JOB SAFETY ANALYSIS (JSA) Overall Risk Assessment Code (RAC) (Use highest code) Risk Assessment Code (RAC) Matrix Probability Severity Frequent Likely Occasional Seldom E E H H Catastrophic M E H H Critical M M L H Marginal M L L L Negligible PRE-TASK PLAN and JOB SAFETY ANALYSIS Work Plan Description Project Name Project Number Foreman Date Unlikely M L L L Step 1: Review each “Hazard” with identified safety “Controls” and determine RAC (See above) “Probability” is the likelihood to cause an incident, near miss, or accident and RAC Chart identified as: Frequent, Likely, Occasional, Seldom or Unlikely. “Severity” is the outcome/degree if an incident, near miss, or accident did occur E = Extremely High Risk and identified as: Catastrophic, Critical, Marginal, or Negligible H = High Risk Notes: Step 2: Identify the RAC (Probability/Severity) as E, H, M, or L for each “Hazard” on JHA. Annotate the overall highest RAC at the top of JHA. TASKS HAZARDS CORRECTIVE MEASURES 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5 Work in Energized Equipment? M = Moderate Risk L = Low Risk RAC If Yes, Electrical Hot Work Permit is required. PPE TOOLS Hard Hat Long Pants Safety Toed Boots Balaclava (Hood) Gloves (Avail. 100%, appropriate to work activity) Safety Glasses (Z87.1) at all times CAL Suit rating: Volt Rated Gloves Elec. Drill Ext. Cord Hand Tools Volt Rated Tools Injured Today? CHECK Y o r N EQUIPMENT Step Ladder Extension Ladder Power Actuated Tool Hand Pipe Bender Power Pipe Bender Generator Manlift Crew Names / Signatures Print Signature Crew Names / Signatures Print Signature Print Signature Print Signature Print Signature Print Signature Supervisory Review Signature: Wire Puller Machine Light Plant Scissor Lift Forklift Injured Today? CHECK Y o r N Date: JHA Rev. 9.3.2014 Notes or carry over from front page: Safety Suggestions, Concerns or Needs: Equipment, materials or tool needs: How can todays tasks be performed safer or more efficiently: