eeee PROCEDURE FOR MAN, MACHINE, METHOD & MEASUREMENT 1.0 SCOPE: CHANGE This procedure details the approval requirements for any changes made in existing production process including Man, Machine, Method & Measurement ( 4M change ). 2.0 AUTHORITY & RESPONSIBILITY: This procedure is approved and issued by Management Representative. PRD, HRD & HOD's are responsible to implement this procedure 3.0 PROCEDURE: PREPARED BY Name Position Sign Date : : : : APPROVED BY : Name Position Sign Date : : : eeee PROCEDURE FOR MAN, MACHINE, METHOD & MEASUREMENT Sl.No Description / Action Responsibility CHANGE Cross. Ref Document / Records. Procedure for Machine, Method & Measurement changes. If any changes made in the established procedure / System, receive internal request from concern department, enter in the register form to get approval from customer by submission of 4M change documents. a) If any changes made in Method, Machine, Process flow, tool, Process parameters & Process modification the respective action taken by Production & Secondary. b) If any changes made in Measurement, the respective action taken by Quality. c) If any changes made in Sub Supplier, the respective action taken by Secondary Department. Production Dept, Quality Personnel. 4M Change 4.2 For changes in Man a).Provide awareness to personnel on the relevance and Importance of their activities and how they contribute to the Achievement of quality objectives. b).Ensure that, personnel performing specific assigned tasks, with particular attention to the satisfaction of customer Requirements are qualified for that. c).Provide on the job training for personnel, in any new or modified job affecting product quality, including contract Personnel. d).Provide awareness to personnel whose work can affect quality about the consequences to the customer of Non-conformities to quality requirements. e) If any changes made in Man, the respective action taken by HR & Quality. Deputy Manager (HR) / HOD's 4M Change 4.3 Record nature of unexpected changes, Risk associated with the changes and actions in 4M change format Production Dept, Quality Personnel. 4M Change 4.1 PREPARED BY Name Position Sign Date : : : : APPROVED BY : Name Position Sign Date : : :