SLAB IS REQUIRED
S/5
t
150
5
S
t
S/4
(TYPICAL)
4b
SCALE
DS-02
S
t
DOUBLE BARREL SECTION
2
1:30
250
1
DS-02
5
h\4
100
6
BAR DIAGRAMS - DOUBLE & TRIPLE BARREL
3
250
250
(TYPICAL)
c
2
SCHEDULE OF REBAR FOR STANDARD BOX CULVERTS & WINGWALLS
h
CLEAR
1
SPAN HEIGHT
(300)
CONSTRUCTION JOINT
S
4b
BAR 2
BAR 3
BAR 4
DOUBLE AND TRIPLE BARREL BOX CULVERT
BAR 5
t
BAR 1
BAR 2
BAR 3
BAR 4
BAR 5
BAR 6
BAR 7
BAR 8
t
h
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
SPACING
1000
200
12
300
12
300
12
300
12
300
12
300
200
12
300
16
300
12
300
12
300
12
300
20
200
12
300
12
300
1250
200
12
300
12
300
12
300
12
300
12
300
200
12
300
16
300
12
300
12
300
12
300
20
200
12
300
12
300
1500
200
12
300
12
280
12
300
12
300
12
300
200
12
300
16
280
12
300
12
300
12
300
20
200
12
300
12
300
1800
200
12
300
12
260
12
300
12
300
12
300
200
12
300
16
260
12
300
12
300
12
300
20
200
12
300
12
300
1000
200
12
240
12
300
12
240
12
240
12
300
200
16
300
16
300
16
300
16
300
16
300
20
200
12
300
12
280
1250
200
12
240
12
300
12
240
12
240
12
300
200
16
300
16
300
16
300
16
300
16
300
20
200
12
300
12
280
1500
200
12
240
12
280
12
240
12
240
12
300
200
16
300
16
280
16
300
16
300
16
300
20
200
12
300
12
280
1800
200
12
240
12
280
12
240
12
240
12
300
200
16
300
16
260
16
300
16
300
16
300
20
200
12
300
12
280
1250
200
12
260
12
300
12
260
12
260
12
280
250
16
300
16
300
16
300
16
300
16
300
20
190
12
300
12
220
1500
200
12
260
12
300
12
260
12
260
12
280
250
16
300
16
280
16
300
16
300
16
300
20
190
12
300
12
220
1800
200
12
260
12
280
12
260
12
260
12
280
250
16
300
16
280
16
300
16
300
16
300
20
190
12
300
12
220
2100
200
12
260
12
260
12
260
12
260
12
280
250
16
300
16
260
16
300
16
300
16
300
20
190
12
300
12
220
1800
220
12
220
12
280
12
220
12
220
12
240
300
16
300
16
280
16
300
16
300
16
300
20
120
12
300
12
200
2100
220
12
220
12
260
12
220
12
220
12
240
300
16
300
16
280
16
300
16
300
16
300
20
120
12
300
12
200
2400
220
12
220
12
200
12
220
12
220
12
240
300
16
300
16
280
16
300
16
300
16
300
20
120
12
300
12
200
2750
220
12
200
12
180
12
200
12
200
12
240
300
16
300
16
280
16
300
16
300
16
300
20
120
12
300
12
200
2100
280
12
260
12
260
12
260
12
260
12
200
300
20
300
16
280
20
300
20
300
20
300
25
170
12
300
12
200
2400
280
12
260
12
260
12
260
12
260
12
200
300
20
300
16
280
20
300
20
300
20
300
25
170
12
300
12
200
2750
280
12
200
12
240
12
220
12
200
12
200
300
20
300
16
200
20
3600
20
300
20
300
25
170
16
300
12
200
3000
280
12
200
12
220
12
200
12
200
12
200
300
20
300
16
200
20
300
20
300
20
300
25
170
16
300
12
200
220
16
200
1250
t
250
h\4
4b
SINGLE BARREL BOX CULVERT
BAR 1
1500
3a
3
TRIPLE BARREL SECTION
SCALE
1800
1:30
t1
DS-02
3a
LEGEND:
NOTE :
c
=
2400
12D
FOR WALL THICKNESS LESS THAN 240,
STAGGER HORIZONTAL REINFORCEMENT
AS SHOWN.
t3
3000
t
12D
t3
FILLET
t2
SLAB BOTTOM BAR
t1, t2 & t3 50cm
20cm
t1, t2 & t3 30cm 50cm
15cm
t1, t2 & t3 30cm
10cm
SCHEDULE OF REBAR FOR SPECIAL DESIGN BOX CULVERTS & WINGWALLS
4000
350
4500
20
180
REVISIONS
A
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
20
220
25
220
25
220
25
150
20
THE DESIGN CONSULTANTS SHALL BE HELD
FULLY RESPONSIBLE FOR FAILURE OF THE
FACILITY DUE TO FAULTY DESIGN EXCEPT FOR
CHANGES MADE WITHOUT THE CONFORMITY OF
THE CONSULTANTS.
STANDARD DETAILS OF REINFORCED CONCRETE BOX CULVERT (RCBC) BARRELS
SUBMITTED BY
CHECKED BY
200
NOTE :
RCBC FILLET DETAIL
C O N S U L T A N T S
20
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD DETAILS OF REINFORCED CONCRETE
BOX CULVERT (RCBC) BARREL
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-02
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
QUANTITIES FOR STANDARD BOX CULVERTS
SINGLE
SPAN
HEIGHT
S
h
1250
1500
1800
2400
3000
SPECIFICATION :
QUANTITY PER WINGWALL AND APRON SLAB
DOUBLE
TRIPLE
m
h+t
(meter)
(meter)
1L = L 2
SINGLE
DOUBLE
TRIPLE
(meter)
CONCRETE
REINFORCEMENT
CONCRETE
REINFORCEMENT
CONCRETE
REINFORCEMENT
CONCRETE
REINFORCEMENT
CONCRETE
REINFORCEMENT
CONCRETE
REINFORCEMENT
(m3)
(kg)
(m3)
(kg)
(m3)
(kg)
(m3)
(kg)
(m3)
(kg)
(m3)
(kg)
6.33
372
7.50
366
DESIGN LOAD :
1000
0.94
113.32
1.63
209.22
2.33
296.18
1.37
1.20
1.23
5.77
367
1250
1.03
121.63
1.77
216.22
2.51
312.39
1.75
1.45
1.76
7.18
454
8.79
547
10.17
499
CONCRETE :
1500
1.12
130.98
1.90
232.07
2.69
330.39
2.12
1.70
2.29
7.45
489
11.55
582
13.06
657
1800
1.23
141.71
2.07
249.50
2.91
352.09
2.57
2.00
2.93
9.94
659
15.10
749
16.80
832
1000
1.03
165.90
2.04
253.90
2.92
354.80
1.37
1.20
1.23
5.05
326
6.71
419
7.97
513
ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSION STRENGTH IN 28 DAYS OF f'c = 20.7 MPa (3000psi).
ALL EXPOSED CORNERS TO BE CHAMFERED 20 MINIMUM. NO CONSTRUCTION JOINT ARE TO BE MADE
WHERE SHOWN. WHEN BOTTOM SLAB IS SUBJECT TO ABRASION ADD 25mm TO BOTTOM SLAB TO INCREASE
COVERAGE ON STEEL.
1250
1.12
177.10
2.19
256.00
3.12
370.20
1.75
1.45
1.76
7.45
489
9.10
582
10.62
676
1500
1.21
189.60
2.34
279.60
3.32
387.10
2.12
1.70
2.29
8.88
572
11.80
745
13.51
838
1800
1.32
202.50
2.52
296.20
3.56
407.10
2.57
2.00
2.93
9.33
607
15.28
955
17.23
1071
1250
1.38
189.20
3.11
312.30
4.45
437.00
1.78
1.45
1.80
7.07
456
8.35
557
9.89
657
1500
1.48
199.90
3.30
326.10
4.70
454.00
2.15
1.70
2.33
9.33
607
10.62
696
12.35
796
1800
1.60
214.80
3.53
342.80
5.00
475.20
2.60
2.00
2.97
10.14
739
13.57
894
15.53
1015
2100
1.72
239.60
3.75
357.50
5.30
494.40
3.05
2.30
3.61
12.96
890
16.61
980
18.79
1233
1800
2.04
272.70
5.04
431.80
7.20
619.10
2.63
2.02
3.01
9.63
698
16.30
1085
19.10
1105
2100
2.17
288.50
5.31
447.30
7.56
637.10
3.08
2.32
3.65
12.62
913
17.39
1141
20.03
1386
LIVE LOAD DISTRIBUTION REINFORCEMENT :
2400
2.31
314.10
5.58
461.80
7.92
656.40
3.53
2.62
4.28
12.53
1127
21.31
1442
24.27
1648
2750
2.46
356.70
5.90
478.60
8.34
677.70
4.06
2.97
5.03
19.27
1395
22.18
1461
23.35
1967
REINFORCEMENT
WHEN THERE IS LESS THAN 600mm OF FILL ABOVE TOP SLAB OF CULVERT ADDITIONAL
TRANSVERSE TO THE MAIN REINFORCEMENT IS ADDED TO THE BOTTOM OF THE TOP SLAB IN ACCORDANCE
WITH
AASHTO 1.3.2.E.
2100
3.17
308.70
6.03
635.70
8.64
899.70
3.17
2.38
3.78
15.87
1037
20.36
1337
23.90
1529
2400
3.34
321.30
6.30
652.00
9.00
919.60
3.62
2.68
4.41
16.25
1055
22.25
1330
26.56
1796
HEIGHT OF FILL :
2750
3.53
374.40
6.62
705.60
9.42
895.00
4.15
3.03
5.15
20.97
1346
24.15
1605
29.60
2012
3000
3.67
413.50
6.84
721.60
9.72
1015.40
4.52
3.28
5.68
22.73
1362
28.79
1925
32.78
2427
MAXIMUM HEIGHT OF FILL IS 3000mm ABOVE TOP SLAB, FOR HEIGHT OF FILL GREATER THAN 3000mm SPECIAL
DESIGN OF BOX CULVERT SHOULD BE DONE.
QUANTITIES FOR SPECIAL DESIGN BOX CULVERTS
4000
GENERAL NOTES :
QUANTITIES FOR STANDARD WINGWALLS
QUANTITY PER METER OF BARREL
CLEAR
4500
15.56
STEEL REINFORCEMENT :
ALL REINFORCING STEEL TO BE INTERMEDIATE (GRADE 40 OR HIGHER) ASTM A-615 WITH DEFORMATIONS CONFORMING
TO ASTM A-305.
GENERAL :
IN STATING CULVERT SIZE, GIVE SPAN BY HEIGHT (SPAN FIRST) WHEN HEIGHT OF FILL, H=0 THE TOP
SURFACE OF THE UPPER SLAB SHALL FOLLOW THE CROWN OF THE FINISHED ROADWAY. THE
SHALL BE CONSTRUCTED ON A LAYER OF LEAN CONCRETE 50mm MINIMUM THICKNESS.
2153.00
6.88
4.85
9.02
66.57
2916
230
DS-03
LENGTH OF WINGWALLS
1
L = 1.035a
2
L = 2.000a
1
CHAMFER 20
L = L2 = 1.414a
L = 1.414a
1
OF
BOX CULVERT
QUANTITIES FOR SPECIAL DESIGN WINGWALLS
3
HORIZONTAL SKEW
ANGLE O C
EXCEPT
a
L =2
WHERE :
= 1.5 (h+t-600) FOR SLOPE 1.5:1
BATTER 12 IN EVERY 300
WHEN h+t IS 2400 OR
LESS MAKE FACE VERTICAL
2:1
CONSTRUCTION JOINT
(ROUGHEN SURFACE)
h+t
= 2.0 (h+t-600) FOR SLOPE
SEALANT FILLER
h+t
250
CONCRETE
COVER
EXPANSION JOINT WITH
FORMED RUBBER
3
DS-03
TO
SCALE
150
NOT
150
DETAIL
400
4
DS-03
1
400
a
1
50mm
LEAN
CONCRETE
4
DS-03
800
a
VARIES BETWEEN
800 AND 1200
L OR L 2
1
(SEE TABLE)
12mm O /
EXPANSION JOINT WITH
FORMED RUBBER
3
2
L1 OR L
DS-03
2
WINGWALL ELEVATION
SCALE
DS-03
SECTION
SCALE
1:20
1:20
(SEE TABLE)
4
DS-03
C O N S U L T A N T S
NOTE :
WINGWALL PLAN
NOT
TO
THE DESIGN CONSULTANTS SHALL BE HELD
FULLY RESPONSIBLE FOR FAILURE OF THE
FACILITY DUE TO FAULTY DESIGN EXCEPT FOR
CHANGES MADE WITHOUT THE CONFORMITY OF
THE CONSULTANTS.
RCBC WINGWALL DETAILS (WW)
SCALE
SUBMITTED BY
REVISIONS
A
B
CHECKED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
STANDARD DETAILS OF RCBC WINGWALL
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-03
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
PAVEMENT
DESIGN REQUIREMENT OF REINFORCED CONCRETE PIPE CULVERT
STANDARD STRENGTH REINFORCED CONCRETE PIPE CULVERTS
CONCRETE 317 kg/cm 2 (4,500 lb/in 2)
FILL
CONCRETE 247 kg/cm 2 (3,500 lb/in 2)
c
STANDARD STRENGTH PIPES:
FILL 1/2 E.D. FOR FLEXIBLE PAVEMENT OR MIN. OF 0.60 m
0.30 m FOR RIGID PAVEMENT
EXTRA STRENGTH PIPES:
FILL: 0.30 m FOR RIGID AND FLEXIBLE PAVEMENTS
SIZE OF
PIPE
(mm)
WALL
THICKNESS
(mm)
I.D.
