COMPANY ABC Sdn Bhd
JSA No.
Rev No.
Company/ Contractor
Company ABC
Job Number/
Project Name
Prepared By,
Department/ Discipline
Piping & Mechanical - Shut Down & Tie-In
Reviewed By,
Location/ Area/ Elevation
N/A
Approved By,
Job Description
Shut down and tie in work for process line and utility line.
Job Safety Analysis (JSA) Worksheet
No.
Sequence Of Basic Job Steps
Understand job sequence
1.1
2.
Construction material/ equipment
mobilization
2.1
Vehicle/equipment failure
2.2
Mechanical operated machine may produce Fire
spark and have oil leakage.
2.3
Accident may occurs due to mishandling of Personnel injury
vehicle/ traffic issues.
2.4
Loading and unloading accident may occur Personnel injury
during operations.
2.5
Obstruction of access road
Personnel injury
3.1
Wrongly isolate valve
Plant/ system upset
Isolation of piping system for the
shutdown and tie-in work.
0
Personnel injury
Date
22nd July.2010
Page
Project ABC
Hazard Identification
Hazard
Effects
Misunderstand of job sequence
Non compliance on safety
requirement
1.
3.
JSA-Mechanical-011- Shut Down & Tie-In
Determining Control Measures
1.1.1 Supervisors have to brief on JSA before work.
2.1.1 All vehicle/ equipments to be used must be
inspected and approved vehicle/ equipment will
be pasted with a sticker of approval.
2.2.1 Obtain Vehicle Entry Permit/Certicate.
2.2.2 Provide fire extinguisher and spark arrestor for
vehicles.
2.3.1 The driver must have the valid driving license
and vehicle should meet JPJ requirement
2.3.2 Follow road signage and speed limit.
2.3.3 Ensure vehicles have reverse alarm.
2.3.4 Use the approved route by client.
2.3.5 To check condition of soil/access route for heavy
traffic movement.
2.4.1 Ensure crane with PMA and Crane Operator
possess valid licence and registered as
DOSH competence.
2.4.2 Signal man to direct movement of vehicle.
2.4.3 Workers shall never stand under a suspended
and always stand clear of load
2.4.4 Workers shall recheck all the lifting equipment
before used.
2.4.5 Operators and drivers should inspect their crane
/vehicle/equipment before starting work for the
day in order ensure in good confition.
2.4.6 To barricade the working area and put
necessary signage to warn others.
2.4.7 Signalman shall used two way communication
when visual signal is not possible.
2.5.1 Obtain Road Obstruction Certificate from client.
3.1.1 Obtain LOTO (lock Out Tag Out) Certificate /
Permit from client.
Additional Actions
COMPANY ABC Sdn Bhd
Job Safety Analysis (JSA) Worksheet
Company/ Contractor
Company ABC
JSA No.
Rev No.
Job Number/
Project Name
Prepared By,
JSA-Mechanical-011- Shut Down & Tie-In
0
Date
Project ABC
22nd July.2010
Page
JSA No.
COMPANY ABC Sdn Bhd
Rev No.
Job Safety Analysis (JSA) Worksheet
No.
Sequence Of Basic Job Steps
JSA-Mechanical-011- Shut Down & Tie-In
0
Job Number/
Project Name
Hazard Identification
Hazard
Date
22nd July.2010
Page
Project ABC
Effect
Determining Control Measures
3.1.2 Project team (together with client person in
charge) to chain lock and tag the valve with
LOTO on the isolation valve to ensure that the
valve will not accidentally opened.
3.1.3 Ensure that the valve tagging in placed.
3.1.4 Valve isolation shall be done with client person
in charge presence.
4
5
Installation of blinding as per blinding
diagram
Pipe spool/ valve/ pipeline lifting and
laying into tie -in location.
3.2
People accidentally open the valve
Personnel injury
3.2.1 Project team (together with client person in
charge) to chain lock and tag the valve with
LOTO on the isolation valve to ensure that the
valve will not accidentally opened.
4.1
Hydrocarbon/ others toxic or flammable gas Personnel injury
in piping system
4.1.1 To break the flange slowly and check the flange
with gas detector to confirm pipe is free from any
flammable/ toxic gas.
4.2
Wrongly blind on existing line
Personnel injury
4.2.1 Ensure that the blinding tagging number in
placed as per blinding diagram.
4.2.2 Blinding work shall be done with client person
in charge presence.
4.2.3 Supervisor(person in charge) shall be reconfirm
diagram before proceeding with next activities.
4.2.4 LOTO procedure shall be strictly followed to
ensure the correct method is used.
5.1
Loading and unloading accident may occur Personnel injury
during operations.
5.1.1 Load does not exceed the capacity of the lifting
equipment
5.1.2 Signal man to direct movement of vehicle.
5.1.3 Workers shall never stand under a suspended
and always stand clear of load
5.1.4 Workers shall recheck all the lifting equipment
before used.
5.1.5 Operators and drivers should inspect their crane
/vehicle/equipment before starting work for the
day in order ensure in good confition.
5.1.6 To barricade the working area and put
necessary signage to warn others.
5.1.7 Signalman shall used two way communication
when visual signal is not possible.
5.1.8 Padding shall be provided on sharp edge to
prevent lifting slings from damage
5.1.9 Sling of the correct length and capacity for the
job must be used
5.1.10 Rigging the load is carried out by a competent
person
Additional Actions
JSA No.
COMPANY ABC Sdn Bhd
Rev No.
Job Safety Analysis (JSA) Worksheet
No.
