Pressure Systems Integrity Management 1 Furmanite Confidential - 1/9/04 Pressure Systems Integrity Management Objective - To provide a total flange service Result 2 - Zero Leaks Furmanite Confidential - 1/9/04 PSI Management Fugitive Emissions Environmental Legislation 3 Furmanite Confidential - 1/9/04 PSI Management Fugitive Emissions Environmental Legislation Safety Occupational Health & Safety 4 Furmanite Confidential - 1/9/04 PSI Management Fugitive Emissions Environmental Legislation Safety Occupational Health & Safety Commercial Efficiency 5 Furmanite Confidential - 1/9/04 PSI Management Fugitive Emissions Causes Damaged sealing faces Warped sealing faces Gasket selection Poor assembly procedures Incorrect bolt load Uneven bolt load Flange rotation 6 Furmanite Confidential - 1/9/04 PSI Management Fugitive Emissions Costs Loss of product Process inefficiency Cost of leak repair Environmental fines Image 7 Furmanite Confidential - 1/9/04 PSI Management PSI Management Sequence Planning Consultation Analysis Site inspection Specifications Resources Documentation 8 Furmanite Confidential - 1/9/04 PSI Management PSI Management Sequence Planning Site Inspection Supervision Manpower Equipment Documentation 9 Furmanite Confidential - 1/9/04 PSI Management PSI Management Sequence Planning Site Post Job MDR Documentation 10 Furmanite Confidential - 1/9/04 PSI Management Planning Consultation Identification of ‘critical’ plant: History Product contained Temperature / pressure Strategic (risk assessment) Physical size/access 11 Furmanite Confidential - 1/9/04 PSI Management Planning Analysis – Overview When a bolted gasketed flange joint is assembled the gasket seal is subjected to a compressive force – “W” When a system is pressurized the initial compressive force is relieved by ‘H’ To maintain seal integrity there must be a residual compressive force on the gasket when the system is in service 12 Furmanite Confidential - 1/9/04 PSI Management Planning Analysis 13 Maintenance involves opening/closing bolted gasketed joints. Appreciation of the ‘system’ is necessary. The system fails, not the gasket when there is a leak. Flanges Gasket Bolts Type Chemical Compatibility Strength Material Creep Resistance Temp Relaxation Strength Elasticity Compatibility to Flange Corrosion Resistance Cost Cost Surface Finish Handling Corrosion Resistance Surface Condition Strength Surface Flatness Temperature Resistance Furmanite Confidential - 1/9/04 PSI Management Planning Site Inspection – Accuracy of Bolting Systems 14 Flogging Spanner ? Impact Wrench ±50% Controlled Torque Wrench ±30% Hydraulic Bolt Tensioner ±15% Micrometer ±10% Ultrasonic Monitoring ±2% Strain Gauging ±1% Furmanite Confidential - 1/9/04 PSI Management Planning Site Inspection – Torque to Tension Time 15 Furmanite Confidential - 1/9/04 PSI Management Planning Specification Flange Surface Finish Flange Flatness Gasket Selection Bolt Material 16 Furmanite Confidential - 1/9/04 PSI Management Planning Resources Right skills for the job Right equipment for the job Work scheduled 17 Furmanite Confidential - 1/9/04 PSI Management Planning Documentation Generic Engineering Procedures Specific Engineering Procedures DS-155 DS-156 DS-158 Colour Coded Tagging 18 Furmanite Confidential - 1/9/04 PSI Management Site Typical Site Workscope Tagging Unbolting / removing flanges Inspection Clocking On-site machining Gasket installation & flange assembly Controlled bolting Documentation 19 Furmanite Confidential - 1/9/04 PSI Management Post Job MDR & Documentation 20 Furmanite Confidential - 1/9/04 PSI Management Training Flange inspection Flange assembly Bolting procedures For non-critical plant 21 Furmanite Confidential - 1/9/04 PSI Management PSI Management Only when all the components of the bolted gasketed flanged joint are working together will an effective long term seal be achieved: Selection of correct components for the application Careful inspection, preparation, installation and assembly Correct bolt tightening KEEP RECORDS 22 Furmanite Confidential - 1/9/04 PSI Management PSI Management PSI Management Past Performance 23 Santos WMC Mobil Caltex TXU ABF BP WMC Furmanite Confidential - 1/9/04 PSI Management Past Performance Santos Moomba Gas Plant LRP Shutdown - 1996 Furmanite - Turn-Key Contract 30 Furmanite Technicians 40 Sub-Contractor Full scope of JIMS + rigging, scaffolding, welding, cleaning, insulation, blasting & painting 150 Critical Flanges serviced Workscope completed 11 hours ahead of schedule Subsequently Furmanite involved on every major shutdown 24 Furmanite Confidential - 1/9/04 PSI Management Past Performance BP QLD Clean Fuel Project 2000 Construction - HGU & HCU Plant Furmanite - Bolt Load / Flange Stress Calc’s Equipment Supervision (Hands on) Documentation 97 Critical Flanges 2 crews - 12 Large Flanges in 1 x Day Full Pressure Test - Zero Leaks 25 Furmanite Confidential - 1/9/04 PSI Management Past Performance WMC Phosphate Hill First Major Shut Down - 2001 Furmanite - Control of 80 Critical Flanges on Ammonia Plant Engineer, Supervisor and 5 Technicians Zero Leaks at Start-Up ( Client signed off Furmanite 4 weeks after start up) Ammonia Plant Shut Down finished on schedule 26 Furmanite Confidential - 1/9/04 PSI Management Past Performance ABF 9th Critical Joint Shut Down Approx 4600 man hours 20 Furmanite Personnel (1 Project Mngr, 3 Sup’s & 16 Tech’s ) 17 Day shutdown 58 Critical Joints – assembled and bolted (18 not part of the original scope) Bolting from 7/8” to 5-1/4” dia. 10 RTJ Flange faces machined or lapped and polished 31 Lens Rings Machined 20 x 2-1/4” seized studs - drilled, threads picked then re-tapped 3 x 4-3/4” seized studs - drilled, threads picked then re-tapped All work handed back on or ahead of schedule. 27 Furmanite Confidential - 1/9/04 PSI Management Past Performance ABF 9th Critical Joint Shut Down 28 Furmanite Confidential - 1/9/04 PSI Management Past Performance WMC Phosphate Hill Major Shut Down – 2003 Furmanite assisted UKG & WMC with development of shutdown work packs from Jan – July 2003 Furmanite - Control of 970 Plant Flanges, including 150 critical on Ammonia Plant 20 personnel, including Project Manager, Engineer, Safety Representative all with the ability to be hands on Over 5,500 shutdown man-hours Zero Injuries throughout works. Zero Leaks at Start-Up. Plant Shut Down finished on schedule 29 Furmanite Confidential - 1/9/04 PSI Management Plant Benefits Safety & Efficiency Right first time Re-work significantly reduced Reduced shutdown duration Down time reduced All above = Plant owner’s confidence increased All above = Improved Safety performance 30 Furmanite Confidential - 1/9/04 PSI Management Plant Benefits Efficiency Example Critical flanges – Syngas line Flange failure – 7 days downtime* at $30,000/hr = $5million 7 days = 3 days cool down + 1 day rectification + 3 days start up JIMS – 100% success on syngas flanges to date. 31 Furmanite Confidential - 1/9/04 PSI Management PSI Management Cost of leaks & un-planned re-work is far greater than cost of avoiding it. 32 Furmanite Confidential - 1/9/04 Worldwide Furmanite America Inc. Corporate Headquarters 2435 North Central Expressway Suite 700 Richardson TEXAS 75080 USA Tel: 001 972 699 4000 •• • • •• • •• • Furmanite International Ltd UK Furman House Shap Road Kendal Cumbria LA9 6RU Tel: 00 44 1539 729009 Email: infouk@furmanite.com 33 Furmanite Confidential - 1/9/04 • • • ••••• • ••• • • • • • • • • • • • •