MINIMUM REINFORCEMENT
2
cm
/m OF PIPE
WALL
THICKNESS
(mm)
E
P
CIRCULAR
ELLIPTICAL
REINFORCEMENT REINFORCEMENT
351
370
44
351
370
44
527
514
534
44
1 LINE 2.54
692
680
699
44
1 LINE 3.60
GROOVE
(mm)
t
A
B
C
300
57
344
363
380
57
344
363
460
64
508
610
76
673
DEPTH
(mm)
CONCRETE 317 kg/cm 2 (4,500 lb/in 2)
kg/m OF PIPE
MINIMUM REINFORCEMENT
2
cm
/m OF PIPE
WALL
THICKNESS
(mm)
TONGUE
(mm)
GROOVE
(mm)
THREE-EDGE-BEARING
METHOD
t
A
B
C
E
P
1 LINE 1.48
51
495
514
502
521
44
1 LINE 1.69
3.355
5.218
1 LINE 1.90
51
495
514
502
521
44
1 LINE 2.33
3.914
6.060
1 LINE 2.12
51
495
514
502
521
44
1 LINE 2.96
4.473
6.709
1 LINE 2.75
64
660
680
667
686
44
1 LINE 4.23
1 LINE 3.60
4.473
7.454
0.00025mCRACK
CIRCULAR
ELLIPTICAL
REINFORCEMENT REINFORCEMENT
LOAD
ULTIMATE
LOAD
GROOVE
(mm)
DEPTH
(mm)
t
A
B
C
E
P
76
673
692
680
699
44
kg/m OF PIPE
MINIMUM REINFORCEMENT
2
cm
/m OF PIPE
THREE-EDGE-BEARING
METHOD
CIRCULAR
ELLIPTICAL
0.00025mCRACK
REINFORCEMENT REINFORCEMENT
LOAD
LOAD
ULTIMATE
1 LINE 5.50
1 LINE 4.23
5.964
8.945
89
858
857
845
864
51
1 LINE 4.66
1 LINE 3.60
76
825
845
832
851
51
1 LINE 5.92
1 LINE 4.44
5.032
8.573
89
838
857
845
864
51
1 LINE 6.56
1 LINE 5.08
7.454
11.182
910
102
1003
1022
1010
1029
64
2 LINES EACH
3.81
1 LINE 3.81
86
988
1007
994
1013
64
2 LINES EACH
4.66
1 LINE 4.66
6.038
9.840
102
1003
1022
1010
1029
64
2 LINES EACH
5.92
1 LINE 5.92
8.945
13.418
64
2 LINES EACH
4.44
64
2 LINES EACH
5.29
64
2 LINES EACH
6.98
1 LINE 6.98
10.436
15.655
1 LINE 5.29
108
1315
1334
1321
1340
64
2 LINES EACH
6.56
1 LINE 6.56
8.051
11.927
127
1334
1353
1340
1359
64
2 LINES EACH
8.04
1 LINE 8.04
11.927
17.891
1 LINE 6.98
127
1639
1658
1645
1664
64
2 LINES EACH
8.68
1 LINE 8.68
8.945
14.909
152
1664
1683
1670
1690
64
2 LINES EACH
10.58
1 LINE 10.58
13.418
22.364
1070
114
1168
1187
1175
1194
1220
127
1334
1353
1340
1359
64
2 LINES EACH
5.29
1520
152
1664
1683
1670
1690
64
2 LINES EACH
6.98
1 LINE 4.44
95
1150
1165
1156
1175
1 LINE 5.29
7.045
10.958
114
1168
1187
1175
1194
3mm
TOP OF PIPE TO BE
MARKED "TOP"
1B
9mm
TEST LOADS FOR SAND-BEARING TEST SHALL BE ONE AND ONE - HALF TIMES THOSE SPECIFIED IN THIS TABLE FOR THE THREE - EDGE BEARING TEST.
9mm
3mm
THE DISTANCE FROM CENTERLINE OF THE REINFORCEMENT TO THE NEAREST SURFACE OF THE CONCRETE HAS BEEN ASSUMED AS 32mm FOR PIPES WITH A SHELL THICKNESS OF 64mm OR MORE.
PAY LENGTH
ONE LINE OF CIRCULAR
REINFORCEMENT
TONGUE
(mm)
760
MINIMUM PIPE COVERING
DS-04
P
t
t
3mm
t
3mm
DEPTH
(mm)
TONGUE
(mm)
EXTRA STRENGTH REINFORCED CONCRETE PIPE CULVERTS
32mm
P
1C
A
B
B
A
.
I.D
B
A
bc
I.D.=SIZE OF PIPE
C
E
I.D
.
.
I.D
I.D. SIZE OF PIPE
32mm
1A
DS-04
LONGITUDINAL SECTION
SCALE :
1B
NTS
DS-04
FINISHED GRADE
FINISHED GRADE
SECTION
SCALE :
1C
DS-04
NTS
ONE LINE OF ELLIPTICAL
REINFORCEMENT
TONGUE END
SECTION
SCALE :
1
DS-04
SCALE :
150
EARTH
MIN=0.25bc
STEP 3 - COMPLETE EMBANKMENT
IN USUAL MANNER.
MIN=0.10bc
GRANULAR BACKFILL
t
CONCRETE OR SETTER
t
METHOD A
FINISHED GRADE
FINISHED GRADE
bc
bc
df = 2bc
t
ROLLER-COMPACTED
EMBANKMENT
100mm
ROLLER-COMPACTED
EMBANKMENT
STEP 1 - CONSTRUCT COMPACTED
EMBANKMENT TO A TOTAL DEPTH
EQUAL TO TWICE THE OUTSIDE DIA.
OF THE PIPE.
2
DS-04
C O N S U L T A N T S
CONCRETE CRADLE BEDDING
bc
bc
df
NTS
NTS
bc
bc
STEP 2 - TRENCH THROUGH THIS COMPACTED
EMBANKMENT AND INSTALL PIPE BACKFILL
WITH COMPACTED GRANULAR MATERIAL.
FINISHED GRADE
SCALE :
STANDARD REINFORCED CONCRETE PIPE CULVERTS
ROLLER-COMPACTED
EMBANKMENT
EARTH OR ROCK
STEP 1 - CONSTRUCT COMPACTED
EMBANKMENT TO AN ELEVATION
ABOVE TOP OF PROPOSED PIPE.
SECTION
1D
NTS
MIN=0.25 INSIDE DIAMETER
ROLLER-COMPACTED
EMBANKMENT
GROOVE END
FINISHED GRADE
df = DEPTH OF FILL
bc = OUTSIDE DIAMETER OF PIPE
df
TWO LINES OF CIRCULAR
REINFORCEMENT
3mm
ONE LINE OF CIRCULAR
REINFORCEMENT
TWO LINES OF CIRCULAR
REINFORCEMENT
9mm
3mm
P
3mm
3mm
9mm
32mm
DS-04
STEP 2 - TRENCH THROUGH THIS COMPACTED
EMBANKMENT AND INSTALL PIPE BACKFILL
WITH COMPACTED GRANULAR MATERIAL.
STEP 3 - FILL REMAINDER OF TRENCH
WITH BACKFILL PLACE IN LOOSEST
POSSIBLE CONDITION.
3
METHOD B
DS-04
ORDINARY BEDDINGS
4
TYPICAL BEDDING FOR CONDUITS
SCALE :
DS-04
DETAIL OF PIPE COLLAR
SCALE :
NTS
NTS
METHODS OF PIPE INSTALLATION
SCALE :
NTS
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD RCPC, METHOD OF PIPE
INSTALLATION AND TYPICAL BEDDING FOR
CONDUITS
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-04
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
3A
1.5
:1 S
SCALE :
t
I.D.
ELEVATION
2B
NTS
-
t
t
I.D.
t
t
I.D.
SCALE :
DS
CL
MEASURED ALONG
AXIS OF WINGS
SEE DISTANCE OF BAR SECTION
h
BATTE
R 1:4
EXTEND INTO BACKWALL
SECTION
3B
DS-05
NTS
SCALE :
SECTION
3C
NTS
SCALE :
DS-05
NTS
CL
200
2
TABLE A ( ONE FLARED TYPE HEADWALL 1.5:1 )
3
DIAMETER & THICKNESS
(mm)
DIMENSIONS
(mm)
SINGLE PIPE
F
F
L
W/2
W
E
DS-05
SCALE :
INTERNAL
DIAMETER
(I.D.)
MIN. THICKNESS
SHELL
(t)
L
460
610
910
1070
1220
1520
51
64
86
95
108
127
710
960
1510
1770
2040
2540
E
95
PLAN
1A
PLAN
2A
SCALE :
DS-05
NTS
FLARED TYPE HEADWALL (SINGLE PIPE)
SCALE :
NTS
NTS
E
F
390
530
840
980
1130
1410
590
800
1260
1470
1690
2110
INTERNAL
DIAMETER
(I.D.)
51
64
86
95
108
127
A
B
B'
H
SCALE :
mm
310
410
610
710
810
1010
350
430
610
780
870
980
200
200
200
300
300
300
1070
1320
1820
2080
2330
3030
1070
1220
1820
1970
2120
2420
1070
1220
1820
VARIES
VARIES
VARIES
610
760
1070
1230
1370
1680
0.57
0.82
1.55
2.38
2.66
3.93
AREA OF
WATERWAY
m2
W
(mm)
0.32
0.58
1.30
1.80
2.34
3.63
1380
1780
2590
3020
3400
4229
CONC.
m3
0.83
1.16
2.22
3.05
3.71
5.47
REINF.
STEEL
kg.
37.35
48.39
92.61
137.25
154.77
228.18
EST. OF QUANTITIES
AREA OF
WATERWAY
m2
W
(mm)
0.51
0.87
1.95
2.70
3.51
5.43
2150
2800
4100
4800
5360
6760
REINF.
STEEL
kg.
57.15
78.75
150.98
178.20
241.34
304.20
CONC.
m3
1.27
1.75
3.36
3.96
5.36
6.76
TABLE C ( ONE STRAIGHT TYPE HEADWALL )
CONCRETE
m3
L
CONC.
m3
REINF.
STEEL
kg.
25.65
36.46
68.92
107.10
110.27
174.74
NTS
DIAMETER & THICKNESS
(mm)
SINGLE PIPE
W
0.17
0.29
0.65
0.90
1.17
1.81
REINF.
STEEL
kg.
INTERNAL
DIAMETER
(I.D.)
MIN. THK.
SHELL
(t)
6
8
11
-
460
610
910
1070
1220
1520
51
64
86
95
108
127
0.66
1.06
2.76
-
DIMENSIONS
(mm)
A
310
410
610
710
810
1010
B
350
430
600
780
870
980
SINGLE PIPE
H
AREA OF
WATERWAY
m2
CONCRETE
m3
1500
2400
3800
4300
4800
6000
0.15
0.29
0.65
0.90
1.17
1.81
0.46
0.87
2.28
3.84
4.43
8.80
W
1070
1320
1820
2080
2330
2830
TRIPLE PIPE
DOUBLE PIPE
(mm)
mm
REINF.
STEEL
kg.
AREA OF
WATERWAY
m2
CONCRETE
m3
(mm)
3.48
4.55
6.68
7.57
8.81
10.94
2600
3500
5200
6050
6900
8600
0.33
0.58
1.30
1.80
2.34
3.63
0.63
1.20
3.16
5.09
6.70
11.93
W
mm
REINF.
STEEL
kg.
AREA OF
WATERWAY
m2
CONCRETE
m3
(mm)
4.90
6.50
9.52
10.67
12.54
15.56
3400
4600
6800
7900
9000
11200
0.45
0.87
1.95
2.70
3.51
5.43
0.80
1.51
3.85
6.43
7.97
15.05
W
mm
REINF.
STEEL
kg.
5.97
8.45
12.36
13.96
16.14
19.82
B'
PE
W
200
W
100
E
LOP
H
t
SOLID PLAIN
CONCRETE
A
A
A
t
t
I.D.
H
t
H
B'
I.D.
I.D.
I.D.
t
t
300
S
1.5:1
300
300
DS
4B 5
-0
300
O
SL
I.D.
:1
1.5
A
460
610
910
1070
1220
1520
MIN. THK.
SHELL
(t)
DIMENSIONS
(mm)
0
0
600
600
600
600
W
(mm)
TRIPLE PIPE
EST. OF QUANTITIES
FLARED TYPE HEADWALL (DOUBLE PIPE)
2
DS-05
TABLE C ( ONE L-TYPE HEADWALL)
DIA. & THICKNESS
(mm)
AREA OF
WATERWAY
m3
h
DOUBLE PIPE
EST. OF QUANTITIES
100
DS-05
GROUND LINE
SECTION
3A
t
@ 300 O.C.
1
@ 300
NTS
DS-05
3B 5
-0
CL
SCALE :
DS-05
@ 300
150
460(MIN)
t
ELEVATION
1B
DS-05
H VARIES
ACCORDING TO SIZE OF PIPE
150
100
t
300
G.L.
600
G.L.
75
G.L.
75
PE
150
G.L.
I.D.+150
I.D.
I.D.
75
EXTEND 300
INTO BACKWALL
200
200
LO
VARIES TO SUIT
LOCAL CONDITION
150
300
t
t
150
300
DS-05
SOLID PLAIN
CONCRETE
B
1.67 ID
B
4A
DS-05
4B
ISOMETRIC
SCALE :
DS-05
SECTION
SCALE :
5A
NTS
DS-05
NTS
SINGLE PIPE
SCALE :
5B
DS-05
NTS
SECTION
SCALE :
5C
DS-05
NTS
DOUBLE PIPE
SCALE :
NTS
B
4
DS-05
L-TYPE HEADWALL
SCALE :
5
DS-05
NTS
STRAIGHT TYPE HEADWALL
SCALE :
NTS
STANDARD REINFORCED CONCRETE HEADWALL FOR RCPC
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD REINFORCED CONCRETE
HEADWALL FOR RCPC
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-05
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
2C
DS-06
1B
DS-06
580
150
170
PIPE SIZE AS CALLED
FOR ON PLAN
CONSTRUCTION JT.
1D
@400mm O.C.(max.)
VARIES
DS-06
130
480
140
30
150mm THK. CONC.
HOLLOW BLOCKS
FLOW
PIPE SIZE AS CALLED
FOR ON PLAN
600mm(MIN.)
A-1(SEE TABLE)
FLOW
2B
EVERY INTERSECTION
BAR GRATE
(SEE DETAIL)
TWO/THREE BLOCKS
COVER
(SEE DETAIL)
580
70
20
50
10 130
300
130 10
PIPE SIZE AS CALLED
FOR ON PLAN
0.10
150
2410
5890
PULLING IRON
(SEE DETAIL)
200
(min.)
50
FLOW
2410
EVERY INTERSECTION
FLOW
DS-06
S=8.00%
GUTTER
2220
P L A N
2A
DS-06
INSTALL STEPS ONLY WHERE
DEPTH EXCEEDS 1220mm
1C
S=8.00%
GUTTER
30
250
100
170
200
S=8.00%
PIPE SIZE AS CALLED
FOR ON PLAN
150
DS-06
140
TYPE A
TYPE B
40
230>
140
400
TOP OF SIDEWALK
150
480
40
A-1(SEE TABLE)
150
30
30
PIPE SIZE AS CALLED
FOR ON PLAN
150
2B
0.05
0.05
CONSTRUCTION JT.
SECTION
DS-06
150
480
A-1(SEE DETAIL)
SECTION
1B
50
P L A N
DS-06
20
1A
DS-06
70
EVERY INTERSECTION
10 130
2C
200
PULLING IRON
(SEE DETAIL)
130 10
SECTION
DS-06
580
2410
2410
580
BAR GRATE
(SEE DETAIL)
50
2
TOP OF SIDEWALK
DS-06
TOP OF SIDEWALK
CONCRETE COVER DETAIL
SCALE
1:10
200
50
COVER (SEE DETAIL)
S=8.00%
S=8.00%
150mm THK. CONC.
HOLLOW BLOCKS
STEPS(SEE DETAIL)
150
CONSTRUCTION JT.
TWO/THREE BLOCKS
CONSTRUCTION JT.
STEPS(SEE DETAIL)
TO BE INSTALLED WHERE
DEPTH EXCEEDS 1220mm.
VARIES
@400mm O.C.(max.)
PIPE SIZE AS CALLED
FOR ON PLAN
VARIES
PIPE SIZE AS CALLED
FOR ON PLAN
PIPE SIZE AS CALLED
FOR ON PLAN
50 64
64 50
1958
FLOW
FLOW
FLOW
FLOW
TABLE OF DIMENSION
CLASS A""CONCRETE
PIPE SIZE AS CALLED
FOR ON PLAN
150
150
SCALE
1:20
SECTION
CONSTRUCTION JT.
1. ALL CONCRETE SHALL BE CLASS A". EXPOSED
"
EDGES SHALL BE
FINISHED WITH SUITABLE EDGER.
2. PULLING IRON, STEPS AND BAR GRATE SHALL BE PAINTED WITH ONE
COAT OF ZINC CHROMATE.
150
3. CONSTRUCTION JOINTS SHALL CONFORM WITH THE GROOVES OF CONCRETE
HOLLOW BLOCKS.
4. CONCRETE HOLLOW BLOCKS OR DSESSED ADOBE BLOCKS SHALL HAVE
AN AVERAGE COMPRESSIVE STRENGTH OF 6.865MPa.
SECTION
1D
5. IN CONCRETE HOLLOW BLOCKS STRUCTURE, ALL HOLES SHALL BE FILLED
WITH CEMENT MORTAR.
DS-06
1:20
DS-06
NOTES:
A-1
A-1(SEE DETAIL)
A-1(SEE TABLE)
1C
SIZE
OF PIPE
(mm)
0.05
0.05
0.05
CONSTRUCTION JT.
TYPE OF
CIM
0.10
0.10
CLASS A""CONCRETE
0.05
150
DS-06
DETAIL OF BAR GRATE
FOR OPENING OF CURB INLET
50
150
50
200
(min.)
5
6. WHERE CONCRETE HOLLOW BLOCKS STRUCTURES ATTAIN A HEIGHT OF
1.20 METER, IT SHALL BE REINFORCED STEEL BARS SPACE AT NOT MORE
THAN 0.60 M. O.C. BOTHWAYS.
1
DS-06
C O N S U L T A N T S
7. INSTALL STEPS ONLY WHERE DEPTH EXCEEDS 1.22 METERS.
CURB INLET MANHOLE
SCALE
1:20
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
STANDARD COMBINATION
CURB INLET MANHOLE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-06
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
150
40 10
b
1
500
500
500 (EMB.)
100
300
100
50
50
500
600
3
500
800
4
600
600
EDGE OF SHOULDER
8%
150
5.0%
400
b
100mm GRANULAR
GRAVEL BASE
2
10
5.0%
150
CURB & GUTTER
BERM DITCH
CONCRETE "BARRIER" CURB AND GUTTER
TYPE "Co-Cb-A"
TYPE "Co-Cb-B"
SCALE
SCALE
1:20
1:20
250
TYPE "DB(M)-C"
5
600
800
6
600
1000
7
800
800
8
800
1000
SCALE
250
EDGE OF SHOULDER
500
a
250
150
9
800
1200
10
1000
1000
11
1000
1200
300
b
5.0%
1:15
(min.)
SCALE
500
a
1:20
SIDE DITCH
TYPE "DS(C)- " C
c
1000
600
VARIES
130
a
500
5.0%
CLASS "A" CONCRETE
100 150
VARIES(500 MIN)
TYPE
DS(C)-C
1000
170
1500 (EMB.)
DIMENSIONS (MM)
170
TABLE A
320
150
170-200
VARIES (500min)
a
150
2000
200
350
5.0%
5.0%
VARIES b=500min
SIDE DITCH
TABLE B
TYPE "DS(m)-A1"
150
SCALE
500
366
500
600
388
3
500
800
435
4
600
600
412
5
600
800
435
c
SIDE DITCH
TYPE "DS(m)-G"
SCALE
NOTE:
SELECTED
MATERIALS
PERFORATED
PIPE
1.
PLACE GRANULAR MATERIALS INTO SOFT
MUCKY TRENCH BOTTOM FOR
STABILIZATION PRIOR TO PLACING OF
BEDDING MATERIALS.
2.
IMPERVIOUS MATERIALS SHALL CONTAIN
ENOUGH GRANULAR MATERIALS TO BE
STABLE WHEN WET AND SHALL BE
COMPACTED IN PLACE.
1:15
EDGE OF SHOULDER
6
c
1000
600
600
1000
481
500
SUBSURFACE DRAIN
SCALE
250
500
a
CONCRETE CLASS "A" SHALL BE PROVIDED FOR
PLAIN CONCRETE UNDER DRAIN PIPE.
3.
TYPE "SSD(G/P)-B"
COMMON FILL MATERIALS
GRAVEL BED FILTER MATERIALS
FILTER CLOTH, GEOTEXTILE
100
500
2
VARIABLE
1
VARIES
(BASED ON BOTTOM WIDTH OF SIDE DITCH)
1000(MIN)
c
1500(MAX)
b
1:15
DEPENDS ON THE TYPE
OF SIDE DITCH USED.
700
a
700
(MIN)
150
DIMENSIONS (MM)
TYPE
DS(m)-G
500
OR SLOTTED PIPE (DISCHARGING
TO CATCH BASIN OR CULVERT
INLET OR AT INTERVAL NOT TO
EXCEED 40m.)
1:20
250
TABLE C
c
b
500
c
500
TABLE E
1
300
500
800
2
400
500
800
3
500
500
1000
4
500
600
1000
5
500
800
1000
a
DIMENSIONS (MM)
150
a
TYPE
DW(M)-J
a
b
c
b
TYPE
DS(m)-A
1
300
300
600
150
300
5.0%
2
400
400
700
3
500
500
800
b
(min.)
1600
DIMENSIONS (MM)
5.0%
200
NOTE:
SMOOTH FINISH FOR SLOPE MORE THAN 4%.
CUT OFF WALL
150mm. thk.
PLACED EVERY
3.00m. INTERVAL
CLASS "A"
GROUTED RIPRAP
SIDE DITCH
TYPE "DS(m)-A"
SCALE
1:15
6
700
800
1200
7
700
1000
1200
8
700
1200
1200
VERTICAL DITCH (ALONG EMBANKMENT/CUT SLOPES)
TYPE "DV (m)-J"
500
c
SCALE
1:20
650
500
600
250
TABLE F
a
350
TYPE
DS(M)-B
c
C O N S U L T A N T S
500
500
200
2
500
600
200
1
910
1000
1410
3
500
800
250
4
600
800
200
2
1070
1000
1570
3
1220
1200
1720
5
600
800
250
4
1520
1400
2020
6
600
1000
250
SIDE DITCH
REVISIONS
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
-
PROJECT MANAGER - UICI
DATE:
-
1
V-SHAPED LINED DITCH BERM
TYPE "D-1"
1:15
A
DATE:
COMMON SOIL
TYPE "DS(M)-B"
SUBMITTED BY
PRESIDENT - UICI
300
b
SCALE
1:15
1
t
1:
a
TYPE "DV(m)-E"
SCALE
b
O
DIMENSIONS (MM)
TYPE
DV(m)-E
5.0%
200
VERTICAL DITCH
(FOR CROSSING DRAINAGE OUTLET)
a
SL
5.0%
b
b
t
150
150
a
PE
EDGE OF SHOULDER
TABLE D
100
150
DIMENSIONS (MM)
t
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
SCALE
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
MINOR DRAINAGE STRUCTURES
(MISCELLANEOUS DETAILS)
1:15
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-07
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
2000
ORIGINAL GROUND
LINE
KINDS OF ROCK
ITEM
SOFT ROCK
HARDROCK
GRADIENT
1.0 : 1
0.8 : 1
0.5 : 1
LOCATION
OF BERM
EVERY 7.0 m
EVERY 10.0 m
-
WIDTH OF
BERM
2.00 m
2.00 m
-
LESS THAN 7000
SOIL
BERM DITCH
2000
SOIL
A
LESS THAN 10,000
CUT SLOPE LINE
SCALE
CL
1:30
ELEVATION
SOFT ROCK
2000
BERM DITCH
TYPICAL 10,000
DETAIL OF SIDE DITCH TRANSITION
DR-08
BERM DITCH
2000
HARD ROCK
DETAIL 3
SIDE DITCH
TYPICAL CROSS SECTION FOR CUT SLOPE
S=0.005min.
S=0.040max.
S
DR-08
SCALE
DR-08
NOT
TO
SCALE
0
15
STEP CHANNEL, TYPE DV(m)-F
-
1:50
15
0
30
0
1000
BERM DITCH
BERM DITCH
150
25
VERTICAL
DITCH
150
100
100
10
130
0
150
BERM
0
100
10
100
25
150
150
100
130
150
CUT SLOPE
150
0
10
150
VERTICAL DITCH
E
150
E.G.
1000
200
CLASS "B" CONC.
(PRECAST L=1M.)
150
DITCH CHECK BARRIER
CUT OFF WALL THK=150 TO BE
PLACED EVERY 2.00m. INTERVAL
CAST IN PLACE AT LAP JOINT
150
30
10 10
0
0
50
00
0
0
VERTICAL
DITCH
C
10
0
10
0
0
THE CONCRETE CATCH
CANOPY IS 1.20m.
DETAIL 1
SECTION E
D
BAFFLE BLOCKS PLAN
150 500
150
150
10 10
0
0
30
0
10
DETAIL 1
INTO THE PRECAST
CONC. SLAB(ONE PER
PRECAST OF 1.0m.)
DITCH CHECK BARRIER
VERTICAL
DITCH
150
150
SIDE DITCH
100
100
150
100
S
S
BAFFLE BLOCKS PLAN
B
DR-08
NOT
TO
SCALE
1
(M 50
IN
)
10
0
10
0
75
75
1
(M 50
IN
)
30
10
50
00
0
0
VERTICAL
DITCH
10
0
0
75
0
10
STONE SHALL BE IN
ACCORDANCE WITH
ITEM 505
0
15 in.)
(m
10 10
0
0
BERM DITCH
30
0
BERM DITCH
TYPICAL VERTICAL DITCH DETAILS, TYPE DS(C)-Bc
-
DETAIL 1
DV(M)-E
SECTION C
DETAIL 2
DETAIL 2
DR-08
SCALE
-
1:20
DR-08
SIDE DITCH TYPE DS(C)-Bb
(FOR RECTANGULAR CONCRETE DITCH WITH SLOPE>4.0%)
NOT
TO
SECTION D
00
BERM DITCH CATCH PIT, CB(m)-G
50
-
TO
SE
C
O
N
D
G
R
O
U
P
FIRST GROUP OF
BOULDER BAFFLES
SCALE
DR-08
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
SIDE DITCH TYPE DS(M)-Gb/Bb
(FOR RECTANGULAR GROUTED RIPRAP DITCH WITH SLOPE>4.0%)
NOT
TO
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
DRAINAGE AND PROTECTION WORKS
SIDE DITCH,BERM DITCH,VERTICAL
DITCH,STEP CHANNEL
SCALE
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-08
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
500
1000
1000
VARIES
500
500
700
2000
2
GUARDWALL BLOCK
SCALE
DS-09
500
1
1:20
0.5
SHOULDER
5
8
PERSPECTIVE
SCALE
DS-09
NTS
SEE DETAIL
SCALE
1:40
FOR MEDIUM TO SOFT SOIL FORMATION (H=900-3000)
DESIGN SOIL BEARING CAPACITY = 132KPa (1.25T/FT )
c
b
300mm THK.
FILTER STONES
(COARSE AGGREGATE NEAR OPENING)
H/12
500
H/6
B
a
LEAN CONCRETE
H/6
b
1000
3
DS-09
1000 1000
GROUND SURFACE
GROUTED RIPRAP PROTECTION FOR SLOPE
OF EMBANKMENT (TYPE R1)
COMMON FILL
300
300mm THK. FILTER STONES
(COARSE AGGREGATE NEAR OPENING)
a
400
(MAXIMUM = 6000)
H/6
H/12
1000
COMMON FILL
500
300
WEEPHOLES SPACED @ 1000 O.C.
AND STAGGERED
WEEPHOLES SPACED @ 1000 O.C.
AND STAGGERED
1:5
(MAXIMUM=3000)
ROCK BACKING
H
VARIES
MFL
NTS
1:5
500
A
SC
300
:1
1.5
600
LE
450
BOULDERS SIZE
MINIMUM 200mm
MAXIMUM 500mm
SCALE
450
BOULDERS SIZE
MINIMUM 200mm
MAXIMUM 500mm
ROCK BACKING
1500
FRONT ELEVATION
DS-09
a
GROUND SURFACE
b
1
H/6
WEEPHOLE PIPE
0.5
FOR MEDIUM SOIL FORMATION
(H=3000-6000)
DESIGN SOIL BEARING CAPACITY = 158KPa (1.50T/FT )
L = 560
(L = 500)
6
DS-09
N
3%
300
500
200
STONE MASONRY
100
( TYPE II-A AND TYPE II-B )
1090
S
250
O
D
D
I N
G
SHOULDER
WALL
H
(mm)
1000
SCALE
CONC.
COBBLE
CONC.
COBBLE
500
TOTAL
VOLUME
H
N
a
b
c
B
h
CLASS "B"
STONE
CLASS "B"
STONE
1000
0.3
300
50
300
435
202
0.31
0.05
0.31
0.07
0.06
0.80
2000
0.4
300
100
300
471
249
0.65
0.22
0.65
0.09
0.07
1.68
3000
0.4
300
100
300
471
249
0.97
0.32
0.97
0.09
0.07
2.42
4000
0.4
350
150
300
564
286
1.51
0.65
1.29
0.12
0.08
3.65
5000
0.5
350
150
300
547
324
1.96
0.84
1.68
0.13
0.07
4.68
6000
0.5
350
200
300
592
346
2.35
1.34
2.01
0.14
0.08
5.92
7000
0.5
350
200
300
592
346
2.60
1.51
2.33
0.14
0.08
6.66
MASONRY
1.50
1.00
ROCK BACKING
NOTES:
AT THE LOCATIONS SHOWN ON THE PLANS, NOT LESS THAN TWO CUBIC
FEET OF ROCKS. BACKING SHALL BE PROVIDED AT EACH DSAIN OR
WEEP HOLES TO INSURE PROPER OPERATION OF THE DSAIN.
ROCK BACKING SHALL EXTENDED TO AT LEAST ONE FOOT ABOVE THE DSAIN
300
N.G.L.
7
400
C O N S U L T A N T S
DS-09
GROUTED RIPRAP PROTECTION FOR SLOPE
OF EMBANKMENT (TYPE R2)
SCALE
1:40
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
B=b+450+H/6
(mm)
STONE MASONRY
H/6
(mm)
(m )
900
-
-
600
150
0.518
1500
238
300
1000
250
0.169
1800
375
450
1200
300
1.598
2100
513
600
1400
350
2.091
2400
650
750
1600
400
2.650
2700
788
900
1800
450
3.274
3000
925
1050
2000
500
3.963
3300
1063
1200
2200
550
4.716
3600
1200
1350
2400
600
5.535
4200
1475
1650
2800
700
7.368
4500
1613
1800
3000
750
8.381
4800
1750
1950
3200
800
9.460
5100
1888
2100
3400
850
10.604
5400
2025
2250
3600
900
11.813
5700
2163
2400
3800
950
13.086
6000
2300
2550
4000
1000
14.425
DSAIN OR WEEP HOLES SHALL BE PROVIDED IN SLOPE OF EMBANKMENT
500
STONE
FOUNDATION
(cu/m)
b
(mm)
1:50
500
SLOPE PROTECTION
(cu/m)
QUANTITIES OF STONE MASONRY
FOR CUT WALL SLOPE (TYPE SM-B)
a
(mm)
II-A
TYPICAL SIDE SLOPE PROTECTION
500
DS-09
DIMENSION (mm)
TYPE
1:50
4
FACTOR OF SAFETY AGAINST SLIDING
NORMAL = 1.5
SEISMIC = 1.125
FACTOR OF SAFETY AGAINST OVERTURNING
NORMAL = 2.00
SEISMIC = 1.50
WALL STABILITY:
= 47
= 13 kN/m
= varies
= 11.31
B=0
Q = 1000 kPA
DIMENSION FOR STONE MASONRY WALL
100
SCALE
1:100
300
STONE MASONRY FOR CUT, TYPE SM-B
DS-09
3350
CARRIAGEWAY
B
COBBLE STONE
FOR FOUNDATION
1
VARIES
SHOULDER
SCALE
WALL STABILITY:
= 30
= 13 kN/m
= 26 kN/m
= 11.31
B=0
Q = 400 kPA
VARIES
100
250
0.30
500
CONCRETE FOUNDATION
(CLASS B)
h
GROUTED LINED
CANAL, TYPE 2b
1
WALL STABILITY:
= 30
= 13 kN/m
= 26 kN/m
= 11.31
B=0
Q = 400 kPA
STONE MASONRY TYPE II-A and TYPE II-B
200
250 500
3000 MAXIMUM
1.5%
1
2000
1000
SHLDS
H = 7000 (MAX.)
COBBLE
STONE
CONCRETE
CLASS "B"
500
B
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
II-B
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
SLOPE PROTECTION DETAILS
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWING
PROJECT CODE
DRAWING NO.
-
DS-09
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
ELECTRICAL DRAWINGS
DESIGN CRITERIA:
LEGEND:
5
5
M6
J
LUMINAIRE
GENERAL NOTES:
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
DESIGN CRITERIA, LEGENDS,
GENERAL NOTES & LUMINAIRES SPECS
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
E-1
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
1-197
1-196
1-198
1-199
1-200
1-201
1-202
1-203
1-204
1-205
1-206
1-195
1-207
1-208
1-209
1-194
1-193
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
17
17
0
68
ROADWAY LIGHTING LAYOUT STA. 7 + 700.000 - STA. 8 + 400.000
(LIGHTING STATIONS 1-193 - 1-209)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 7 + 700.000 - STA. 8 + 400.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-10
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-210
1-211
1-212
1-213
1-214
1-215
1-216
1-217
1-218
1-219
1-220
1-221
1-222
1-223
1-224
1-225
1-227
1-226
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
18
18
0
70
ROADWAY LIGHTING LAYOUT STA. 8 + 400.000 - STA. 9 + 100.000
(LIGHTING STATIONS 1-210 - 1-227)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 8 + 400.000 - STA. 9 + 100.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-11
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-228
1-229
1-230
1-231
1-232
1-233
1-234
1-235
1-236
1-237
1-238
1-239
1-240
1-241
1-242
1-243
1-244
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
17
17
0
70
ROADWAY LIGHTING LAYOUT STA. 9 + 100.000 - STA. 9 + 800.000
(LIGHTING STATIONS 1-228 - 1-244)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 9 + 100.000 - STA. 9 + 800.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-12
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-250
1-251
1-252
1-253
1-254
1-255
1-256
1-249
1-257
1-258
1-248
1-259
1-247
1-260
1-246
1-261
1-245
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
17
17
0
70
ROADWAY LIGHTING LAYOUT STA. 9 + 800.000 - STA. 10 + 500.000
(LIGHTING STATIONS 1-245 - 1-261)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 9 + 800.000 - STA. 10 + 500.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-13
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-267
1-269
1-268
1-270
1-271
1-272
1-273
1-274
1-275
1-266
1-276
1-265
1-277
1-264
1-278
1-263
1-279
1-262
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
18
18
0
62
ROADWAY LIGHTING LAYOUT STA. 10 + 500.000 - STA. 11 + 200.000
(LIGHTING STATIONS 1-262 - 1-279)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 10 + 500.000 - STA. 11 + 200.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-14
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-280
1-284
1-283
1-282
1-281
1-285
1-286
1-287
1-288
1-289
1-290
1-291
1-292
1-293
1-294
1-295
1-296
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
17
17
0
70
ROADWAY LIGHTING LAYOUT STA. 11 + 200.000 - STA. 11 + 900.000
(LIGHTING STATIONS 1-280 - 1-296)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 11 + 200.000 - STA. 11 + 900.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-15
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-297
1-302
1-301
1-300
1-299
1-298
1-304
1-303
1-305
1-306
1-307
1-308
1-309
1-310
1-311
1-312
1-313
1-314
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
18
18
0
70
ROADWAY LIGHTING LAYOUT STA. 11 + 900.000 - STA. 12 + 600.000
(LIGHTING STATIONS 1-297 - 1-314)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 11 + 900.000 - STA. 12 + 600.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-16
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-315
1-316
1-317
1-318
1-319
1-320
1-321
1-322
1-323
1-324
1-325
1-326
1-327
1-328
1-329
1-330
1-331
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 3.0M-HT 1.5M-DOUBLE-ARM
17
17
0
70
ROADWAY LIGHTING LAYOUT STA. 12 + 600.000 - STA. 13 + 300.000
(LIGHTING STATIONS 1-315 - 1-331)
1-349
1-348
1-347
1-346
1-345
1-344
1-343
1-332
1-333
1-334
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
1-335
1-336
1-337
1-338
1-339
1-340
1-341
1-342
ROADWAY LIGHTING LAYOUT STA. 13 + 300.000 - STA. 14 + 000.000
18
18
0
66
(LIGHTING STATIONS 1-332 - 1-349)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 12 + 600.000 - STA. 14 + 000.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-17
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-355
1-354
1-353
1-356
1-357
1-358
1-359
1-360
1-361
1-362
1-363
1-352
1-364
1-351
1-365
1-350
1-366
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 3.0M-HT 1.5M-DOUBLE-ARM
17
17
0
68
ROADWAY LIGHTING LAYOUT STA. 14 + 000.000 - STA. 14 + 700.000
(LIGHTING STATIONS 1-350 - 1-366)
1-384
1-383
1-382
1-381
1-380
1-379
1-367
1-368
1-369
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
1-370
1-371
1-372
1-373
1-374
1-375
1-377
1-376
1-378
ROADWAY LIGHTING LAYOUT STA. 14 + 700.000 - STA. 15 + 400.000
18
18
0
70
(LIGHTING STATIONS 1-367 - 1-384)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 14 + 000.000 - STA. 15 + 400.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-18
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-385
1-386
1-387
1-388
1-389
1-390
1-391
1-392
1-393
1-394
1-002a
CONSTRUCTION LIMIT
1-001a
1-003a
1-395
1-004a
1-396
1-397
1-398
1-399
1-400
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 3.0M-HT 1.5M-DOUBLE-ARM
16
16
4
64
ROADWAY LIGHTING LAYOUT STA. 15 + 400.000 - STA. 16 + 100.000
(LIGHTING STATIONS 1-385 - 1-400)
1-401
1-416
1-402
1-415
1-007a
1-403
1-005a
1-417
1-414
1-404
1-008a
1-405
1-006a
1-406
1-413
1-407
1-412
1-408
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
1-409
1-411
1-410
ROADWAY LIGHTING LAYOUT STA. 16 + 100.000 - STA. 16 + 800.000
17
17
4
64
(LIGHTING STATIONS 1-401 - 1-417)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 15 + 400.000 - STA. 16 + 800.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-19
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-009a
1-418
1-419
1-420
1-421
1-422
1-423
1-424
1-425
1-426
1-427
1-428
1-010a
1-011a
1-012a
1-429
1-430
1-431
1-432
1-433
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 3.0M-HT 1.5M-DOUBLE-ARM
16
16
4
56
ROADWAY LIGHTING LAYOUT STA. 16 + 800.000 - STA. 17 + 500.000
(LIGHTING STATIONS 1-418 - 1-433)
1-434
1-435
1-436
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
1-437
1-438
1-439
1-440
1-441
1-442
1-443
1-444
1-445
1-446
1-447
1-448
1-449
1-013a
1-015a
1-014a
1-016a
1-450
ROADWAY LIGHTING LAYOUT STA. 17 + 500.000 - STA. 18 + 200.000
17
17
4
66
(LIGHTING STATIONS 1-434 - 1-450)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 16 + 800.000 - STA. 18 + 200.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-20
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-451
1-452
1-453
1-454
1-455
1-457
1-456
1-458
1-459
1-460
1-461
1-462
1-463
1-464
1-465
1-466
1-467
1-468
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
18
18
0
68
ROADWAY LIGHTING LAYOUT STA. 18 + 200.000 - STA. 18 + 900.000
(LIGHTING STATIONS 1-451 - 1-468)
1-469
1-470
1-471
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 3.0M-HT 1.5M-DOUBLE-ARM
1-472
1-473
1-474
1-475
1-476
1-017a
1-019a
1-018a
1-020a
1-477
1-478
1-479
1-480
1-481
1-482
1-483
1-484
ROADWAY LIGHTING LAYOUT STA. 18+ 900.000 - STA. 19 + 600.000
16
16
4
62
(LIGHTING STATIONS 1-469 - 1-484)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 18 + 200.000 - STA. 19 + 600.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-21
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
1-485
1-486
1-487
1-488
1-489
1-490
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 3.0M-HT 1.5M-DOUBLE-ARM
6
6
0
20
ROADWAY LIGHTING LAYOUT STA. 19 + 600.000 - STA. 19 + 826.284
(LIGHTING STATIONS 1-485 - 1-490)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 19 + 600.000 - STA. 19 + 826.284
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-22
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
199 200 201 202 203 204 205 206 207 208 209
210 211 212 213 214 215 216 217 218 219 220
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
221 222 223 224 225 226 227 228 229 230 231
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-19
232 233 234 235 236 237 238 239 240 241 242
FEEDER-21
254 255 256 257 258 259 260 261 262 263 264
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-22
FEEDER-23
265 266 267 268 269 270 271 272 273 274 275
FEEDER-25
LOCATED AT STA 11+900
LOCATED AT STA 11+500
LOCATED AT STA 11+460
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-26, 22-120W LED IP67 POST LAMPS
276 277 278 279 280 281 282 283 284 285 286
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-24
LOCATED AT STA 11+060
LOCATED AT STA 11+020
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-25, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 10+620
LOCATED AT STA 10+680
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-24, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 10+180
LOCATED AT STA 10+140
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-23, 22-120W LED IP67 POST LAMPS
243 244 245 246 247 248 249 250 251 252 253
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-20
LOCATED AT STA 9+740
LOCATED AT STA 9+700
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-22, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 9+300
LOCATED AT STA 9+260
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-21, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 8+860
LOCATED AT STA 8+820
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-20, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 8+420
LOCATED AT STA 8+380
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
LOCATED AT STA 7+980
FEEDER-19, 22-120W LED IP67 POST LAMPS
FEEDER-27, 22-120W LED IP67 POST LAMPS
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
287 288 289 290 291 292 293 294 295 296 297
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-26
FEEDER-27
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
LOCATED AT POST-204
STA 8+180
LOCATED AT POST-215
STA 8+620
LOCATED AT POST-226
STA 9+060
LOCATED AT POST-237
STA 9+500
LOCATED AT POST-248
STA 9+940
LOCATED AT POST-259
STA 10+380
LOCATED AT POST-270
STA 10+820
LOCATED AT POST-281
STA 11+060
LOCATED AT POST-292
STA 11+700
CLARK ELECTRIC
CLARK ELECTRIC
M
3P100AT
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
FEEDER-19
FEEDER-21
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-7
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
FEEDER-20
PROVISION (SIDE1)
S/WALK & B. LANE
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
M
G
45
45KVA 400V
3 60HZ
45
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
GENERATORS
LIGHTING PANEL
45KVA 400V
3 60HZ
45
FEEDER-25
PLC
PROVISION (SIDE1)
S/WALK & B. LANE
FEEDER-27
PROVISION (SIDE 1)
S/WALK & B. LANE
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
M
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
FEEDER-26
PROVISION (SIDE1)
S/WALK & B. LANE
PROVISION (SIDE 1)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
M
G
45
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-9
G
LP-PH-7
18KAIC
FEEDER-23
M
G
GENERATORS
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
M
G
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-9
3P100AT
18KAIC
2P20AT
FEEDER-24
PROVISION (SIDE 2)
S/WALK & B. LANE
3P100AT
18KAIC
FEEDER-22
PLC
PROVISION (SIDE 1)
S/WALK & B. LANE
M
3P100AT
18KAIC
18KAIC
PLC
M
3P100AT
3P100AT
18KAIC
CLARK ELECTRIC
M
G
LP-PH-8
GENERATORS
LIGHTING PANEL
45KVA 400V
3 60HZ
45
LP-PH-9
45
LIGHTING PANEL
PH-7 (POWER HOUSE - 7)
PH-8 (POWER HOUSE - 8)
PH-9 (POWER HOUSE - 9)
(LOCATED AT STA 8+620)
(LOCATED AT STA 9+940)
(LOCATED AT STA 11+060)
RISER DIAGRAM
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
AS SHOWN
PROJECT CODE
F
MAIN RISER DIAGRAM
FINAL DRAWINGS
DRAWING NO.
