To: Ines Bisset From: Alyssa Halages Subject: Le Palaise d’argent Construction Recommendation Dear Ines, After carefully analyzing and comparing the benefits and drawbacks of each construction option, I recommend that Adaptive Re-use would be the most beneficial in every way. In the table below, I’ve projected the costs for all desired amenities within both potential scenarios: Description Residential Space (200,000 sq. ft) Restaurants (67,000 sq. ft) Retail Space (182,000 sq. ft) Parking (45,000 sq. ft) SUB-TOTAL Contractor Fees Architectural Fees SUB-TOTAL ($238/sq.ft) Adaptive Re-use 47,600,000 ($264/sq. ft) New Construction 52,800,000 ($183/sq. ft) 12,261,000 ($174/sq. ft) 11,658,000 ($183/sq. ft) 33,306,000 ($174/sq.ft) 31,668,000 ($3.24/sq. ft) 145,800 93,312,000 ($3.24/sq.ft) 145,800 96,271,800 20% 6% 16,662,400 5,598,720 22,261,120 20% 8% 19,254,360 7,701,744 26,955,804 TOTAL 115,573,120 123,227,604 Along with being the cheaper option, there are multiple reasons that Adaptive Re-use is the overall best way to go for this facility, a few of the benefits are: Cultural Preservation for the Community Increases value and demand Reduces industrial waste Creates a positive impact for surrounding areas Drawbacks: Can’t change the building layout More potential maintenance issues In the short-run, renovating instead of demolishing is the better option overall. There are potential issues in the long run due to maintenance but that can be of any building. If you have any questions or concerns, please don’t hesitate to contact me at 205-555-555 or by email. Regards, Alyssa Halages