PWA-RPD-ENV-FM-027a R01 13/03/2019 08:46 Page 1 of 31 Contents Document Properties............................................................................................................................ 3 Version Control......................................................................................................................................3 1 Project Details................................................................................................................................ 4 Appendices Appendix A Environmental Permit.......................................................................................................5 Appendix B Miscellaneous Construction Permits.............................................................................. 6 Appendix C Reporting Requirements.................................................................................................. 7 Appendix D Housekeeping................................................................................................................... 8 Appendix E Inspections and Audits.................................................................................................. 15 Appendix F Air Quality Monitoring.................................................................................................... 18 Appendix G Noise and Vibration Monitoring.....................................................................................21 Appendix H Training / Tool Box Talks............................................................................................... 24 Appendix I Waste Management........................................................................................................ 25 Appendix J Resource Management...................................................................................................30 DOCUMENT PROPERTIES Document Owner (Position) Project Construction Director Document Owner (Name) Malek istwani Author (Position) Environmental Manager Author (Name) Fatima Rahim Approval by Malek Istwani VERSION CONTROL Versio n 03 Amendment Description Revision aligned with ESMR Issue Date 23/05/2020 Planned Revision Date 1 Project Details Refer to the Environmental & Sustainability Monthly Report (ESMR), “Project Snapshot” Tab. Refer to the Environmental & Sustainability Monthly Report (ESMR), “Project Snapshot” Tab. The DW081 project is located on the western periphery of Doha, in Zones 55 in the municipality of Al Rayyan. The project is a deep micro-tunnel system consisting of approximately 4.5km of deep trunk surface water drainage pipelines. The project will allow upstream areas to connect to the micro-tunnel system that will ultimately lead to the Abu Hamour Southern Outfall via the strategic micro-tunnel at Al Furousiya Street. DW081 consists of two sections: Section 3A and Section 3B. Section 3A is located along Al Sailiya Street, Al Talha Street and connects to Al Ashjar Street. Al Sailiya Street is bounded to the north by DW044 and DW002 and to the south by DW012. The remainder of Section 3A is located within DW012. Section 3B is bounded by Muaither South to the north and Furousiya Street to the east. Both sections lie within the DW012 project area and overlap with DW002 and DW017. The project involves the construction of new surface and groundwater drainage, foul sewerage, and pavement works for new roads. Project activities during the construction phase will include: Excavation works Microtunnelling works Shaft construction Backfilling activities Reinstatement works Setting out Blinding Frameworks Steel fixing Appendix A Environmental Permit Does the Contractor have a valid environmental permit and fulfil all necessary conditions on site? 1. Refer to the Environmental &Sustainability Monthly Report (ESMR), Compliance Guidance Tab A “Environmental Permit” 2. Insert a copy of the Permit Compliance Table / Tool for the Project’s Overall Environmental Permit, or complete the below table. Permit Reference Number 2018/145171 Permit Renewal Reference Number 2019/175199 Permit Expiration Date April 25, 2020 Numbe r Conditio n Compliance Mechanism Appendix B Miscellaneous Construction Permits Does the Contractor have valid permits for all miscellaneous construction activities and fulfil all necessary conditions on site? 1. Refer to the Environmental &Sustainability Monthly Report (ESMR), Compliance Guidance Tab B . “Miscellaneous Construction Permits” for the Miscellaneous Construction Permit Register. Miscellaneous Construction Permits have been attached with the documents. Appendix C Reporting Requirements Has the Contractor fulfilled all contractual and statutory monthly environmental and sustainability reporting requirements and ensured appropriate records are maintained on site? 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), Compliance Guidance Tab C “Reporting Requirements” for the Miscellaneous Construction Permit Register. Appendix D Housekeeping Has the Contractor conducted internal environmental and sustainability inspection / audits and maintained good housekeeping on site? Below are the guidelines / instructions to follow: 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), Compliance Guidance Tab D “Housekeeping” for the Monthly Internal Inspection, Audit, Observation and Non-Conformance Register. 2. Insert 2 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) for each of the following Work Areas / Activities (a – l) as applicable. 3. Insert 1 x Sample Internal Weekly Inspection Checklist / Report below. Below to be completed: 2 a) Insert 2 x Photographs for each of the following Work Areas / Activities (a – l) Site Office b) Lay down Area c) Activity – Excavations d) Activity – Crushing, Screening and Stockpile e) Activity – Microtunnelling, Slurry Lagoon f) Dewatering Lagoon, Groundwater Treatment Plant g) Batching Plant, Manual Concrete Mixing h) Asphalt Plant i) Wet Mix, Stabilizer Plant j) Maintenance, Workshop Area k) Refueling Area, Mobile Refueling l) 3. Hazardous Materials Storage Area Insert 1 x Sample Internal Weekly Inspection Checklist / Report below. Appendix E Inspections and Audits Has the Contractor appropriately addressed all non-conformances on site? Complete the below table and attach the project’s non-conformance tracker: 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), Compliance Guidance Tab E “Inspections & Audits” for the Monthly Inspection, Audit, Observation and Non-Conformance Register. 2. Insert 2 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Areas for Improvement”. 3. Insert 4 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Good Environmental Practices”. 4. Insert 1 x Sample Observation / NCR Close-Out Report for reference. 5. Insert Project Non-Conformance Register. Below to be completed: 2. Insert 2 x Photographs showing Areas for Improvement 3. Insert 4 x Photographs showing Good Environmental Practices 4. Insert 1 x Sample Observation / NCR Close-Out Report for reference. 5. Insert Project Non-Conformance Register. Appendix F Air Quality Monitoring Has the Contractor conducted air quality monitoring, implemented appropriate mitigation measures for dust control, and addressed any public complaints as per the CEMP requirements on site? Below are the guidelines / instructions to follow: 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), Compliance Guidance Tab F“Air Quality Monitoring” for the Monthly Air Quality Monitoring Results Register. 2. Insert 4 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Air Quality Monitoring and Related Mitigation Measures” Insert 1 x Sample of the following, as applicable to your Project: 3. If Visual Dust Monitoring is being conducted, insert 1 x Sample of Visual Dust Monitoring Field Report. 4. If a Hand-Held Monitor is being used, insert 1 x Sample Air Quality Monitoring Report (Profile). 5. If 3rd Party Air Quality Monitoring is being conducted, insert the 3rd-Party Air Quality Monitoring Report. Below to be completed: 2. Insert 4 x Photographs showing Air Quality Monitoring and Related Mitigation Measures. 3. If Visual Dust Monitoring is being conducted, insert 1 x Sample of Visual Dust Monitoring Field Report. 4. If a Hand-Held Monitor is being used, insert 1 x Sample Air Quality Monitoring Report (Profile). 5. If 3rd Party Air Quality Monitoring is being conducted, insert the 3rd-Party Air Quality Monitoring Report. Appendix G Noise and Vibration Monitoring Has the Contractor conducted noise and vibration monitoring, implemented appropriate mitigation measures for dust control, and addressed any public complaints as per the CEMP requirements on site? Below are the guidelines / instructions to follow: 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), Compliance Guidance Tab G “Noise & Vibration Monitoring” for the Monthly Noise and Vibration Monitoring Results Register. 2. Insert 4 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Noise and Vibration Monitoring and Related Mitigation Measures” Insert 1 x Sample of the following, as applicable to your Project: 3. If a Hand-Held Monitor is being used, insert 1 x Sample Noise Monitoring Report (Profile). 4. If 3rd-Party Noise Monitoring is being conducted, insert the 3rd-Party Noise Monitoring Report. Below to be completed: 2. Insert 4 x Photographs showing “Noise and Vibration Monitoring and Related Mitigation Measures” 3. 1 x Sample of the following, as applicable to your Project a) If a Hand-Held Monitor is being used, insert 1 x Sample Noise Monitoring Report (Profile). b) If 3rd-Party Noise Monitoring is being conducted, insert the 3rd-Party Noise Monitoring Report. Appendix H Training / Tool Box Talks Has the Contractor conducted training / tool box talks on any issues related to environment and sustainability according to the schedule as per the approved CEMP requirements on site? Below are the guidelines / instructions to follow: 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), Compliance Guidance Tab H “Training & Tool Box Talks” for the Monthly Environmental Training Register. 2. Insert 2 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Environmental Training Being Conducted” 3. Insert 1 x Sample Training Attendance Register and Related Training Material. Below to be completed: 2. Insert 2 x Photographs showing “Environmental Training Being Conducted” 3. Insert 1 x Sample Training Attendance Register and Related Training Material. Appendix I Waste Management Compliance Query #9: Does the Contractor implement appropriate and comprehensive waste management practices and records as per the CEMP requirements on site? Below are the guidelines/instructions to follow: 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), “Non-Hazardous Waste” and “Hazardous Waste” Tabs for related data. 2. Insert 6 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Non-Hazardous Waste Management Areas, and Waste Removal.” 3. Insert 2 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Hazardous Waste Management Areas, and Waste Removal.” 4. Insert 2 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing “Other Waste Management Areas (i.e. Stockpile / Concrete Washout etc.)” 5. Insert 1 x Sample Waste Transfer Note (WTN), no more than 150 KB each, for Each Type of Waste Disposed and / or Recycled. 6. Insert 1 x Sample Material Transfer Note (MTN), no more than 150 KB each, for Each Type of Material Imported / Exported (TSE, Excavated Material, RAP etc.) Below to be completed: 2. Insert 6 x Photographs showing “Non-Hazardous Waste Management Areas, and Waste Removal.” 3. Insert 2 x Photographs showing “Hazardous Waste Management Areas, and Waste Removal.” 4. Insert 2 x Photographs showing “Other Waste Management Areas (i.e. Stockpile / Concrete Washout etc.).” 5. Insert 1 x Sample Waste Transfer Note (WTN) for Each Type of Waste Disposed and / or Recycled. a) Waste Type 1: (Insert Waste Type - Text). Insert WTN below. b) Waste Type 2: (Insert Waste Type - Text). Insert WTN below. c) Waste Type 3: (Insert Waste Type - Text). Insert WTN below. d) Waste Type 4: (Insert Waste Type - Text). Insert WTN below. e) Waste Type 5: (Insert Waste Type - Text). Insert WTN below. f) Waste Type 6: (Insert Waste Type - Text). Insert WTN below. g) Waste Type 7: (Insert Waste Type - Text). Insert WTN below. h) Waste Type 8: (Insert Waste Type - Text). Insert WTN below. i) Waste Type 9: (Insert Waste Type - Text). Insert WTN below. j) Waste Type 10: (Insert Waste Type - Text). Insert WTN below. k) Waste Type 11: (Insert Waste Type - Text). Insert WTN below. l) Waste Type 12: (Insert Waste Type - Text). Insert WTN below. 6. Insert 1 x Sample Material Transfer Note (MTN), for Each Type of Material Imported / Exported (TSE, Excavated Material, RAP etc.) a) Material Type 1: (Insert Waste Type - Text). Insert WTN below. b) Material Type 2: (Insert Waste Type - Text). Insert WTN below. c) Material Type 3: (Insert Waste Type - Text). Insert WTN below. d) Material Type 4: (Insert Waste Type - Text). Insert WTN below. e) Material Type 5: (Insert Waste Type - Text). Insert WTN below. f) Material Type 6: (Insert Waste Type - Text). Insert WTN below. g) Material Type 7: (Insert Waste Type - Text). Insert WTN below. h) Material Type 8: (Insert Waste Type - Text). Insert WTN below. i) Material Type 9: (Insert Waste Type - Text). Insert WTN below. j) Material Type 10: (Insert Waste Type - Text). Insert WTN below. k) Material Type 11: (Insert Waste Type - Text). Insert WTN below. l) Material Type 12: (Insert Waste Type - Text). Insert WTN below. Appendix J Resource Management Does the Contractor implement appropriate and comprehensive resource management practices and records as per the CEMP requirements on site? Below are the guidelines / instructions to follow: 1. Refer to the Environmental & Sustainability Monthly Report (ESMR), Compliance Guidance Tab J “Resource Management” for description of Areas and / or Assets related to Environmental Restoration, Ecological and Cultural Heritage, as applicable. 2. Insert 4 x Photographs (no more than 100 KB, Max. Height - 6.15 cm, and Max. Width 7.45 cm each) showing Areas and / or Assets related to Environmental Restoration, Ecological and Cultural Heritage, as applicable. Below to be completed: 2. Insert 4 x Photographs showing Areas and / or Assets related to Environmental Restoration, Ecological and Cultural Heritage, as applicable.