E-25
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
320 321 322 323 324 325 326 327 328 329 330
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-28
331 332 333 334 335 336 337 338 339 340 341
FEEDER-30
353 354 355 356 357 358 359 360 361 362 363
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-31
FEEDER-32
364 365 366 367 368 369 370 371 372 373 374
FEEDER-34
LOCATED AT STA 15+840
LOCATED AT STA 15+460
LOCATED AT STA 15+420
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-35, 22-120W LED IP67 POST LAMPS
375 376 377 378 379 380 381 382 383 384 385
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-33
LOCATED AT STA 15+020
LOCATED AT STA 14+980
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-34, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 14+580
LOCATED AT STA 14+540
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-33, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 14+140
LOCATED AT STA 14+100
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-32, 22-120W LED IP67 POST LAMPS
342 343 344 345 346 347 348 349 350 351 352
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-29
LOCATED AT STA 13+700
LOCATED AT STA 13+660
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-31, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 13+260
LOCATED AT STA 13+220
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-30, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 12+ 820
LOCATED AT STA 12+780
309 310 311 312 313 314 315 316 317 318 319
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-29, 22-120W LED IP67 POST LAMPS
FEEDER-36, 22-120W LED IP67 POST LAMPS
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
386 387 388 389 390 391 392 393 394
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-35
1-004a
1-003a
1-002a
1-001a
298 299 300 301 302 303 304 305 306 307 308
LOCATED AT STA 12+380
LOCATED AT STA 12+340
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
LOCATED AT STA 11+940
FEEDER-28, 22-120W LED IP67 POST LAMPS
FEEDER-36
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
LOCATED AT POST-303
STA 12+140
LOCATED AT POST-314
STA 12+580
LOCATED AT POST-325
STA 13+020
LOCATED AT POST-336
STA 13+460
LOCATED AT POST-347
STA 13+900
LOCATED AT POST-358
STA 14+340
LOCATED AT POST-369
STA 14+780
LOCATED AT POST-380
STA 15+220
LOCATED AT POST-391
STA 15+660
CLARK ELECTRIC
CLARK ELECTRIC
M
3P100AT
FEEDER-28
FEEDER-30
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-10
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
FEEDER-29
PROVISION (SIDE1)
S/WALK & B. LANE
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
M
G
45
45KVA 400V
3 60HZ
45
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
GENERATORS
LIGHTING PANEL
45KVA 400V
3 60HZ
45
FEEDER-34
PLC
PROVISION (SIDE1)
S/WALK & B. LANE
FEEDER-36
PROVISION (SIDE 1)
S/WALK & B. LANE
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
M
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
FEEDER-35
PROVISION (SIDE1)
S/WALK & B. LANE
PROVISION (SIDE 1)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
M
G
45
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-12
G
LP-PH-10
18KAIC
FEEDER-32
M
G
GENERATORS
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
M
G
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-11
3P100AT
18KAIC
2P20AT
FEEDER-33
PROVISION (SIDE 2)
S/WALK & B. LANE
3P100AT
18KAIC
FEEDER-31
PLC
PROVISION (SIDE 1)
S/WALK & B. LANE
M
3P100AT
18KAIC
18KAIC
PLC
M
3P100AT
3P100AT
18KAIC
CLARK ELECTRIC
M
G
LP-PH-11
GENERATORS
LIGHTING PANEL
45KVA 400V
3 60HZ
45
LP-PH-12
45
LIGHTING PANEL
PH-10 (POWER HOUSE - 10)
PH-8 (POWER HOUSE - 11)
PH-12 (POWER HOUSE - 12)
(LOCATED AT STA 12+580)
LOCATED AT STA 13+900)
(LOCATED AT STA 15+220)
RISER DIAGRAM
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
AS SHOWN
PROJECT CODE
F
MAIN RISER DIAGRAM
FINAL DRAWINGS
DRAWING NO.
E-26
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
FEEDER-39
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
429 430 431 432 443 434
435 436 437 438 439 440 441 442 443 444 445
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
446 447 448 449
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-40
FEEDER-41
450 451 452 453 454
455 456 457 458 459 460 461 462 463 464 465
477 478 479 480 481 482 483 484 485
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-44
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
2P40AT IN NEMA-4X
LOCATED AT POST-420
STA 16+920
LOCATED AT POST-429
STA 17+300
LOCATED AT POST-440
STA 17+740
LOCATED AT POST-(1-015a-1-016a)
STA 18+140
LOCATED AT POST-460
STA 18+560
LOCATED AT POST-471
STA 19+000
LOCATED AT POST-480
STA 19+400
3P100AT
FEEDER-37
PLC
FEEDER-39
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-13
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
PLC
PROVISION (SIDE1)
S/WALK & B. LANE
FEEDER-42
PROVISION (SIDE 1)
S/WALK & B. LANE
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
FEEDER-41
45
PROVISION (SIDE1)
S/WALK & B. LANE
FEEDER-45
PROVISION (SIDE 1)
S/WALK & B. LANE
SYNCHRONYZING PANEL
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 1)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
PROVISION (SIDE 2)
S/WALK & B. LANE
M
G
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
2P20AT
2P20AT
5KAIC
5KAIC
FEEDER-44
FEEDER-46
PROVISION (SIDE 1)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
PROVISION (SIDE 2)
S/WALK & B. LANE
G
GENERATORS
LP-PH-14
45
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-15
G
45KVA 400V
3 60HZ
FEEDER-43
PLC
M
GENERATORS
LP-PH-13
LIGHTING PANEL
18KAIC
2P20AT
M
G
45
PROVISION (SIDE 2)
S/WALK & B. LANE
SPARE
G
45KVA 400V
3 60HZ
PROVISION (SIDE 1)
S/WALK & B. LANE
SP-PH-14
M
GENERATORS
45
FEEDER-40
3P100AT
18KAIC
2P20AT
FEEDER-38
M
G
3P100AT
18KAIC
2P20AT
LOCATED AT POST-488
STA 19+720
M
3P100AT
18KAIC
18KAIC
2P20AT
M
3P100AT
3P100AT
18KAIC
CLARK ELECTRIC
M
LOCATED AT STA 19+800
FEEDER-46
2P40AT IN NEMA-4X
LOCATED AT POST-411
STA 16+500
CLARK ELECTRIC
486 487 488 489 490
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
2P40AT IN NEMA-4X
M
FEEDER-46
10-120W LED
IP67 POST LAMPS
FEEDER-45
LOCATED AT POST-400
STA 16+060
CLARK ELECTRIC
LOCATED AT STA 19+640
LOCATED AT STA 19+600
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-45, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 19+220
LOCATED AT STA 19+200
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-43
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-44, 22-120W LED IP67 POST LAMPS
466 467 468 469 470 471 472 473 474 475 476
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-42
LOCATED AT STA 18+800
LOCATED AT STA 18+760
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-43, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 18+360
LOCATED AT STA 18+320
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-42, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 17+980
LOCATED AT STA 17+940
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-41, 22-120W LED IP67 POST LAMPS
END OF LINE
LOCATED AT STA 17+540
LOCATED AT STA 17+500
426 427 428
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-38
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
LOCATED AT STA 17+120
LOCATED AT STA 17+160
FEEDER-40, 22-120W LED IP67 POST LAMPS
1-020a
1-019a
1-018a
1-017a
415 416 417 418 419 420 421 422 423 424 425
END OF LINE
END OF LINE
LOCATED AT STA 16+680
LOCATED AT STA 16+720
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
1-016a
1-015a
1-014a
1-013a
414
FEEDER-39, 22-120W LED IP67 POST LAMPS
1-012a
1-011a
1-010a
1-009a
406 407 408 409 410 411 412 413
SPARE CONNECTING LINK
FOR EMERGENCY ONLY
FEEDER-37
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
FEEDER-38, 22-120W LED IP67 POST LAMPS
1-008a
1-007a
1-006a
1-005a
395 396 397 398 399 400 401 402 403 404 405
LOCATED AT STA 16+300
LOCATED AT STA 16+260
END OF LINE
50MM DIA PVC WITH 2-22SQMM
THW/N + 1-8SQMM G, TYPICAL
END OF LINE
LOCATED AT STA 15+860
FEEDER-37, 22-120W LED IP67 POST LAMPS
LIGHTING PANEL
45
45KVA 400V
3 60HZ
45
LP-PH-15
LIGHTING PANEL
PH-10 (POWER HOUSE - 13)
PH-8 (POWER HOUSE - 14)
PH-12 (POWER HOUSE - 15)
(LOCATED AT STA 16+500)
(LOCATED AT STA 17+740)
(LOCATED AT STA 19+080)
RISER DIAGRAM
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
AS SHOWN
PROJECT CODE
F
MAIN RISER DIAGRAM
FINAL DRAWINGS
DRAWING NO.
E-27
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
TYP. 12M LIGHT POST
TYP. 12M LIGHT POST
TYP. 12M LIGHT POST
P L A N
NOT TO SCALE
NOTES:
NOTES:
P L A N
NOT TO SCALE
SECTION
ELEVATION
P L A N
SECTION
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
NOT TO SCALE
LIGHT POST CONCRETE FOUNDATION
DETAILS (FOR 12M & 9M)
C O N S U L T A N T S
JUNCTION BOX DETAILS
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
SCALE
DRAWING STATUS
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
PROJECT CODE
DRAWING NO.
DETAILS
LIGHT POSTS, LIGHT POST CONCRETE FOUNDATION
AND JUNCTION BOX
-
E-28
DATE APPROVED
DATE REVISED
AS SHOWN
-
FINAL DRAWINGS
-
SIZE
A1
REV.
-
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
D
E
F
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
E-29
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
D
E
F
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
E-30
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
TYPICAL FEEDERS 1 TO 45 (FEEDING 22 LED LUMINAIRES)
PROVISION FOR SIDEWALK & BICYCLE LANE LIGHTINGS, 'SIDE 1' (POWER HOUSE 1 TO 15)
PROVISION FOR SIDEWALK & BICYCLE LANE LIGHTINGS, 'SIDE 2' (POWER HOUSE 1 TO 15)
PROVISION FOR SIDEWALK & BICYCLE LANE LIGHTINGS, 'SIDE 1 & 2' (POWER HOUSE 15 - CKT NoS. 5 TO 12)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
D
E
F
ELECTRICAL LOAD ANALYSIS & LOAD SCHEDULE
SCALE
AS SHOWN
DRAWING STATUS
FINAL DRAWINGS
PROJECT CODE
DRAWING NO.
-
E-31
DATE APPROVED
DATE REVISED
-
-
SIZE
A1
REV.
