Uploaded by jeffylyn

List Of Staff Entering Bay Suite Project 2020

advertisement
No.
01
02
03
04
05
06
LIst of Leppo Concrete Sdn Bhd Staff Entering Bay Suite Project
Name
NRIC No.
Position
Rudy Bin Mintau
760623-12-5291
Operation Supervisor
Mohd Saidi Bin Ambo
771020-12-5093
Operation Supervisor
Joe Michael Mensin
920313-12-5915
Pump Operator
Vilsamson Danial
920607-12-5515
Pump Operator
Razman Tai
980616-12-5327
Assistant Pump Operator
Jeckson Madily
980225-12-6015
Assistant Pump Operator
07 Nigel Johannis @Nigel Bin Johanis
710504-12-5461
Mixer- Truck Driver
08
09
10
11
12
13
14
15
16
17
18
860907-65-5049
830825-12-5987
640428-12-5695
900902-12-5933
831103-12-6405
760225-12-5627
910106-12-5083
010419-12-1995
920909-12-7161
010107-12-0109
021130-12-0813
Mixer- Truck Driver
Mixer- Truck Driver
Mixer- Truck Driver
Mixer- Truck Driver
Mixer- Truck Driver
Mixer- Truck Driver
QA Technician
Lab Technician
Lab Technician
Lab Technician
Lab Technician
Mutadil Bin Abdul Ham
M. Ali Bin Asmat
Petrus Bin Rintingan
Sabli Bin Lajah
Sunardi Bin Mansor
Ashil Bin Billahi
Herman Bin Vin En Julinus @ Onong
Mohamad Adnan Bin Mubin
Christo Arnold Bin Paulus
Joe Jimmy Mensin
Eldy Samri
Remark
Remark: As per details above , we would like to inform that we have no foreigner worker will be entering your site.
Download