6
Sequence Of Basic Job Steps
Field welding for tie-in work
JSA-Mechanical-011- Shut Down & Tie-In
0
Job Number/
Project Name
Hazard Identification
Hazard
Date
22nd July.2010
Page
Project ABC
Effect
Determining Control Measures
3.1.2 Project team (together with client person in
5.2.1 Ensure that the load and boom is lowered when
the cranes left unattended.
5.2.2 Lifting work shall only commence after confirming
that the crane is set up satisfactory
5.2.3 Outrigger shall be resting on flat and firm ground
with steel plate and wooden plank.
5.2.4 To barricade the working area and put
necessary signage to warn others.
5.2.5 Signalman shall used two way communication
when visual signal is not possible.
5.2.6 Crane and trailer parking location shall be
approved by client prior to start any lifting work
5.2
Crane topple
Personnel injury/ property damage
5.3
Obstruction of access road
Personnel injury
5.3.1 Obtain Road Obstruction Certificate from client.
6.1
Welding spark
Fire, face and eye injury
6.1.1 To standby fire extinguisher (ABC Type 9.0 kg)
6.1.2 To ensure sufficient fire blanket provided to
cover the hotwork area & below hotwork area.
6.1.3 To cover and protect any near by cable, pipe
or instrument with fire blanket.
6.1.4 To remove any combustible material from
directly coming into contact with the spark.
6.1.5 Ensure flash back arrestor are fitted to oxygen
and acetylene gas regulators.
6.1.6 To ensure the oxygen and acetylene cylinders
are mounted to cylinder trolley with chain or
in cylinder cradle.
6.1.7 All gas hoses, fittings and gauges shall be check
in good condition and no leak before start work.
6.1.8 Provide standby water hose with stop valve
(If required)
6.1.9 Welder must wear face shield and leather glove
for protection during the works progress
6.2
Welding machine / generator may produce Fire
spark
6.2.1 To stand - by fire watch & fire extinguisher near
to engine driven equipment
6.2.2 Engine driven equipment shall be fitted with
spark arrestor.
6.2.3 Engine shall be checked daily to ensure is in
good condition and without leakage
6.2.4 Engine shall be stopped while fill-in-diesel.
6.2.5 Welding set used shall properly grounded.
6.3
Electrocution
6.3.1 Regular check the extension cable to ensure
Personnel injury/fatal
Additional Actions
JSA No.
COMPANY ABC Sdn Bhd
Rev No.
Job Safety Analysis (JSA) Worksheet
No.
Sequence Of Basic Job Steps
JSA-Mechanical-011- Shut Down & Tie-In
0
Job Number/
Project Name
Hazard Identification
Hazard
Date
22nd July.2010
Page
Project ABC
Effect
Determining Control Measures
3.1.2 Project
(together with client person in
in good team
condition.
6.3.2 To ensure extension cables are not to lay
across on wet ground or stagnant water.
6.3.3 All electrical tools are to be inspected before
6.3.4 All hotwork to be stop when heavy rain.
7
Deblinding work and Joint Integrity Test
(JIT) for flange joint.
6.4
Workers fall from height
Personnel injury
6.5
Falling object
Personnel injury, property damage
7.1
Wrongly remove blinding point
Personnel injury
7.2
Line leaking due not proper tightening work Personnel injury
at flange joint.
6.4.1 Workers shall wear full body harness with
double lanyard and hook to fixed structures
while working at height.
6.4.2 No work on structure/slippery condition before
grating installation.
6.4.3 Supervisor has to closely supervise all the
elevated works.
6.4.4 Provide lifeline if there is no anchorage point
to hook lanyard.(Steel cable)
6.4.5 Workers are allowed to use scaffolding platform
displayed Green Tag only.
6.5.1 Proper barricade and signage below working
area to prevent unauthorized entry.
6.5.2 Handling loose materials by throwing from height
are strictly prohibited
6.5.3 Use container to store tools and consumable
and transfer by using rope.
6.5.4 Safety net shall be installed under the surface
or structure on which employees are working.
6.5.5 Obtain Certificate for The Removal &
Reinstallation of Gratings, Handrails, Stair
Treads & Other Pieces of Equipment when
required to open grating, handrails and other
steel structure member.
7.1.1 Ensure that the blinding tagging number in place
as per blinding diagram.
Supervisor person in charge to reconfirm on the
de-blinding point as per diagram before blind
removal.
7.2.1 JIT team to check and confirm specification
gasket and flange surface cleanesess before
flange reinstatement.
7.2.2 Proper torquw and sequence of bolt tightening
as per procedure.
7.2.3 To carry out Joint Integrity Test during the
re-instatement work.
Additional Actions
JSA No.
COMPANY ABC Sdn Bhd
Job Safety Analysis (JSA) Worksheet
No.
Sequence Of Basic Job Steps
8
Re- Isolate valve for the shutdown tie-in
work
JSA-Mechanical-011- Shut Down & Tie-In
Rev No.
Job Number/
Project Name
Hazard Identification
0
Date
22nd July.2010
Page
Project ABC
8.1
Hazard
Wrongly reopening valve isolation
Effect
Personnel injury
8.2
People accidentally closed the valve
Personnel injury
Determining Control Measures
3.1.2 Project
(together
with client
person
in
8.1.1
Ensure team
that the
valve tagging
number
in placed
as per blinding diagram.
8.1.2 Supervisor person in charge to reconfirm on the
valve location as per valve isolation diagram.
8.1.3 Valve re-isolation shall be done with client
person in charge presence.
8.2.1 Ensure that the line already de-blinding, JIT has
been carry out and valve chain lock has been
removed before handover to client person in
charge for tagged out (LOTO).