-
1-192
1-191
1-190
1-189
1-175
1-188
1-176
1-187
1-177
1-186
1-178
1-185
1-179
1-184
1-180
1-183
1-181
1-182
PARTICULARS
LIGHTING STATIONS (CLUSTERS)
LIGHT POSTS, 12.0M-HT 3.0M-DOUBLE-ARM
LIGHT POSTS, 12.0M-HT 3.0M-SINGLE-ARM
LIGHT POSTS, 6.0M-HT 0.8M-DOUBLE-ARM
18
18
0
70
ROADWAY LIGHTING LAYOUT STA. 7 + 000.000 - STA. 7 + 700.000
(LIGHTING STATIONS 1-175 - 1-192)
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT TO NCC ACCESS ROAD
SHEET CONTENT
ROADWAY LIGHTING LAYOUT
STA. 7 + 000.000 - STA. 7 + 700.000
SCALE
AS SHOWN
PROJECT CODE
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
E-9
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
LANDSCAPE DRAWINGS
10.50m
10.50m
5.00m 3.60m
3.60m 5.00m
WALK- BIKE- CARRIAGEWAYCARRIAGEWAY BIKE- WALK(3 LANES)
(3 LANES)
WAY WAY
WAY WAY
2.50m
PLANTING STRIP
2.50m
PLANTING STRIP
1.50m PLANTING STRIP
PEDESTRIAN
CROSSING
LA-3
5.00
TYPICAL PALM
SPACING
4
LA-3
NEW CLARK CITY
NEW CLARK CITY
TYPICAL SEQUENCE OF
PLANTING DESIGN PATTERNS
TOWARDS CENTERLINE OF
ROAD BLOCK LENGTH
10.00
10.00
PLANTING PLANTING
DESIGN 2 DESIGN 1
PEDESTRIAN
REFUGE
3
PACKAGE 3 - AIRPORT TO NEW CLARK CITY
[KM. 1+500.00 TO KM. 16+000.00]
ACCESS RAMP
NEW CLARK CITY
ACCESS RAMP
PALM ROW TO SIGNAL INTERSECTION
ROAD
WIDTH
CENTERLINE
PEDESTRIAN CROSSING
NEW CLARK CITY
3
1
NEW CLARK CITY
NEW CLARK CITY
10.00
TYPICAL
TREE SPACING 10.00
KEY PLAN OF PACKAGE 2 - AIRPORT-NCC ACCESS ROAD
2
68.00m
AIRPORT-NEW CLARK CITY ACCESS ROAD
3.50m
LANE
3.50m
LANE
3.50m
LANE
LEVEL
0%
2.0 %
2.0 %
2.0 %
1.80m
MEDIAN
20.00m
LIGHT RAIL TRANSIT RIGHT-OF-WAY
3.50m
LANE
3.50m
LANE
3.50m
LANE
2.50m
GREEN
2.0 %
2.0 %
2.0 %
LEVEL
0%
1.50m
3.60m
BIKEWAY GREEN
5.00m
SIDEWALK
6.50m
RAIL RIGHT-OF-WAY
6.50m
RAIL RIGHT-OF-WAY
5
LOT BOUNDARY
NEW CLARK CITY
10.00
PAVING
DESIGN 2
1:150M
2.50m
GREEN
3.50m
LANE
3.50m
LANE
3.50m
LANE
LEVEL
0%
2.0 %
2.0 %
2.0 %
LEVEL
0%
2.0 %
2.0 %
3.50m
LANE
3.50m
LANE
2.50m
GREEN
2.0 %
2.0 %
2.0 %
LEVEL
0%
0%
3
2.0 %
LEVEL
0%
6.50m
RAIL RIGHT-OF-WAY
2.0 %
URBAN STREETSCAPE TYPICAL CROSS SECTION NEAR INTERSECTION
1:150M
48.00m
VEHICULAR AND PEDESTRIAN ROAD RIGHT-OF-WAY
5.00m
SIDEWALK
NEW CLARK CITY
1.50m
3.60M
GREEN BIKEWAY
2.50m
GREEN
3.50m
LANE
3.50m
LANE
3.50m
LANE
1.80m
MEDIAN
3.50m
LANE
3.50m
LANE
20.00m
LIGHT RAIL TRANSIT RIGHT-OF-WAY
3.50m
LANE
2.50m
GREEN
SPACE FOR
TRANSPORT STOP SHED
LEVEL
0%
2.0 %
LEVEL
0%
2.0 %
3.60m
1.50m
BIKEWAY GREEN
5.00m
SIDEWALK
6.50m
RAIL RIGHT-OF-WAY
6.50m
RAIL RIGHT-OF-WAY
SPACE FOR
TRANSPORT STOP SHED
2.0 %
2.0 %
2.0 %
2.0 %
0%
2.0 %
2.0 %
LEVEL
0%
2.0 %
LEVEL
0%
2.0 %
1
LA-5
TRACK CL
4
URBAN STREETSCAPE TYPICAL CROSS SECTION AT TRANSPORT STOP PROVISION
1
SUBMITTED BY
1:150M
REVISIONS
NEW CLARK CITY
A
CHECKED BY
B
APPROVED BY
C
-
6.50m
RAIL RIGHT-OF-WAY
68.00m
AIRPORT-NEW CLARK CITY ACCESS ROAD
1:500M
DATE:
5.00m
SIDEWALK
1
URBAN STREETSCAPE TYPICAL ROAD BLOCK LENGTH SITE DEVELOPMENT PLAN
Urban Integrated Consultants, Inc.
1.50m
3.60m
BIKEWAY GREEN
TRACK CL
LOT BOUNDARY
PALM ROW TO SIGNAL INTERSECTION
3.50m
LANE
NEW CLARK CITY
10.00
TYPICAL
10.00 TREE SPACING
5.00
TYPICAL PALM SPACING
1.80m
MEDIAN
20.00m
LIGHT RAIL TRANSIT RIGHT-OF-WAY
LOT BOUNDARY
1.50m
3.60M
GREEN BIKEWAY
1
C O N S U L T A N T S
URBAN STREETSCAPE TYPICAL CROSS SECTION
1
LOT BOUNDARY
10.00
TYPICAL TREE SPACING
5.00m
SIDEWALK
LA-2
1
2.0 %
48.00m
VEHICULAR AND PEDESTRIAN ROAD RIGHT-OF-WAY
3
LA-2
LEVEL
0%
68.00m
AIRPORT-NEW CLARK CITY ACCESS ROAD
1
LA-2
NEW CLARK CITY
2.0 %
2
4
4
2
0%
ROAD LENGTH
CENTERLINE
NEW CLARK CITY
TYP. SEQUENCE OF PAVING DESIGN PATTERNS
FR. EDGE OF ROAD BLOCK LENGTH TOWARDS
ROAD BLOCK LENGTH CENTERLINE
10.00
10.00
10.00
10.00
10.00
PAVING
PAVING
PAVING
PAVING
PAVING
DESIGN 1 DESIGN 2 DESIGN 3 DESIGN 4 DESIGN 1
2.0 %
TRACK CL
NEW CLARK CITY
LA-2
LEVEL
0%
2.0 %
10.00
PAVING
DESIGN 3
NEXT PATTERN
TO FIT TO
REMAINING LENGTH
BEFORE SPACE
10.00 PROVISION FOR
PAVING TRANSPORT
20.00
DESIGN 4 STOP SHED
SPACE PROVISION FOR
TRANSPORT STOP SHED
(VERIFY BCDA ARCHITECT
FOR DESIGN OF SHED)
PROPOSED LAY-BY FOR TRANSPORT STOP
LA-2
NEW CLARK CITY
INTERSECTION
2.50m
GREEN
NEW CLARK CITY
1
1.50m
3.60M
GREEN BIKEWAY
LOT BOUNDARY
NEW CLARK CITY
URBAN AREA TYPICAL ROAD BLOCK
(VERIFY ROAD DESIGN ENGINEERING DRAWINGS FOR LENGTH OF EACH BLOCK)
NEW CLARK CITY
48.00m
VEHICULAR AND PEDESTRIAN ROAD RIGHT-OF-WAY
5.00m
SIDEWALK
NEW CLARK CITY
10.00
TYPICAL TREE SPACING
1
LOT BOUNDARY
ROAD INTERSECTION
1.50m PLANTING STRIP
1.80m
CENTER
ISLAND
20.00m
LIGHT RAIL
RIGHT-OF-WAY
EFREN L. DAVID
ALBERTO C. CAÑETE
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PRESIDENT - UICI
PROJECT MANAGER - UICI
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE:
-
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT-NCC ACCESS ROAD
SHEET CONTENT
URBAN STREETSCAPE TYPICAL
ROAD BLOCK LENGTH SITE DEVELOPMENT PLAN
SCALE
AS SHOWN
PROJECT CODE
-
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
LA-1
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
0.20
2.80
0.20
1.80
0.20
NEW CLARK CITY
0.20
2.80
0.20
1.80
0.20
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
1
4
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
2.40
2.50
0.75 SQ.M. GRASS STRIPS
"Paspalum cv." (FROG GRASS)
TILE PAVING MAINFIELD (0.40M X 0.60M
TEXTURED HOMOGENOUS TILE FINISH, DARK GRAY)
0.20
0.20
1.30
3
URBAN STREETSCAPE PAVING PATTERN 3 DETAILED PLAN
2
1:100M
NOTE: PAVING DESIGN PATTERN 3 IS NEXT TO PAVING DESIGN PATTERN 2 TOWARDS ROAD BLOCK LENGTH CENTERLINE.
NOTE: FOR BRIDGE WALKWAY/BIKEWAY, PAVING DESIGN WILL BE SAME AS STREETSCAPE PAVING PATTERN.
HOWEVER, MATERIAL FINISH WILL BE STAMPED CONCRETE FINISH. GRASS STRIP SHALL BE ARTIFICIAL GRASS STRIP.
18°
4.20
18°
4
± 0.00
0.17
± 0.00
R6.0
0
1.50
RAMP DOWN
RAMP DOWN
+0.15M
PLAIN CEMENT FINISH
+0.15M
0.20
3.60
BIKEWAY
18°
6
R7.00
4.20
0.20
1.50
TILE PAVING MAINFIELD
(0.20M X 0.20M HOMOGENOUS TILE
FINISH, ALTERNATE BOND
ARRANGEMENT, DARK GRAI)
0.20
1.50
1.50
PLANTING
STRIP
0.20
0.20
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
0.20
1.80
CONCRETE PAVERS ON SAND SETTING PAVING MAINFIELD
(0.125M X 0.368M PLANK PAVER, DARK GRAY, 3000 PSI)
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
13.05
0.17
0.20
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
CONCRETE PAVING MAINFIELD
(PLAIN CONCRETE FINISH, 3000 PSI)
0.20
2.80
18°
R7.00
0.20
4
CONCRETE PAVING BANDING
(PLAIN CONCRETE FINISH,
3000 PSI)
TILE PAVING MAINFIELD
(0.20M X 0.20M HOMOGENOUS TILE
FINISH, ALTERNATE BOND
ARRANGEMENT, DARK GRAI)
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
4
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
5.00
WALKWAY
4.60
CONCRETE PAVERS ON SAND SETTING PAVING MAINFIELD
(0.125M X 0.368M PLANK PAVER, DARK GRAY, 3000 PSI)
TILE PAVING MAINFIELD (0.40M X 0.60M
TEXTURED HOMOGENOUS TILE FINISH, DARK GRAY)
CONCRETE PAVING MAINFIELD
(PLAIN CONCRETE FINISH, 3000 PSI)
CONCRETE PAVING BANDING
(PLAIN CONCRETE FINISH,
3000 PSI)
0.20
1
5.00
WALKWAY
4.60
0.20
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
10.00
0.20
1.30
0.20
4
3.30
NOTE: FOR BRIDGE WALKWAY/BIKEWAY, PAVING DESIGN WILL BE SAME AS STREETSCAPE PAVING PATTERN.
HOWEVER, MATERIAL FINISH WILL BE STAMPED CONCRETE FINISH. GRASS STRIP SHALL BE ARTIFICIAL GRASS STRIP.
0.17
0.20
0.20
2
0.20
1.30
1.30
0.20
NEW CLARK CITY
0.17
0.20
0.20
0.20
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
1:100M
NOTE: PAVING DESIGN PATTERN 2 IS NEXT TO PAVING DESIGN PATTERN 1 TOWARDS ROAD BLOCK LENGTH CENTERLINE.
0.675
ROAD AND GUTTER
0.20
1.30
2
0.20
0.20
0.15M-HIGH X 0.0125M DEEP NEW CLARK CITY LETTERINGS
CONCRETE INSET (ARIAL BLACK FONT STYLE, BLACK)
URBAN STREETSCAPE PAVING PATTERN 2 DETAILED PLAN
2
PART OF
CARRIAGEWAY
0.20
1.80
2
2.50
PLANTING
STRIP
0.20
2.80
1.50
0.675
ROAD AND GUTTER
0.20
1.80
0.20
0
R6.0
2.50
PLANTING
STRIP
0.15
CONCRETE PAVERS ON SAND SETTING PAVING MAINFIELD
(0.125M X 0.368M PLANK PAVER, DARK GRAY, 3000 PSI)
TILE PAVING MAINFIELD (0.40M X 0.60M
TEXTURED HOMOGENOUS TILE FINISH, DARK GRAY)
CONCRETE PAVING MAINFIELD
(PLAIN CONCRETE FINISH, 3000 PSI)
2.80
0.20
0.17
PART OF
CARRIAGEWAY
0.20
1.80
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
1.80
10.00
10.00
3.60
BIKEWAY
4
10.00
1.30
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
1
3.30
1:100M
NOTE: PAVING DESIGN PATTERN 1 ALWAYS STARTS AT INTERSECTION OF AIRPORT-NCC ROAD AND PERPENDICULAR ROAD
OR AT END OF ROAD BLOCK LENGTH.
NOTE: FOR BRIDGE WALKWAY/BIKEWAY, PAVING DESIGN WILL BE SAME AS STREETSCAPE PAVING PATTERN.
HOWEVER, MATERIAL FINISH WILL BE STAMPED CONCRETE FINISH. GRASS STRIP SHALL BE ARTIFICIAL GRASS STRIP.
1.50
PLANTING
STRIP
0.20
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
1.30
URBAN STREETSCAPE PAVING PATTERN 1 DETAILED PLAN
2
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
ROAD LENGTH CENTERLINE
0.20
3.30
0.20
0.20
4
0.20
0.20
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
0.20
2
0.75 SQ.M. GRASS STRIPS
"Paspalum cv." (FROG GRASS)
2.50
0.20
0.20
2.40
0.20
1.30
1.30
NEW CLARK CITY
CONCRETE PAVERS ON SAND SETTING PAVING MAINFIELD
(0.125M X 0.368M PLANK PAVER, DARK GRAY, 3000 PSI)
TILE PAVING MAINFIELD (0.40M X 0.60M
TEXTURED HOMOGENOUS TILE FINISH, DARK GRAY)
CONCRETE PAVING MAINFIELD
(PLAIN CONCRETE FINISH, 3000 PSI)
1.80
NEW CLARK CITY
5.00
WALKWAY
0.20
4.60
0.20
1.20 0.10
0.10
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
2.80
0.20
3.60
BIKEWAY
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
1
1.50
PLANTING
STRIP
0.20
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
1.50M-WIDE BIKEWAY PAVING MAINFIELD
(COLORED ASPHALT FINISH, GREEN)
0.20
5.00
WALKWAY
4.60
0.20
0.20M-WIDE BIKEWAY PAVING BANDING
(PLAIN CONCRETE FINISH, 3000 PSI)
0.20
4
0.20
1.50
PLANTING
STRIP
0.20
2.50
PLANTING
STRIP
0.17
2
4
INTERSECTION
POINT OF ROAD 2
AND
PERPENDICULAR
ROAD
1
0.20
0.675
ROAD AND GUTTER
0.20
1.80
1.50
0.20
1.30
1.50
0.20
1.30
PART OF
CARRIAGEWAY
0.20
1.80
1.50
0.675
ROAD AND GUTTER
0.20
10.00
10.00
2.80
1.50
3.60
BIKEWAY
2.50
PLANTING
STRIP
PART OF
CARRIAGEWAY
0.20
1.80
1.50
2.50
PLANTING
PLANTING
PART OF
5.00
3.60
STRIP
STRIP
CARRIAGEWAY
WALKWAY
BIKEWAY
4.60
0.20
0.675
0.10
1.50
1.50
ROAD AND GUTTER
0.10
0.20 1.20
0.20
0.20
0.20
0.17
10.00
1.30
0.20
3.30
0.20
2.80
0.20
1.80
0.20
0.20
1.80
0.20
2.80
0.20
1.80
0.20
1.30
0.20
1.30
0.20
1.80
0.20
2.80
0.20
1.80
1.30
0.20M-WIDE WALKWAY PAVING BANDING (0.20M X 0.20M &
0.20M X 0.40M TEXTURED HOMOGENOUS TILE FINISH, GRAY)
VERIFY PAVING DESIGN PATTERN NUMBER
19.80
VERIFY PAVING DESIGN PATTERN NUMBER
1.30
10.00
4
5
URBAN STREETSCAPE PAVING PATTERN 4 DETAILED PLAN
2
SPACE FOR TRANSPORT STOP SHED PAVING DESIGN DETAILED PLAN
2
1:100M
NOTE: PAVING DESIGN PATTERN 4 IS NEXT TO PAVING DESIGN PATTERN 3 TOWARDS ROAD BLOCK LENGTH CENTERLINE.
1:100M
NOTE: TRANSPORT STOP SHED DESIGN BY BCDA ARCHITECT.
NOTE: FOR BRIDGE WALKWAY/BIKEWAY, PAVING DESIGN WILL BE SAME AS STREETSCAPE PAVING PATTERN.
HOWEVER, MATERIAL FINISH WILL BE STAMPED CONCRETE FINISH. GRASS STRIP SHALL BE ARTIFICIAL GRASS STRIP.
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
Urban Integrated Consultants, Inc.
B
APPROVED BY
C
DATE:
-
EFREN L. DAVID
ALBERTO C. CAÑETE
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PRESIDENT - UICI
PROJECT MANAGER - UICI
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE:
-
DATE:
-
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT-NCC ACCESS ROAD
SHEET CONTENT
URBAN STREETSCAPE TYPICAL
WALKWAY AND BIKEWAY PAVING DETAILED PLANS
SCALE
AS SHOWN
PROJECT CODE
-
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
LA-2
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
5.00
2.00
PLANTING
STRIP
1.80
PLANTING
STRIP
55 PCS.-"Hymenocallis littoralis"
(SPIDERLILY)
0.50m.ht. @ 0.30m.o.c.
24 PCS.-"Calathea lutea"
(CIGAR PLANT)
0.75m.ht. @ 0.40m.o.c.
1 PC.-"Bucida philippinensis"
(PHILIPPINE TALISAY)
3.0m.ht. as shown
PROPOSED LAY-BY FOR TRANSPORT STOP
PATTERN 1 URBAN STREETSCAPE
PLANTING PLAN
3
1 PC.-"Cassia philippinensis"
(PALAWAN CHERRY)
2.5m.ht. as shown
3
1 PC.-"Livistonia philippinensis" or 1 PC.-"Alstonia scholaris"
(ANAHAW)
(DITA)
5.0m.ht. as shown
3.5m.ht. as shown
1 PC.-"Alstonia scholaris"
(DITA)
3.5m.ht. as shown
1:100M
55 PCS.-"Bougainvillea 'Mary Palmer""
(FUSCHIA BOUGAINVILLEA)
0.40m.ht. @ 0.30m.o.c.
100 PCS.-"Iris pseudacorus"
(YELLOW IRIS)
0.40m.ht. @ 0.20m.o.c.
3
1:100M
UTILITIES LEGEND
LAMP POST
QUICK COUPLER
3
1:100M
NOTE: PLANTING DESIGN PATTERN 3 FOLLOWS PLANTING DESIGN PATTERN 2
TOWARDS CENTER OF ROAD BLOCK LENGTH AND/OR ROAD INTERSECTION.
REVISIONS
CHECKED BY
B
APPROVED BY
C
-
EFREN L. DAVID
ALBERTO C. CAÑETE
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PRESIDENT - UICI
PROJECT MANAGER - UICI
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE:
-
5.00
40 PCS.-"Crinum xanthophyllum"
(YELLOW CRINUM)
0.60m.ht. @ 0.30m.o.c.
1 PC.-"Livistonia philippinensis" or 1 PC.-"Alstonia scholaris"
(ANAHAW)
(DITA)
5.0m.ht. as shown
3.5m.ht. as shown
10.00
5.00
5.00
100 PCS.-"Ipomoea pes-caprae"
(BEACH KANGKONG)
0.60m.long @ 0.20m.o.c.
185 PCS.-"Arachis pintoi"
(PEANUT PLANT)
0.15m.ht. @ 0.15m.o.c.
30 PCS.-"Calathea lutea"
(CIGAR PLANT)
0.75m.ht. @ 0.40m.o.c.
40 PCS.-"Crinum xanthophyllum"
(YELLOW CRINUM)
0.60m.ht. @ 0.30m.o.c.
88 PCS.-"Ipomoea pes-caprae"
(BEACH KANGKONG)
0.60m.long @ 0.20m.o.c.
88 PCS.-"Iris pseudacorus"
(YELLOW IRIS)
0.40m.ht. @ 0.20m.o.c.
DATE:
-
44 PCS.-"Philodendron selloum"
(SELLOUM)
0.60m.ht. @ 0.30m.o.c.
1 PC.-"Bucida philippinensis"
(PHILIPPINE TALISAY)
3.0m.ht. as shown
PATTERN 3 URBAN STREETSCAPE
PLANTING PLAN
5
RESPECTIVE ENGINEERING TRADE
TO VERIFY AND COORDINATE FINAL LOCATIONS
AND SPECIFICATIONS OF FIXTURES
WITH LANDSCAPE ARCHITECT.
170 PCS.-"Arachis pintoi"
(PEANUT PLANT)
0.15m.ht. @ 0.15m.o.c.
NEW CLARK CITY
A
DATE:
24 PCS.-"Calathea lutea"
(CIGAR PLANT)
0.75m.ht. @ 0.40m.o.c.
1.50
PLANTING
STRIP
NEW CLARK CITY
1 PC.-"Bucida philippinensis"
(PHILIPPINE TALISAY)
3.0m.ht. as shown
DIRECTION OF DRAIN
165 PCS.-"Arachis pintoi"
(PEANUT PLANT)
0.15m.ht. @ 0.15m.o.c.
2.00
PLANTING
STRIP
44 PCS.-"Hymenocallis littoralis"
(SPIDERLILY)
0.50m.ht. @ 0.30m.o.c.
44 PCS.-"Alocasia odorata"
(ELEPHANT EAR)
0.60m.ht. @ 0.30m.o.c.
NOTE:
LOCATIONS OF FIXTURES ARE INDICATIVE
TO CONVEY INTENT OF DESIGN.
SEE TECHNICAL SPECIFICATIONS
FOR PROPOSED FIXTURE DETAILS.
CORRESPONDING CENTER ISLAND
88 PCS.-"Ipomoea pes-caprae"
(BEACH KANGKONG)
0.60m.long @ 0.20m.o.c.
1.50
PLANTING
STRIP
30.00
PEDESTRIAN LAMP POST
TYPICAL SPACING
APPLY TYPICAL
ROAD INTERSECTION
PLANTING DESIGN
1
APPLY TYPICAL SEQUENCE OF
PLANTING DESIGN PATTERNS
TOWARDS CENTERLINE OF
ROAD BLOCK LENGTH
AND/OR ROAD INTERSECTION
NEW CLARK CITY
ROAD
WIDTH
CENTERLINE
55 PCS.-"Alocasia odorata"
(ELEPHANT EAR)
0.60m.ht. @ 0.30m.o.c.
88 PCS.-"Wedelia trilobata"
(WEDELIA)
0.25m.ht. @ 0.20m.o.c.
STREETSCAPE
TYPICAL ROAD BLOCK LENGTH
PLANTING AND UTILITIES PLAN
1:100M
NOTE: PLANTING DESIGN PATTERN 2 FOLLOWS PLANTING DESIGN PATTERN 1
TOWARDS CENTER OF ROAD BLOCK LENGTH AND/OR ROAD INTERSECTION.
1 PC.-"Alstonia scholaris"
(DITA)
3.5m.ht. as shown
5.00
SUBMITTED BY
Urban Integrated Consultants, Inc.
40 PCS.-"Alocasia odorata"
(ELEPHANT EAR)
0.60m.ht. @ 0.30m.o.c.
10.00
5.00
55 PCS.-"Philodendron selloum"
(SELLOUM)
0.60m.ht. @ 0.30m.o.c.
NEW CLARK CITY
3
2.00
PLANTING
STRIP
NEW CLARK CITY
30.00
QUICK COUPLER VALVE
TYPICAL SPACING
10.00
TYPICAL TREE SPACING
10.00
4.90 5.00 5.00 5.00 5.00
TYPICAL
PALM ROW TO SIGNAL INTERSECTION 10.00 TREE SPACING
NEW CLARK CITY
30.00
QUICK COUPLER VALVE
TYPICAL SPACING
NEW CLARK CITY
T-ROAD
INTERSECTION
STREETSCAPE
ROAD INTERSECTION
PLANTING PLAN
2
5.00
40 PCS.-"Bougainvillea
'Mary Palmer""
(FUSCHIA BOUGAINVILLEA)
0.40m.ht. @ 0.30m.o.c.
PATTERN 2 URBAN STREETSCAPE
PLANTING PLAN
4
CORRESPONDING CENTER ISLAND
88 PCS.-"Iris pseudacorus"
(YELLOW IRIS)
0.40m.ht. @ 0.20m.o.c.
100 PCS.-"Iris pseudacorus"
(YELLOW IRIS)
0.40m.ht. @ 0.20m.o.c.
D
E
F
44 PCS.-"Costus spectabilis"
(RED COSTUS)
0.40m.ht. @ 0.30m.o.c.
NEW CLARK CITY
C O N S U L T A N T S
88 PCS.-"Ipomoea pes-caprae"
(BEACH KANGKONG)
0.60m.long @ 0.20m.o.c.
1:100M
NOTE: PLANTING DESIGN PATTERN 1 ALWAY
STARTS AT INTERSECTION OF AIRPORT-NCC ROAD AND PERPENDICULAR ROAD
OR AT END OF ROAD BLOCK LENGTH AND/OR ROAD INTERSECTION.
NEW CLARK CITY
2
LA-3
170 PCS.-"Arachis pintoi"
(PEANUT PLANT)
0.15m.ht. @ 0.15m.o.c.
NEW CLARK CITY
NEW CLARK CITY
2.0 SQ.M.-"Paspalum cv."
(FROG GRASS)
SODDED
3
44 PCS.-"Philodendron selloum"
(SELLOUM)
0.60m.ht. @ 0.30m.o.c.
INTERSECTION
POINT OF ROAD 2
AND
PERPENDICULAR
ROAD
ROAD LENGTH
CENTERLINE
LA-3
55 PCS.-"Crinum xanthophyllum"
(YELLOW CRINUM)
0.50m.ht. @ 0.30m.o.c.
1 PC.-"Bucida philippinensis"
(PHILIPPINE TALISAY)
3.0m.ht. as shown
1.80
PLANTING
STRIP
NEW CLARK CITY
NEW CLARK CITY
4
100 PCS.-"Wedelia trilobata"
(WEDELIA)
0.25m.ht. @ 0.20m.o.c.
NEW CLARK CITY
5
5.00
NEW CLARK CITY
40 PCS.-"Philodendron selloum"
(SELLOUM)
0.60m.ht. @ 0.30m.o.c.
LA-3
10.00
5.00
1.50
PLANTING
STRIP
44 PCS.-"Crinum xanthophyllum"
(YELLOW CRINUM)
0.50m.ht. @ 0.30m.o.c.
2.5 SQ.M.-"Paspalum cv."
(FROG GRASS)
SODDED
40 PCS.-"Crinum xanthophyllum"
(YELLOW CRINUM)
0.60m.ht. @ 0.30m.o.c.
30 PCS.-"Calathea lutea"
(CIGAR PLANT)
0.75m.ht. @ 0.40m.o.c.
1.50
PLANTING
STRIP
44 PCS.-"Costus spectabilis"
(RED COSTUS)
0.40m.ht. @ 0.30m.o.c.
3
6
1.80
PLANTING
STRIP
55 PCS.-"Bougainvillea
'Mary Palmer""
(FUSCHIA BOUGAINVILLEA)
0.40m.ht. @ 0.30m.o.c.
100 PCS.-"Wedelia trilobata"
(WEDELIA)
0.25m.ht. @ 0.20m.o.c.
CORRESPONDING CENTER ISLAND
5.00
1 PC.-"Livistonia philippinensis" or 1 PC.-"Alstonia scholaris"
(ANAHAW)
(DITA)
5.0m.ht. as shown
3.5m.ht. as shown
100 PCS.-"Iris pseudacorus"
(YELLOW IRIS)
0.40m.ht. @ 0.20m.o.c.
55 PCS.-"Philodendron selloum"
(SELLOUM)
0.60m.ht. @ 0.30m.o.c.
2.0 SQ.M.-"Paspalum cv."
(FROG GRASS)
SODDED
NEW CLARK CITY
88 PCS.-"Iris pseudacorus"
(YELLOW IRIS)
0.40m.ht. @ 0.20m.o.c.
1 PC.-"Alstonia scholaris"
(DITA)
3.5m.ht. as shown
10.00
5.00
100 PCS.-"Ipomoea pes-caprae"
(BEACH KANGKONG)
0.60m.long @ 0.20m.o.c.
12 PCS.-"Hymenocallis littoralis"
(SPIDERLILY)
0.50m.ht. @ 0.30m.o.c.
40 PCS.-"Hymenocallis littoralis"
(SPIDERLILY)
0.50m.ht. @ 0.30m.o.c.
88 PCS.-"Wedelia trilobata"
(WEDELIA)
0.25m.ht. @ 0.20m.o.c.
24 PCS.-"Calathea lutea"
(CIGAR PLANT)
0.75m.ht. @ 0.40m.o.c.
NEW CLARK CITY
NEW CLARK CITY
30.00
QUICK COUPLER VALVE
TYPICAL SPACING
10.00
TYPICAL
TREE SPACING 10.00
NEW CLARK CITY
10.00
TYPICAL TREE SPACING
1 PC.-"Livistonia philippinensis" or 1 PC.-"Alstonia scholaris"
(ANAHAW)
(DITA)
5.0m.ht. as shown
3.5m.ht. as shown
1 PC.-"Alstonia scholaris"
(DITA)
3.5m.ht. as shown
NEW CLARK CITY
NEW CLARK CITY
40 PCS.-"Bougainvillea
'Mary Palmer""
(FUSCHIA BOUGAINVILLEA)
0.40m.ht. @ 0.30m.o.c.
5.00
88 PCS.-"Ipomoea pes-caprae"
(BEACH KANGKONG)
0.60m.long @ 0.20m.o.c.
30.00
PEDESTRIAN LAMP POST
TYPICAL SPACING
5.00 5.00 5.00 5.00 4.90
PALM ROW TO SIGNAL INTERSECTION
30.00
QUICK COUPLER VALVE
TYPICAL SPACING
NEW CLARK CITY
NEW CLARK CITY
CORRESPONDING CENTER ISLAND
2.00
PLANTING
STRIP
1.50m PLANTING STRIP
40 PCS.-"Philodendron selloum"
(SELLOUM)
0.60m.ht. @ 0.30m.o.c.
LA-3
LA-3
2.50m
PLANTING STRIP
NEW CLARK CITY
ROAD
URBAN AREA TYPICAL ROAD BLOCK
INTER(VERIFY ROAD DESIGN ENGINEERING DRAWINGS FOR LENGTH OF EACH BLOCK)
SECTION
NEXT PATTERN
NEXT PATTERN
TO FIT TO
TO FIT TO
TYPICAL SEQUENCE OF PLANTING DESIGN PATTERNS
TYPICAL SEQUENCE OF PLANTING DESIGN PATTERNS
REMAINING LENGTH
REMAINING LENGTH
TOWARDS CENTERLINE OF ROAD BLOCK LENGTH
TOWARDS CENTERLINE OF ROAD BLOCK LENGTH
BEFORE SPACE
BEFORE SPACE
AND/OR ROAD INTERSECTION
AND/OR ROAD INTERSECTION
10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00 PROVISION FOR
PROVISION FOR 10.00
10.00
10.00
10.00
10.00
10.00
10.00
10.00
PLANTING PLANTING PLANTING PLANTING PLANTING PLANTING PLANTING PLANTING TRANSPORT
TRANSPORT PLANTING PLANTING PLANTING PLANTING PLANTING PLANTING PLANTING PLANTING
DESIGN 1 DESIGN 2 DESIGN 3 DESIGN 4 DESIGN 1 DESIGN 2 DESIGN 3 DESIGN 4 STOP SHED
STOP SHED DESIGN 4 DESIGN 3 DESIGN 2 DESIGN 1 DESIGN 4 DESIGN 3 DESIGN 2 DESIGN 1
20.00
SPACE PROVISION FOR
30.00
TRANSPORT STOP SHED
30.00
PEDESTRIAN LAMP POST
(VERIFY BCDA ARCHITECT
PEDESTRIAN LAMP POST
TYPICAL SPACING
FOR DESIGN OF SHED)
TYPICAL SPACING
1.50m PLANTING STRIP
1.80m
CENTER
ISLAND
CORRESPONDING CENTER ISLAND
1.80
PLANTING
STRIP
2.50m
PLANTING STRIP
20.00m
LIGHT RAIL
RIGHT-OF-WAY
1.80
PLANTING
STRIP
10.50m
10.50m
5.00m 3.60m
3.60m 5.00m
WALK- BIKE- CARRIAGEWAYCARRIAGEWAY BIKE- WALK(3 LANES)
(3 LANES)
WAY WAY
WAY WAY
PATTERN 4 URBAN STREETSCAPE
PLANTING PLAN
6
3
DATE
1:100M
NOTE: PLANTING DESIGN PATTERN 4 FOLLOWS PLANTING DESIGN PATTERN 3
TOWARDS CENTER OF ROAD BLOCK LENGTH AND/OR ROAD INTERSECTION.
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT-NCC ACCESS ROAD
SHEET CONTENT
URBAN STREETSCAPE TYPICAL
ROAD BLOCK LENGTH PLANTING AND UTILITIES PLAN
SCALE
AS SHOWN
PROJECT CODE
-
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
LA-3
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
0.10
0.10
0.10
10MM SQUARE BAR RAIL
MEMBERS, WELDED,
PAINTED FINISH, BLACK
2.00
1.80
3.60
BIKEWAY
REINFORCED CONCRETE,
PLAIN CEMENT FINISH,
3000 PSI MIN.
VERIFY FINISH AT
PAVING DETAILED PLANS
0.20
PAVING
BANDING
1.50
PAVING
MAINFIELD
0.10
REINFORCED CONCRETE,
PLAIN CEMENT FINISH, 3000 PSI
MIN.ASPHALT ON
COLORED
AGGREGATE BASE,
GREEN COLOR
VERIFY LENGTH AND LOCATION
OF ACCESS RAMPS
AT PAVING PATTERN PLANS
PART OF
WALKWAY/
BIKEWAY
PART OF
CARRIAGEWAY
0.20M X 0.20M
ROAD
TEXTURED HOMOGENOUS
GUTTER
TILE FINISH, DARK GRAY
0.20
ALTERNATING RUNNING BOND
PAVING
ARRANGEMENT
BANDING
PLAIN CEMENT FINISH,
3000 PSI MIN.
FILLET EDGE
.01
R0
VERIFY
LENGTH AND LOCATION
OF ACCESS RAMPS
AT PAVING PATTERN
PLANS
0.20
PAVING
BANDING
0.20
PAVING
BANDING
ACCESS RAMP DETAILED SECTION (FOR 1.00M TO 1.85M IN LENGTH)
4
1:20M
1:20M
PART OF
CARRIAGEWAY
0.20M X 0.20M
ROAD
TEXTURED HOMOGENOUS
GUTTER
TILE FINISH, DARK GRAY
0.20
ALTERNATING RUNNING BOND
PAVING
ARRANGEMENT
BANDING
PLAIN CEMENT FINISH,
3000 PSI MIN.
FILLET EDGE
.01
R0
0.025
4
ACCESS RAMP DETAILED SECTION (FOR 1.850M IN LENGTH & ABOVE)
4
ROADSIDE RAILING GENERAL DETAILS
VERIFY
LENGTH AND LOCATION
OF ACCESS RAMPS
AT PAVING PATTERN
PLANS
PART OF
WALKWAY/
BIKEWAY
0.20
PAVING
BANDING
0.10 0.10 0.10 0.10 0.10
0.10 0.10 0.10 0.10 0.10
0.10 0.10 0.10 0.10
0.10 0.10 0.10 0.10
4
1:20M
0.075
TO
0.15
0.025
0.20
PAVING
BANDING
7
BIKEWAY DETAILED SECTION
4
1:20M
PART OF
WALKWAY/
BIKEWAY
3
2
WALKWAY DETAILED SECTION
4
0.10
0.075
TO
0.15
1
2.00
1.80
10MM SQUARE BAR RAIL
MEMBERS AND POSTS,
WELDED
PAINTED FINISH, BLACK
0.05
VERIFY FINISH AT
PAVING DETAILED PLANS
0.20
PAVING
BANDING
1.50
PAVING
MAINFIELD
0.10
0.20
PAVING
BANDING
4.60
PAVING
MAINFIELD
VERIFY FINISH AT
PAVING DETAILED PLANS
0.20
PAVING
BANDING
1.00
0.90
5.00
WALKWAY
0.20
PAVING
BANDING
10MM SQUARE BAR RAIL
POST SQUARE GRID, WELDED,
PAINTED FINISH, BLACK
1:20M
10MM SQUARE BAR RAIL
MEMBERS, WELDED,
PAINTED FINISH, BLACK
0.20
10MM SQUARE BAR RAILING SUPPORT
RECTANGULAR GRID, WELDED,
PAINTED FINISH, BLACK
0.20M X 0.20M
TEXTURED HOMOGENOUS
TILE FINISH, DARK GRAY
ALTERNATING RUNNING BOND
0.10
VERIFY PAVING PATTERN PLANS FOR WIDTH OF LAY-BY
ROAD
PART OF
GUTTERCARRIAGEWAY
DOUBLE ROW OF
10MM SQUARE BAR
PAINTED FINISH, BLACK
1.00
0.90
R
LAY- BY PAVING FINISH
(VERIFY ENGINEERING PLANS)
0.15
FILLET EDGE
.01
R0
.01
6
PEDESTRIAN REFUGE DETAILED SECTION
4
C O N S U L T A N T S
DESIGN OF RAIL POST
(REFER TO ENGINEERING
DRAWINGS)
8
LAY-BY DETAILED SECTION
4
1:20M
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
DATE:
-
EFREN L. DAVID
ALBERTO C. CAÑETE
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PRESIDENT - UICI
PROJECT MANAGER - UICI
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE:
-
DATE:
-
0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10
0.03 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.10 0.03
BRIDGE RAILING GENERAL DETAILS
4
1:20M
SUBMITTED BY
Urban Integrated Consultants, Inc.
DESIGN OF TOP RAIL
(REFER TO ENGINEERING
DRAWINGS)
0.10
PAVING FINISH (VERIFY PAVING DESIGN PLANS)
FILLET EDGE
1
0.0
0.05
5
2.00
1.80
0.10
PART OF WALKWAY/
BIKEWAY
0.03
0.03
0.15
R0
PLAIN CEMENT FINISH,
3000 PSI MIN.
0.20
BANDING
0.15
0.20
BANDING
FILLET EDGE
PART OF
ROAD CARRIAGEWAY
GUTTER
CENTER ISLAND
0.03
PART OF
CARRIAGEWAY ROAD
GUTTER
D
E
F
DATE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
PACKAGE 3 - AIRPORT-NCC ACCESS ROAD
SHEET CONTENT
URBAN STREETSCAPE HARSCAPE COMPONENTS
DETAILED SECTIONS
1:20M
SCALE
AS SHOWN
PROJECT CODE
-
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
LA-4
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-
MISCELLANEOUS
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
AS SHOWN
PROJECT CODE
F
PROJECT SIGNBOARD
FINAL DRAWINGS
DRAWING NO.
M-1
D
E
DRAWING STATUS
DATE APPROVED
-
DATE REVISED
-
SIZE
A1
REV.
-
AURORA
PANGASINAN
CHEZIA RIE GEN. MERCHANDIZE
San Bartolome, Mayantoc
Boulders
Quantity: Unlimited
SUMAKBAW RIVER
Pias, General Tinio
Boulders, gravel, sand
Quantity: Unlimited
NEW CLARK CITY
NUEVA ECIJA
TARLAC
CALUMPANG PIT
Calumpang, Mabalacat
Common borrow, clay
TOKWING CONSTRUCTION
Carmencita, Floridablanca
Fine aggregate
Quantity: Unlimited
ZAMBALES
JAGAL AGGREGATES CORPORATION
Sapang Bayabas, Floridablanca
Base, subbase, concrete aggregate
Quantity: Unlimited
D' PRIME ROCK CRUSHING PLANT
Palacol, San Jose, Floridablanca
Base, subbase, concrete aggregate
Quantity: Unlimited
ROCK-MIX, INCORPORATED
Talisay River, Pilar
Base, subbase, concrete aggregate
Quantity: Unlimited
NUEVA ECIJA
PAMPANGA
TAI PHIL SAND QUARRY
Gumain River, Apalit, Floridablanca
Fine aggregate
Quantity: Unlimited
ACCUMEN CONSTRUCTION
& DEVELOPMENT CORP.
Talisay River, Pilar
Base, subbase, concrete aggregate,
boulders
Quantity: Unlimited
BULACAN
PAMPANGA
RODELYN BUILDERS
CONTRUCTION CORP.
Dancol, Balanga
Base, subbase, concrete aggregates,
boulders
Quantity: Unlimited
RIZAL
BATAAN
1
MATERIAL SOURCES MAP
-
SCALE
NTS
CAVITE
C O N S U L T A N T S
SUBMITTED BY
REVISIONS
A
CHECKED BY
B
APPROVED BY
C
EFREN L. DAVID
PRESIDENT - UICI
DATE:
-
PROJECT MANAGER - UICI
DATE:
-
DATE:
-
RYAN PAUL S. GALURA
JOVITO M. SUNGA
PROJECT MANAGER
OIC - PMD
DATE:
-
DATE
SCALE
PROJECT TITLE
DETAILED ENGINEERING DESIGN OF THE
PROPOSED AIRPORT-NCC ACCESS ROAD, MACARTHUR-NCC ACCESS ROAD,
MACARTHUR-SCTEX ACCESS ROAD & OLYMPIC VILLAGE ACCESS ROAD
AIRPORT - NCC ACCESS ROAD
SHEET CONTENT
D
E
F
MATERIAL SOURCES MAP
AS SHOWN
PROJECT CODE
-
DRAWING STATUS
FINAL DRAWINGS
DRAWING NO.
M-2
DATE APPROVED DATE REVISED
-
-
SIZE
A1
REV.
-