Uploaded by SPPIP PT

1

advertisement
NO
1
2
3
4
5
6
7
8
9
10
PEKERJAAN
Split IMB
Split SHM
Tahap Persiapan Pagar dan Drainase
Sewa Alat Berat
Mobilisasi Alat Berat
Koordinasi dengan Pihak Terkait
solar untuk alat Berat
Operator Alat berat
Batu Kali
Buis
VOL
1
9
1
4
1
1
160
4
263
596
SAT
Paket
Unit
Paket
Hari
Paket
Paket
Liter
Hari
M3
Unit
HARGA
14,000,000.00
3,500,000.00
4,000,000.00
1,440,000.00
3,000,000.00
2,000,000.00
12,000.00
250,000.00
125,000.00
90,000.00
JUMLAH
14,000,000.00
31,500,000.00
4,000,000.00
5,760,000.00
3,000,000.00
2,000,000.00
1,920,000.00
1,000,000.00
32,875,000.00
53,640,000.00
149,695,000.00